COMPANY OVERVIEW
www envambien comwww.envambien.com
INDEX
ENVAMBIEN S.A.ENVAMBIEN S.A.ServicesProject Execution ModelProject Execution ModelReferences and QualificationsThe ENVAMBIEN WayThe ENVAMBIEN Way
2
ENVAMBIEN S.A.
3
THE COMPANY
ENVAMBIEN S.A. is an Environmental Engineering and Consulting ServicesCompany that designs develops and applies customized solutions for theCompany that designs, develops and applies customized solutions for thespecific challenges experienced by our clients.
ENVAMBIEN S.A. is a team of professionals with expertise in a wide range ofENVAMBIEN S.A. is a team of professionals with expertise in a wide range ofEngineering disciplines and extensive experience related to EnvironmentalSciences.
Headquarters in Malveira, Portugal. We are a member of the international groupAdvanced Environmental Resources (AER), holder of a portfolio of differentenvironmental companies, with offices in U S A , Saudi Arabia and Luxembourgenvironmental companies, with offices in U.S.A., Saudi Arabia and Luxembourg.
The ENVAMBIEN Way: we build relationships with our clients. We are committed toquality, professionalism, and partnership at all times, from project design toimplementation.
4
SERVICES
5
SERVICES
Water and Wastewater Treatment Plants(WTP and WWTP)(WTP and WWTP)Project Design and Construction
Plant Maintenance and RenovationPlant Rehabilitation, Revamping and Requalification of Existing Plants
Environmental Biofuels ConsultingEnvironmental Processes, Biodiesel and Bioalcohol
6
SERVICES
WATER AND WASTEWATER TREATMENT PLANTS
Design and Build Plants for Primary , Secondary and Tertiary Treatment of Effluents:
Domestic
Food and Beverage Industry
Chemical and Pharmaceutical Industry
Ceramic and Textile IndustryCeramic and Textile Industry
Other Domestic and Industrial Effluents
7
SERVICES
MAINTENANCE AND RENOVATION
Design, Planning and Execution for:
Rehabilitation and Requalification of Pre-existing Installations
Plant O erha l Moderni ation and E pansionPlant Overhaul, Modernization and Expansion
Maintenance and Technical Assistance:Maintenance and Technical Assistance:
Routine Preventive
Scheduled Overhaul
TroubleshootingTroubleshooting
Efficiencies
8
SERVICES
ENVIRONMENTAL BIOFUELS CONSULTING
Consulting Projects for:
Environmental Needs Analysis
Water and Wastewater Management Planning
Environmental Viability Studies
Process Optimization and Viability Analysis Process Optimization and Viability Analysis (for Biodiesel and Bioalcohol Processes)
Heat and Power Integration Heat and Power Integration (for Biodiesel and Bioalcohol Processes)
9
PROJECT EXECUTION MODEL
10
PROJECT EXECUTION MODEL
ENVAMBIEN S.A. is committed to deliver safe and predictable projectsth h t th t lif l f d l i d i t d fi itithroughout the asset life cycle, from needs analysis and requirements definitionthrough design and engineering, to procurement and project delivery withclient acceptance. Once operational, ENVAMBIEN S.A. can assist with
it i f d i t f ti l ffi imonitoring performance and maintenance for optimal efficiency.
epta
nce
epta
nce
epta
nce
Client Acceptance
Scope Definition
Clie
nt A
cce
Clie
nt A
cce
Clie
nt A
cce
Tendering System Design
ProcurementConstruction
AssemblyCompletion Operation
AssemblyInternal Knowledge &
Learned Lessons
Client Requirements:- Operation
- Maintenance
11
REFERENCES AND QUALIFICATIONS
12
PROJECTS DEVELOPED WITH PARTICIPATION OF OUR TEAM
ENVIRONMENT WWTP’S AND WTP’S
Areas Project Description References
Domestic Effluents
Environmental Diagnosis, Design, Engineering Project.WWTP with Aerobic Biological Treatment Systems
• Project/Construction Celeirós WWTP (Portugal) 4 000 m3/day
• Project/Construction Sousel WWTP (Portugal) -2 500 m3/day
• Project/Construction Pegões (Portugal) -Effluents WWTP with Aerobic Biological Treatment Systems. j g ( g )1 500 m3/day
• Design Project Dhuba WWTP (Saudi Arabia) • Design Project Al-Baha WWTP (Saudi Arabia) -
16 200 m3/day
Water and Beverage Industry
Environmental Diagnosis, Design, Detailed Engineering Project, Project Management, Installation and Start-Up.
• Design Project Planalto Beirão WWTP (Portugal)• Conception Project Unicer WWTP (Portugal)
Wine-MakingIndustry
Design, Project, Project Management, Installation, Start-up and Maintenance.WWTP with Aerobic Biological Treatment Systems.
• Project/Construction A.C. de Dois Portos WWTP (Portugal)• Project/Construction A.C. Santa Marta WWTP (P t l) e ob c o og ca ea e Sys e s. (Portugal)
13
PROJECTS DEVELOPED WITH PARTICIPATION OF OUR TEAM
ENVIRONMENT WWTP’S AND WTP’S (CONT.)
