    Expansion of Hout Crude Onshore Production Facility

    OWNER / CLIENT

    Khafji Joint Operations (KJO).CONTRACT TYPE

    EPC LSTK Consortium Enppi/Petrojet

    Enppi Lead

    SCOPE OF SERVICES

    Engineering, Material Supply,

    Construction, Commissioning andStart-up and Overall Management.

    PROJECT DESCRIPTION

    Due to Production capacity increase 50,000 Barrels / day,

    Alkhafji Storage Capacity will expand by installation 5

    Storage tanks (150,000 to 500,000) Barrels, booster

    pumps, Instrument, Piping, Fire fighting and a new

    Electrical substation.

  • 8/12/2019 Enppi Profile Summary

    2/38

    Khafji Field DevelopmentPhase 1

    August 06- January 09

    OWNER / CLIENTKhafji Joint Operations (KJO).

    CONTRACT TYPE

    EPC LSTK Consortium Enppi (Leader) / PMS /Petrojet

    SCOPE OF SERVICES

    Engineering, Material Supply, onshore Structure fabrication, offshore

    laying / Installation, Overall Management, Construction Supervision,Commissioning and Start-up and.

    PROJECT DESCRIPTION

    Installation of new 6 platforms, modifications of 5 existing platforms,subsea new pipeline with total length 110 km sizes 28 / 36 / 42 andlaying of subsea cables with total length of 8km diameter 6.

    Located at the Joint operations area - North of Arabia Gulf.

  • 8/12/2019 Enppi Profile Summary

    3/38

    on shore gas

    Receiving

    Facilities

    Onshore

    Inlet

    Separators

    New

    OnshoreFlare

    Gas

    Processing

    Plant

    UtilityUnit

    Khafgi

    Onshore

    facility

    Y-2B

    (New)

    240,000 BPD

    Pdp-3(new)

    Y-1b(new)

    240,000 BPD

    PDP1

    (NEW)

    PDP-2

    (new)

    Scope of work for FDP-1

    Existing gas

    line

    New crude line

    Existing sub-sea cable

    New Sub-sea cable

    5 WELLS 14x2

    12 wells

    24

    14 x 2

    7 wells

    24

    24

    24

    12

    2 cables

    Onshore

    Offshore

    Existing crude oil line

    Existing12Gas Supply line

    Existing

    12 Gas pipelin

    Existing

    12 gas pipeline

    New gas line

    150

    Existing facilities

    Living

    quarter

    Offshore

    Control

    platform

    Pump

    platform

    Ratawi

    Prodn

    platform

    Gas lift

    station

    Y-2

    150,000 BPD

    Y-1

    75,000 BPSD

    Y-

    75,000

    Utility

    Platform

    Exiting

    26 x 2 pipelines

    (250,000 BPDX 2)

  • 8/12/2019 Enppi Profile Summary

    4/38

    Safaniya Water Disposal System Upgrade

    August 06May 08 OWNER / CLIENT

    Saudi AramcoCONTRACT TYPE

    EPC LSTK

    SCOPE OF SERVICES

    Engineering, Material Supply, Construction, Commissioning

    and Start-up and Overall Management.

    PROJECT DESCRIPTIONThe project will expand Safaniya Arabian Heavy Crude and Utilities Plants tomaintain the plant's crude oil demand until 2011.

    Area:Plant #369 Scope / New Commodities:

    Crude Header , Low Pressure Production Trap (LPPT) designed to 600 MBD oilwith 40% WC, relevant utilities.

    Area:Plant G26 Scope:

    CPIs designed to handle 400 MBD of formation water, IGFs designed to handle805 MBD of formation water, Booster/Injection pumps to deliver formation waterto injection wells.

