159
ANSONIA VILLAGE PWS OH1900012 ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE Community System Type: Operating Period: to 1/1 12/31 Sampling Location Facility ID: SMP ID: 1953744 EP001 Facility Name: ANSONIA VILLAGE Effective Date: 01/01/2016 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM. Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Also, monitoring schedules may be revised during the year based on sampling results. For water emergencies that occur after hours, please call 800-282-9378 ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016 Chemicals Monitoring Requirements Facility Class: CLASS 1 Facility Source: Ground Water Not Required INORGANICS Not Required NITRITE - 1041 Sample(s) Required between NITRATE - 1040 1 and 1/1/2016 5/31/2016 Not Required RADIOLOGICALS Not Required SYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 Not Required VOLATILE ORGANIC CHEMICALS (VOC)

ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

ANSONIA VILLAGE PWSOH1900012

ENTRY POINT MONITORING SCHEDULE

2016 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

1953744EP001

Facility Name: ANSONIA VILLAGE

Effective Date: 01/01/2016

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2016 5/31/2016

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 2: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

ANSONIA VILLAGE PWSOH1900012

2016 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: ANSONIA, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1

LEAD - 1030 AND COPPER - 1022 Not Required

2TOTAL COLIFORM (TCR) - 3100 Sample(s) Required between 1/1/2016 and 1/31/20162 Sample(s) Required between 2/1/2016 and 2/29/20162 Sample(s) Required between 3/1/2016 and 3/31/20162 Sample(s) Required between 4/1/2016 and 4/30/20162 Sample(s) Required between 5/1/2016 and 5/31/20162 Sample(s) Required between 6/1/2016 and 6/30/20162 Sample(s) Required between 7/1/2016 and 7/31/20162 Sample(s) Required between 8/1/2016 and 8/31/20162 Sample(s) Required between 9/1/2016 and 9/30/20162 Sample(s) Required between 10/1/2016 and 10/31/20162 Sample(s) Required between 11/1/2016 and 11/30/20162 Sample(s) Required between 12/1/2016 and 12/31/2016

2TOTAL CHLORINE - 1000 Sample(s) Required between 1/1/2016 and 1/31/20162 Sample(s) Required between 2/1/2016 and 2/29/20162 Sample(s) Required between 3/1/2016 and 3/31/20162 Sample(s) Required between 4/1/2016 and 4/30/20162 Sample(s) Required between 5/1/2016 and 5/31/20162 Sample(s) Required between 6/1/2016 and 6/30/20162 Sample(s) Required between 7/1/2016 and 7/31/20162 Sample(s) Required between 8/1/2016 and 8/31/20162 Sample(s) Required between 9/1/2016 and 9/30/20162 Sample(s) Required between 10/1/2016 and 10/31/20162 Sample(s) Required between 11/1/2016 and 11/30/20162 Sample(s) Required between 12/1/2016 and 12/31/2016

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: ANSONIA, VILLAGE OF DISTRIBUTIONADDRESS NOT KNOWN

Facility Class: CLASS 1

at SMP: DS2011DISINFECTION BYPRODUCTS Sample(s) Required between 7/1/2016 and 9/30/2016Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Page 3: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

ANSONIA VILLAGE PWSOH1900012

2016 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS202

Facility Name: ANSONIA, VILLAGE OF DISTRIBUTIONADDRESS NOT KNOWN

Facility Class: CLASS 1

at SMP: DS2021DISINFECTION BYPRODUCTS Sample(s) Required between 7/1/2016 and 9/30/2016Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Page 4: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

ARCANUM VILLAGE PWSOH1900112

ENTRY POINT MONITORING SCHEDULE

2016 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

1953745EP001

Facility Name: ARCANUM VILLAGE

Effective Date: 01/01/2016

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2016 5/31/2016

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 5: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

ARCANUM VILLAGE PWSOH1900112

2016 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: ARCANUM,VILLAGE OF DISTRIBUTION Facility Class: CLASS 1

LEAD - 1030 AND COPPER - 1022 Not Required

2TOTAL COLIFORM (TCR) - 3100 Sample(s) Required between 1/1/2016 and 1/31/20162 Sample(s) Required between 2/1/2016 and 2/29/20162 Sample(s) Required between 3/1/2016 and 3/31/20162 Sample(s) Required between 4/1/2016 and 4/30/20162 Sample(s) Required between 5/1/2016 and 5/31/20162 Sample(s) Required between 6/1/2016 and 6/30/20162 Sample(s) Required between 7/1/2016 and 7/31/20162 Sample(s) Required between 8/1/2016 and 8/31/20162 Sample(s) Required between 9/1/2016 and 9/30/20162 Sample(s) Required between 10/1/2016 and 10/31/20162 Sample(s) Required between 11/1/2016 and 11/30/20162 Sample(s) Required between 12/1/2016 and 12/31/2016

2TOTAL CHLORINE - 1000 Sample(s) Required between 1/1/2016 and 1/31/20162 Sample(s) Required between 2/1/2016 and 2/29/20162 Sample(s) Required between 3/1/2016 and 3/31/20162 Sample(s) Required between 4/1/2016 and 4/30/20162 Sample(s) Required between 5/1/2016 and 5/31/20162 Sample(s) Required between 6/1/2016 and 6/30/20162 Sample(s) Required between 7/1/2016 and 7/31/20162 Sample(s) Required between 8/1/2016 and 8/31/20162 Sample(s) Required between 9/1/2016 and 9/30/20162 Sample(s) Required between 10/1/2016 and 10/31/20162 Sample(s) Required between 11/1/2016 and 11/30/20162 Sample(s) Required between 12/1/2016 and 12/31/2016

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: ARCANUM,VILLAGE OF DISTRIBUTION208 SOUTH MAIN STREET (FIREHOUSE)

Facility Class: CLASS 1

at SMP: DS2011DISINFECTION BYPRODUCTS Sample(s) Required between 7/1/2016 and 9/30/2016Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Page 6: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

ARCANUM VILLAGE PWSOH1900112

2016 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS202

Facility Name: ARCANUM,VILLAGE OF DISTRIBUTION605 NORTH MAIN STREET (GROCERY)

Facility Class: CLASS 1

at SMP: DS2021DISINFECTION BYPRODUCTS Sample(s) Required between 7/1/2016 and 9/30/2016Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Page 7: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

BRADFORD VILLAGE PWSOH1900212

ENTRY POINT MONITORING SCHEDULE

2016 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

1953746EP001

Facility Name: BRADFORD WTP

Effective Date: 07/15/2016

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

Sample(s) Required betweenARSENIC - 1005 1 and7/1/2016 9/30/2016Sample(s) Required between1 and10/1/2016 12/31/2016

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2016 5/31/2016

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 8: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

BRADFORD VILLAGE PWSOH1900212

2016 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: BRADFORD, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1

LEAD - 1030 AND COPPER - 1022 Not Required

ASBESTOS - 1094 Not Required

2TOTAL COLIFORM (TCR) - 3100 Sample(s) Required between 1/1/2016 and 1/31/20162 Sample(s) Required between 2/1/2016 and 2/29/20162 Sample(s) Required between 3/1/2016 and 3/31/20162 Sample(s) Required between 4/1/2016 and 4/30/20162 Sample(s) Required between 5/1/2016 and 5/31/20162 Sample(s) Required between 6/1/2016 and 6/30/20162 Sample(s) Required between 7/1/2016 and 7/31/20162 Sample(s) Required between 8/1/2016 and 8/31/20162 Sample(s) Required between 9/1/2016 and 9/30/20162 Sample(s) Required between 10/1/2016 and 10/31/20162 Sample(s) Required between 11/1/2016 and 11/30/20162 Sample(s) Required between 12/1/2016 and 12/31/2016

2TOTAL CHLORINE - 1000 Sample(s) Required between 1/1/2016 and 1/31/20162 Sample(s) Required between 2/1/2016 and 2/29/20162 Sample(s) Required between 3/1/2016 and 3/31/20162 Sample(s) Required between 4/1/2016 and 4/30/20162 Sample(s) Required between 5/1/2016 and 5/31/20162 Sample(s) Required between 6/1/2016 and 6/30/20162 Sample(s) Required between 7/1/2016 and 7/31/20162 Sample(s) Required between 8/1/2016 and 8/31/20162 Sample(s) Required between 9/1/2016 and 9/30/20162 Sample(s) Required between 10/1/2016 and 10/31/20162 Sample(s) Required between 11/1/2016 and 11/30/20162 Sample(s) Required between 12/1/2016 and 12/31/2016

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: BRADFORD, VILLAGE OF DISTRIBUTIONADDRESS NOT KNOWN

Facility Class: CLASS 1

at SMP: DS2011DISINFECTION BYPRODUCTS Sample(s) Required between 7/1/2016 and 9/30/2016Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Page 9: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

