Environmental Impact Assessment Update James Alflatt – Associate, Planning Division Email: [email protected] DD: 01603 229345

Environmental Impact Assessment Update - IEMA Q Mark Presentations/bidw… · Multi-stage consents; Requirement to give reasons for negative screening ... Alignment with 2011 Regs

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Environmental Impact Assessment Update - IEMA Q Mark Presentations/bidw… · Multi-stage consents; Requirement to give reasons for negative screening ... Alignment with 2011 Regs

Environmental Impact Assessment UpdateJames Alflatt – Associate, Planning Division

Email: [email protected] DD: 01603 229345

Page 2: Environmental Impact Assessment Update - IEMA Q Mark Presentations/bidw… · Multi-stage consents; Requirement to give reasons for negative screening ... Alignment with 2011 Regs

Introduction: EIA – a time for change

Revised EIA DirectiveNPPG & EIARaising Screening ThresholdsImplications for Practice & IndustryFuture Direction of EIA in the UK

Page 3: Environmental Impact Assessment Update - IEMA Q Mark Presentations/bidw… · Multi-stage consents; Requirement to give reasons for negative screening ... Alignment with 2011 Regs

Revised EIA Directive

Directive 2014/52/EUpublished 25 April 2014

Came into force on 16 May

3 Year Transposition Period

Transitional arrangementsin place

Page 4: Environmental Impact Assessment Update - IEMA Q Mark Presentations/bidw… · Multi-stage consents; Requirement to give reasons for negative screening ... Alignment with 2011 Regs

EIA Directive – Key Changes

Requirement for ‘CompetentExperts’ to prepare EIA

More stringent screeningrequirements

More focus on post consentmonitoring

LPAs to make own reasonedconclusions

Page 5: Environmental Impact Assessment Update - IEMA Q Mark Presentations/bidw… · Multi-stage consents; Requirement to give reasons for negative screening ... Alignment with 2011 Regs

EIA Directive – Key Changes

New environmental topics introduced:Human healthLandBiodiversity

Infringements may result in “effective, proportionate anddissuasive penalties”

Page 6: Environmental Impact Assessment Update - IEMA Q Mark Presentations/bidw… · Multi-stage consents; Requirement to give reasons for negative screening ... Alignment with 2011 Regs

EIA & NPPG – Is it worth the wait?

Launched 6 March by DCLGEIA is one of 41 topics coveredNew guidance replaces:

Circular 02/99DETR 'EIA: A Guide to Procedures' from 2000

EIA Guidance largely unchanged from Circular 02/99Picks up the changes brought about by 2011Regulations, including:

Multi-stage consents;Requirement to give reasons for negative screening decisions; andChanges or extensions to existing development;

Page 7: Environmental Impact Assessment Update - IEMA Q Mark Presentations/bidw… · Multi-stage consents; Requirement to give reasons for negative screening ... Alignment with 2011 Regs

EIA & NPPG - Implications

More straightforward and usable format?Alignment with 2011 Regs provides more clarityProvides less detail on certain matters e.g. ScreeningSchedule 2 projectsMore scope for local interpretation raising uncertaintyGuidance likely to be short lived

Page 8: Environmental Impact Assessment Update - IEMA Q Mark Presentations/bidw… · Multi-stage consents; Requirement to give reasons for negative screening ... Alignment with 2011 Regs

Raising EIA Screening Thresholds

Autumn Statement 2012

Technical Consultation on Planning (July 2014)Govt approach to reducing unnecessary burden & costDeregulation Vs Directive requirementsFocus on industrial estate and urban developmentReduction in number of screenings per year (1600-300)

Page 9: Environmental Impact Assessment Update - IEMA Q Mark Presentations/bidw… · Multi-stage consents; Requirement to give reasons for negative screening ... Alignment with 2011 Regs

Raising EIA Screening Thresholds

Changes Proposed:No changes to projects located in sensitive areas

Industrial Estate Development (Para 10a of Schedule 2)Current screening threshold – 0.5haProposed screening threshold – 5ha

Urban Development Projects (Para 10b of Schedule 2)Current screening threshold – 0.5haProposed screening threshold – 5ha

Page 10: Environmental Impact Assessment Update - IEMA Q Mark Presentations/bidw… · Multi-stage consents; Requirement to give reasons for negative screening ... Alignment with 2011 Regs

Implications for Practice & Industry

ScreeningMore rigorousMinimum requirementsOption to incorporate design &mitigation measures tominimise adverse impacts

ScopingLargely unchangedVoluntary processWhere Scoping Opinion isadopted, there is a requirementto fulfil scope in any EIA Report

Page 11: Environmental Impact Assessment Update - IEMA Q Mark Presentations/bidw… · Multi-stage consents; Requirement to give reasons for negative screening ... Alignment with 2011 Regs

Implications for Practice & Industry

Production of EIAEIA to be prepared by ‘competent experts’Provide more information on operational phase impactsEnhanced consideration of alternativesMore co-ordination with other Directive requirements

Post Consent MonitoringImplementation of mitigation measuresEffectiveness of mitigation measures

PenalitiesMember States to lay down rules on penaltiesPenalties for infringement of national EIA provisionsPenalties to be ‘effective, proportionate and dissuasive’

Page 12: Environmental Impact Assessment Update - IEMA Q Mark Presentations/bidw… · Multi-stage consents; Requirement to give reasons for negative screening ... Alignment with 2011 Regs

Implications for Practice & Industry

Proportionate EIA

Effective ScopingShould not be afraid to scope out topics

Integrated design & EIAEmbeds the EIA specialist within the design team

Role of EIA CoordinatorCrucial/central role embedded in design/project teamEarly appointmentDemand for competent practitioners

Page 13: Environmental Impact Assessment Update - IEMA Q Mark Presentations/bidw… · Multi-stage consents; Requirement to give reasons for negative screening ... Alignment with 2011 Regs

Future for EIA in the UK

Devil will be in the Detail

Revised Directive vs UK Regs

Competent Experts vs SufficientLPA expertise

EIA & Legal Challenge

New EIA Regs by 16 May 2017

New EIA Guidance?

Proportionate Approach to EIA

Page 14: Environmental Impact Assessment Update - IEMA Q Mark Presentations/bidw… · Multi-stage consents; Requirement to give reasons for negative screening ... Alignment with 2011 Regs

Thank You – Any Questions

James AlflattAssociateIEMA Registered EIA Practitionert: 01603 229345e: [email protected]

www.bidwells.co.uk/eia