    http://rds.yahoo.com/S=96062857/K=aramco+logo/v=2/SID=e/l=II/R=2/SS=i/OID=f0e9aa84fe43714e/SIG=1i457qk16/EXP=1132559743/*-http%3A//images.search.yahoo.com/search/images/view?back=http%3A%2F%2Fimages.search.yahoo.com%2Fsearch%2Fimages%3Fp%3Daramco%2Blogo%26sm%3DYahoo%2521%2BSearch%26fr%3DFP-tab-img-t%26toggle%3D1%26cop%3D%26ei%3DUTF-8&h=56&w=145&imgcurl=www.thecwcgroup.com%2FUserFiles%2FSponsorImage%2FAramco_logo.jpg&imgurl=www.thecwcgroup.com%2FUserFiles%2FSponsorImage%2FAramco_logo.jpg&size=3.6kB&name=Aramco_logo.jpg&rcurl=http%3A%2F%2Fwww.thecwcgroup.com%2Fcorp_sponsors.asp&rurl=http%3A%2F%2Fwww.thecwcgroup.com%2Fcorp_sponsors.asp&p=aramco+logo&type=jpeg&no=2&tt=29&ei=UTF-8
  • 8/12/2019 Enppi Profile Summary

    5/38

    Safaniya Water Disposal System Upgrade

    Safaniya offshoreField is the largest oil field in the world,producing more than 1.2 million barrels/day

    Plant # 369

    Plant # G26

  • 8/12/2019 Enppi Profile Summary

    6/38

  • 8/12/2019 Enppi Profile Summary

    7/38

    Yanbu Gas Plant Expansion

    2006 / 2008OWNER / CLIENT

    SAUDI ARAMCOCONTRACT TYPE

    EPC Main Contractor - LSTK

    SCOPE OF SERVICES

    Detailed Engineering, Material Supply

    Construction - Enppi / Petrojet Saudi Arabia IKCommissioning and Start-upEnppi / Petrojet Saudi Arabia IK.

    PROJECT DESCRIPTION

    Expand Yanbu NGL Plant Capacity from 390 to 585, scope of work

    includes: 195 MBOD Deethanizer with ancillaries and propane,

    refrigeration system, Feed to the existing De-propanizer & De-butanizerColumns, Construct Substation with Process Interface Room, Expand

    DCS and ESD systems.

  • 8/12/2019 Enppi Profile Summary

    8/38

    KHURSANIYAH GAS PLANT

    2005 / 2006

    OWNER / CLIENT

    Saudi Aramco / Bechtel UK.

    CONTRACT TYPE

    Professional services - Reimbursable basis

    SCOPE OF SERVICES

    Engineering services assistance

    PROJECT DESCRIPTIONKhursaniyah Gas Plant includes two gas-conditioning trains, ethane

    and natural gas liquids recovery units process 1000 MMSCFD of

    natural gas, produce 550 MMSCFD sales gas, 240,000 BL/D ethane /

    natural gas liquids, and 1,800 metric tons / day sulfur.

    The complex will process natural gas from three onshore fields in the

    Eastern Province: Abu Hadriya, Fadhili, and Khursaniyah.

    http://rds.yahoo.com/S=96062857/K=aramco+logo/v=2/SID=e/l=II/R=2/SS=i/OID=f0e9aa84fe43714e/SIG=1i457qk16/EXP=1132559743/*-http%3A//images.search.yahoo.com/search/images/view?back=http%3A%2F%2Fimages.search.yahoo.com%2Fsearch%2Fimages%3Fp%3Daramco%2Blogo%26sm%3DYahoo%2521%2BSearch%26fr%3DFP-tab-img-t%26toggle%3D1%26cop%3D%26ei%3DUTF-8&h=56&w=145&imgcurl=www.thecwcgroup.com%2FUserFiles%2FSponsorImage%2FAramco_logo.jpg&imgurl=www.thecwcgroup.com%2FUserFiles%2FSponsorImage%2FAramco_logo.jpg&size=3.6kB&name=Aramco_logo.jpg&rcurl=http%3A%2F%2Fwww.thecwcgroup.com%2Fcorp_sponsors.asp&rurl=http%3A%2F%2Fwww.thecwcgroup.com%2Fcorp_sponsors.asp&p=aramco+logo&type=jpeg&no=2&tt=29&ei=UTF-8http://rds.yahoo.com/S=96062857/K=bechtel+logo/v=2/SID=e/l=II/R=1/SS=i/OID=d347783075b9ed32/SIG=1l596bv4n/EXP=1132559706/*-http%3A//images.search.yahoo.com/search/images/view?back=http%3A%2F%2Fimages.search.yahoo.com%2Fsearch%2Fimages%3Fp%3Dbechtel%2Blogo%26ei%3DUTF-8%26fr%3DFP-tab-img-t%26fl%3D1%26vl%3Dlang_ar%26x%3Dwrt&h=88&w=99&imgcurl=www.hej.hr%2Fimages%2Fnews%2F834329_Bechtel_logo.jpg&imgurl=www.hej.hr%2Fimages%2Fnews%2F834329_Bechtel_logo.jpg&size=11.7kB&name=834329_Bechtel_logo.jpg&rcurl=http%3A%2F%2Fwww.hej.hr%2Fhej%2Fd_show%3Fhejid%3D8076288125843012%26type%3DNewsMain%26b%3Dc%26page%3D6%26idcat%3D28&rurl=http%3A%2F%2Fwww.hej.hr%2Fhej%2Fd_show%3Fhejid%3D8076288125843012%26type%3DNewsMain%26b%3Dc%26page%3D6%26idcat%3D28&p=bechtel+logo&type=jpeg&no=1&tt=61&ei=UTF-8
  • 8/12/2019 Enppi Profile Summary