BRADFORD VILLAGE PWSOH1900212

2016 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS202

Facility Name: BRADFORD, VILLAGE OF DISTRIBUTIONADDRESS NOT KNOWN

Facility Class: CLASS 1

at SMP: DS2021DISINFECTION BYPRODUCTS Sample(s) Required between 7/1/2016 and 9/30/2016Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Page 10: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

GETTYSBURG VILLAGE PWSOH1900512

ENTRY POINT MONITORING SCHEDULE

2016 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

1953747EP001

Facility Name: GETTYSBURG VILLAGE

Effective Date: 01/01/2016

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2016 5/31/2016

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 11: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

GETTYSBURG VILLAGE PWSOH1900512

2016 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: GETTYSBURG, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1

10LEAD - 1030 AND COPPER - 1022 Sample(s) Required between 6/1/2016 and 9/30/2016

Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx

ASBESTOS - 1094 Not Required

1TOTAL COLIFORM (TCR) - 3100 Sample(s) Required between 1/1/2016 and 1/31/20161 Sample(s) Required between 2/1/2016 and 2/29/20161 Sample(s) Required between 3/1/2016 and 3/31/20161 Sample(s) Required between 4/1/2016 and 4/30/20161 Sample(s) Required between 5/1/2016 and 5/31/20161 Sample(s) Required between 6/1/2016 and 6/30/20161 Sample(s) Required between 7/1/2016 and 7/31/20161 Sample(s) Required between 8/1/2016 and 8/31/20161 Sample(s) Required between 9/1/2016 and 9/30/20161 Sample(s) Required between 10/1/2016 and 10/31/20161 Sample(s) Required between 11/1/2016 and 11/30/20161 Sample(s) Required between 12/1/2016 and 12/31/2016

1TOTAL CHLORINE - 1000 Sample(s) Required between 1/1/2016 and 1/31/20161 Sample(s) Required between 2/1/2016 and 2/29/20161 Sample(s) Required between 3/1/2016 and 3/31/20161 Sample(s) Required between 4/1/2016 and 4/30/20161 Sample(s) Required between 5/1/2016 and 5/31/20161 Sample(s) Required between 6/1/2016 and 6/30/20161 Sample(s) Required between 7/1/2016 and 7/31/20161 Sample(s) Required between 8/1/2016 and 8/31/20161 Sample(s) Required between 9/1/2016 and 9/30/20161 Sample(s) Required between 10/1/2016 and 10/31/20161 Sample(s) Required between 11/1/2016 and 11/30/20161 Sample(s) Required between 12/1/2016 and 12/31/2016

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: GETTYSBURG, VILLAGE OF DISTRIBUTIONADDRESS NOT KNOWN

Facility Class: CLASS 1

at SMP: DS2011DISINFECTION BYPRODUCTS Sample(s) Required between 3/8/2016 and 3/14/2016at SMP: DS2011 Sample(s) Required between 6/8/2016 and 6/14/2016at SMP: DS2011 Sample(s) Required between 9/8/2016 and 9/14/2016

Page 12: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

GETTYSBURG VILLAGE PWSOH1900512

2016 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: GETTYSBURG, VILLAGE OF DISTRIBUTIONADDRESS NOT KNOWN

Facility Class: CLASS 1

at SMP: DS2011DISINFECTION BYPRODUCTS Sample(s) Required between 12/8/2016 and 12/14/2016Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS202

Facility Name: GETTYSBURG, VILLAGE OF DISTRIBUTIONADDRESS NOT KNOWN

Facility Class: CLASS 1

at SMP: DS2021DISINFECTION BYPRODUCTS Sample(s) Required between 3/8/2016 and 3/14/2016at SMP: DS2021 Sample(s) Required between 6/8/2016 and 6/14/2016at SMP: DS2021 Sample(s) Required between 9/8/2016 and 9/14/2016at SMP: DS2021 Sample(s) Required between 12/8/2016 and 12/14/2016

Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Page 13: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

GREENVILLE CITY PWSOH1900714

ENTRY POINT MONITORING SCHEDULE

2016 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

1953749EP001

Facility Name: GREENVILLE WTP

Effective Date: 05/13/2016

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016

Chemicals Monitoring Requirements

Facility Class: CLASS 3Facility Source: Surface Water

Sample(s) Required betweenINORGANICS 1 and1/1/2016 5/31/2016Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2016 1/31/2016Sample(s) Required between1 and2/1/2016 2/29/2016Sample(s) Required between1 and3/1/2016 3/31/2016Sample(s) Required between1 and4/1/2016 4/30/2016Sample(s) Required between1 and5/1/2016 5/31/2016Sample(s) Required between1 and6/1/2016 6/30/2016Sample(s) Required between1 and7/1/2016 7/31/2016Sample(s) Required between1 and8/1/2016 8/31/2016Sample(s) Required between1 and9/1/2016 9/30/2016Sample(s) Required between1 and10/1/2016 10/31/2016Sample(s) Required between1 and11/1/2016 11/30/2016Sample(s) Required between1 and12/1/2016 12/31/2016

Not RequiredRADIOLOGICALS

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 and4/1/2016 4/30/2016Sample(s) Required between1 and5/1/2016 5/31/2016Sample(s) Required between1 and6/1/2016 6/30/2016

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2016 5/31/2016

Paired Sample Set Required betweenTOTAL ORGANIC CARBON (TOC) 1 and1/1/2016 1/31/2016Paired Sample Set Required between1 and2/1/2016 2/29/2016Paired Sample Set Required between1 and3/1/2016 3/31/2016Paired Sample Set Required between1 and4/1/2016 4/30/2016Paired Sample Set Required between1 and5/1/2016 5/31/2016Paired Sample Set Required between1 and6/1/2016 6/30/2016Paired Sample Set Required between1 and7/1/2016 7/31/2016Paired Sample Set Required between1 and8/1/2016 8/31/2016Paired Sample Set Required between1 and9/1/2016 9/30/2016Paired Sample Set Required between1 and10/1/2016 10/31/2016Paired Sample Set Required between1 and11/1/2016 11/30/2016Paired Sample Set Required between1 and12/1/2016 12/31/2016

A paired sample set refers to one source water and one treated water sample. A source water alkalinity is also required at thesame time the TOC sample is taken.

Page 14: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

GREENVILLE CITY PWSOH1900714

ENTRY POINT MONITORING SCHEDULE

2016 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

1953749EP001/LT2001

Facility Name: GREENVILLE WTP

Effective Date: 05/13/2016

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016

Chemicals Monitoring Requirements

Facility Class: CLASS 3Facility Source: Surface Water

Sample Set Required WEEKLYstarting June 5

TOTAL MICROCYSTINS 1

Total microcystins sample set refers to one raw source water sample at LT2001 and one finished water sample at EP001. Both arerequired every week from January 1 to December 31 (reduced monitoring available from November to April). A week is defined asSunday through Saturday. Samples must be analyzed at a lab accepted by Ohio EPA for microcystins analysis.

Page 15: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

GREENVILLE CITY PWSOH1900714

ENTRY POINT MONITORING SCHEDULE

2016 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

1953749LT2001

Facility Name: GREENVILLE WTP

Effective Date: 05/13/2016

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016

Chemicals Monitoring Requirements

Facility Class: CLASS 3Facility Source: Surface Water

Sample(s) Required betweenCYANOBACTERIA SCREENING 1 and6/5/2016 6/11/2016Sample(s) Required between1 and6/19/2016 6/25/2016Sample(s) Required between1 and7/3/2016 7/9/2016Sample(s) Required between1 and7/17/2016 7/23/2016Sample(s) Required between1 and7/31/2016 8/6/2016Sample(s) Required between1 and8/14/2016 8/20/2016Sample(s) Required between1 and8/28/2016 9/3/2016Sample(s) Required between1 and9/11/2016 9/17/2016Sample(s) Required between1 and9/25/2016 10/1/2016Sample(s) Required between1 and10/9/2016 10/15/2016Sample(s) Required between1 and10/23/2016 10/29/2016Sample(s) Required between1 and11/6/2016 11/12/2016Sample(s) Required between1 and11/20/2016 11/26/2016Sample(s) Required between1 and12/4/2016 12/10/2016Sample(s) Required between1 and12/18/2016 12/24/2016

Cyanobacteria screening sample is to be collected biweekly from raw source water at sample point LT2001 and must be collectedat the same time as the raw total microcystins sample. SAMPLES MUST BE SHIPPED OVERNIGHT ON ICE ON THE DAY OFCOLLECTION AND ARRIVE AT OHIO EPA DIVISION OF ENVIRONMENTAL SERVICES BY NOON MONDAY THROUGH THURSDAYONLY!

