1 ENVIRONMENTAL COMPLIANCE MONITORING Final Summary Report Project: Homeland Tower Cheshire Facility CT-005 Facility APT Project #: CT283251 Address: 1325 Cheshire Street, Cheshire, Connecticut Regulatory Compliance Permitting Agency & Permit ID: ACOE NED : CT Siting Council : Docket No.451, January 8, 2015; Condition #2.c) CTDEEP IWRD : CTDEEP NDDB : 201508722, November 13, 2015 Resource Protection Program: Rare Species Species Name: eastern box turtle, wood turtle Wetland Vernal Pool Dates of Inspection Report # Date 1 11/6/15 2 11/15/15 3 11/30/15 Compliance Species Observed During Inspection: Yes No Species Name: N/A # Species: N/A Condition of Species: N/A Date Reported to CTDEEP: N/A Non-Compliance Species Observed During Inspection: Yes No Species Name: Wood Frog # Species: 1 Condition of Species: unharmed, removed from construction area prior to erosion control installation

ENVIRONMENTAL COMPLIANCE MONITORING Final …...Photos taken on November 6, 2015 Photo 4: Wood frog removed from construction site prior to erosion control installation. Photo 3: View

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

1

ENVIRONMENTAL COMPLIANCE MONITORING

Final Summary Report

Project: Homeland Tower Cheshire Facility CT-005 Facility APT Project #: CT283251 Address: 1325 Cheshire Street, Cheshire, Connecticut

Regulatory Compliance Permitting Agency & Permit ID: ACOE NED ☐: CT Siting Council ☒: Docket No.451, January 8, 2015; Condition #2.c) CTDEEP IWRD ☐: CTDEEP NDDB ☒: 201508722, November 13, 2015 Resource Protection Program: Rare Species ☒ Species Name: eastern box turtle, wood turtle Wetland ☐ Vernal Pool ☒ Dates of Inspection Report # Date

1 11/6/15

2 11/15/15

3 11/30/15

Compliance Species Observed During Inspection: Yes ☐ No ☒ Species Name: N/A # Species: N/A Condition of Species: N/A Date Reported to CTDEEP: N/A Non-Compliance Species Observed During Inspection: Yes ☒ No ☐ Species Name: Wood Frog # Species: 1 Condition of Species: unharmed, removed from construction area prior to erosion control installation

2

Inspection Report # Type of Corrective Action Date Corrective Action Implemented

2 Corrective Area #1 – section of silt fence not trenched properly, see attached

11/26/15

2 Corrective Area #2 – broken silt fence stakes, see attached sketch map 11/26/15

Comments: Inspection Report #3 verified that erosion controls have been properly installed. Since the construction project is beyond the active season for eastern box turtle, wood turtle or vernal pool herpetofauna, no further inspections are recommended in compliance with the approved species protection plans. Completion of construction is anticipated to occur prior to the spring 2016 active period for these species, which would begin April 1st (for turtles) and March 1st (herpetofauna migration). If construction activities are still occurring on March 1, 2016, please immediately contact Dean Gustafson, Senior Environmental Scientist with All-Points Technology Corp. at (860) 663-1697 ext. 201 or [email protected] to schedule an inspection.

Enclosure: Daily Inspection Reports

1

ENVIRONMENTAL MONITORING DAILY SITE OBSERVATION FORM

Report No._1_

Project: Homeland Tower Cheshire Facility CT-005 APT Project #: CT283251 Address: 1325 Cheshire Street, Cheshire, Connecticut

Date of Inspection: 11/6/2015 Weather: cloudy, mid, 60's Time of Inspection: 7:30 AM Latest Precipitation Event > ¼” (NOAA): 3.22” on 10/29/2015 Compliance Monitor: Dean Gustafson, Senior Wetland Scientist

Regulatory Compliance Permitting Agency & Permit ID: ACOE NED ☐: CT Siting Council ☒: Docket No. 451, January 8, 2015; Condition #2.c) CTDEEP IWRD ☐: CTDEEP NDDB ☒: 201508722, November 13, 2015 Resource Protection Program: Rare Species ☒ Species Name: eastern box turtle, wood turtle Wetland ☐ Vernal Pool ☒ Workers Environmental Awareness Program Training Completed: Yes ☒ No ☐ Date of Training: 11/6/2015 Signage Installed Date: 11/6/2015

