25
2021-2024 Transportation Improvement Program North Central Texas Council of Governments DFW Metropolitan Planning Organization Appendix D Environmental Clearance and Out-Year Projects Appendix D contains a list of projects that are not planned for construction within the four- year time frame of the TIP, but are referenced in the current Transportation Improvement Program in order to allow engineering, feasibility, environmental clearance or other pre- construction/project development efforts to continue. Please note that most of these projects are preliminary and do not represent any commitment of construction funding, but are strictly intended to pursue environmental clearance and early project development activities. Consistency with the Mobility Plan will be reexamined as alternatives are explored in these studies and environmental clearance efforts.

Environmental Clearance and Out-Year Projects · 2020. 7. 20. · limits from: 07/2020 tip description: remarks: limits to: rev date: mtp reference: ft1-14.20.7, in1-14.153.1 mpo

  • Upload
    others

  • View
    20

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Environmental Clearance and Out-Year Projects · 2020. 7. 20. · limits from: 07/2020 tip description: remarks: limits to: rev date: mtp reference: ft1-14.20.7, in1-14.153.1 mpo

2021-2024 Transportation Improvement Program

North Central Texas Council of Governments DFW Metropolitan Planning Organization

Appendix D

Environmental Clearance and Out-Year Projects

Appendix D contains a list of projects that are not planned for construction within the four-

year time frame of the TIP, but are referenced in the current Transportation Improvement

Program in order to allow engineering, feasibility, environmental clearance or other pre-

construction/project development efforts to continue.

Please note that most of these projects are preliminary and do not represent any

commitment of construction funding, but are strictly intended to pursue environmental

clearance and early project development activities. Consistency with the Mobility Plan will

be reexamined as alternatives are explored in these studies and environmental clearance

efforts.

Page 2: Environmental Clearance and Out-Year Projects · 2020. 7. 20. · limits from: 07/2020 tip description: remarks: limits to: rev date: mtp reference: ft1-14.20.7, in1-14.153.1 mpo

this is a blank page

T h i s p a g e i s i n t e n t i o n a l l y b l a n k

Page 3: Environmental Clearance and Out-Year Projects · 2020. 7. 20. · limits from: 07/2020 tip description: remarks: limits to: rev date: mtp reference: ft1-14.20.7, in1-14.153.1 mpo

2021-2024 Transportation Improvement Program

North Central Texas Council of Governments DFW Metropolitan Planning Organization

Environmental Clearance Projects Fort Worth District

D.3

Page 4: Environmental Clearance and Out-Year Projects · 2020. 7. 20. · limits from: 07/2020 tip description: remarks: limits to: rev date: mtp reference: ft1-14.20.7, in1-14.153.1 mpo

this is a blank page

T h i s p a g e i s i n t e n t i o n a l l y b l a n k

D.4

Page 5: Environmental Clearance and Out-Year Projects · 2020. 7. 20. · limits from: 07/2020 tip description: remarks: limits to: rev date: mtp reference: ft1-14.20.7, in1-14.153.1 mpo

DALLAS-FORT WORTH MPOMONDAY, JULY 13, 2020

3:16:17 PM

PAGE: 1

RURAL PROJECTSAPPENDIX D

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR

FORT WORTH DISTRICT PROJECTS

FY 2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM

FORT WORTH PARKER 0008-03-094 IH 20 C ALEDO TXDOT-FORT WORTH

FM 1187/3325

CONSTRUCT INTERCHANGE AT WALSH RANCH PARKWAY AND EASTBOUND ENTRANCE RAMP, WESTBOUND EXIT RAMP, AND U-TURN AT FM 1187

TARRANT/PARKER COUNTY LINE

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

IN1-30.568.1, IN1-30.57.1, TSMO2-001MTP REFERENCE:

13061MPO PROJECT ID:

10-YEAR PLAN PROJECTProject History:

FORT WORTH TARRANT 0008-13-124 IH 820 C,E,R VARIOUS TXDOT-FORT WORTH

NORTH INTERCHANGE AT SH 121

FROM SH 121/183 INTERCHANGE TO TRINITY BLVD: RECONST 9 TO 11 MAIN LANES WITH 2 CONCURRENT MANAGED TOLL LANES AND 2/6 LANE CONT FRONTAGE RDS; FROM TRINITY BLVD TO RANDOL MILL RD: RECONST 4 TO 10 MAIN LANES (ULTIMATE)

LOCAL CONTRIBUTION PAID BY CDA PARTNER

RANDOL MILL ROAD

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-151.10.1, FT1-151.20.1MTP REFERENCE:

55009MPO PROJECT ID:

Project History:

FORT WORTH TARRANT 0008-14-132 IH 820 C VARIOUS TXDOT-FORT WORTH

NAVAHO TRAIL/CAHOBA DRIVE

RELOCATE RAMPS, REALIGN FRONTAGE ROADS, AND ADD BRIDGES

MARINE CREEK PARKWAY

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

MO3-001, MO3-002MTP REFERENCE:

13005.1MPO PROJECT ID:

RELATED TO TIP 13005/CSJ 0171-05-068; REGIONAL 10-YEAR PLAN PROJECT

Project History:

FORT WORTH TARRANT 0008-16-043 IH 20 C,E FORT WORTH TXDOT-FORT WORTH

AT CHISHOLM TRAIL

ADD NB/SB DIRECT CONNECT RAMPS

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

IN1-30.31.1MTP REFERENCE:

13019MPO PROJECT ID:

PART OF REGIONAL 10-YEAR PLANProject History:

FORT WORTH WISE 0013-08-111 US 81/287 E VARIOUS TXDOT-FORT WORTH

NORTH OF PIONEER ROAD

CONVERT FRONTAGE ROADS TO 4/6 ONE-WAY OPERATION

WISE/TARRANT COUNTY LINE

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

NRSA1-1.30.1, NRSA1-1.30.2, NRSA1-1.40.1, NRSA1-1.40.2

MTP REFERENCE:

55026MPO PROJECT ID:

Project History:

FORT WORTH TARRANT 0014-15-037 US 287 E VARIOUS TXDOT-FORT WORTH

ON US 81/287 FROM TARRANT/WISE COUNTY LINE

CONVERT FRONTAGE ROADS FROM 4 DISC. FRTG ROADS TO 4/8 CON. FRTG ROADS ONE-WAY OPERATION

IH 35W

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-1.40.2, NRSA1-1.40.2MTP REFERENCE:

55027MPO PROJECT ID:

Project History:

FORT WORTH TARRANT 0014-15-076 US 81/287 E VARIOUS TXDOT-FORT WORTH

TARRANT/WISE COUNTY LINE

CONVERT 2 LANE, 2-WAY FRONTAGE ROADS TO 2 LANE, ONE WAY FRONTAGE ROADS IN EACH DIRECTION AND RAMP MODIFICATIONS

AVONDALE-HASLET

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

NRSA1-1.40.2MTP REFERENCE:

55026.1MPO PROJECT ID:

Project History:

FORT WORTH TARRANT 0014-16-252 IH 35W C,E,R FORT WORTH TXDOT-FORT WORTH

IH 820

WIDEN 4 LANES TO 8 LANES WITH INTERMITTENT AUXILIARY LANES AND 4/8 LANE DISCONTINUOUS TO 4/8 LANE CONTINUOUS FRONTAGE ROADS; AND ADD 2 MANAGED LANES FROM BASSWOOD TO IH 820 FOR AN ULITMATE OF 6 MANAGED LANES (SECTION 3B)

LOCAL CONTRIBUTION PAID BY CDA PARTNER

US 81/287

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-5.40.1, FT1-5.40.2MTP REFERENCE:

11578MPO PROJECT ID:

Project History:

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

D.5

Page 6: Environmental Clearance and Out-Year Projects · 2020. 7. 20. · limits from: 07/2020 tip description: remarks: limits to: rev date: mtp reference: ft1-14.20.7, in1-14.153.1 mpo

DALLAS-FORT WORTH MPOMONDAY, JULY 13, 2020

3:16:17 PM

PAGE: 2

RURAL PROJECTSAPPENDIX D

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR

FORT WORTH DISTRICT PROJECTS

FY 2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM

FORT WORTH TARRANT 0014-16-268 IH 35W C,E,R FORT WORTH TXDOT-FORT WORTH

IH 820 (SEGMENT 3A-ULTIMATE)

WDN 4 TO 8 GP LNS & RCNST 4/6 DSCNT FR FROM IH 820 TO SH 183; WDN 6 TO 8 GP LNS & WDN 4/6 DSCNT TO 4/6 CONT FR LNS FROM SH 183 TO SH 121; RCNST 8 TO 8 GP LANES & 4 TO 4/6 DSCNT FR LNS FROM SH 121 TO IH 30

LOCAL CONTRIBUTION PAID FOR BY CDA PARTNER

IH 30

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-5.50.1, FT1-5.50.2, FT1-5.60.1MTP REFERENCE:

54109MPO PROJECT ID:

Project History:

FORT WORTH TARRANT 0081-12-041 IH 35W C,E,R FORT WORTH TXDOT-FORT WORTH

US 81/287

RECONSTRUCT FROM 4 TO 6 LANES WITH 0 TO 4 CONCURRENT MANAGED TOLL LANES AND 4/8 DISCONTINUOUS TO 4/8 CONTINUOUS FRONTAGE ROAD LANES (SEGMENT 3C)

LOCAL CONTRIBUTION TO BE FUNDED BY CDA PARTNER

DENTON COUNTY LINE

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-5.20.2MTP REFERENCE:

54104.1MPO PROJECT ID:

CAT 10 CONGRESSIONAL EARMARK- IMD; RELATED TO CSJ 0081-13-060

Project History:

FORT WORTH DENTON 0081-13-060 IH 35W C,R FORT WORTH TXDOT-FORT WORTH

DENTON COUNTY LINE

RECONSTRUCT FROM 4 TO 6 LANES WITH 0 TO 4 CONCURRENT MANAGED TOLL LANES AND 6/8 CONTINUOUS TO 6/8 CONTINUOUS FRONTAGE ROAD LANES (SEGMENT 3C) (ULTIMATE)

LOCAL CONTRIBUTION PAID BY CDA PARTNERS

EAGLE PARKWAY

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-5.20.2MTP REFERENCE:

54104.2MPO PROJECT ID:

RELATED TO TIP 54104.1/CSJ 0081-12-041Project History:

FORT WORTH TARRANT 0094-05-070 SH 183 C FORT WORTH TXDOT-FORT WORTH

AT PUMPHREY

CONSTRUCT INTERSECTION IMPROVEMENTS INCLUDING TURN LANES AND NEW TRAFFIC SIGNAL

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

TSMO2-001MTP REFERENCE:

13064MPO PROJECT ID:

REGIONAL 10-YEAR PLAN PROJECTProject History:

FORT WORTH TARRANT 0171-05-068 SH 199 C LAKE WORTH TXDOT-FORT WORTH

AZLE AVENUE

CONSTRUCT 0 TO 6 MAIN LANES AND INTERCHANGE AT IH 820

IH 820

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-14.20.7, IN1-14.153.1MTP REFERENCE:

13005MPO PROJECT ID:

PART OF REGIONAL 10 YEAR PLAN Project History:

FORT WORTH TARRANT 0353-03-101 SH 114 E GRAPEVINE TXDOT-FORT WORTH

FM 1709

CONSTRUCT REMAINING COMPONENTS OF DFW CONNECTOR PROJECT INCLUDING SH 114 EXPRESS LANE CONNECTIONS, INTERCHANGE AT INTERNATIONAL PARKWAY/DFW AIRPORT, TEXAN TRAIL, AND FM 1709 CONNECTOR

DALLAS COUNTY LINE

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

IN1-11.12.1, IN1-11.12.2MTP REFERENCE:

55192MPO PROJECT ID:

Project History:

FORT WORTH TARRANT 0363-01-110 SH 26 E,R HURST TXDOT-FORT WORTH

IH 820

RECONSTRUCT FROM 4 LANE TO 6 LANE DIVIDED

BROWN TRAIL (HURST SECTION)

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

RSA1-1.495.250, RSA1-1.495.275MTP REFERENCE:

54065MPO PROJECT ID:

Project History:

FORT WORTH TARRANT 0363-03-051 SH 121 E,R RICHLAND HILLS TXDOT-FORT WORTH

IH 820

RECONSTRUCT FROM 6 GP LANES TO 6 GP LANES; 4 LANE CONT FRONTAGE ROADS TO 2/6 LANE CONT FRONTAGE ROADS AND 2 CONCURRENT MANAGED TOLL LANES (ULTIMATE)

HANDLEY-EDERVILLE

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-11.100.1MTP REFERENCE:

54133MPO PROJECT ID:

Project History:

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

D.6

Page 7: Environmental Clearance and Out-Year Projects · 2020. 7. 20. · limits from: 07/2020 tip description: remarks: limits to: rev date: mtp reference: ft1-14.20.7, in1-14.153.1 mpo

DALLAS-FORT WORTH MPOMONDAY, JULY 13, 2020

3:16:17 PM

PAGE: 3

RURAL PROJECTSAPPENDIX D

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR

FORT WORTH DISTRICT PROJECTS

FY 2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM

FORT WORTH TARRANT 0364-05-039 SH 183 E,R FORT WORTH TXDOT-FORT WORTH

SH 121

WIDEN 3 TO 6 CONCURRENT MANAGED LANES AND RECONSTRUCT AND WIDEN EXISTING 2/6 LANE DISCONTINUOUS TO 4/6 CONTINUOUS FRONTAGE ROADS (ULTIMATE)

SH 10

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-22.10.1MTP REFERENCE:

55034MPO PROJECT ID:

Project History:

FORT WORTH JOHNSON 0747-05-035 FM 157 C MANSFIELD TXDOT-FORT WORTH

BU 287 P

REALIGN AND WIDEN ROADWAY AND WIDEN 2 TO 4 LANES RURAL DIVIDED

US 67

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

RSA1-1.465.400, RSA1-1.465.425MTP REFERENCE:

54053MPO PROJECT ID:

REGIONAL 10-YEAR PLAN PROJECTProject History:

FORT WORTH JOHNSON 0902-50-104 CS C BURLESON BURLESON

ON ALSBURY FROM HULEN ST

CONSTRUCTION OF A 4 LANE EXTENSION OF ALSBURY BOULEVARD

LOCAL CONTRIBUTION PAID BY BURLESON

CR 1020 (APPROXIMATELY 0.2 MILES)

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

NRSA1-FTW-20MTP REFERENCE:

53079MPO PROJECT ID:

MPO MILESTONE POLICY (ROUND 2) PROJECT; CONGRESSIONAL EARMARK (2008 OMNIBUS APPROP ACT)

Project History:

FORT WORTH TARRANT 0902-90-148 CS C FORT WORTH FORT WORTH

HORNE STREET FROM VICKERY BLVD.

WIDEN FROM 2 TO 3 LANES WITH BICYCLE LANES, PEDESTRIAN/SIDEWALK IMPROVEMENTS, AND TRAFFIC SIGNAL IMPROVEMENTS

CMAQ FUNDS ARE FOR BICYCLE LANES, PEDESTRIAN/SIDEWALK AND TRAFFIC SIGNAL IMPROVEMENTS ONLY

CAMP BOWIE BLVD.

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

BP2-002, NRSA1-FTW-76, SD2-001, SD2-004, TSMO2-002

MTP REFERENCE:

3.6 3.91NOX (LBS/DAY): VOC (LBS/DAY):

14054MPO PROJECT ID:

Project History:

FORT WORTH TARRANT 0902-90-151 CS C FORT WORTH FORT WORTH

TRINITY BLVD FROM IH 820

RECONSTRUCT 4 LANE UNDIVIDED TO 4 LANE DIVIDED CONTEXT SENSITIVE ROADWAY, INCLUDING MINIMUM 10' WIDE SIDEWALKS AND MINIMUM 12' WIDE SHARED-USE PATH

CMAQ FUNDS FOR SIDEWALKS AND SHARED-USE PATH ONLY

SALADO TRAIL

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

BP2-002, NRSA1-FTW-77, SD2-001MTP REFERENCE:

2.47 2.71NOX (LBS/DAY): VOC (LBS/DAY):

14057MPO PROJECT ID:

Project History:

FORT WORTH TARRANT 0902-90-152 CS C FORT WORTH FORT WORTH

TRINITY BLVD FROM SALADO TRAIL

RECONSTRUCT 4 LANE UNDIVIDED TO 4 LANE DIVIDED, INCLUDING MINIMUM 10' WIDE SIDEWALKS AND MINIMUM 12' WIDE SHARED-USE PATH

CMAQ FUNDS ARE FOR SIDEWALKS AND SHARED-USE PATH ONLY

PRECINCT LINE ROAD

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

BP2-002, NRSA1-FTW-78MTP REFERENCE:

2.35 2.58NOX (LBS/DAY): VOC (LBS/DAY):

14049MPO PROJECT ID:

Project History:

FORT WORTH TARRANT 0902-90-169 CS C FORT WORTH FORT WORTH

UNIVERSITY DRIVE FROM TRAIL DRIVE

PEDESTRIAN IMPROVEMENTS INCLUDING NEW AND WIDENED SIDEWALKS, CROSSWALKS, WAYFINDING SIGNAGE, AND TRAFFIC SIGNALS

ROSEDALE BRIDGE

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

BP2-002, TSMO2-001, TSMO2-002MTP REFERENCE:

1.12 0.93NOX (LBS/DAY): VOC (LBS/DAY):

14055MPO PROJECT ID:

Project History:

FORT WORTH TARRANT 1068-02-147 IH 30 C ARLINGTON TXDOT-FORT WORTH

COOPER ST

RECONSTRUCT AND WIDEN 6 TO 8 GENERAL PURPOSE LANES, CONVERT 2 CONCURRENT EXPRESS LANES TO 2/3 CONCURRENT EXPRESS LANES, AND RECONSTRUCT EXISTING 4/6 TO 4/6 DISCONTINUOUS FRONTAGE ROAD LANES

DALLAS COUNTY LINE

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-28.40.3MTP REFERENCE:

13001MPO PROJECT ID:

REGIONAL 10-YEAR PLAN PROJECT; RELATED TO TIP 55097/ CSJ 1068-02-127

Project History:

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

D.7

Page 8: Environmental Clearance and Out-Year Projects · 2020. 7. 20. · limits from: 07/2020 tip description: remarks: limits to: rev date: mtp reference: ft1-14.20.7, in1-14.153.1 mpo

DALLAS-FORT WORTH MPOMONDAY, JULY 13, 2020

3:16:17 PM

PAGE: 4

RURAL PROJECTSAPPENDIX D

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR

FORT WORTH DISTRICT PROJECTS

FY 2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM

FORT WORTH PARKER 1068-05-014 IH 30 C FORT WORTH TXDOT-FORT WORTH

IH 20

CONSTRUCT WESTBOUND RAMPS TO FM 1187, CONSTRUCT EASTBOUND RAMPS TO IH 30 AND IH 20

TARRANT/PARKER COUNTY LINE

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

NRSA2-002MTP REFERENCE:

13062MPO PROJECT ID:

REGIONAL 10-YEAR PLAN PROJECTProject History:

FORT WORTH PARKER 1601-02-028 FM 1884 C WEATHERFORD TXDOT-FORT WORTH

SH 171

WIDEN FROM 2 LANE TO 4 LANE WITH RAISED MEDIAN

SOUTH OF B.B. FIELDER ROAD

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

NRSA1-FTW-43MTP REFERENCE:

54004MPO PROJECT ID:

Project History:

FORT WORTH TARRANT 2266-02-054 SH 360 E,R ARLINGTON TXDOT-FORT WORTH

AVE K/BROWN BLVD

RECONSTRUCT 6 TO 6 LANES FROM AVE K/BROWN BLVD TO IH 30 AND RECONSTRUCT FROM 6 TO 8 LANES FROM IH 30 TO ABRAM ST

ABRAM STREET

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

AO1-9.20.3, FT1-9.30.1MTP REFERENCE:

51345MPO PROJECT ID:

Project History:

FORT WORTH TARRANT 2266-02-157 SH 360 C,E ARLINGTON NTTA

SUBLETT/CAMP WISDOM ROAD

CNST 4 TO 8 TOLL LN FRM SUBLETT/CAMP WISDOM RD TO DEBBIE LN; 4 TO 6 TOLL LN FRM DEBBIE LN TO TARRANT/ELLIS CO LINE; ADD 4/6 TO 4/6 CONT FRD FRM SUBLETT/CAMP WISDOM TO HERITAGE & 4 TO 4 TOLL LN & 4 TO 4 CONT FRDS FRM HERITAGE TO TARRANT/ELLIS CO LINE (ULT)

LOCAL CONTRIBUTION PAID BY NTTA

TARRANT/ELLIS COUNTY LINE

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-9.40.2, FT1-9.40.3, FT1-9.40.4, FT1-9.40.5

MTP REFERENCE:

55028MPO PROJECT ID:

Project History:

FORT WORTH TARRANT 2266-03-006 SH 360 C,E ARLINGTON NTTA

TARRANT/ELLIS COUNTY LINE

CONSTRUCT 4 TO 6 TOLL LANES AND 4 TO 4 CONTINUOUS FRONTAGE ROADS (ULTIMATE)

LOCAL CONTRIBUTION PAID BY NTTA

US 287

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-9.40.5MTP REFERENCE:

55030MPO PROJECT ID:

Project History:

FORT WORTH TARRANT 2374-05-093 IH 20 C ARLINGTON TXDOT-FORT WORTH

PARK SPRINGS BLVD

OPERATIONAL IMPROVEMENTS

RELATED TO TIP 13027.1/CSJ 2374-05-084

DALLAS COUNTY LINE

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-30.60.2MTP REFERENCE:

13027.2MPO PROJECT ID:

REGIONAL 10-YEAR PLAN PROJECTProject History:

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

D.8

Page 9: Environmental Clearance and Out-Year Projects · 2020. 7. 20. · limits from: 07/2020 tip description: remarks: limits to: rev date: mtp reference: ft1-14.20.7, in1-14.153.1 mpo

2021-2024 Transportation Improvement Program

North Central Texas Council of Governments DFW Metropolitan Planning Organization

Environmental Clearance Projects Dallas District

D.9

Page 10: Environmental Clearance and Out-Year Projects · 2020. 7. 20. · limits from: 07/2020 tip description: remarks: limits to: rev date: mtp reference: ft1-14.20.7, in1-14.153.1 mpo

this is a blank page

T h i s p a g e i s i n t e n t i o n a l l y b l a n k

D.10

Page 11: Environmental Clearance and Out-Year Projects · 2020. 7. 20. · limits from: 07/2020 tip description: remarks: limits to: rev date: mtp reference: ft1-14.20.7, in1-14.153.1 mpo

DALLAS-FORT WORTH MPOFRIDAY, JULY 17, 2020

6:06:58 PM

PAGE: 1

RURAL PROJECTSAPPENDIX D

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR

DALLAS DISTRICT PROJECTS

FY 2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM

DALLAS COLLIN 0000-18-027 CS C FRISCO FRISCO

ON LEBANON RD FROM COIT RD

WIDEN FROM 2 LANES TO 4 LANES

LOCAL CONTRIBUTION PAID BY FRISCO

INDEPENDENCE PKWY

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

NRSA1-DAL-167MTP REFERENCE:

83112MPO PROJECT ID:

Project History:

DALLAS DALLAS 0000-18-071 CS C ROWLETT ROWLETT

ON HICKOX RD FROM TOLER RD

WIDEN FROM 2 LANES TO 4 LANES (PHASE 2)

LOCAL CONTRIBUTION PAID BY ROWLETT

MERRITT RD

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

NRSA1-DAL-165MTP REFERENCE:

83030MPO PROJECT ID:

Project History:

DALLAS COLLIN 0000-18-082 MH E VARIOUS COLLIN CO

ON COLLIN COUNTY OUTER LOOP FROM DENTON COUNTY LINE

DEVELOP SCHEMATIC FOR ROW ACQUISITION

LOCAL CONTRIBUTION PAID BY COLLIN COUNTY

US 75

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-110.10.1, FT1-110.20.1, FT3-008

MTP REFERENCE:

84149MPO PROJECT ID:

Project History:

DALLAS VARIOUS 0000-18-107 VA C VARIOUS NTTA

PGBT-SH 360 CONNECTOR FROM PGBT (SH 161)

CONSTRUCT 0 TO 4 TOLLED COLLECTOR DISTRIBUTOR LANES

LOCAL CONTRIBUTION PAID BY NTTA

SH 360/SUBLETT ROAD

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-39.10.1MTP REFERENCE:

84157MPO PROJECT ID:

Project History:

DALLAS DALLAS 0009-11-129 IH 30 E,R VARIOUS TXDOT-DALLAS

IH 635

RECONSTRUCT 8 TO 8 GENERAL PURPOSE LANES AND RECONSTRUCT 4/6 LANE DISCONTINUOUS TO 4/6 LANE CONTINUOUS FRONTAGE ROADS

BASS PRO DRIVE

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

AO1-28.80.1, AO1-28.80.2MTP REFERENCE:

13043MPO PROJECT ID:

REGIONAL 10-YEAR PLAN PROJECTProject History:

DALLAS DALLAS 0009-11-252 IH 30 C,E,R VARIOUS TXDOT-DALLAS

IH 45

RECONSTRUCT AND WIDEN FROM 6/8 TO 10 GENERAL PURPOSE LANES AND RECONSTRUCT 4/6/8 DISCONTINUOUS TO 4/6 DISCONTINUOUS FRONTAGE ROADS

IH 635

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-28.60.3, FT1-28.70.1, FT1-28.70.2MTP REFERENCE:

13043.1MPO PROJECT ID:

REGIONAL 10-YEAR PLAN PROJECTProject History:

DALLAS DALLAS 0009-11-254 IH 30 C DALLAS TXDOT-DALLAS

IH 35E

RECONSTRUCT & WIDEN 6 TO 12 MAINLANES AND RECONSTRUCT AND WIDEN 0/6 LANE DISCONTINUOUS TO 2/8 LANE DISCONTINUOUS FRONTAGE ROADS

IH 45

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-28.60.1, FT1-28.60.2MTP REFERENCE:

13030MPO PROJECT ID:

REGIONAL 10-YEAR PLAN PROJECTProject History:

DALLAS COLLIN 0047-04-022 SH 5 E,R MELISSA TXDOT-DALLAS

SH 121

RECONSTRUCT AND WIDEN 2 LANE RURAL HIGHWAY TO 4 LANE URBAN HIGHWAY

RTR 121-CC1

CR 375

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

RSA1-1.680.200, RSA1-1.680.210MTP REFERENCE:

20085MPO PROJECT ID:

Project History:

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

D.11

Page 12: Environmental Clearance and Out-Year Projects · 2020. 7. 20. · limits from: 07/2020 tip description: remarks: limits to: rev date: mtp reference: ft1-14.20.7, in1-14.153.1 mpo

DALLAS-FORT WORTH MPOFRIDAY, JULY 17, 2020

6:06:59 PM

PAGE: 2

RURAL PROJECTSAPPENDIX D

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR

DALLAS DISTRICT PROJECTS

FY 2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM

DALLAS COLLIN 0047-06-158 US 75 C,E VARIOUS TXDOT-DALLAS

DALLAS COUNTY LINE

REMOVE HOV LANES AND ADD PEAK HOUR TRAVEL LANES

PART OF THE EASTERN SUBREGION SUPPLEMENTAL PROJECT COMMITMENTS FOR THE TXDOT CONGESTION RELIEF PROGRAM APPROVED BY THE RTC JANUARY 20, 2016

BETHANY DRIVE

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

AO1-23.50.1, AO1-23.40.3, AO1-23.40.4, AO1-23.40.5

MTP REFERENCE:

30006MPO PROJECT ID:

Project History:

DALLAS COLLIN 0047-06-163 US 75 C,E ALLEN TXDOT-DALLAS

BETHANY DRIVE

ADD PEAK HOUR TRAVEL LANES

SH 121

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

AO1-2.40.1, AO1-23.402MTP REFERENCE:

30007MPO PROJECT ID:

Project History:

DALLAS DALLAS 0047-07-232 US 75 C,E RICHARDSON TXDOT-DALLAS

IH 635

REMOVE HOV LANES AND ADD PEAK HOUR TRAVEL LANES

PLANNING CSJ 0047-07-990; PART OF THE EASTERN SUBREGION SUPPLEMENTAL PROJECT COMMITMENTS FOR THE TXDOT CONGESTION RELIEF PROGRAM APPROVED BY THE RTC JANUARY 20, 2016

COLLIN COUNTY LINE

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

AO1-23.50.1MTP REFERENCE:

30005MPO PROJECT ID:

Project History:

DALLAS COLLIN 0047-14-053 US 75 C,E VARIOUS TXDOT-DALLAS

NORTH OF CR 370

RECONSTRUCT AND WIDEN FROM 4 LANE TO 6 LANE FREEWAY AND RECONSTRUCT EXISTING 4 LANE TO 4/6 LANE FRONTAGE ROADS

RTR 121-CC1

CR 375 (GRAYSON COUNTY LINE)

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-23.10.1MTP REFERENCE:

20084MPO PROJECT ID:

Project History:

DALLAS ELLIS 0048-04-090 IH 35E E WAXAHACHIE TXDOT-DALLAS

US 77 SOUTH

RECONSTRUCT 4 INTERCHANGES (BUS 287/US 287 BYPASS/LOFLAND/STERRET RD), 4 LN DISCON TO 4/6 LN CONTINUOUS FRTG RD & RAMP MODIFICATIONS

US 77 NORTH

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-7.100.5, IN1-1.7.1, IN1-7.508.1, IN1-7.509.1, IN1-7.512.1

MTP REFERENCE:

55092MPO PROJECT ID:

PREVIOUS PLANNING CSJ 0048-04-912; ROW CSJ 0048-04-096

Project History:

DALLAS ELLIS 0048-04-096 IH 35E R WAXAHACHIE TXDOT-DALLAS

US 77 SOUTH

RECONSTRUCT 4 INTERCHANGES (BUS 287/US 287 BYPASS/LOFLAND/STERRET RD), 4 LN DISCON TO 4/6 LN CONTINUOUS FRTG RD & RAMP MODIFICATIONS

US 77 NORTH

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-7.100.5, IN1-1.7.1, IN1-7.508.1, IN1-7.509.1, IN1-7.512.1

MTP REFERENCE:

55092MPO PROJECT ID:

RELATED TO CSJ 0048-04-090Project History:

DALLAS DENTON 0081-03-047 US 377 C ARGYLE TXDOT-DALLAS

SOUTH OF FM 1171

RECONSTRUCT AND WIDEN ROADWAY FROM 2 LANE RURAL TO 4 LANE DIVIDED URBAN

RTR 121-DE1

CRAWFORD ROAD

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

RSA1-1.540.230MTP REFERENCE:

20115MPO PROJECT ID:

Project History:

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

D.12

Page 13: Environmental Clearance and Out-Year Projects · 2020. 7. 20. · limits from: 07/2020 tip description: remarks: limits to: rev date: mtp reference: ft1-14.20.7, in1-14.153.1 mpo

DALLAS-FORT WORTH MPOFRIDAY, JULY 17, 2020

6:06:59 PM

PAGE: 3

RURAL PROJECTSAPPENDIX D

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR

DALLAS DISTRICT PROJECTS

FY 2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM

DALLAS DENTON 0081-03-054 US 377 E VARIOUS DENTON CO

CRAWFORD RD

RECONSTRUCT AND WIDEN 2 LANE RURAL HIGHWAY TO 6 LANE DIVIDED URBAN

LOCAL CONTRIBUTION PAID BY DENTON COUNTY

NORTH OF HICKORY CREEK

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

RSA1-1.540.220MTP REFERENCE:

55002MPO PROJECT ID:

Project History:

DALLAS DENTON 0081-04-038 US 377 E VARIOUS DENTON CO

NORTH OF HICKORY CREEK

RECONSTRUCT AND WIDEN 2 LANE RURAL HIGHWAY TO 6 LANE DIVIDED URBAN

LOCAL CONTRIBUTION PAID BY DENTON COUNTY

FM 1830

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

RSA1-1.540.220MTP REFERENCE:

55004MPO PROJECT ID:

Project History:

DALLAS COLLIN 0091-03-022 SH 289 E,R VARIOUS TXDOT-DALLAS

N BUS 289C, NORTH OF CELINA

RECONSTRUCT AND WIDEN 2 LANE RURAL HIGHWAY TO 4 LANE DIVIDED URBAN (ULTIMATE 6 LANES)

N CR 60/CR 107 (GRAYSON C/L)

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

RSA1-1.605.200MTP REFERENCE:

54023MPO PROJECT ID:

Project History:

DALLAS DALLAS 0092-02-130 IH 45 C VARIOUS TXDOT-DALLAS

AT SL 9

RECONSTRUCT EXISTING 2 TO 2 LANE SOUTHBOUND FRONTAGE ROAD AND RAMP MODIFICATIONS

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

NRSA1-27.30.2MTP REFERENCE:

55249MPO PROJECT ID:

REGIONAL 10-YEAR PLAN PROJECT; RELATED TO TIP 54119/CSJ 2964-10-005, 54119.1/2964-10-008, 54119.2/2964-10-009, 54119.3/2964-12-001, 54119.4/2964-12-002, 54119.5/0442-02-162, & 54119.6/0442-03-044

Project History:

DALLAS TARRANT 0094-02-136 SH 183 E,R VARIOUS TXDOT-DALLAS

WEST OF SH 360

WIDEN 6 TO 8 GENERAL PURPOSE LANES, 2 TO 6 HOV/MANAGED-C, RECONSTRUCT 4/6 LANE DISCONTINUOUS TO 4/6 LANE CONTINUOUS FRONTAGE ROADS & EXISTING 4 LANE COLLECTOR DISTRIBUTOR FROM SH 360 TO INTL PKWY

DALLAS COUNTY LINE

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-22.10.1, FT1-22.20.1MTP REFERENCE:

55035MPO PROJECT ID:

Project History:

DALLAS DALLAS 0094-03-120 SH 183 E,R IRVING TXDOT-DALLAS

WEST OF SH 161

WIDEN 6 TO 8 GENERAL PURPOSE LANES AND RECONSTRUCT 4/6 LANE DISCONTINUOUS TO 4/6 LANE CONTINUOUS FRONTAGE ROADS (ULTIMATE)

0.66 MILES WEST OF SL 12

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-22.20.1, FT1-22.30.1MTP REFERENCE:

55032MPO PROJECT ID:

RELATED TO TIP 55032.2/CSJ 0094-03-125Project History:

DALLAS DALLAS 0094-03-121 SH 183 E,R IRVING TXDOT-DALLAS

0.66 MILES WEST OF SL 12

WIDEN 4/6 LANE TO 4/8 LANE CONTINUOUS FRONTAGE ROADS AND CONSTRUCT ULTIMATE INTERCHANGE OF SL 12/SH 183/SH 114 (ULTIMATE)

1 MILE EAST OF SL 12

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-22.30.1, FT1-22.40.1, FT1-22.40.2, IN1-17.12.1, IN1-12.11.1, IN1-17.22.1

MTP REFERENCE:

54129MPO PROJECT ID:

RELATED TO TIP 54129.2/CSJ 0094-03-124Project History:

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

D.13

Page 14: Environmental Clearance and Out-Year Projects · 2020. 7. 20. · limits from: 07/2020 tip description: remarks: limits to: rev date: mtp reference: ft1-14.20.7, in1-14.153.1 mpo

DALLAS-FORT WORTH MPOFRIDAY, JULY 17, 2020

6:07:00 PM

PAGE: 4

RURAL PROJECTSAPPENDIX D

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR

DALLAS DISTRICT PROJECTS

FY 2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM

DALLAS DALLAS 0094-03-124 SH 183 E,R IRVING TXDOT-DALLAS

0.66 MILES WEST OF SL 12

WIDEN 2 TO 4 CONCURRENT HOV/MANAGED LANES

1 MILE EAST OF SL 12

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-22.30.1, FT1-22.40.1MTP REFERENCE:

54129.2MPO PROJECT ID:

RELATED TO TIP 54129/CSJ 0094-03-121Project History:

DALLAS DALLAS 0094-03-125 SH 183 E,R IRVING TXDOT-DALLAS

WEST OF SH 161

WIDEN 2/4 TO 4 CONCURRENT HOV/MANAGED LANES

0.66 MILES WEST OF SL 12

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-22.30.1MTP REFERENCE:

55032.2MPO PROJECT ID:

RELATED TO TIP 55032/CSJ 0094-03-120Project History:

DALLAS DALLAS 0094-07-044 SH 183 E,R IRVING TXDOT-DALLAS

1.0 MILE EAST OF SL 12

RECONSTRUCT EXISTING 8 GP LANES, 2 TO 6 CONCURRENT MANAGED LANES, AND 4/6 DISCONTINUOUS TO 6/8 CONTINUOUS FRONTAGE ROADS (ULTIMATE)

WEST END OF ELM FORK TRINITY RIVER BRIDGE

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-22.40.2MTP REFERENCE:

53198MPO PROJECT ID:

Project History:

DALLAS DALLAS 0094-07-045 SH 183 E,R IRVING TXDOT-DALLAS

WEST END OF ELM FORK TRINITY RIVER BRIDGE

RECONSTRUCT AND WIDEN 6/8 TO 6/8 GP LANES & RECONSTRUCT 4/6 DISCONTINUOUS TO 4/8 LANE CONTINUOUS FRONTAGE ROADS (ULTIMATE)

WEST OF IH 35E

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-22.40.2, FT1-22.40.3MTP REFERENCE:

54072MPO PROJECT ID:

RELATED TO TIP 54072.2/CSJ 0094-07-046Project History:

DALLAS DALLAS 0094-07-046 SH 183 E,R IRVING TXDOT-DALLAS

WEST END OF ELM FORK TRINITY RIVER BRIDGE

RECONSTRUCT AND WIDEN 2 TO 2/6 MANAGED LANES

WEST OF IH 35E

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-22.40.2, FT1-22.40.3MTP REFERENCE:

54072.2MPO PROJECT ID:

RELATED TO TIP 54072/CSJ 0094-07-045Project History:

DALLAS DALLAS 0095-02-096 US 80 C SUNNYVALE TXDOT-DALLAS

BELT LINE RD

RECONSTRUCT AND WIDEN 4 TO 6 MAINLANES AND 2/4 TO 4/6 LANE CONTINUOUS FRONTAGE ROADS

LAWSON RD

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-32.10.3MTP REFERENCE:

53110MPO PROJECT ID:

REGIONAL 10-YEAR PLAN PROJECTProject History:

DALLAS DALLAS 0095-02-107 US 80 C MESQUITE TXDOT-DALLAS

EAST OF TOWN EAST BLVD

RECONSTRUCT AND WIDEN 4 TO 6/8 MAINLANES AND 2/4/6 TO 4/6 LANE CONTINUOUS FRONTAGE ROADS AND RECONSTRUCT IH 635 INTERCHANGE

BELT LINE RD

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-32.10.1, FT1-32.10.2, IN1-32.131.1

MTP REFERENCE:

53109MPO PROJECT ID:

REGIONAL 10-YEAR PLAN PROJECTProject History:

DALLAS KAUFMAN 0095-03-080 US 80 C DALLAS TXDOT-DALLAS

LAWSON ROAD (DALLAS/KAUFMAN C/L)

RECONSTRUCT AND WIDEN 4 TO 6 MAINLANES AND RECONSTRUCT AND WIDEN 2/4 LANE DISCONTINUOUS TO 4/6 LANE CONTINUOUS FRONTAGE ROADS

FM 460

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-32.10.3MTP REFERENCE:

53086MPO PROJECT ID:

REGIONAL 10-YEAR PLAN PROJECTProject History:

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

D.14

Page 15: Environmental Clearance and Out-Year Projects · 2020. 7. 20. · limits from: 07/2020 tip description: remarks: limits to: rev date: mtp reference: ft1-14.20.7, in1-14.153.1 mpo

DALLAS-FORT WORTH MPOFRIDAY, JULY 17, 2020

6:07:00 PM

PAGE: 5

RURAL PROJECTSAPPENDIX D

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR

DALLAS DISTRICT PROJECTS

FY 2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM

DALLAS DENTON 0196-01-108 IH 35E E,R VARIOUS TXDOT-DALLAS

TURBEVILLE RD

RECONSTRUCT EXISTING 6/8 INTERIM GP LANES TO 8 GP LANES; RECONSTRUCT AND CONVERT 2 INTERIM REVERSIBLE TO 4 CONCURRENT MANAGED LANES FROM TURBEVILLE TO CORINTH

US 77

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-7.10.3, FT1-7.10.4, FT1-7.10.5MTP REFERENCE:

25033.1MPO PROJECT ID:

Project History:

DALLAS DENTON 0196-01-109 IH 35E C DENTON TXDOT-DALLAS

SOUTH OF MAYHILL ROAD

RECONSTRUCT GRADE SEPARATION AND EXISTING 4 TO 4 LANE FRONTAGE ROADS

SOUTH OF SL 288

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-7.10.4, TSMO2-001, MO3-002MTP REFERENCE:

25033.3MPO PROJECT ID:

REGIONAL 10-YEAR PLAN PROJECTProject History:

DALLAS DENTON 0196-02-124 IH 35E E,R VARIOUS TXDOT-DALLAS

DALLAS COUNTY LINE

RCNST & CONVERT 2 REV TO 4 CONC MNGD LNS; WIDEN 6 TO 6 CD LANES (DALLAS C/L TO SH 121); RCNST 8 TO 8 GP LNS (SH 121 TO FM 407); RCNST 2/6 TO 2/8 CONT FRTG (FM 407 TO SRT/SH 121); AND RCNST 4/6 TO 2/6 CONT FRTG FROM (SRT/SH 121 TO DALLAS C/L)

FM 407

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-7.10.6, FT1-7.20.1MTP REFERENCE:

13033MPO PROJECT ID:

REGIONAL 10-YEAR PLAN PROJECTProject History:

DALLAS DENTON 0196-02-125 IH 35E E,R VARIOUS TXDOT-DALLAS

FM 407

RECONSTRUCT EXISTING 4 GENERAL PURPOSE LANES (NB ONLY); WIDEN AND CONVERT 2 LANE REVERSIBLE TO 4 LANE CONCURRENT MANAGED LANES; WIDEN 4/6 LANE CONTINUOUS TO 4/8 LANE CONTINUOUS FRONTAGE ROADS

TURBEVILLE ROAD

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-7.10.5MTP REFERENCE:

25033.2MPO PROJECT ID:

REGIONAL 10-YEAR PLAN PROJECTProject History:

DALLAS DALLAS 0196-03-199 IH 35E E DALLAS TXDOT-DALLAS

IH 30

RECONSTRUCT 10 TO 10 GENERAL PURPOSE LANES AND RECONSTRUCT AND ADD 2/6 DISCONTINUOUS TO 2/6 LANE DISCONTINUOUS FRONTAGE ROADS

NORTH OF OAK LAWN AVE

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-7.60.6, FT1-7.70.1MTP REFERENCE:

55061MPO PROJECT ID:

LOWEST STEMMONS PHASE 2; RELATED TO TIP 55061.2/CSJ 0196-03-285

Project History:

DALLAS DALLAS 0196-03-223 IH 35E E,R DALLAS TXDOT-DALLAS

LOMBARDY LANE

CONSTRUCT 0 TO 2 SB FRONTAGE ROAD AND RAMP MODIFICATIONS

SPUR 482 (STOREY RD)

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-7.50.1, NRSA1-7.50.1, TSMO2-005

MTP REFERENCE:

52201MPO PROJECT ID:

Project History:

DALLAS DALLAS 0196-03-263 IH 35E E DALLAS DALLAS CO

MANANA DRIVE

CONSTRUCT NEW 0 TO 2 LANE FRONTAGE ROADS NORTHBOUND FROM MANANA DR TO ROYAL LANE AND SOUTHBOUND FROM WALNUT HILL LANE TO MANANA DR AND PEDESTRIAN IMPROVEMENTS ALONG WALNUT HILL LANE

LOCAL CONTRIBUTION PAID BY DALLAS COUNTY

ROYAL LANE

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

NRSA1-7.40.1, BP2-002MTP REFERENCE:

83259MPO PROJECT ID:

Project History:

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

D.15

Page 16: Environmental Clearance and Out-Year Projects · 2020. 7. 20. · limits from: 07/2020 tip description: remarks: limits to: rev date: mtp reference: ft1-14.20.7, in1-14.153.1 mpo

DALLAS-FORT WORTH MPOFRIDAY, JULY 17, 2020

6:07:00 PM

PAGE: 6

RURAL PROJECTSAPPENDIX D

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR

DALLAS DISTRICT PROJECTS

FY 2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM

DALLAS DALLAS 0196-03-266 IH 35E E,R DALLAS TXDOT-DALLAS

NORTH OF OAK LAWN AVE

RECONSTRUCT EXISTING 10 GENERAL PURPOSE LANES AND RECONSTRUCT EXISTING 4/6 LANE FRONTAGE ROADS

SH 183

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-7.60.1, FT1-7.60.2, FT1-7.60.3, FT1-7.60.4, FT1-7.60.5

MTP REFERENCE:

55062MPO PROJECT ID:

LOWER STEMMONS; RELATED TO TIP 55062.2/CSJ 0196-03-286

Project History:

DALLAS DALLAS 0196-03-285 IH 35E E,R DALLAS TXDOT-DALLAS

IH 30

CONSTRUCT 2 REVERSIBLE MANAGED LANES

NORTH OF OAK LAWN AVE

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-7.60.6, FT1-7.70.1MTP REFERENCE:

55061.2MPO PROJECT ID:

RELATED TO TIP 55061/CSJ 0196-03-285Project History:

DALLAS DALLAS 0196-03-286 IH 35E E,R DALLAS TXDOT-DALLAS

NORTH OF OAK LAWN AVE

CONSTRUCT 0 TO 2 REVERSIBLE MANAGED LANES

SH 183

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-7.60.6, FT1-7.70.1MTP REFERENCE:

55062.2MPO PROJECT ID:

RELATED TO TIP 55062/CSJ 0196-03-266Project History:

DALLAS DALLAS 0196-07-034 SS 366 C DALLAS TXDOT-DALLAS

WEST OF AKARD ST

CONSTRUCT EXTENSION OF EXISTING KLYDE WARREN PARK DECK PLAZA; STRUCTURE ONLY

SAINT PAUL ST

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT3-014MTP REFERENCE:

14070MPO PROJECT ID:

Project History:

DALLAS DALLAS 0197-02-107 US 175 E DALLAS TXDOT-DALLAS

SH 310 AND SM WRIGHT

RECONSTRUCT AND WIDEN FREEWAY FROM 6 TO 8 LANES WITH AUXILIARY LANE AND 2/4 TO 4/6 LANE DISCONTINUOUS FRONTAGE ROADS AND ASSET OPTIMIZATION FROM LAKE JUNE TO IH 20

IH 20

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-36.10.1, AO1-36.10.2MTP REFERENCE:

11900MPO PROJECT ID:

Project History:

DALLAS ELLIS 0261-01-041 US 67 C CEDAR HILL TXDOT-DALLAS

AT LAKE RIDGE PARKWAY

CONSTRUCT GRADE SEPARATION - PHASE 1

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

MO3-002, TSMO2-001MTP REFERENCE:

55014MPO PROJECT ID:

REGIONAL 10-YEAR PLAN PROJECTProject History:

DALLAS DALLAS 0261-02-044 US 67 E,R DALLAS TXDOT-DALLAS

FM 1382

CONSTRUCT FROM 0 TO 1 REVERSIBLE EXPRESS LANE

SOUTH OF IH 20

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-38.20.1MTP REFERENCE:

55040MPO PROJECT ID:

Project History:

DALLAS DENTON 0353-02-072 SH 114 E FORT WORTH TXDOT-DALLAS

EAST OF FM 156

CONSTRUCT 0 TO 6 MAINLANES, AND RECONSTRUCT EXISTING 4/6 FRONTAGE ROADS TO 4/8 FRONTAGE ROADS

WEST OF IH 35W

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-12.20.3MTP REFERENCE:

53195MPO PROJECT ID:

Project History:

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

D.16

Page 17: Environmental Clearance and Out-Year Projects · 2020. 7. 20. · limits from: 07/2020 tip description: remarks: limits to: rev date: mtp reference: ft1-14.20.7, in1-14.153.1 mpo

DALLAS-FORT WORTH MPOFRIDAY, JULY 17, 2020

6:07:01 PM

PAGE: 7

RURAL PROJECTSAPPENDIX D

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR

DALLAS DISTRICT PROJECTS

FY 2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM

DALLAS DALLAS 0353-04-068 SP 348 E IRVING TXDOT-DALLAS

SH 114

WIDEN 4 LANE DIVIDED URBAN TO 6 LANE DIVIDED URBAN

W OF LUNA RD (NEAR ELM FORK TRIN R)

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

RSA1-2.410.225, RSA1-2.410.250MTP REFERENCE:

54054MPO PROJECT ID:

Project History:

DALLAS DALLAS 0353-04-111 SH 114 E,R IRVING TXDOT-DALLAS

EAST OF INTERNATIONAL PARKWAY

EAST OF INT PKWY TO SH 161: RECONSTRUCT AND WIDEN 7 TO 8 GP LNS, 1 WB TO 4 CONCUR HOV/MNGD LNS AND 4 LN TO 4/8 LN DISCONT FRDS; FROM SH 161 TO SP 348: WIDEN 6 TO 8 GP LNS, 2 TO 4 CONCUR HOV/MNGD LNS, AND RECONSTRUCT 4/8 LN TO 4/8 LN CONT FRDS (ULTIMATE)

SP 348

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-12.50.1, FT1-12.50.2MTP REFERENCE:

11951MPO PROJECT ID:

PART OF THE SH 183/MIDTOWN EXPRESS CORRIDOR

Project History:

DALLAS DALLAS 0353-05-120 SL 12 C,E,R DALLAS TXDOT-DALLAS

AT SKILLMAN

RECONSTRUCT GRADE SEPARATION

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

TSMO2-001MTP REFERENCE:

55112MPO PROJECT ID:

10-YEAR PLAN PROJECTProject History:

DALLAS DALLAS 0353-06-063 SH 114 E,R IRVING TXDOT-DALLAS

SP 348

WIDEN 4 TO 8 GENERAL PURPOSE LANES, 2 TO 4 CONCURRENT HOV/MANAGED LANES, AND RECONSTRUCT 4/6 LANE TO 4/8 LANE CONTINUOUS FRONTAGE ROADS (ULTIMATE)

EAST OF ROCHELLE BLVD

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-12.50.3MTP REFERENCE:

11950MPO PROJECT ID:

PART OF THE SH 183/MIDTOWN EXPRESS CORRIDOR

Project History:

DALLAS DALLAS 0353-06-064 SH 114 E,R IRVING TXDOT-DALLAS

SL 12

WIDEN 4 TO 6 GENERAL PURPOSE LANES AND RECONSTRUCT 4/6 TO 6/8 CONTINUOUS FRONTAGE ROADS (ULTIMATE)

SH 183

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-12.50.5MTP REFERENCE:

52569MPO PROJECT ID:

RELATED TO TIP 52569.2/CSJ 0353-06-066Project History:

DALLAS DALLAS 0353-06-066 SH 114 E,R IRVING TXDOT-DALLAS

EAST OF ROCHELLE

WIDEN 2 TO 4 CONCURRENT MANAGED LANES

SH 183

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-12.50.4, FT1-12.50.5MTP REFERENCE:

52569.2MPO PROJECT ID:

RELATED TO TIP 52569/CSJ 0353-06-064Project History:

DALLAS DENTON 0353-09-002 SH 114 E ROANOKE TXDOT-DALLAS

WEST OF US 377

CONSTRUCT 0 TO 6 LANE GRADE SEPARATION OVER US 377

EAST OF US 377

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-12.30.1, TSMO2-001MTP REFERENCE:

55177MPO PROJECT ID:

Project History:

DALLAS DALLAS 0442-02-159 IH 35E E,R DALLAS TXDOT-DALLAS

US 67

CONSTRUCT 0 TO 1 REVERSIBLE EXPRESS LANE

LAURELAND DR

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-7.90.1MTP REFERENCE:

55094MPO PROJECT ID:

REGIONAL 10-YEAR PLAN PROJECTProject History:

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

D.17

Page 18: Environmental Clearance and Out-Year Projects · 2020. 7. 20. · limits from: 07/2020 tip description: remarks: limits to: rev date: mtp reference: ft1-14.20.7, in1-14.153.1 mpo

DALLAS-FORT WORTH MPOFRIDAY, JULY 17, 2020

6:07:01 PM

PAGE: 8

RURAL PROJECTSAPPENDIX D

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR

DALLAS DISTRICT PROJECTS

FY 2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM

DALLAS DALLAS 0442-02-162 IH 35E C VARIOUS TXDOT-DALLAS

ELLIS COUNTY LINE

CONSTRUCT INTERCHANGE AT LOOP 9 AND IH 35E

BEAR CREEK ROAD

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

IN1-7.6.1, TSMO2-001MTP REFERENCE:

54119.5MPO PROJECT ID:

REGIONAL 10-YEAR PLAN PROJECT; RELATED TO TIP 54119/CSJ 2964-10-005, 54119.1/2964-10-008, 54119.2/2964-10-009, 54119.3/2964-12-001, 54119.4/2964-12-002, 54119.6/0442-03-044, & 55249/0092-02-130

Project History:

DALLAS ELLIS 0442-03-044 IH 35E C VARIOUS TXDOT-DALLAS

REESE DRIVE

CONSTRUCT INTERCHANGE AT LOOP 9 AND IH 35E

DALLAS COUNTY LINE

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

IN1-7.6.1, TSMO2-001MTP REFERENCE:

54119.6MPO PROJECT ID:

REGIONAL 10-YEAR PLAN PROJECT; RELATED TO TIP 54119/CSJ 2964-10-005, 54119.1/2964-10-008, 54119.2/2964-10-009, 54119.3/2964-12-001, 54119.4/2964-12-002, 54119.5/0442-02-162 & 55249/0092-02-130

Project History:

DALLAS ROCKWALL 0451-01-053 SH 205 E,R ROCKWALL TXDOT-DALLAS

SOUTH OF FM 548

WIDEN 2 LANE RURAL HIGHWAY TO 4 LANE DIVIDED (6 LANE ULTIMATE)

JCT SH 205/JOHN KING (S. GOLIAD ST)

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

RSA1-1.715.475, RSA1-1.715.500, RSA1-1.715.525

MTP REFERENCE:

55071MPO PROJECT ID:

Project History:

DALLAS KAUFMAN 0451-02-028 SH 205 E,R TERRELL TXDOT-DALLAS

SOUTH OF FM 548

WIDEN 2 LANE RURAL HIGHWAY TO 4 LANE DIVIDED (6 LANE ULTIMATE)

US 80

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

RSA1-1.715.550MTP REFERENCE:

55072MPO PROJECT ID:

Project History:

DALLAS ROCKWALL 0451-04-021 SH 205 C ROCKWALL TXDOT-DALLAS

JCT SH 205/ JOHN KING (N. GOLIAD ST)

WIDEN 2 LANE RURAL HIGHWAY TO 4 LANE DIVIDED (6 LANE ULTIMATE)

NORTH OF JOHN KING (COLLIN COUNTY LINE)

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

RSA1-1.715.200MTP REFERENCE:

55074MPO PROJECT ID:

REGIONAL 10-YEAR PLAN PROJECTProject History:

DALLAS ROCKWALL 0451-05-001 SH 205 C ROCKWALL TXDOT-DALLAS

JCT SH 205/JOHN KING (S GOLIAD ST)

WIDEN 4 TO 6 LANE DIVIDED URBAN ROADWAY

JCT SH 205/JOHN KING (N GOLIAD ST)

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

RSA1-1.720.300, RSA1-1.720.350MTP REFERENCE:

13038MPO PROJECT ID:

REGIONAL 10-YEAR PLAN PROJECTProject History:

DALLAS KAUFMAN 0495-01-064 SP 557 C,E TERRELL TERRELL

AT LAS LOMAS PARKWAY (CR 305)

CONSTRUCT PHASE 1 (4-LANES) OF ULTIMATE 8 LANE BRIDGE PLUS CONNECTIONS TO LAS LOMAS PARKWAY

LOCAL CONTRIBUTION PAID FOR BY CITY OF TERRELL AND KAUFMAN CO

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

IN1-34.575.1MTP REFERENCE:

53138.2MPO PROJECT ID:

Project History:

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

D.18

Page 19: Environmental Clearance and Out-Year Projects · 2020. 7. 20. · limits from: 07/2020 tip description: remarks: limits to: rev date: mtp reference: ft1-14.20.7, in1-14.153.1 mpo

DALLAS-FORT WORTH MPOFRIDAY, JULY 17, 2020

6:07:01 PM

PAGE: 9

RURAL PROJECTSAPPENDIX D

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR

DALLAS DISTRICT PROJECTS

FY 2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM

DALLAS KAUFMAN 0495-01-065 SP 557 C,E TERRELL TERRELL

AT LAS LOMAS PARKWAY (CR 305)

CONSTRUCT PHASE 2 (FINAL 4-LANES) OF ULTIMATE 8 LANE BRIDGE PLUS CONNECTIONS TO LAS LOMAS PARKWAY

LOCAL CONTRIBUTION PAID FOR BY CITY OF TERRELL

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

IN1-34.575.1MTP REFERENCE:

