Page 1: Environmental Impact Assessment colour

Environmental Impact Assessment

Awareness TrainingBy

David King

Page 2: Environmental Impact Assessment colour

Why do we need an EIA in Ausgrid

Due to the Environmental Planning legislation (Environmental Planning and Assessment Act 1979)

All new work requires an assessment

To ensure that the environment is considered

As an environmental planning instrument / tool

To consider ecologically Sustainable Development

Page 3: Environmental Impact Assessment colour

Why do we need an EIA in Ausgrid network construction & maintenance

Consequences of breaching the legislation

Severe penalties For corporations , Directors, Managers and individuals

Fines up to 1.1m – EP& A NSW planning $5m – POEO – NSW Pollution $5.5m – EPBC – Federal environmental Up to 7 years Jail Remediation and other additional costs

Page 4: Environmental Impact Assessment colour

Typical Ausgrid network Projects that are covered by an EIA

Distribution substations Kiosks Pole transformers (PT)

Distributors Underground cables Overhead power lines

Page 5: Environmental Impact Assessment colour

Typical Activities covered in an Ausgrid EIA

Construction Excavation Traffic disruptions After hours works Vegetation clearing Using heavy machinery Storing materials &

equipment Staging areas Discharging water

Operation Construction Noise Handling oil Oil filled equipment EMF

Maintenance Traffic disruptions Excavation Vehicle access

Page 6: Environmental Impact Assessment colour

Things to be aware of about Ausgrid EIA document

EIA is a legal Document EIA will be used in court as evidence for and

against you EIA Is a document to be taken seriously by both

parties and will form part of the contract with the Construction Company

Page 7: Environmental Impact Assessment colour

The Ausgrid EIA Worksheet is divided basically into four tables following

Table 1 – project details including a description of the environment where the works will take place

Table 2 – possible approval and licences which may be required

Table 3 - sensitive areas and issues that be affected by the project. etc. sulphate soils

Table 4 – Project specific environmental controls that are required in addition to the controls already listed in Environmental handbook

Page 8: Environmental Impact Assessment colour

Typical Ausgrid network project that required the EIA Document provisions to be reviewed

Project location Yerroulbin St

BirchgroveCCO016339Field service representative Peter MarozCCL representativeDavid KingConstruction CompanyDunmain pty LtdAusgrid Project officer Nesta Penna

Page 9: Environmental Impact Assessment colour

Ausgrid proposed network project located at Yerroulbin St Birchgrove

Page 10: Environmental Impact Assessment colour

Ausgrid proposed Network project located at Yerroulbin st Birchgrove

The following EIA did not address the issue of the close proximately of the harbour foreshore and the associated risk in polluting this prestige area. This issue was raised at the pre-works and the EIA was amended

Page 11: Environmental Impact Assessment colour

Original EIA Document for Ausgrid located at Yerroulbin st Birchgrove

Page 12: Environmental Impact Assessment colour

Original EIA Document for Yerroulbin st Birchgrove areas highlights are deficient

Page 13: Environmental Impact Assessment colour

Original EIA Document for Yerroulbin st Birchgrove areas highlights are deficient

Page 14: Environmental Impact Assessment colour

Original EIA Document for Yerroulbin st Birchgrove areas highlights are deficient

Page 15: Environmental Impact Assessment colour

Amended EIA Document for Yerroulbin st Birchgrove (Not all pages shown)

Page 16: Environmental Impact Assessment colour

Amended EIA Document for Yerroulbin st Birchgrove (Not all pages shown)

New EIA addresses the issue of the waterways and has requested that an Erosion and sedimentation plan to be produced and approved by Environmental services group

Please see the following 5 slides showing the plan

Page 17: Environmental Impact Assessment colour

Existing kiosk

Trial hole (trench)

Pro

perty

line

Tem

pora

rySe

curit

yFe

ncin

g

Property 111 D

Louisa Rd

Future Temp kiosk

Property 113

Louisa Rd

Yerroulbin Rd

Sediment Fencing

Sediment Fencing

Minimum 1 meter

Minimum 0.5 meter

Approx 25 metersto Snails Bay (Sydney Harbour)

SKETCH 1 OF 4

TRIAL HOLE Sedimentation Control Plan for Yerroulbin St Rozelle

EA project CCO016339

NTS

Prepared by P. Marosz ph 9394 6772 08/12/2010

Minimum 1 meter

Must exceed 1 meter

Slope approx1 :10

Slope approx1 :10

Grassed area where: - excavation may take place, or- surface soil cover is disturbed

Legend

Sandbag bund wall

Minimum 0.2 meter

Page 18: Environmental Impact Assessment colour

Existing kiosk

Excavation to install compacted road base (instead of piers)