Compliance Species Observed During Construction: Yes ☐ No ☒ Species Name: N/A # Species: N/A

Non-Compliance Species Observed During Construction: Yes ☒ No ☐ Species Name: wood frog # Species: 1 Condition of Species: unharmed, removed from construction area prior to erosion control installation Progress of Construction: Pre-Construction ☒ Initial Exclusion Fencing Inspection ☐ Clearing & Grubbing ☐ Intermediate ☐ Final Inspection ☐

2

DESCRIPTION OF OBSERVED ACTIVITY Compliance Level: Communication ☒ Acceptable ☐ Problem Area ☐ ☐ Minor Exclusion Fencing Repair ☐ Additional Exclusion Fencing Required ☐ Sediment release into upland habitat without risk of resource impact Non-Compliance ☐ ☐ Sediment release into upland habitat with risk of resource impact ☐ Sediment release into wetland habitat ☐ Sediment release into watercourse

Issues Requiring Corrective Action Corrective Action Implemented

None N/A

Project Modification Requested: Extra Work Space Requested ☐ Change to Work Area ☒ Description of Modification: Per town request, stockpile area was changed from the northeast side of the construction area to the northwest. Area consists of existing cleared area with soil piles just to the north. Erosion control limits were modified to enclose this area. See attached sketch map.

Enclosure: Environmental Training Attendance Sheet Photo Documentation Sketch Map

PHOTO DOCUMENTATIONHomeland Towers Compliance Monitoring Inspection1325 Cheshire Street, Cheshire, CTPhotos taken on November 6, 2015

Photo 2: View of proposed tower site (cleared area) looking north.

Photo 1: View of proposed tower site (cleared area) looking west.

1

PHOTO DOCUMENTATIONHomeland Towers Compliance Monitoring Inspection1325 Cheshire Street, Cheshire, CTPhotos taken on November 6, 2015

Photo 4: Wood frog removed from construction site prior to erosion control installation.

Photo 3: View of turtle protection caution signs at entrance to proposed tower site looking north.

2

1

ENVIRONMENTAL MONITORING DAILY SITE OBSERVATION FORM

Report No._2_

Project: Homeland Tower Cheshire Facility CT-005 APT Project #: CT283251 Address: 1325 Cheshire Street, Cheshire, Connecticut

Date of Inspection: 11/15/2015 Weather: partly sunny, mid, 50's Time of Inspection: 8:00 AM Latest Precipitation Event >¼” (NOAA): 0.38” on 11/12/2015 Compliance Monitor: Dean Gustafson, Senior Wetland Scientist

Regulatory Compliance Permitting Agency & Permit ID: ACOE NED ☐: CT Siting Council ☒: Docket No. 451, January 8, 2015; Condition #2.c) CTDEEP IWRD ☐: CTDEEP NDDB ☒: 201508722, November 13, 2015 Resource Protection Program: Rare Species ☒ Species Name: eastern box turtle, wood turtle Wetland ☐ Vernal Pool ☒ Workers Environmental Awareness Program Training Completed: Yes ☒ No ☐ Date of Training: 11/6/2015 Signage Installed Date: 11/6/2015

Compliance Species Observed During Inspection: Yes ☐ No ☒ Species Name: N/A # Species: N/A

Non-Compliance Species Observed During Construction: Yes ☐ No ☒ Species Name: N/A # Species: N/A Condition of Species: N/A Progress of Construction: Pre-Construction ☐ Initial Exclusion Fencing Inspection ☒ Clearing & Grubbing ☐ Intermediate ☐ Final Inspection ☐

2

DESCRIPTION OF OBSERVED ACTIVITY Compliance Level: Communication ☐ Acceptable ☐ Problem Area ☒ ☒ Minor Exclusion Fencing Repair ☐ Additional Exclusion Fencing Required ☐ Sediment release into upland habitat without risk of resource impact Non-Compliance ☐ ☐ Sediment release into upland habitat with risk of resource impact ☐ Sediment release into wetland habitat ☐ Sediment release into watercourse