    9/38

    OWNER / CLIENT

    Petroleos De Venezuela S.A.

    CONTRACT TYPE

    Professional Services Lumpsum

    SCOPE OF SERVICES

    Basic Engineering

    PROJECT DESCRIPTION

    New NGL Extraction Plant (4thTrain) in

    San Joaquin)Processing Capacity

    1000 MMSCFD of NGProducing

    52,500 BPD of C3.

    PDVSA NGL PLANT 2006

  • 8/12/2019 Enppi Profile Summary

    10/38

    HPC-SYRIA ENGINEERING SERVICES

    2006 / 2008

    OWNER / CLIENT

    HAYAN PETROLEUM COMPANY HPC

    CONTRACT TYPE

    Lump-sum Professional services

    SCOPE OF SERVICES

    Three Years Service Contract: Basic Engineering, Detailed

    Engineering review and Construction Supervision.PROJECT DESCRIPTION

    New Gas and Oil production facilities in Jihar including; Gathering

    and Transportation pipelines, Satellite Gathering Station, Gas

    Treatment Plant 3 MM m3/day, Product Export system and export

    P/Ls to Syrian Oil and gas distribution system, Oil production

    capacity for 400 m3/day and 250 000 m3/day associated gas, Liquidphasecondensate plant capacity will be 1200 m3/day,LPG

    production in range of 300 m3/ day

  • 8/12/2019 Enppi Profile Summary

    11/38

    OWNEREgyptian Natural Gas Company (GASCO)

    CONTRACT TYPELump-sum Professional Services / Material Supply Disbursable

    SCOPE OF SERVICESEPC Main Contractor:

    Basic and Detailed Engineering, Procurement, Construction

    Supervision, Commissioning & Start up Assistance, Overall Project

    Management

    PROJECT DESCRIPTIONMaximize C2 & C3 recovery in Western Desert Gas Complex and

    install a new facility at Amerya LPG plant to produce C2 & C3

    mixture

    Maximization of C2 & C32005 / 2008

  • 8/12/2019 Enppi Profile Summary

    12/38

    OWNERKHALDA PETROLUEM COMPANY (KPC)

    CONTRACT TYPELump-sum CTR Professional Services

    SCOPE OF SERVICESBasic and Detailed Engineering, Procurement Services

    PROJECT DESCRIPTIONNew Oil Production facilities at OZORIS to accommodate Qasr /

    Ozoris / Syrah oil well production 20,000 BFPD

    QASR / OZORIS NEW OIL FACILITY2006 / 2008

  • 8/12/2019 Enppi Profile Summary

    13/38

    GUPCO REHABILITATION PROJECT

    2005-2010OWNER

    GUPCO - bpCONTRACT TYPE

    Reimbursable Professional services / Cost Plus Material &

    Subcontracts.