Pro

perty

line

Tem

pora

rySe

curit

yFe

ncin

g

Property 111 D

Louisa Rd

Future Temp kiosk

Property 113

Louisa Rd

Yerroulbin Rd

Sediment Fencing

Sediment Fencing

Minimum 0.5 meter

Minimum 0.5 meter

Approx 25 metersto Snails Bay (Sydney Harbour)

SKETCH 2 OF 4

EXCAVATION & INSTALLTION OF COMPACTED ROAD BASE (INSTEAD OF PIERS) FOR TEMP KIOSK -Sedimentation Control Plan for Yerroulbin St Rozelle

EA project CCO016339

NTS

Prepared by P. Marosz ph 9394 6772 08/12/2010

Minimum 1 meter

Must exceed 1 meter

Slope approx1 :10

Slope approx1 :10

Slope approx1 :10

Grassed area where: - excavation may take place, or- surface soil cover is disturbed

Legend

Sandbag bund wall

Minimum 0.2 meter

Page 19: Environmental Impact Assessment colour

Existing kiosk

Excavation to install & connect new cables

Pro

perty

line

Tem

pora

rySe

curit

yFe

ncin

g

Property 111 D

Louisa Rd Temp kiosk

Property 113

Louisa Rd

Yerroulbin Rd

Sediment Fencing

Sediment Fencing

Minimum 0.5meter

Minimum 0.5 meter

Approx 25 metersto Snails Bay (Sydney Harbour)

SKETCH 3 OF 4

EXCAV TO INSTALL & CONNECT NEW CABLES , INSTAL PIERS FOR PERMANENT KIOSK -Sedimentation Control Plan for Yerroulbin St Rozelle EA project CCO016339

NTS

Prepared by P. Marosz ph 9394 6772 08/12/2010

Minimum 1 meter

Must exceed 1 meter

Slope approx1 :10

Slope approx1 :10

Grassed area where: - surface soil cover might be disturbed

Legend

Sandbag bund wallMinimum 0.2 meter

Pump out of trench water permissible over site grass – NO sediment into water ways.

Page 20: Environmental Impact Assessment colour

Existing kiosk

Bulkheads in trench every 6 meters

or trench backfilled after each length of conduits installed

Property line

Property 111 D

Louisa Rd

Temp kiosk

Property 113

Louisa Rd

Yerr

oulb

in R

d

Sediment Fencing

Approx 25 metersto Snails Bay (Sydney Harbour)

SKETCH 4 OF 4

EXCAVATION & INSTALLATION OF NEW CONDUITS -Sedimentation Control Plan for Yerroulbin St Rozelle EA project CCO016339

NTS

Prepared by P. Marosz ph 9394 6772 08/12/2010

Slope approx1 :10

Grassed area v

Legend

Sandbag bund wall

New trench & conduits 2 on 2

Baulk head -extending at least 1 meter on either side of bund wall

Conduits sealed to prevent water ingress.

Louisa Rd

Slope approx1 :10

Sealed area ( asphalt & concrete) v

Excavation covered with plywood /steel plates & sealed with cold mix at edges to minimise water ingress

Pump out of trench water permissible over site grass – NO sediment into water ways.

Page 21: Environmental Impact Assessment colour
Page 22: Environmental Impact Assessment colour

Another project that the EIA Document needed to be revised due do to the changes in the scope of works

Project location Ewos St Cronulla

CCO016191Field service representativeMatt mobile 0421 416 329CCL representativeStephen BrennanConstruction CompanyCLMAusgrid Project officerDavid King

Page 23: Environmental Impact Assessment colour

Ewos St Cronulla CCO016191

The proposed Low Voltage jointbay original position was to be excavated adjacent the pole. Unfortunately due to the location of the existing cable this would have raised the issue of maintaining pedestrian access and also the bending radius / length of the existing cable in the jointbay

With consultation with the field service representative it was proposed the jointbay be moved into the park area to follow the existing cable

Page 24: Environmental Impact Assessment colour

Ewos St Cronulla CCO016191

Unfortunately the EIA only covered the excavation works in the carriageway & footway area.

The EIA did not address the issue of the close proximately of the waterway and the associated risk in polluting this prestige area.

Page 25: Environmental Impact Assessment colour

Ewos St Cronulla CCO016191

The issue was raised with the field service representative and work in the park was put on hold until the matter was resolved.

Outcome was to minimise the impact of the works . Additional sediment measure was initiated in the park area and the jointbay was only excavated on the morning of the commissioning of the new cable . Backfilled same day

Page 26: Environmental Impact Assessment colour

Summary EIA documents are legal

documents EIA document are to minimise

the risks to Ausgrid & the environment

If the EIA document supplied with the Ausgrid works order does not cover or seems not to cover the proposed work please refer the matter to your Ausgrid representative assigned to that project

Be aware of your Ausgrid responsibilities -see environmental code of conduct

Not banana bread was harmed in the produce of this presentation