Issues Requiring Corrective Action Corrective Action Implemented

Corrective Area #1 – section of silt fence not trenched properly, see attached sketch map 11/26/15

Corrective Area #2 – broken silt fence stakes, see attached sketch map 11/26/15

Project Modification Requested: Extra Work Space Requested ☐ Change to Work Area ☐ Description of Modification: N/A

Enclosure: Photo Documentation Sketch Map

PHOTO DOCUMENTATIONHomeland Tower Cheshire Facility CT-0051325 Cheshire Street, Cheshire, ConnecticutPhotos taken on November 15, 2015

Photo 2: Corrective Area #2 - view of broken stake to be fixed.

Photo 1: View of proposed tower site looking north.

1

PHOTO DOCUMENTATIONHomeland Tower Cheshire Facility CT-0051325 Cheshire Street, Cheshire, ConnecticutPhotos taken on November 15, 2015

Photo 4: Corrective Area #2 - view of broken stakes looking north.

Photo 3: Corrective Area #1 - view of silt fence that needs to be trenched.

2

1

ENVIRONMENTAL MONITORING DAILY SITE OBSERVATION FORM

Report No._3_

Project: Homeland Tower Cheshire Facility CT-005 APT Project #: CT283251 Address: 1325 Cheshire Street, Cheshire, Connecticut

Date of Inspection: 11/30/2015 Weather: cloudy, low, 30's Time of Inspection: 8:30 AM Latest Precipitation Event >¼” (NOAA): 1.69” on 11/20/2015 Compliance Monitor: Dean Gustafson, Senior Wetland Scientist

Regulatory Compliance Permitting Agency & Permit ID: ACOE NED ☐: CT Siting Council ☒: Docket No. 451, January 8, 2015; Condition #2.c) CTDEEP IWRD ☐: CTDEEP NDDB ☒: 201305288, December 4, 2014 Resource Protection Program: Rare Species ☒ Species Name: eastern box turtle, wood turtle Wetland ☐ Vernal Pool ☒ Workers Environmental Awareness Program Training Completed: Yes ☒ No ☐ Date of Training: 11/6/2015 Signage Installed Date: 11/6/2015

Compliance Species Observed During Inspection: Yes ☐ No ☒ Species Name: N/A # Species: N/A

Non-Compliance Species Observed During Construction: Yes ☐ No ☒ Species Name: N/A # Species: N/A Condition of Species: N/A Progress of Construction: Pre-Construction ☐ Initial Exclusion Fencing Inspection ☐ Clearing & Grubbing ☒ Intermediate ☐ Final Inspection ☒

2

DESCRIPTION OF OBSERVED ACTIVITY Compliance Level: Communication ☐ Acceptable ☒ Problem Area ☐ ☐ Minor Exclusion Fencing Repair ☐ Additional Exclusion Fencing Required ☐ Sediment release into upland habitat without risk of resource impact Non-Compliance ☐ ☐ Sediment release into upland habitat with risk of resource impact ☐ Sediment release into wetland habitat ☐ Sediment release into watercourse

Issues Requiring Corrective Action Corrective Action Implemented

None N/A

Project Modification Requested: Extra Work Space Requested ☐ Change to Work Area ☐ Description of Modification: N/A

Enclosure: Photo Documentation

PHOTO DOCUMENTATIONHomeland Tower Cheshire Facility CT-0051325 Cheshire Street, Cheshire, ConnecticutPhotos taken on November 30, 2015

Photo 2: View of fixed gap in silt fence looking west.

Photo 1: Overview of site looking southeast.

1

Homeland Tower Cheshire Facility CT-005

PHOTO DOCUMENTATIONHomeland Tower Cheshire Facility CT-0051325 Cheshire Street, Cheshire, ConnecticutPhotos taken on November 30, 2015

Photo 4: View of proposed soil stockpile area looking northwest.

Photo 3: View of silt fence looking north.

2

PHOTO DOCUMENTATIONHomeland Tower Cheshire Facility CT-0051325 Cheshire Street, Cheshire, ConnecticutPhotos taken on November 30, 2015

Photo 6: View of restaked silt fence (replaced broken stakes) looking west.

Photo 5: View of fixed buried silt fence looking southeast.

3