Sample(s) Required betweenLT2 MONITORING 1 and1/4/2016 1/8/2016Sample(s) Required between1 and2/1/2016 2/5/2016Sample(s) Required between1 and3/7/2016 3/11/2016Sample(s) Required between1 and4/4/2016 4/8/2016Sample(s) Required between1 and5/2/2016 5/6/2016Sample(s) Required between1 and6/6/2016 6/10/2016Sample(s) Required between1 and7/4/2016 7/8/2016Sample(s) Required between1 and8/1/2016 8/5/2016Sample(s) Required between1 and9/5/2016 9/9/2016Sample(s) Required between1 and10/3/2016 10/7/2016Sample(s) Required between1 and11/7/2016 11/11/2016Sample(s) Required between1 and12/5/2016 12/9/2016

Monitor for: Cryptosporidium - 2078, E-coli count - 3014, Turbidity - 0100

Sample(s) Required betweenLT2 MATRIX SPIKE SAMPLE 1 and1/4/2016 1/8/2016

Page 16: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

GREENVILLE CITY PWSOH1900714

2016 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: GREENVILLE, CITY OF DISTRIBUTION Facility Class: CLASS 1

30LEAD - 1030 AND COPPER - 1022 Sample(s) Required between 6/1/2016 and 9/30/2016

Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx

15TOTAL COLIFORM (TCR) - 3100 Sample(s) Required between 1/1/2016 and 1/31/201615 Sample(s) Required between 2/1/2016 and 2/29/201615 Sample(s) Required between 3/1/2016 and 3/31/201615 Sample(s) Required between 4/1/2016 and 4/30/201615 Sample(s) Required between 5/1/2016 and 5/31/201615 Sample(s) Required between 6/1/2016 and 6/30/201615 Sample(s) Required between 7/1/2016 and 7/31/201615 Sample(s) Required between 8/1/2016 and 8/31/201615 Sample(s) Required between 9/1/2016 and 9/30/201615 Sample(s) Required between 10/1/2016 and 10/31/201615 Sample(s) Required between 11/1/2016 and 11/30/201615 Sample(s) Required between 12/1/2016 and 12/31/2016

15TOTAL CHLORINE - 1000 Sample(s) Required between 1/1/2016 and 1/31/201615 Sample(s) Required between 2/1/2016 and 2/29/201615 Sample(s) Required between 3/1/2016 and 3/31/201615 Sample(s) Required between 4/1/2016 and 4/30/201615 Sample(s) Required between 5/1/2016 and 5/31/201615 Sample(s) Required between 6/1/2016 and 6/30/201615 Sample(s) Required between 7/1/2016 and 7/31/201615 Sample(s) Required between 8/1/2016 and 8/31/201615 Sample(s) Required between 9/1/2016 and 9/30/201615 Sample(s) Required between 10/1/2016 and 10/31/201615 Sample(s) Required between 11/1/2016 and 11/30/201615 Sample(s) Required between 12/1/2016 and 12/31/2016

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: GREENVILLE, CITY OF DISTRIBUTION601 WAGNER STREET (EDISON)

Facility Class: CLASS 1

at SMP: DS2011DISINFECTION BYPRODUCTS Sample(s) Required between 2/8/2016 and 2/14/2016at SMP: DS2011 Sample(s) Required between 5/8/2016 and 5/14/2016at SMP: DS2011 Sample(s) Required between 8/8/2016 and 8/14/2016

Page 17: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

GREENVILLE CITY PWSOH1900714

2016 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: GREENVILLE, CITY OF DISTRIBUTION601 WAGNER STREET (EDISON)

Facility Class: CLASS 1

at SMP: DS2011DISINFECTION BYPRODUCTS Sample(s) Required between 11/8/2016 and 11/14/2016Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS202

Facility Name: GREENVILLE, CITY OF DISTRIBUTION1348 SEBRING WARNER ROAD

Facility Class: CLASS 1

at SMP: DS2021DISINFECTION BYPRODUCTS Sample(s) Required between 2/8/2016 and 2/14/2016at SMP: DS2021 Sample(s) Required between 5/8/2016 and 5/14/2016at SMP: DS2021 Sample(s) Required between 8/8/2016 and 8/14/2016at SMP: DS2021 Sample(s) Required between 11/8/2016 and 11/14/2016

Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS203

Facility Name: GREENVILLE, CITY OF DISTRIBUTION5105 COUNTY HOME

Facility Class: CLASS 1

at SMP: DS2031DISINFECTION BYPRODUCTS Sample(s) Required between 2/8/2016 and 2/14/2016at SMP: DS2031 Sample(s) Required between 5/8/2016 and 5/14/2016at SMP: DS2031 Sample(s) Required between 8/8/2016 and 8/14/2016at SMP: DS2031 Sample(s) Required between 11/8/2016 and 11/14/2016

Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS204

Facility Name: GREENVILLE, CITY OF DISTRIBUTION1425 KITCHEN-AID WAY

Facility Class: CLASS 1

at SMP: DS2041DISINFECTION BYPRODUCTS Sample(s) Required between 2/8/2016 and 2/14/2016at SMP: DS2041 Sample(s) Required between 5/8/2016 and 5/14/2016at SMP: DS2041 Sample(s) Required between 8/8/2016 and 8/14/2016at SMP: DS2041 Sample(s) Required between 11/8/2016 and 11/14/2016

Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Page 18: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

A AND R UNION CITY PARK MHP PWSOH1900812

ENTRY POINT MONITORING SCHEDULE

2016 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

1953750EP001

Facility Name: A AND R UNION CITY PARK MHP

Effective Date: 01/01/2016

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

Sample(s) Required betweenARSENIC - 1005 1 and1/1/2016 3/31/2016Sample(s) Required between1 and4/1/2016 6/30/2016Sample(s) Required between1 and7/1/2016 9/30/2016Sample(s) Required between1 and10/1/2016 12/31/2016

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2016 5/31/2016

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 19: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

A AND R UNION CITY PARK MHP PWSOH1900812

2016 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: A AND R UNION CITY PARK MHP DISTRIBUTION

5LEAD - 1030 AND COPPER - 1022 Sample(s) Required between 6/1/2016 and 9/30/2016

Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx

1TOTAL COLIFORM (TCR) - 3100 Sample(s) Required between 1/1/2016 and 1/31/20161 Sample(s) Required between 2/1/2016 and 2/29/20161 Sample(s) Required between 3/1/2016 and 3/31/20161 Sample(s) Required between 4/1/2016 and 4/30/20161 Sample(s) Required between 5/1/2016 and 5/31/20161 Sample(s) Required between 6/1/2016 and 6/30/20161 Sample(s) Required between 7/1/2016 and 7/31/20161 Sample(s) Required between 8/1/2016 and 8/31/20161 Sample(s) Required between 9/1/2016 and 9/30/20161 Sample(s) Required between 10/1/2016 and 10/31/20161 Sample(s) Required between 11/1/2016 and 11/30/20161 Sample(s) Required between 12/1/2016 and 12/31/2016

1TOTAL CHLORINE - 1000 Sample(s) Required between 1/1/2016 and 1/31/20161 Sample(s) Required between 2/1/2016 and 2/29/20161 Sample(s) Required between 3/1/2016 and 3/31/20161 Sample(s) Required between 4/1/2016 and 4/30/20161 Sample(s) Required between 5/1/2016 and 5/31/20161 Sample(s) Required between 6/1/2016 and 6/30/20161 Sample(s) Required between 7/1/2016 and 7/31/20161 Sample(s) Required between 8/1/2016 and 8/31/20161 Sample(s) Required between 9/1/2016 and 9/30/20161 Sample(s) Required between 10/1/2016 and 10/31/20161 Sample(s) Required between 11/1/2016 and 11/30/20161 Sample(s) Required between 12/1/2016 and 12/31/2016

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: A AND R UNION CITY PARK MHP DISTRIBUTIONADDRESS NOT KNOWN

at SMP: DS2011DISINFECTION BYPRODUCTS Sample(s) Required between 7/1/2016 and 9/30/2016Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Page 20: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

NEW MADISON VILLAGE PWSOH1900912

ENTRY POINT MONITORING SCHEDULE

2016 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

1953751EP001

Facility Name: NEW MADISON VILLAGE OF

Effective Date: 01/01/2016

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2016 5/31/2016

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 21: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

NEW MADISON VILLAGE PWSOH1900912

2016 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: NEW MADISON,VILLAGE OF DISTRIBUTION Facility Class: CLASS 1