83262MPO PROJECT ID:

Project History:

DALLAS KAUFMAN 0495-01-066 SP 557 C TERRELL TERRELL

FM 148

NEW LOCATION TWO LANE FRONTAGE ROAD EASTBOUND ONLY

LOCAL CONTRIBUTION PAID BY TERRELL; ROW WILL BE DONATED

IH 20

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

NRSA1-34.10.1MTP REFERENCE:

83224MPO PROJECT ID:

Project History:

DALLAS COLLIN 0549-03-021 SH 121 E MELISSA TXDOT-DALLAS

NORTH OF FM 455

RECONSTRUCT AND WIDEN FROM 2 LANE TO 4 LANE RURAL DIVIDED; CONSTRUCT 0 TO 2 LANE DISCONTINUOUS FRONTAGE ROADS AND FM 2862 INTERCHANGE (ENGINEERING ONLY)

CR 635 (FANNIN COUNTY LINE)

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

IN1-11.505.1, RSA1-1.745.200, RSA1-1.745.250, RSA1-1.745.260

MTP REFERENCE:

20076MPO PROJECT ID:

Project History:

DALLAS DALLAS 0581-02-077 SL 12 E,R VARIOUS TXDOT-DALLAS

SP 408

RECONSTRUCT & WIDEN 6 TO 8 GENERAL PURPOSE LANES FROM SH 356 TO SH 183; CONSTRUCT 0 TO 2 REVERSIBLE MANAGED LANES, RECONSTRUCT AND WIDEN 4 DISCONTINUOUS TO 4/6 LANE CONTINUOUS FRONTAGE ROADS FROM SP 408 TO SH 183 (ULTIMATE)

SOUTH OF SH 183

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-17.20.1, FT1-17.20.2, FT1-17.30.1MTP REFERENCE:

11930MPO PROJECT ID:

PART OF THE SH 183/MIDTOWN EXPRESS CORRIDOR

Project History:

DALLAS DALLAS 0581-02-146 SL 12 E,R DALLAS TXDOT-DALLAS

AT IH 30

CONSTRUCT DIRECT CONNECTORS (PHASE 1)

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

IN1-17.28.1MTP REFERENCE:

13018MPO PROJECT ID:

REGIONAL 10-YEAR PLAN PROJECTProject History:

DALLAS DALLAS 0581-02-153 SL 12 E,R IRVING TXDOT-DALLAS

SOUTH OF SH 183

WIDEN 6 TO 8 GENERAL PURPOSE LANES AND RECONSTRUCT 4/6 LANE DISCONTINUOUS TO 4/6 LANE CONTINUOUS FRONTAGE ROADS (ULTIMATE)

IH 35E

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-17.10.1MTP REFERENCE:

54128MPO PROJECT ID:

RELATED TO TIP 54128.2/CSJ 0581-02-055Project History:

DALLAS DALLAS 0581-02-155 SL 12 E,R IRVING TXDOT-DALLAS

SOUTH OF SH 183

CONSTRUCT 2 TO 4 CONCURRENT HOV/MANAGED LANES

IH 35E

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-17.10.1MTP REFERENCE:

54128.2MPO PROJECT ID:

RELATED TO TIP 54128/CSJ 0581-02-153Project History:

DALLAS KAUFMAN 0751-05-001 FM 148 E,R CRANDALL TXDOT-DALLAS

SOUTH OF FM 3039

REALIGN EXISTING 2 LANE RURAL UNDIVIDED ROADWAY TO 2 LANE RURAL UNDIVIDED ROADWAY

US 175

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

NRSA1-DAL-175MTP REFERENCE:

83284MPO PROJECT ID:

2013 KAUFMAN COUNTY BOND PROGRAMProject History:

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

D.19

Page 20: Environmental Clearance and Out-Year Projects · 2020. 7. 20. · limits from: 07/2020 tip description: remarks: limits to: rev date: mtp reference: ft1-14.20.7, in1-14.153.1 mpo

DALLAS-FORT WORTH MPOFRIDAY, JULY 17, 2020

6:07:02 PM

PAGE: 10

RURAL PROJECTSAPPENDIX D

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR

DALLAS DISTRICT PROJECTS

FY 2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM

DALLAS DALLAS 0918-45-812 CS C IRVING IRVING

ON CONFLANS RD FROM SH 161

CONSTRUCT 0 TO 4 LANE DIVIDED FACILITY WITH NEW SIDEWALKS AND SHARED USE PATH

VALLEY VIEW LANE

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

NRSA1-DAL-11, BP2-002MTP REFERENCE:

11237.2MPO PROJECT ID:

2017 PE AUDIT PROJECTProject History:

DALLAS DALLAS 0918-47-073 CS C IRVING IRVING

IRVING BOULEVARD/2ND STREET FROM SOWERS ROAD

PLANNING AND IMPLEMENTATION STUDY FOR IRVING BOULEVARD/2ND STREET TO MOVE FROM TXDOT ON-SYSTEM TO CITY OF IRVING CONTROL; IMPLEMENTING COMPLETE STREETS THROUGH THE DOWNTOWN CORE

LEE STREET

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

SD2-004, BP2-001MTP REFERENCE:

83219MPO PROJECT ID:

CAT 10 IS EARMARK FUNDINGProject History:

DALLAS ROCKWALL 1016-01-023 FM 551 E,R FATE TXDOT-DALLAS

IH 30

RECONSTRUCT 2-LANE TO 3-LANE W/ CONTINUOUS LEFT TURN LANE

SH 66

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

TSMO2-001MTP REFERENCE:

53051MPO PROJECT ID:

Project History:

DALLAS ELLIS 1051-01-051 FM 664 C VARIOUS TXDOT-DALLAS

IH 35E

RECONSTRUCT AND WIDEN 2/4 LANE RURAL ROADWAY TO 6 LANE DIVIDED URBAN

WEST OF FERRIS ROAD

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

RSA1-2.710.300, RSA1-2.710.325MTP REFERENCE:

13035.1MPO PROJECT ID:

REGIONAL 10-YEAR PLAN PROJECT; RELATED TO TIP 13035.2/CSJ 1051-03-001

Project History:

DALLAS ELLIS 1051-01-052 FM 664 C MIDLOTHIAN TXDOT-DALLAS

FM 1387

RECONSTRUCT AND WIDEN 2 LANE RURAL TO 4 LANE DIVIDED URBAN ROADWAY (ULTIMATE 6 LANE)

WESTMORELAND ROAD

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

RSA1-1.563.200, RSA1-2.710.225MTP REFERENCE:

13028MPO PROJECT ID:

REGIONAL 10-YEAR PLAN PROJECTProject History:

DALLAS ELLIS 1051-03-001 FM 664 C FERRIS TXDOT-DALLAS

WEST OF FERRIS ROAD

REALIGN EXISTING 2 LANE RURAL UNDIVIDED ROADWAY TO A 6 LANE URBAN DIVIDED ROADWAY

IH 45

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

RSA1-2.710.325MTP REFERENCE:

13035.2MPO PROJECT ID:

REGIONAL 10-YEAR PLAN PROJECT; RELATED TO TIP 13035.1/CSJ 1051-01-051

Project History:

DALLAS DENTON 1311-01-055 FM 1171 R VARIOUS DENTON CO

IH 35W

CONSTRUCT NEW 0 TO 6 LANE DIVIDED ARTERIAL

LOCAL CONTRIBUTION PAID BY DENTON COUNTY

WEST OF FM 156

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

NRSA1-DAL-195MTP REFERENCE:

55218MPO PROJECT ID:

R PHASE IN FY 2023 IS FOR ROW, R PHASE IN APPENDIX D IS FOR UTILITIES

Project History:

DALLAS ELLIS 1394-02-027 FM 1387 C MIDLOTHIAN TXDOT-DALLAS

MIDLOTHIAN PARKWAY

RECONSTRUCT AND WIDEN FROM 2 LANE UNDIVIDED RURAL TO 4 LANE URBAN DIVIDED (ULTIMATE 6 LANE)

FM 664

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

NRSA1-DAL-193MTP REFERENCE:

13020MPO PROJECT ID:

REGIONAL 10-YEAR PLAN PROJECTProject History:

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

D.20

Page 21: Environmental Clearance and Out-Year Projects · 2020. 7. 20. · limits from: 07/2020 tip description: remarks: limits to: rev date: mtp reference: ft1-14.20.7, in1-14.153.1 mpo

DALLAS-FORT WORTH MPOFRIDAY, JULY 17, 2020

6:07:02 PM

PAGE: 11

RURAL PROJECTSAPPENDIX D

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR

DALLAS DISTRICT PROJECTS

FY 2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM

DALLAS DENTON 2250-02-014 SL 288 C DENTON TXDOT-DALLAS

US 380 WEST OF DENTON

CONSTRUCT 0 TO 2 LANE FRONTAGE ROADS (ULTIMATE 4 LANES)

LOCAL CONTRIBUTION PAID BY DENTON COUNTY

IH 35W SOUTH OF DENTON

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

RSA1-1.430.150MTP REFERENCE:

53075MPO PROJECT ID:

RELATED TO TIP 20175/CSJ 2250-02-013Project History:

DALLAS DALLAS 2374-01-192 IH 635 E,R DALLAS TXDOT-DALLAS

SL 354 (DENTON DRIVE)

CONSTRUCTION OF ULTIMATE IH 35E/IH 635 INTERCHANGE INCLUDING 4 CONCURRENT MANAGED LANES, 10 GENERAL PURPOSE LANES AND 4 DISCONTINUOUS FRONTAGE ROADS

BNSF RAILROAD

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

IN1-7.130.1, AO1-130.20.2MTP REFERENCE:

55163MPO PROJECT ID:

Project History:

DALLAS DALLAS 2374-01-193 IH 635 E DALLAS TXDOT-DALLAS

EAST OF US 75

WIDEN EXISTING 2 TO 4 CONCURRENT MANAGED LANES (ULTIMATE)

MILLER ROAD

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-131.10.1MTP REFERENCE:

55165.3MPO PROJECT ID:

LBJ EAST CORRIDORProject History:

DALLAS DALLAS 2374-01-194 IH 635 E DALLAS TXDOT-DALLAS

MILLER ROAD

WIDEN EXISTING 2 TO 4 CONCURRENT MANAGED LANES (ULTIMATE)

WEST OF THE KCS RR (WEST OF SH 78)

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-131.10.2MTP REFERENCE:

55060.3MPO PROJECT ID:

LBJ EAST CORRIDORProject History:

DALLAS DALLAS 2374-02-158 IH 635 E GARLAND TXDOT-DALLAS

WEST OF THE KCS RR (WEST OF SH 78)

WIDEN EXISTING 2 TO 4 CONCURRENT MANAGED LANES (ULTIMATE)

IH 30

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-131.10.2, FT1-131.10.3MTP REFERENCE:

55075.4MPO PROJECT ID:

LBJ EAST CORRIDORProject History:

DALLAS DALLAS 2374-04-085 IH 20 C VARIOUS TXDOT-DALLAS

WEST OF COCKRELL HILL RD

CONSTRUCT 0 TO 4 LANE FRONTAGE ROAD

HAMPTON RD

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

NRSA1-30.80.5, NRSA1-30.80.6, FT3-014

MTP REFERENCE:

55240MPO PROJECT ID:

REGIONAL 10-YEAR PLAN PROJECTProject History:

DALLAS DALLAS 2374-07-063 IH 635 E COPPELL TXDOT-DALLAS

ROYAL LANE

CONSTRUCT 0 TO 2 LANE WB FRONTAGE ROAD AND RAMP MODIFICATIONS

LOCAL CONTRIBUTION TO BE PAID BY COPPELL

WEST OF BELT LINE RD

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

NRSA1-130.10.2, TSMO2-005MTP REFERENCE:

54047MPO PROJECT ID:

Project History:

DALLAS DALLAS 2374-07-075 IH 635 E,R DALLAS TXDOT-DALLAS

WEST OF LUNA ROAD

RECONSTRUCTION OF IH 35E/IH 635 INTERCHANGE INCLUDING 0 TO 4 CONCURRENT MANAGED LANES, 10 TO 10 GENERAL PURPOSE LANES, AND 4 TO 4/6 CONTINUOUS FRONTAGE ROADS

BNSF RAILROAD

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

AO1-130.20.2MTP REFERENCE:

55164MPO PROJECT ID:

Project History:

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

D.21

Page 22: Environmental Clearance and Out-Year Projects · 2020. 7. 20. · limits from: 07/2020 tip description: remarks: limits to: rev date: mtp reference: ft1-14.20.7, in1-14.153.1 mpo

DALLAS-FORT WORTH MPOFRIDAY, JULY 17, 2020

6:07:03 PM

PAGE: 12

RURAL PROJECTSAPPENDIX D

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR

DALLAS DISTRICT PROJECTS

FY 2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM

DALLAS KAUFMAN 2588-01-017 FM 548 C FORNEY TXDOT-DALLAS

WINDMILL FARMS BLVD

WIDEN AND RECONSTRUCT 2 LANE RURAL TO 4 LANE URBAN DIVIDED (6 LANE ULTIMATE)

S OF SH 205 (ROCKWALL C/L)

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

NRSA1-DAL-169MTP REFERENCE:

55111MPO PROJECT ID:

REGIONAL 10-YEAR PLAN PROJECT; RELATED TO TIP 55111.2/CSJ 2588-01-022

Project History:

DALLAS COLLIN 2845-01-014 FM 455 E,R ANNA TXDOT-DALLAS

WILDWOOD TRAIL

WIDEN FACILITY TO 4 LANE URBAN DIVIDED (ULTIMATE 6 LANE DIVIDED)

SH 121

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

NRSA1-DAL-51MTP REFERENCE:

52559MPO PROJECT ID:

Project History:

DALLAS COLLIN 2845-01-020 FM 455 E,R ANNA TXDOT-DALLAS

SH 5

RECONSTRUCT AND WIDEN 2 TO 4 LANE URBAN DIVIDED (ULTIMATE 6 LANES)

EAST OF WILDWOOD TRAIL

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

NRSA1-DAL-306MTP REFERENCE:

55238MPO PROJECT ID:

Project History:

DALLAS DALLAS 2964-06-011 SH 190 E,R VARIOUS NTTA

IH 30

CONSTRUCT 0 TO 6 LANE TOLLWAY AND 0 TO 4 LANE DISCONTINUOUS FRONTAGE ROADS

US 80

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-39.10.1MTP REFERENCE:

54015MPO PROJECT ID:

PGBT EAST BRANCHProject History:

DALLAS DALLAS 2964-06-012 SH 190 E VARIOUS NTTA

US 80

CONSTRUCT 0 TO 6 LANE TOLLWAY AND 0 TO 4 LANE DISCONTINOUS FRONTAGE ROADS

IH 20

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-39.10.1MTP REFERENCE:

54070MPO PROJECT ID:

EIS ONGOING; PBGT EAST BRANCHProject History:

DALLAS DALLAS 2964-10-005 SL 9 E,R VARIOUS TXDOT-DALLAS

SL 9 (SOUTHEAST CORRIDOR) FROM IH 35E

CONSTRUCT 2 TO 6 LANE FRONTAGE ROADS (ULTIMATE)

IH 45

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-6.30.1, RSA1-2.700.225MTP REFERENCE:

54119MPO PROJECT ID:

REGIONAL 10-YEAR PLAN PROJECT; RELATED TO TIP 54119.1/CSJ 2964-10-008, 54119.2/2964-10-009, 54119.3/2964-12-001, 54119.4/2964-12-002, 54119.5/0442-02-162, 54119.6/0442-03-044, & 55249/0092-02-130

Project History:

DALLAS DALLAS 2964-10-006 SL 9 E,R VARIOUS TXDOT-DALLAS

US 67

CONSTRUCT 0 TO 2 (ULTIMATE 6) LANE FRONTAGE ROADS

IH 35E

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-6.20.1MTP REFERENCE:

55105MPO PROJECT ID:

PRIOR CSJ 2964-10-901Project History:

DALLAS DALLAS 2964-10-012 SL 9 E,R VARIOUS TXDOT-DALLAS

IH 45

CONSTRUCT 0 TO 2 (ULTIMATE 6) LANE FRONTAGE ROADS

IH 20

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

FT1-6.40.1, FT1-6.50.1MTP REFERENCE:

55106MPO PROJECT ID:

Project History:

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

D.22

Page 23: Environmental Clearance and Out-Year Projects · 2020. 7. 20. · limits from: 07/2020 tip description: remarks: limits to: rev date: mtp reference: ft1-14.20.7, in1-14.153.1 mpo

2021-2024 Transportation Improvement Program

North Central Texas Council of Governments DFW Metropolitan Planning Organization

Environmental Clearance Projects Paris District

D.23

Page 24: Environmental Clearance and Out-Year Projects · 2020. 7. 20. · limits from: 07/2020 tip description: remarks: limits to: rev date: mtp reference: ft1-14.20.7, in1-14.153.1 mpo

this is a blank page

T h i s p a g e i s i n t e n t i o n a l l y b l a n k

D.24

Page 25: Environmental Clearance and Out-Year Projects · 2020. 7. 20. · limits from: 07/2020 tip description: remarks: limits to: rev date: mtp reference: ft1-14.20.7, in1-14.153.1 mpo

DALLAS-FORT WORTH MPOTHURSDAY, JULY 16, 2020

3:24:28 PM

PAGE: 1

RURAL PROJECTSAPPENDIX D

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR

PARIS DISTRICT PROJECTS

FY 2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM

PARIS HUNT 0009-13-173 IH 30 C VARIOUS TXDOT-PARIS

WEST OF FM 1903

RECONSTRUCT OVERPASS AND APPROACHES

EAST OF FM 1903

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

MO3-002, IN1-28.535.1MTP REFERENCE:

55223MPO PROJECT ID:

REGIONAL 10-YEAR PLAN PROJECTProject History:

PARIS HUNT 0768-01-057 SH 24/SH 11 C COMMERCE TXDOT-PARIS

CULVER ST TO LIVE OAK ST AND SH 11 FROM SH 24 TO MONROE ST

CONSTRUCT PEDESTRIAN SAFETY AND TRAFFIC CALMING IMPROVEMENTS

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

BP2-002, MO3-001MTP REFERENCE:

13053MPO PROJECT ID:

REGIONAL 10-YEAR PLAN PROJECTProject History:

PARIS HUNT 2658-01-013 FM 2642 C ROYSE CITY TXDOT-PARIS

FM 35

WIDEN 2 LANE TO 4 LANE DIVIDED URBAN WITH SIDEWALKS

SH 66

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

NRSA1-PAR-6MTP REFERENCE:

13039MPO PROJECT ID:

REGIONAL 10-YEAR PLAN PROJECTProject History:

PARIS HUNT 2659-01-010 FM 1570 C GREENVILLE TXDOT-PARIS

IH 30

CONSTRUCT 2 LANE TO 4 LANE DIVIDED WITH SHOULDERS (HMAC PAVEMENT AND RR CROSSING) NORTH PROJECT

SH 66

07/2020LIMITS FROM:

TIP DESCRIPTION:

REMARKS:

LIMITS TO:

REV DATE:

NRSA1-PAR-7MTP REFERENCE:

13052MPO PROJECT ID:

REGIONAL 10-YEAR PLAN PROJECTProject History:

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

D.25