Areas Project Description References
Food ProcessingIndustry
WWTP Design for Several Food Industries (chips, nuts and peanuts, meat processing, etc.)WWTP M t S t I l t ti
• Monitoring System Matutano WWTP (Portugal)• Design Project Lays WWTP (Saudi Arabia) -
60m3/day• Design Project Raporal WWTP (Portugal)• Project/Construction Azevedo dos Leitõesy WWTP Management System Implementation. j /
WWTP (Portugal)• Project/Construction Ouricoelho WWTP
(Portugal)
PharmaceuticalIndustry
WWTP Design for Antibiotic Effluent Treatment.Biological System Treatment with No Sludge Excess Production.
• Design Project Bioton WWTP (Poland) • Design Project Atral-Cipan (Portugal)
Dairy Industry
Environmental Diagnosis, Design, Project, Project Management, Installation, Start-up and Maintenance.Treatment System with Biogas Production.
• Project/Construction Lacticínio Marofa WWTP (Portugal)
• Project/Construction Lactovil WWTP (Portugal)• Project/Construction Lactejo WWTP (Portugal)
14
PROJECTS DEVELOPED WITH PARTICIPATION OF OUR TEAM
ENVIRONMENT WWTP’S AND WTP’S (CONT.)
Areas Project Description References
HospitalityIndustry
Design, Detailed Engineering, Project Engineering, Installation and Start-up.WWTP with Biological Treatment.
• Project/Construction Empreendimento TurismoRural Barrancos WWTP (Portugal) – 10 m3/day
• Project/Construction Convento do EspinheiroHeritage Hotel & SPA WWTP (Portugal) –60 m3/day.y
Textile Industry
Project Design for WWTP for Textile Industry.WWTP with Physical-Chemical Treatment.
• Design Project Washnah WWTP (Saudi Arabia) - 200 m3/day
Dye and PigmentsIndustry
Environmental Diagnosis, Project, Project Management, Installation and Start-Up.WWTP with Physical-Chemical Treatment.
• Project/Construction Idealtom WWTP (Portugal)
Chemical Industry
Design, Construction and Exploitation of Reed Bedsfor Removal of Nitro-Aromatic Compounds. • Project/Construction Quimigal WWTP (Portugal)
H d Project for the Industrial Complex for Collecting,HazardousResidues
Project for the Industrial Complex for Collecting,Evaluation and Treatment of Dangerous IndustrialResidues.
• Project SISAV (Portugal) - 20 000 ton/year
15
PROJECTS DEVELOPED WITH PARTICIPATION OF OUR TEAM
ENVIRONMENT BIOFUELS
Areas Project Description References
Biodiesel Production
Environmental Analysis, Design, Engineering Project and Economic Feasibility Evaluation.
• Project P. Duarte (Portugal) -10 000 ton/year• Project BB-Diesel (Portugal) - 20 000 ton/year• Project Sisav (Portugal) - 35 000 ton/year• Project EPS (Malasya) - 450 ton/year• Project DPHI (France) - 450 ton/yearj ( ) y• Project Lipor (Portugal) - 900 ton/year
Glycerine Recovery from
Design of Purifying Glycerine Systems, Subproduct of Biodiesel Production. • Project BB-Diesel (Portugal) - 400 L/hour
Biodiesel Purification
Final Stage for Glycerine Purification to Pharmaceutical Grade.
• Project Bioking (Holland) - 70 kg/hour
Methanol R f D i f M th l P if i S t f Bi di l
• Design Project BB-Diesel (Portugal) -400 L/hRecovery from
Biodiesel Production
Design of Methanol Purifying Systems for Biodiesel Production Plants.
400 L/hour• Design Project Bioking (Holland) -
70 kg/hour
Design of Purifying Biodiesel Systems Biodiesel Biodiesel Purification
Design of Purifying Biodiesel Systems. Biodiesel Purifying System for Water, Methanol and Glycerine Removal to EN-14214 Standards Fulfilment.
• Project BB-Diesel (Portugal) - 2 000 L/hour• Project BioKing (Holland) - 3 600 L/hour
16
PROJECTS DEVELOPED WITH PARTICIPATION OF OUR TEAM
ENVIRONMENT BIOFUELS (CONT.)
Areas Project Description References
Bioethanol Production
Design, Base Project, Engineering Project and Economical Evaluation.
• Design Project Derbio (Portugal) -10 000 m3/year
• Design Project Enersis (Portugal) -30 000 m3/year
• Design Project CME (Portugal) -g j ( g )30 000 m3/year
• Design Project Decov (Portugal) -100 000 m3/year
Bioethanol Purification
System Design, Dimensioning and Economical Evaluation. Process Conception and Energetic Optimization.
• Design Project Derbio (Portugal) -2 200 m3/year
P j t/C t ti H i Fi i dDistillation Process Optimization
Environmental Diagnosis, Design, Engineering Project, Project Management, Installation, Start-Up and Maintenance.
• Project/Construction Henrique Figueiredo(Portugal) - 1 000 m3/year
• Design Project Decov (Portugal) -5 000 m3/year
17
THE ENVAMBIEN WAY
18
THE ENVAMBIEN WAY
ENVAMBIEN S.A. will provide our partners with high quality engineering services
and advanced technological solutions for current and future environmental
challenges.
ENVAMBIEN S.A.
Continuously contributing to sustained environmental development.
19
advanced environmental management
Edifício Terraços do Sol, 11D Estrada Nacional N8 2665-258 Malveira PortugalT: +351 918 637 400 F: +351 219 663 624H: www.envambien.com