LEAD - 1030 AND COPPER - 1022 Not Required

ASBESTOS - 1094 Not Required

1TOTAL COLIFORM (TCR) - 3100 Sample(s) Required between 1/1/2016 and 1/31/20161 Sample(s) Required between 2/1/2016 and 2/29/20161 Sample(s) Required between 3/1/2016 and 3/31/20161 Sample(s) Required between 4/1/2016 and 4/30/20161 Sample(s) Required between 5/1/2016 and 5/31/20161 Sample(s) Required between 6/1/2016 and 6/30/20161 Sample(s) Required between 7/1/2016 and 7/31/20161 Sample(s) Required between 8/1/2016 and 8/31/20161 Sample(s) Required between 9/1/2016 and 9/30/20161 Sample(s) Required between 10/1/2016 and 10/31/20161 Sample(s) Required between 11/1/2016 and 11/30/20161 Sample(s) Required between 12/1/2016 and 12/31/2016

1TOTAL CHLORINE - 1000 Sample(s) Required between 1/1/2016 and 1/31/20161 Sample(s) Required between 2/1/2016 and 2/29/20161 Sample(s) Required between 3/1/2016 and 3/31/20161 Sample(s) Required between 4/1/2016 and 4/30/20161 Sample(s) Required between 5/1/2016 and 5/31/20161 Sample(s) Required between 6/1/2016 and 6/30/20161 Sample(s) Required between 7/1/2016 and 7/31/20161 Sample(s) Required between 8/1/2016 and 8/31/20161 Sample(s) Required between 9/1/2016 and 9/30/20161 Sample(s) Required between 10/1/2016 and 10/31/20161 Sample(s) Required between 11/1/2016 and 11/30/20161 Sample(s) Required between 12/1/2016 and 12/31/2016

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: NEW MADISON,VILLAGE OF DISTRIBUTION406 SOUTH MAIN STREET

Facility Class: CLASS 1

at SMP: DS2011DISINFECTION BYPRODUCTS Sample(s) Required between 7/1/2016 and 9/30/2016Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Page 22: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

NEW MADISON VILLAGE PWSOH1900912

2016 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS202

Facility Name: NEW MADISON,VILLAGE OF DISTRIBUTIONADDRESS NOT KNOWN

Facility Class: CLASS 1

at SMP: DS2021DISINFECTION BYPRODUCTS Sample(s) Required between 7/1/2016 and 9/30/2016Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Page 23: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

NORTHTOWNE COMMUNITIES LLCOH1901012

ENTRY POINT MONITORING SCHEDULE

2016 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

1953752EP001

Facility Name: NORTHTOWNE COMMUNITIES LLC

Effective Date: 01/01/2016

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

Sample(s) Required betweenARSENIC - 1005 1 and1/1/2016 3/31/2016Sample(s) Required between1 and4/1/2016 6/30/2016Sample(s) Required between1 and7/1/2016 9/30/2016Sample(s) Required between1 and10/1/2016 12/31/2016

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2016 5/31/2016

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 24: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

NORTHTOWNE COMMUNITIES LLCOH1901012

2016 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: NORTHTOWNE APARTMENTS DISTRIBUTION

LEAD - 1030 AND COPPER - 1022 Not Required

1TOTAL COLIFORM (TCR) - 3100 Sample(s) Required between 1/1/2016 and 1/31/20161 Sample(s) Required between 2/1/2016 and 2/29/20161 Sample(s) Required between 3/1/2016 and 3/31/20161 Sample(s) Required between 4/1/2016 and 4/30/20161 Sample(s) Required between 5/1/2016 and 5/31/20161 Sample(s) Required between 6/1/2016 and 6/30/20161 Sample(s) Required between 7/1/2016 and 7/31/20161 Sample(s) Required between 8/1/2016 and 8/31/20161 Sample(s) Required between 9/1/2016 and 9/30/20161 Sample(s) Required between 10/1/2016 and 10/31/20161 Sample(s) Required between 11/1/2016 and 11/30/20161 Sample(s) Required between 12/1/2016 and 12/31/2016

1TOTAL CHLORINE - 1000 Sample(s) Required between 1/1/2016 and 1/31/20161 Sample(s) Required between 2/1/2016 and 2/29/20161 Sample(s) Required between 3/1/2016 and 3/31/20161 Sample(s) Required between 4/1/2016 and 4/30/20161 Sample(s) Required between 5/1/2016 and 5/31/20161 Sample(s) Required between 6/1/2016 and 6/30/20161 Sample(s) Required between 7/1/2016 and 7/31/20161 Sample(s) Required between 8/1/2016 and 8/31/20161 Sample(s) Required between 9/1/2016 and 9/30/20161 Sample(s) Required between 10/1/2016 and 10/31/20161 Sample(s) Required between 11/1/2016 and 11/30/20161 Sample(s) Required between 12/1/2016 and 12/31/2016

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: NORTHTOWNE APARTMENTS DISTRIBUTIONADDRESS NOT KNOWN

at SMP: DS2011DISINFECTION BYPRODUCTS Sample(s) Required between 7/1/2016 and 9/30/2016Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Page 25: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

SHERWOOD FOREST MHP PWSOH1901112

ENTRY POINT MONITORING SCHEDULE

2016 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

1953753EP001

Facility Name: SHERWOOD FOREST MHP

Effective Date: 01/01/2016

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2016 5/31/2016

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 26: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

SHERWOOD FOREST MHP PWSOH1901112

2016 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: SHERWOOD FOREST MHP DISTRIBUTION Facility Class: CLASS 1

10LEAD - 1030 AND COPPER - 1022 Sample(s) Required between 6/1/2016 and 9/30/2016

Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx

1TOTAL COLIFORM (TCR) - 3100 Sample(s) Required between 1/1/2016 and 1/31/20161 Sample(s) Required between 2/1/2016 and 2/29/20161 Sample(s) Required between 3/1/2016 and 3/31/20161 Sample(s) Required between 4/1/2016 and 4/30/20161 Sample(s) Required between 5/1/2016 and 5/31/20161 Sample(s) Required between 6/1/2016 and 6/30/20161 Sample(s) Required between 7/1/2016 and 7/31/20161 Sample(s) Required between 8/1/2016 and 8/31/20161 Sample(s) Required between 9/1/2016 and 9/30/20161 Sample(s) Required between 10/1/2016 and 10/31/20161 Sample(s) Required between 11/1/2016 and 11/30/20161 Sample(s) Required between 12/1/2016 and 12/31/2016

1TOTAL CHLORINE - 1000 Sample(s) Required between 1/1/2016 and 1/31/20161 Sample(s) Required between 2/1/2016 and 2/29/20161 Sample(s) Required between 3/1/2016 and 3/31/20161 Sample(s) Required between 4/1/2016 and 4/30/20161 Sample(s) Required between 5/1/2016 and 5/31/20161 Sample(s) Required between 6/1/2016 and 6/30/20161 Sample(s) Required between 7/1/2016 and 7/31/20161 Sample(s) Required between 8/1/2016 and 8/31/20161 Sample(s) Required between 9/1/2016 and 9/30/20161 Sample(s) Required between 10/1/2016 and 10/31/20161 Sample(s) Required between 11/1/2016 and 11/30/20161 Sample(s) Required between 12/1/2016 and 12/31/2016

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: SHERWOOD FOREST MHP DISTRIBUTIONADDRESS NOT KNOWN

Facility Class: CLASS 1

at SMP: DS2011DISINFECTION BYPRODUCTS Sample(s) Required between 7/1/2016 and 9/30/2016Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Page 27: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

SHERWOOD FOREST MHP PWSOH1901112

2016 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS202

Facility Name: SHERWOOD FOREST MHP DISTRIBUTIONADDRESS NOT KNOWN

Facility Class: CLASS 1

at SMP: DS2021DISINFECTION BYPRODUCTS Sample(s) Required between 7/1/2016 and 9/30/2016Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Page 28: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

UNION CITY VILLAGE PWSOH1901212

ENTRY POINT MONITORING SCHEDULE

2016 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

1953754EP001

Facility Name: UNION CITY VILLAGE

Effective Date: 01/01/2016

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

Sample(s) Required betweenINORGANICS 1 and1/1/2016 5/31/2016Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and1/1/2016 5/31/2016

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2016 5/31/2016

Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2016 5/31/2016

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 and1/1/2016 5/31/2016

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2016 3/31/2016Sample(s) Required between1 and4/1/2016 6/30/2016Sample(s) Required between1 and7/1/2016 9/30/2016Sample(s) Required between1 and10/1/2016 12/31/2016

Page 29: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

UNION CITY VILLAGE PWSOH1901212

2016 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: UNION CITY, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1