    SCOPE OF SERVICES

    Basic, Detailed Engineering, Procurement Services, Construction,Commissioning and Start-up and overall management.

    PROJECT DESCRIPTION

    Rehabilitation of GUPCO offshore facilities includes , 9 complexes

    , 69 satellites platforms, and 1600 km of sub sea pipelines in

    addition to onshore facilities Ras Shukhier / Dahshour / WesternDesert including associated pipelines.

  • 8/12/2019 Enppi Profile Summary

    14/38

    FIELD DEVELOPMENT OF SAQQARA

    July-05 / Nov-05OWNER

    GUPCO

    CONTRACT TYPE

    Reimbursable Service

    SCOPE OF SERVICES

    Detailed Engineering Enppi/KBR-UK, and technical support during

    construction phase

    PROJECT DESCRIPTION

    Production of Saqqara field via an unmanned fixed steel nine-slot platform

    through a 16 multiphase P/L to onshore facilities. Power, signals and

    chemicals from onshore facilities to the Saqqara platform is supplied via an

    umbilical.

    Onshore Facilities: reception facilities approximately 1 km South East of the

    existing Ras-Shukeir Plant where the gas and liquids will be separated. The

    gas will then be sweetening and dehydration units and utilities.

  • 8/12/2019 Enppi Profile Summary

    15/38

    NEEM EXPORT PIPELINEJULY-05 / JUNE-06

    OWNERGreater Nile Petroleum Operating

    Company Ltd. (GNPOC) - Sudan

    CONTRACT TYPE

    LumpSum S/C of Ram/Petrojet

    Consortium

    SCOPE OF SERVICES

    Basic & Detailed Engineering

    PROJECT DESCRIPTION

    16- 100 km crude oil pipelineNeem to Diffra 100,000 B/D

    Diffra

    Neem

  • 8/12/2019 Enppi Profile Summary

    16/38

    SHARARA MELLITAH PIPELINE - LIBYA

    2004 - 2005

    OWNERAGIP OIL COMPANY Ltd.

    CONTRACT TYPE

    Lump SumS/C from Petrojet.

    SCOPE OF SERVICES

    Basic Engineering & Detailed Engineering

    PROJECT DESCRIPTION

    30" Crude Oil Pipeline from Sharara area to Melittah -

    750 KM The new pipeline will be three sectionsincluding Metering skids, Scada System.

  • 8/12/2019 Enppi Profile Summary

    17/38

    SHARARA MELLITAH PIPELINE - LIBYA

    2004 - 2005

    DEVELOPMENT OF THE JORDANIAN

  • 8/12/2019 Enppi Profile Summary

    18/38

    DEVELOPMENT OF THE JORDANIAN

    GAS TRANSMISSION PIPELINE 2003 - 2005

    OWNER

    Jordanian EGYPTIAN FAJR FOR NATURAL GASTRANSMISSION AND SUPPLY COMPANY

    CONTRACT TYPE

    EPCM - Consortium (Enppi, Petrojet & Gasco)

    SCOPE OF SERVICES

    Engineering & Procurement Services / MaterialSupply, Construction Supervision,Commissioning & Start Up AssistanceConsortium LeadershipPROJECT DESCRIPTION

    A 36, 394 KM Pipeline. From AQABA, South Of

    Jordan To Samra And Rehab Power Stations

    North Of Jordan10 BCM/Y Gas.

    DEVELOPMENT OF THE JORDANIAN

  • 8/12/2019 Enppi Profile Summary

    19/38

    DEVELOPMENT OF THE JORDANIAN

    GAS TRANSMISSION PIPELINE 2003 - 2005

    UGDC NGL PROJECT AT PORT SAID 2001 2004

  • 8/12/2019 Enppi Profile Summary

    20/38

    Port-Said Process area &

    Damietta export facilities areasNorth East Delta.

