    EIA Environmental Impact Assessment (EIA) is used to

    identify the environmental and social impacts of aproject prior to decision-making. It aims to predict

    environmental impacts at an early stage in projectplanning and design, find ways and means to reduceadverse impacts, shape projects to suit the localenvironment and present the predictions and optionsto decision-makers.

    By using EIA both environmental and economicbenefits can be achieved, such as reduced cost andtime of project implementation and design, avoidedtreatment/clean-up costs and impacts of laws and

    regulations.

  • 8/2/2019 Environmental Impact Assessment Rev4

    2/24

    Environmental ImpactAssessment Activities involved

    Baseline data collection primary and secondary

    Understanding Project characteristics

    Superimposing project characteristics on the baseline

    Prediction of impacts

    Environmental Management Plans

    Presenting the report to decision makers

  • 8/2/2019 Environmental Impact Assessment Rev4

    3/24

    Environmental ImpactAssessment Environmental components

    Land

    Air

    Noise

    Water Ecology

    Socioeconomic

  • 8/2/2019 Environmental Impact Assessment Rev4

    4/24

    Environmental Impact

    Assessment Land Environment

    Location setting (Regional)

    Location setting (Local)

    Land Use Pattern

    Soil characteristics

  • 8/2/2019 Environmental Impact Assessment Rev4

    5/24

    Environmental Impact

    Assessment

    THE MALANJKHAND MINE inBalaghat district of

    Madhya Pradesh, in an area that wasonce forested land on which Adivasis depended.

  • 8/2/2019 Environmental Impact Assessment Rev4

    6/24

    Environmental Impact

    AssessmentAir Environment

    Reconnaissance Survey

    Air Quality

    Topography and meteorology

    Wind

    Temperature and Humidity Rainfall

  • 8/2/2019 Environmental Impact Assessment Rev4

    7/24

    Environmental Impact

    Assessment Air Environment

    Windrose at site:

    Max/Min/Mean annual temperature:

    Frequency of inversion:

    Frequency ofcyclones/tornadoes/cloud burst:

    Ambient air quality data:

  • 8/2/2019 Environmental Impact Assessment Rev4

    8/24

    Environmental Impact

    Assessment

    http://www.bom.gov.au/climate/averages/wind/images/wr2.GIF
  • 8/2/2019 Environmental Impact Assessment Rev4

    9/24

    Environmental Impact

    Assessment

  • 8/2/2019 Environmental Impact Assessment Rev4

    10/24

    Environmental Impact

    Assessment

  • 8/2/2019 Environmental Impact Assessment Rev4

    11/24

    Environmental Impact

    Assessment

  • 8/2/2019 Environmental Impact Assessment Rev4

    12/24

    Environmental Impact

    Assessment Noise

    Sources of Noise and Vibrations

    Ambient noise level

    Traffic

  • 8/2/2019 Environmental Impact Assessment Rev4

    13/24

    Environmental Impact

    Assessment Water Environment

    Surface water

    Ground water Surface drainage

    Sewerage and waste water disposal

    Water quality Surface water

    Ground water

  • 8/2/2019 Environmental Impact Assessment Rev4

    14/24

    Environmental Impact

    Assessment Ecology

  • 8/2/2019 Environmental Impact Assessment Rev4

    15/24

    Environmental Impact

    Assessment Socio economic environment

    Demographic structure

    Infrastructure resource base

    Health status

    Economy

    Endemic health problems in the area due towaste water/air/soil borne diseases

    Health care system existing

  • 8/2/2019 Environmental Impact Assessment Rev4

    16/24

    Environmental Impact

    Assessment Identification and assessment of impacts

    Air Environment

    Construction phase Operation phase

    Air quality modelling

    Modelling results

    Noise Environment Modelling

    Assessment of impact

  • 8/2/2019 Environmental Impact Assessment Rev4

    17/24

    Environmental Impact

    Assessment Identification and assessment of

    impacts

    Water Environment

    Land Environment

    Biological Environment

    Socio-economic Environment Infrastructure

  • 8/2/2019 Environmental Impact Assessment Rev4

    18/24

    Environmental ImpactAssessment

    Environmental impact statement

    Air Environment

    Noise Environment

    Water Environment

    Land and Biological Environment

    Socio-economic Environment

    Impact Matrix

  • 8/2/2019 Environmental Impact Assessment Rev4

    19/24

    Environmental Impact

    Assessment

    Ports and Harbours

    Airports

    Rapid Transit

    Highways

    Oil/Gas pipelines

    Significant Impact

    Moderate to Significant Impact

    Insignificant Impact

    Development Projects

    Environmental Parameters

    SurfaceWaterQuality

    A

    irQuality

    Seismology

    Erosion

    LandQuality

    Fisheries

    Forests

    TerrestrialWildlife

    N

    oise

    LandUse

    A

    esthetics

    In

    dustries

    Resettlement

    A

    rcheological

    H

    istoricalsignificance

    PublicHealth

    Socio-economic

  • 8/2/2019 Environmental Impact Assessment Rev4

    20/24

    Environmental ImpactAssessment

    Environmental management plan Formulation of EMP is an important outcome of EIA

    process

    Has cost implications, monitoring and auditrequirements during project life cycle

    Typically consists of specific measures (WWTP, APC,Noise barriers, green belt) with details sufficient to

    enable realistic cost and time estimates EMPs need not mean management of issues alone

    and could include opportunities for enhancement

  • 8/2/2019 Environmental Impact Assessment Rev4

    21/24

    Environmental ImpactAssessment

    Asking pertinent questions to issues Can the activity related to an issue be

    eliminated? Or modified? Can be relocated w.r.t. sensitive

    environmental receptor?

    Can protection or buffers be provided around

    sensitive receptors? Combinations of the above effective?

    Residual issues? Who will remain affected?

  • 8/2/2019 Environmental Impact Assessment Rev4

    22/24

    Environmental ImpactAssessment

    Negative impacts may also be linked tomitigation measures, eg. Hazardous

    waste disposal Systemic view needed. Mitigation

    measures also need to be screened for

    impacts

  • 8/2/2019 Environmental Impact Assessment Rev4

    23/24

    Environmental ImpactAssessment

    Environmental management plan Construction phase

    Operation phaseAir Environment

    Noise Environment

    Water Environment

    Land Environment Solid Waste

    Socio-Economic Environment

  • 8/2/2019 Environmental Impact Assessment Rev4

    24/24

    EIA Process in India

    Issues with quality of EIA reports Improper / Inadequate scoping of EIA

    Consultants not having adequate understanding fordeveloping EIA

    Cut and paste jobs

    No checks on competence of EIA consultants

    No liability for EIA consultants

    NABET (National Accreditation Board for Educationand Training) Criteria for Registration of EIAConsultant Organizations