LEAD - 1030 AND COPPER - 1022 Not Required

2TOTAL COLIFORM (TCR) - 3100 Sample(s) Required between 1/1/2016 and 1/31/20162 Sample(s) Required between 2/1/2016 and 2/29/20162 Sample(s) Required between 3/1/2016 and 3/31/20162 Sample(s) Required between 4/1/2016 and 4/30/20162 Sample(s) Required between 5/1/2016 and 5/31/20162 Sample(s) Required between 6/1/2016 and 6/30/20162 Sample(s) Required between 7/1/2016 and 7/31/20162 Sample(s) Required between 8/1/2016 and 8/31/20162 Sample(s) Required between 9/1/2016 and 9/30/20162 Sample(s) Required between 10/1/2016 and 10/31/20162 Sample(s) Required between 11/1/2016 and 11/30/20162 Sample(s) Required between 12/1/2016 and 12/31/2016

2TOTAL CHLORINE - 1000 Sample(s) Required between 1/1/2016 and 1/31/20162 Sample(s) Required between 2/1/2016 and 2/29/20162 Sample(s) Required between 3/1/2016 and 3/31/20162 Sample(s) Required between 4/1/2016 and 4/30/20162 Sample(s) Required between 5/1/2016 and 5/31/20162 Sample(s) Required between 6/1/2016 and 6/30/20162 Sample(s) Required between 7/1/2016 and 7/31/20162 Sample(s) Required between 8/1/2016 and 8/31/20162 Sample(s) Required between 9/1/2016 and 9/30/20162 Sample(s) Required between 10/1/2016 and 10/31/20162 Sample(s) Required between 11/1/2016 and 11/30/20162 Sample(s) Required between 12/1/2016 and 12/31/2016

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: UNION CITY, VILLAGE OF DISTRIBUTIONADDRESS NOT KNOWN

Facility Class: CLASS 1

at SMP: DS2011DISINFECTION BYPRODUCTS Sample(s) Required between 7/1/2016 and 9/30/2016Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Page 30: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

UNION CITY VILLAGE PWSOH1901212

2016 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS202

Facility Name: UNION CITY, VILLAGE OF DISTRIBUTIONADDRESS NOT KNOWN

Facility Class: CLASS 1

at SMP: DS2021DISINFECTION BYPRODUCTS Sample(s) Required between 7/1/2016 and 9/30/2016Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Page 31: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

VERSAILLES VILLAGE PWSOH1901312

ENTRY POINT MONITORING SCHEDULE

2016 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

1953755EP001

Facility Name: VERSAILLES WATER DEPARTMENT

Effective Date: 01/01/2016

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016

Chemicals Monitoring Requirements

Facility Class: CLASS 2Facility Source: Ground Water

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2016 5/31/2016

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 32: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

VERSAILLES VILLAGE PWSOH1901312

2016 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: VERSAILLES, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1

10LEAD - 1030 AND COPPER - 1022 Sample(s) Required between 6/1/2016 and 9/30/2016

Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx

ASBESTOS - 1094 Not Required

3TOTAL COLIFORM (TCR) - 3100 Sample(s) Required between 1/1/2016 and 1/31/20163 Sample(s) Required between 2/1/2016 and 2/29/20163 Sample(s) Required between 3/1/2016 and 3/31/20163 Sample(s) Required between 4/1/2016 and 4/30/20163 Sample(s) Required between 5/1/2016 and 5/31/20163 Sample(s) Required between 6/1/2016 and 6/30/20163 Sample(s) Required between 7/1/2016 and 7/31/20163 Sample(s) Required between 8/1/2016 and 8/31/20163 Sample(s) Required between 9/1/2016 and 9/30/20163 Sample(s) Required between 10/1/2016 and 10/31/20163 Sample(s) Required between 11/1/2016 and 11/30/20163 Sample(s) Required between 12/1/2016 and 12/31/2016

3TOTAL CHLORINE - 1000 Sample(s) Required between 1/1/2016 and 1/31/20163 Sample(s) Required between 2/1/2016 and 2/29/20163 Sample(s) Required between 3/1/2016 and 3/31/20163 Sample(s) Required between 4/1/2016 and 4/30/20163 Sample(s) Required between 5/1/2016 and 5/31/20163 Sample(s) Required between 6/1/2016 and 6/30/20163 Sample(s) Required between 7/1/2016 and 7/31/20163 Sample(s) Required between 8/1/2016 and 8/31/20163 Sample(s) Required between 9/1/2016 and 9/30/20163 Sample(s) Required between 10/1/2016 and 10/31/20163 Sample(s) Required between 11/1/2016 and 11/30/20163 Sample(s) Required between 12/1/2016 and 12/31/2016

Samples should be collected at the same time and place as the Total Coliform samples.

Page 33: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

VERSAILLES VILLAGE PWSOH1901312

2016 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2016

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: VERSAILLES, VILLAGE OF DISTRIBUTION16 MARKER ROAD

Facility Class: CLASS 1

at SMP: DS2011DISINFECTION BYPRODUCTS Sample(s) Required between 7/1/2016 and 9/30/2016Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS202

Facility Name: VERSAILLES, VILLAGE OF DISTRIBUTIONADDRESS NOT KNOWN

Facility Class: CLASS 1

at SMP: DS2021DISINFECTION BYPRODUCTS Sample(s) Required between 7/1/2016 and 9/30/2016Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Page 34: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

ALBERT HURLEY CAMP 1

2016 MONITORING SCHEDULE

OH1930112 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 9/30

04/15/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: ALBERT HURLEY CAMP 1 DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 35: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

ALBERT HURLEY CAMP 1

2016 MONITORING SCHEDULE

OH1930112 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 9/30

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: ALBERT HURLEY CAMP 1Ground Water

1953756

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 36: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

OLD ANNIE OAKLEY

2016 MONITORING SCHEDULE

OH1930412 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: OLD ANNIE OAKLEY DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 37: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

OLD ANNIE OAKLEY

2016 MONITORING SCHEDULE

OH1930412 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: OLD ANNIE OAKLEYGround Water

1953757

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 38: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

ANTHONY WAYNE SCHOOLOH1930512

ENTRY POINT MONITORING SCHEDULE

2016 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

1953758EP001

Facility Name: ANTHONY WAYNE SCHOOL

Effective Date: 01/01/2016

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

Sample(s) Required betweenARSENIC - 1005 1 and1/1/2016 3/31/2016Sample(s) Required between1 and4/1/2016 6/30/2016Sample(s) Required between1 and7/1/2016 9/30/2016Sample(s) Required between1 and10/1/2016 12/31/2016

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2016 5/31/2016

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 39: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

ANTHONY WAYNE SCHOOLOH1930512

2016 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: ANTHONY WAYNE SCHOOL DISTRIBUTION

LEAD - 1030 AND COPPER - 1022 Not Required

1TOTAL COLIFORM (TCR) - 3100 Sample(s) Required between 1/1/2016 and 3/31/20161 Sample(s) Required between 4/1/2016 and 6/30/20161 Sample(s) Required between 7/1/2016 and 9/30/20161 Sample(s) Required between 10/1/2016 and 12/31/2016

Page 40: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

BGS RESTAURANT PWS

2016 MONITORING SCHEDULE

OH1931012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: SPARKYS DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 41: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

BGS RESTAURANT PWS

2016 MONITORING SCHEDULE

OH1931012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: B & G CAFEGround Water

1953760

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 42: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

THIRD BASE BAR

2016 MONITORING SCHEDULE

OH1932512 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: THIRD BASE BAR DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 43: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

THIRD BASE BAR

2016 MONITORING SCHEDULE

OH1932512 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: THIRD BASE BARGround Water

1953766

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 44: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

E AND R PUB

2016 MONITORING SCHEDULE

OH1933212 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: E & R PUB DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 45: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

E AND R PUB

2016 MONITORING SCHEDULE

OH1933212 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: E & R PUBGround Water

1953767

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 46: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

TURTLE CREEK GOLF COURSE

2016 MONITORING SCHEDULE

OH1934112 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: TURTLE CREEK GOLF DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 47: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

TURTLE CREEK GOLF COURSE

2016 MONITORING SCHEDULE

OH1934112 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: TURTLE CREEK GOLF COURSEGround Water

1953771

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 48: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

MARSHALLS SERVICE PWS

2016 MONITORING SCHEDULE

OH1935212 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: MARSHALLS SERVICE DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 49: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

MARSHALLS SERVICE PWS

2016 MONITORING SCHEDULE

OH1935212 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: MARSHALLS AMOCO SERVICE STATIONGround Water Facility Class: CLASS A

1960074

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 50: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

MISSISSINAWA VALLEY HIGHOH1935712

ENTRY POINT MONITORING SCHEDULE

2016 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

1953773EP001

Facility Name: MISSISSINAWA VALLEY LOCAL SCH DIST OFFIC

Effective Date: 01/01/2016

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

Sample(s) Required betweenARSENIC - 1005 1 and1/1/2016 3/31/2016Sample(s) Required between1 and4/1/2016 6/30/2016Sample(s) Required between1 and7/1/2016 9/30/2016Sample(s) Required between1 and10/1/2016 12/31/2016

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2016 5/31/2016

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 51: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

MISSISSINAWA VALLEY HIGHOH1935712

2016 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: MISSISSINAWA VALLEY HIGH DISTRIBUTION Facility Class: CLASS 1

LEAD - 1030 AND COPPER - 1022 Not Required

1TOTAL COLIFORM (TCR) - 3100 Sample(s) Required between 1/1/2016 and 3/31/20161 Sample(s) Required between 4/1/2016 and 6/30/20161 Sample(s) Required between 7/1/2016 and 9/30/20161 Sample(s) Required between 10/1/2016 and 12/31/2016

Page 52: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

SILVER SPUR BAR AND RESTAURANT

2016 MONITORING SCHEDULE

OH1935912 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: SILVER SPUR BAR & REST. DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 53: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

SILVER SPUR BAR AND RESTAURANT

2016 MONITORING SCHEDULE

OH1935912 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: SILVER SPUR BAR AND RESTAURANTGround Water

1953774

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 54: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

JACKIES PLACE PWS

2016 MONITORING SCHEDULE

OH1937312 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: JACKIES PLACE DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 55: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

JACKIES PLACE PWS

2016 MONITORING SCHEDULE

OH1937312 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: JACKIES PLACEGround Water

1953778

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 56: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

RED AND RUTHS TAVERN PWS

2016 MONITORING SCHEDULE

OH1937412 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: RED AND RUTHS TAVERN DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 57: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

RED AND RUTHS TAVERN PWS

2016 MONITORING SCHEDULE

OH1937412 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: RED AND RUTHS TAVERNGround Water

1953779

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 58: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

WHITE SPRINGS GOLF CLUB

2016 MONITORING SCHEDULE

OH1939612 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

04/15/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: WHITE SPRINGS GOLF CLUB DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 59: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

WHITE SPRINGS GOLF CLUB

2016 MONITORING SCHEDULE

OH1939612 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: WHITE SPRINGS GOLF CLUBGround Water

1953784

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 60: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

WILDCAT WOODS CAMPGROUND

2016 MONITORING SCHEDULE

OH1939712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

04/15/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: WILDCAT WOODS CAMPGROUND DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 61: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

WILDCAT WOODS CAMPGROUND

2016 MONITORING SCHEDULE

OH1939712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: WILDCAT WOODS CAMPGROUNDGround Water

1953785

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2016 and10/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 62: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

WOODLAND HEIGHTS ELEMENTARY SCHOOLOH1940012

ENTRY POINT MONITORING SCHEDULE

2016 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

1953786EP001

Facility Name: WOODLAND HTS ELEM SCH

Effective Date: 01/01/2016

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

Sample(s) Required betweenARSENIC - 1005 1 and1/1/2016 3/31/2016Sample(s) Required between1 and4/1/2016 6/30/2016Sample(s) Required between1 and7/1/2016 9/30/2016Sample(s) Required between1 and10/1/2016 12/31/2016

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2016 5/31/2016

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and6/1/2016 10/31/2016

Page 63: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

WOODLAND HEIGHTS ELEMENTARY SCHOOLOH1940012

2016 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: WOODLAND HEIGHTS ELEM SC DISTRIBUTIONFacility Class: CLASS 1

10LEAD - 1030 AND COPPER - 1022 Sample(s) Required between 6/1/2016 and 9/30/2016

Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx

1TOTAL COLIFORM (TCR) - 3100 Sample(s) Required between 1/1/2016 and 3/31/20161 Sample(s) Required between 4/1/2016 and 6/30/20161 Sample(s) Required between 7/1/2016 and 9/30/20161 Sample(s) Required between 10/1/2016 and 12/31/2016

1TOTAL CHLORINE - 1000 Sample(s) Required between 1/1/2016 and 3/31/20161 Sample(s) Required between 4/1/2016 and 6/30/20161 Sample(s) Required between 7/1/2016 and 9/30/20161 Sample(s) Required between 10/1/2016 and 12/31/2016

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: WOODLAND HEIGHTS ELEM SC DISTRIBUTIONADDRESS NOT KNOWN

Facility Class: CLASS 1

at SMP: DS2011DISINFECTION BYPRODUCTS Sample(s) Required between 7/1/2016 and 9/30/2016Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS202

Facility Name: WOODLAND HEIGHTS ELEM SC DISTRIBUTIONADDRESS NOT KNOWN

Facility Class: CLASS 1

at SMP: DS2021DISINFECTION BYPRODUCTS Sample(s) Required between 7/1/2016 and 9/30/2016Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Page 64: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

FORT JEFFERSON METHODIST CHURCH PWS

2016 MONITORING SCHEDULE

OH1940812 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: FT JEFFERSON METH CHURCH DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 65: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

FORT JEFFERSON METHODIST CHURCH PWS

2016 MONITORING SCHEDULE

OH1940812 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: FT JEFFERSON METH CHURCHGround Water

1953789

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 66: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

ST LOUIS CATHOLIC CHURCH

2016 MONITORING SCHEDULE

OH1941512 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: ST LOUIS CATHOLIC CHURCH DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 67: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

ST LOUIS CATHOLIC CHURCH

2016 MONITORING SCHEDULE

OH1941512 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: SAINT LOUIS CATHOLIC CHURCHGround Water

1953790

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 68: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

ST JOHN LUTHERAN CHURCH

2016 MONITORING SCHEDULE

OH1941612 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: ST JOHN LUTHERAN CHURCH DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 69: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

ST JOHN LUTHERAN CHURCH

2016 MONITORING SCHEDULE

OH1941612 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: SAINT JOHN LUTHERAN CHURCHGround Water

1953791

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 70: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

ARROWHEAD CAMPGROUND

2016 MONITORING SCHEDULE

OH1942012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to4/1 10/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: ARROWHEAD CAMPGROUND DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 71: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

ARROWHEAD CAMPGROUND

2016 MONITORING SCHEDULE

OH1942012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to4/1 10/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: ARROWHEAD CAMPGROUNDGround Water

1953793

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 72: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

CASTINE CHURCH OF THE BRETHREN PWS

2016 MONITORING SCHEDULE

OH1942212 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: CASTINE CHURCH OF THE BR DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 73: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

CASTINE CHURCH OF THE BRETHREN PWS

2016 MONITORING SCHEDULE

OH1942212 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CASTINE CHURCH OF THE BRETHRENGround Water Facility Class: CLASS A

1953794

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 74: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

HILLGROVE FEDERATED CHURCH

2016 MONITORING SCHEDULE

OH1942612 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: HILLGROVE FEDERATED CH DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 75: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

HILLGROVE FEDERATED CHURCH

2016 MONITORING SCHEDULE

OH1942612 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: HILLGROVE FEDERATED CHURCHGround Water

1953797

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 76: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

PITSBURG PIZZA AND GRILL

2016 MONITORING SCHEDULE

OH1942712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: PITSBURG PIZZA & GRILL DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 77: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

PITSBURG PIZZA AND GRILL

2016 MONITORING SCHEDULE

OH1942712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: PITSBURG PIZZA & GRILLGround Water

1953798

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 78: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

PITSBURG CHURCH OF THE BRETHREN PWS

2016 MONITORING SCHEDULE

OH1943012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: PITSBURG CH OF BRETHREN DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 79: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

PITSBURG CHURCH OF THE BRETHREN PWS

2016 MONITORING SCHEDULE

OH1943012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: PITSBURG CHURCH OF BRETHRENGround Water

1953799

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 80: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

PLEASANT VIEW MISSIONARY CHURCH

2016 MONITORING SCHEDULE

OH1943512 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: PLEASANT V. MISSION CH DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 81: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

PLEASANT VIEW MISSIONARY CHURCH

2016 MONITORING SCHEDULE

OH1943512 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: PLEASANT V MISSION CHURCHGround Water Facility Class: CLASS A

1953801

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 82: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

TRINITY LUTHERAN CHURCH

2016 MONITORING SCHEDULE

OH1943712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: TRINITY LUTHERAN CHURCH DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 83: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

TRINITY LUTHERAN CHURCH

2016 MONITORING SCHEDULE

OH1943712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: TRINITY LUTHERAN CHURCHGround Water

1953803

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 84: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

GRACE METHODIST CHURCH WORSHIP CENTER

2016 MONITORING SCHEDULE

OH1943812 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: GRACE METHODIST CHURCH WORSHIP CENTER DIGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 85: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

GRACE METHODIST CHURCH WORSHIP CENTER

2016 MONITORING SCHEDULE

OH1943812 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: GRACE METHODIST CHURCH WORSHIP CENTERGround Water

1953804

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 86: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

COTTONWOOD LAKES CAMPGROUND

2016 MONITORING SCHEDULE

OH1944012 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to4/1 10/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: COTTONWOOD LAKES CAMPGRO DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 87: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

COTTONWOOD LAKES CAMPGROUND

2016 MONITORING SCHEDULE

OH1944012 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to4/1 10/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: COTTONWOOD LAKES CAMPGROUNDGround Water

1953805

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 88: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

GORDON UNITED METHODIST CHURCH

2016 MONITORING SCHEDULE

OH1944412 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: GORDON UNITED METH. CHUR DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 89: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

GORDON UNITED METHODIST CHURCH

2016 MONITORING SCHEDULE

OH1944412 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: GORDON UNITED METH CHURCHGround Water

1953807

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 90: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

ST. NICHOLAS CATHOLIC CHURCH

2016 MONITORING SCHEDULE

OH1945012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: ST.NICHOLAS CATHOLIC CH. DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 91: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

ST. NICHOLAS CATHOLIC CHURCH

2016 MONITORING SCHEDULE

OH1945012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: ST. NICHOLAS CATHOLIC CHURCHGround Water

1953809

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 92: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

STILLWATER BEACH CAMP

2016 MONITORING SCHEDULE

OH1945212 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: STILLWATER BEACH CAMP DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 93: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

STILLWATER BEACH CAMP

2016 MONITORING SCHEDULE

OH1945212 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP002 Facility Source:

Facility Name: STILLWATER BEACH CAMP STU 2Ground Water

1953811

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 94: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

STILLWATER BEACH CAMP

2016 MONITORING SCHEDULE

OH1945212 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: STILLWATER BEACH CAMP DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 95: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

STILLWATER BEACH CAMP

2016 MONITORING SCHEDULE

OH1945212 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: STILLWATER BEACH CAMP STU 1Ground Water

1962357

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 96: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

STILLWATER VALLEY GOLF CLUB

2016 MONITORING SCHEDULE

OH1945312 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: STILLWATER VALLEY GOLF C DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 97: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

STILLWATER VALLEY GOLF CLUB

2016 MONITORING SCHEDULE

OH1945312 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: STILLWATER VALLEY GOLF CLUBGround Water

1953812

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 98: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

UNION CITY COUNTRY CLUB

2016 MONITORING SCHEDULE

OH1945612 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to4/1 10/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: UNION CITY COUNTRY CLUB DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 99: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

UNION CITY COUNTRY CLUB

2016 MONITORING SCHEDULE

OH1945612 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to4/1 10/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: UNION CITY COUNTRY CLUBGround Water

1953813

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 100: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

OAKLAND CHURCH OF THE BRETHREN

2016 MONITORING SCHEDULE

OH1945812 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: OAKLAND CHURCH OF THE BRETH DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 101: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

OAKLAND CHURCH OF THE BRETHREN

2016 MONITORING SCHEDULE

OH1945812 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: OAKLAND CHURCH OF THE BRETHREN - TPGround Water

1953814

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 102: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

BIBLE FELLOWSHIP CHURCH

2016 MONITORING SCHEDULE

OH1945912 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: BIBLE FELLOWSHIP CHURCH DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 103: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

BIBLE FELLOWSHIP CHURCH

2016 MONITORING SCHEDULE

OH1945912 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: BIBLE FELLOWSHIP CHURCHGround Water

1953815

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 104: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

KINGDOM HALL OF GREENVILLE

2016 MONITORING SCHEDULE

OH1946112 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: KINGDOM HALL OF GREENVIL DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 105: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

KINGDOM HALL OF GREENVILLE

2016 MONITORING SCHEDULE

OH1946112 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: KINGDOM HALL OF GREENVILLEGround Water Facility Class: CLASS A

1953817

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 106: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

LIGHTHOUSE CHRISTIAN CENTER

2016 MONITORING SCHEDULE

OH1946212 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: LIGHTHOUSE CHRISTIAN CTR DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 107: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

LIGHTHOUSE CHRISTIAN CENTER

2016 MONITORING SCHEDULE

OH1946212 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: LIGHTHOUSE CHRISTIAN CTRGround Water

1953818

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 108: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

PAK-A-SAK 38 PWS

2016 MONITORING SCHEDULE

OH1947012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: PAK-A-SAK 38 DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 109: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

PAK-A-SAK 38 PWS

2016 MONITORING SCHEDULE

OH1947012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: PAK-A-SAK 38Ground Water Facility Class: CLASS A

1953825

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 110: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

HOLLANSBURG PARK/BALL DIAMOND PWS

2016 MONITORING SCHEDULE

OH1947212 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: HOLLANSBURG PARK/BALL DI DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 111: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

HOLLANSBURG PARK/BALL DIAMOND PWS

2016 MONITORING SCHEDULE

OH1947212 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: HOLLANSBURG PARK BALL DIAMONDGround Water

1953826

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 112: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

DARKE COUNTY NATURE EDUCATION CENTER

2016 MONITORING SCHEDULE

OH1947512 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: DARKE CO NATURE EDUCATIO DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 113: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

DARKE COUNTY NATURE EDUCATION CENTER

2016 MONITORING SCHEDULE

OH1947512 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: DARKE CO NATURE EDUCATION CENTERGround Water

1953827

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 114: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

BEECHWOOD GOLF COURSE-CLUBHOUSE

2016 MONITORING SCHEDULE

OH1947612 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: BEECHWOOD GOLF COURSE-CLUBHOUSE DISTRIBUGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 115: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

BEECHWOOD GOLF COURSE-CLUBHOUSE

2016 MONITORING SCHEDULE

OH1947612 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: BEECHWOOD GOLF COURSE-CLUBHOUSEGround Water

1960662

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 116: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

CEDAR GROVE CHURCH

2016 MONITORING SCHEDULE

OH1947812 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: CEDAR GROVE CHURCH DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 117: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

CEDAR GROVE CHURCH

2016 MONITORING SCHEDULE

OH1947812 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CEDAR GROVE CHURCHGround Water

1953828

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 118: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

PALESTINE CHURCH OF CHRIST PWS

2016 MONITORING SCHEDULE

OH1947912 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: PALESTINE CH.OF CHRIST DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 119: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

PALESTINE CHURCH OF CHRIST PWS

2016 MONITORING SCHEDULE

OH1947912 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: PALESTINE CHURCH OF CHRISTGround Water

1953829

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 120: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

LAZY R CAMPGROUND

2016 MONITORING SCHEDULE

OH1948012 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to4/1 10/31

02/12/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: LAZY R CAMPGROUND DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 121: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

LAZY R CAMPGROUND

2016 MONITORING SCHEDULE

OH1948012 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to4/1 10/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: LAZY R CAMPGROUNDGround Water

1960075

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 122: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

BEECHWOOD GOLF COURSE-MAINTENANCE PWS

2016 MONITORING SCHEDULE

OH1948212 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: BEECHWOOD GOLF COURSE-MAINTENANCE DISTRIGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 123: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

BEECHWOOD GOLF COURSE-MAINTENANCE PWS

2016 MONITORING SCHEDULE

OH1948212 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: BEECHWOOD GOLF COURSE-MAINTENANCEGround Water

1960764

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 124: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

GETTYSBURG COMMUNITY PARK

2016 MONITORING SCHEDULE

OH1948312 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: GETTYSBURG BALL PARK DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 125: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

GETTYSBURG COMMUNITY PARK

2016 MONITORING SCHEDULE

OH1948312 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: GETTYSBURG COMMUNITY PARKGround Water

1960993

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 126: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

RUMPKE WASTE SERVICES

2016 MONITORING SCHEDULE

OH1948512 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: RUMPKE WASTE SERVICES DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 127: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

RUMPKE WASTE SERVICES

2016 MONITORING SCHEDULE

OH1948512 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: RUMPKE WASTE SERVICESGround Water

1960649

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 128: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

PAK-A-SAK 37 PWS

2016 MONITORING SCHEDULE

OH1948712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: PAK-A-SAK 37 DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 129: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

PAK-A-SAK 37 PWS

2016 MONITORING SCHEDULE

OH1948712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: PAK-A-SAK 37Ground Water Facility Class: CLASS A

1960705

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 130: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

THE GATEHOUSE

2016 MONITORING SCHEDULE

OH1948912 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: THE GATEHOUSE DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 131: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

THE GATEHOUSE

2016 MONITORING SCHEDULE

OH1948912 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: THE GATEHOUSEGround Water

1960812

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 132: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

FARMER BROWN PWS

2016 MONITORING SCHEDULE

OH1949212 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: FARMER BROWN DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 133: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

FARMER BROWN PWS

2016 MONITORING SCHEDULE

OH1949212 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: FARMER BROWN RESTAURANTGround Water

1960907

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 134: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

GREENVILLE CHURCH OF GOD PWS

2016 MONITORING SCHEDULE

OH1949412 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: GREENVILLE CHURCH OF GOD DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 135: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

GREENVILLE CHURCH OF GOD PWS

2016 MONITORING SCHEDULE

OH1949412 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: GREENVILLE CHURCH OF GODGround Water Facility Class: CLASS A

1961033

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 136: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

SOLID ROCK APOSTOLIC CHURCH-BRADFORD PWS

2016 MONITORING SCHEDULE

OH1949912 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: SOLID ROCK APOSTOLIC CHURCH DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 137: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

SOLID ROCK APOSTOLIC CHURCH-BRADFORD PWS

2016 MONITORING SCHEDULE

OH1949912 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: SOLID ROCK APOSTOLIC CHURCHGround Water

1961444

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 138: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

BURKETTSVILLE PARK PWS

2016 MONITORING SCHEDULE

OH1950012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: BURKETTSVILLE PARK DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 139: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

BURKETTSVILLE PARK PWS

2016 MONITORING SCHEDULE

OH1950012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: BURKETTSVILLE PARKGround Water

1961488

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 140: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

GREENVILLE GRACE BRETHEREN PWS

2016 MONITORING SCHEDULE

OH1950112 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: GREENVILLE GRACE BRETHEREN DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 141: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

GREENVILLE GRACE BRETHEREN PWS

2016 MONITORING SCHEDULE

OH1950112 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: GREENVILLE GRACE BRETHRENGround Water

1961920

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 142: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

BEAMSVILLE CHRISTIAN CHURCH PWS

2016 MONITORING SCHEDULE

OH1950212 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: BEAMSVILLE CHRISTIAN CHURCHGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 143: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

BEAMSVILLE CHRISTIAN CHURCH PWS

2016 MONITORING SCHEDULE

OH1950212 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: BEAMSVILLE CHRISTIAN CHURCHGround Water

1962198

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 144: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

ROSSBURG ACRES CAMPGROUND PWS

2016 MONITORING SCHEDULE

OH1950312 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to5/1 10/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: ROSSBURG ACRES CAMPGROUND DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 145: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

ROSSBURG ACRES CAMPGROUND PWS

2016 MONITORING SCHEDULE

OH1950312 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to5/1 10/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: ROSSBURG ACRES CAMPGROUNDGround Water

1962199

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 146: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

FRANKLIN MONROE SCHOOL NEW PWSOH1950512

ENTRY POINT MONITORING SCHEDULE

2016 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

1962376EP001

Facility Name: FRANKLIN MONROE SCHOOL NEW

Effective Date: 01/01/2016

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

Sample(s) Required betweenARSENIC - 1005 1 and1/1/2016 3/31/2016Sample(s) Required between1 and4/1/2016 6/30/2016Sample(s) Required between1 and7/1/2016 9/30/2016Sample(s) Required between1 and10/1/2016 12/31/2016

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2016 10/31/2016

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and6/1/2016 10/31/2016

Page 147: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

FRANKLIN MONROE SCHOOL NEW PWSOH1950512

2016 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: FRANKLIN MONROE SCHOOL NEW DISTRIBUTIONFacility Class: CLASS 1

10LEAD - 1030 AND COPPER - 1022 Sample(s) Required between 6/1/2016 and 9/30/2016

Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx

1TOTAL COLIFORM (TCR) - 3100 Sample(s) Required between 1/1/2016 and 3/31/20161 Sample(s) Required between 4/1/2016 and 6/30/20161 Sample(s) Required between 7/1/2016 and 9/30/20161 Sample(s) Required between 10/1/2016 and 12/31/2016

1TOTAL CHLORINE - 1000 Sample(s) Required between 1/1/2016 and 3/31/20161 Sample(s) Required between 4/1/2016 and 6/30/20161 Sample(s) Required between 7/1/2016 and 9/30/20161 Sample(s) Required between 10/1/2016 and 12/31/2016

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: FRANKLIN MONROE SCHOOL NEW DISTRIBUTIONADDRESS NOT KNOWN

Facility Class: CLASS 1

at SMP: DS2011DISINFECTION BYPRODUCTS Sample(s) Required between 7/1/2016 and 9/30/2016Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS202

Facility Name: FRANKLIN MONROE SCHOOL NEW DISTRIBUTIONADDRESS NOT KNOWN

Facility Class: CLASS 1

at SMP: DS2021DISINFECTION BYPRODUCTS Sample(s) Required between 7/1/2016 and 9/30/2016Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Page 148: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

BRUMBAUGH FRUIT FARM PWS

2016 MONITORING SCHEDULE

OH1950613 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: BRUMBAUGH FRUIT FARM DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 149: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

BRUMBAUGH FRUIT FARM PWS

2016 MONITORING SCHEDULE

OH1950613 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: BRUMBAUGH FRUIT FARMGround Water

1962390

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2016 and10/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 150: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

NORTH STAR HARDWARE AND IMPLEMENT CO PWS

2016 MONITORING SCHEDULE

OH1950614 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: NORTH STAR HARDWARE DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 151: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

NORTH STAR HARDWARE AND IMPLEMENT CO PWS

2016 MONITORING SCHEDULE

OH1950614 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: NORTH STAR HARDWARE AND IMPLEMENT COGround Water

1962391

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2016 and 5/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 152: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

ELDORA SPEEDWAY INFIELD WELL PWS

2016 MONITORING SCHEDULE

OH1950615 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to4/1 10/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 153: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

ELDORA SPEEDWAY INFIELD WELL PWS

2016 MONITORING SCHEDULE

OH1950615 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to4/1 10/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: ELDORA SPEEDWAY INFIELD WELLGround Water Facility Class: CLASS A

1962392

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2016 and10/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 154: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

ELDORA SPEEDWAY MAIN CONCESSIONS PWS

2016 MONITORING SCHEDULE

OH1950616 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2016 and 3/31/2016Sample(s) Required between3 4/1/2016 and 4/30/2016Sample(s) Required between3 5/1/2016 and 5/31/2016Sample(s) Required between3 6/1/2016 and 6/30/2016Sample(s) Required between3 7/1/2016 and 7/31/2016Sample(s) Required between3 8/1/2016 and 8/31/2016Sample(s) Required between3 9/1/2016 and 9/30/2016Sample(s) Required between3 10/1/2016 and10/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 155: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

ELDORA SPEEDWAY MAIN CONCESSIONS PWS

2016 MONITORING SCHEDULE

OH1950616 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: ELDORA SPEEDWAY MAIN CONCESSIONSGround Water Facility Class: CLASS A

1962393

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2016 and10/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 156: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

ELDORA SPEEDWAY NORTH WELL PWS

2016 MONITORING SCHEDULE

OH1950617 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to4/1 10/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: DISTRIBUTIONGU

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 4/1/2016 and 6/30/2016Sample(s) Required between1 7/1/2016 and 9/30/2016Sample(s) Required between1 10/1/2016 and12/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 157: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

ELDORA SPEEDWAY NORTH WELL PWS

2016 MONITORING SCHEDULE

OH1950617 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to4/1 10/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: ELDORA SPEEDWAY NORTH WELLGround Water Facility Class: CLASS A

1962394

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2016 and10/31/2016

Well

Treatment* PressureTank Distribution

System

Where to Collect Samples For a Small Public Water System

EP00#

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

DS000

Raw Tap

RS00#,LT200#,or GWR00#

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

Page 158: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

HOWES HENS PWSOH1950618

ENTRY POINT MONITORING SCHEDULE

2016 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

1962395EP001

Facility Name: HOWES HENS

Effective Date: 01/01/2016

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

Sample(s) Required betweenINORGANICS 1 and6/1/2016 10/31/2016Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and1/1/2016 5/31/2016

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2016 5/31/2016

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 and1/1/2016 5/31/2016

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2016 3/31/2016Sample(s) Required between1 and4/1/2016 6/30/2016Sample(s) Required between1 and7/1/2016 9/30/2016Sample(s) Required between1 and10/1/2016 12/31/2016

Page 159: ENTRY POINT MONITORING SCHEDULE - Ohio EPA · 2016-07-19 · ENTRY POINT MONITORING SCHEDULE 2016 ENTRY POINT SCHEDULE System Type: Community Operating Period: 1/1 to 12/31 Sampling

HOWES HENS PWSOH1950618

2016 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2016Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: DISTRIBUTION

5LEAD - 1030 AND COPPER - 1022 Sample(s) Required between 1/1/2016 and 6/30/20165 Sample(s) Required between 7/1/2016 and 12/31/2016

Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx

1TOTAL COLIFORM (TCR) - 3100 Sample(s) Required between 1/1/2016 and 3/31/20161 Sample(s) Required between 4/1/2016 and 6/30/20161 Sample(s) Required between 7/1/2016 and 9/30/20161 Sample(s) Required between 10/1/2016 and 12/31/2016