    Project

    Area

    Propane ExportP/L1052 KM

    ProcessArea

    Propane ExportArea

    UGDC, NGL PROJECT AT PORT SAID 2001-2004

    UGDC NGL PROJECT AT PORT SAID 2001-2004

  • 8/12/2019 Enppi Profile Summary

    21/38

    UGDC, NGL PROJECT AT PORT SAID 2001 2004(COMPLETED)

    Gas Drying& Treatment

    Refrigeration GasSeparation

    1100 MMSCFD

    Natural Gas

    Gas To Grid

    2000T/D Propan

    1500T/D LPG

    350T/D Condensat

    SCOPE OF SERVICESFEED review, Detailed Engineering,

    Procurement, Construction Supervision,

    Commissioning & Start Up Assistance,

    Overall Project Management

    OWNER

    United Gas Derivatives (UGDC)

    bpAgip - GASCO

    CONTRACT TYPELump sum turnkey responsibilities:

    Professional Services Lump-sum price

    Material Supply - Disbursable

    PROJECT DESCRIPTION

    - NGL Process Facility Which

    Has The Capacity ToProce

    1100 MMSCFD Of Natural G

    From Elgamil And Hapy Fie

    - Propane Export Facilities A

    Dameitta Port

    UGDC NGL PROJECT AT PORT SAID 2001 2004

  • 8/12/2019 Enppi Profile Summary

    22/38

    UGDC, NGL PROJECT AT PORT SAID 2001-2004(COMPLETED)

    NGL Damietta Storage & Export Facilities 2001 2004

  • 8/12/2019 Enppi Profile Summary

    23/38

    NGL - Damietta Storage & Export Facilities 20012004(Completed)

  • 8/12/2019 Enppi Profile Summary

    24/38

    Simian / Sienna - Sapphire Gas Development Project

    2003 - 2005

    OWNER:

    Burullus Gas Company.

    CONTRACT TYPE:

    (Consortium Enppi/Petrojet)

    Lumpsum Turnkey

    Simian / Sienna - Sapphire Gas Development Project

  • 8/12/2019 Enppi Profile Summary

    25/38

    Simian / Sienna - Sapphire Gas Development Project

    2003 - 2005

    Simian / Sienna - Sapphire Gas Development Project

  • 8/12/2019 Enppi Profile Summary

    26/38

    SCOPE OF SERVICES:

    Lump-sum turnkey scope: engineering services, procurement

    services , overall project management / consortium leadership,

    material supply , construction supervision, commissioning & start-up.

    PROJECT DESCRIPTION:

    Extension to existing Scarab / Saffron onshore facilities and increasetotal gas production to 2100 MMSCFD by utilizing 2*665 MMSCFD of

    natural gas produced from Simian / Sienna and sapphire wells to feed

    the Egyptian Gas Liquefaction Plant (ELNG)

    Simian / Sienna - Sapphire Gas Development Project

    ( Continued )

  • 8/12/2019 Enppi Profile Summary

    27/38

    Baltim-NW2 Platform 2005

    OWNER:

    Belayim Petroleum Company (PETROBEL)

    CONTRACT TYPE:

    Lump Sum

    SCOPE OF SERVICE:

    Basic Engineering,Detailed Engineering & Procurement Services

    PROJECT DESCRIPTION:

    12-slots RULE platform, Capacity 10 MMSCMD Gas.

    Gas, water & Condensate are Directed to onshore through 24, 10 and

    4 and sub-sea PLEM2 Km distance.

  • 8/12/2019 Enppi Profile Summary

    28/38

    Temsah 4 Platform 2003 2004

  • 8/12/2019 Enppi Profile Summary

    29/38

    Temsah - 4 Platform 2003-2004

    Barboni Platform 2003-2004

  • 8/12/2019 Enppi Profile Summary

    30/38

    Barboni Platform 2003-2004

    OWNER:

    Belayim Petroleum Company (PETROBEL)

    CONTRACT TYPE:

    Lump Sum

    SCOPE OF SERVICE:

    Basic Engineering, Detailed Engineering

    & Procurement Services

    PROJECT DESCRIPTION:

    4 Legged unmanned Steel Jacket Platform Located

    Rosetta 49 m Water Depth, Capacity of 275 MM

    SCFD. Weight 450 tons. Through a 26" Sub Sea Pipeline 17km to The Onshore Terminal for Final Processing.

    Barboni Platform 2003-2004

  • 8/12/2019 Enppi Profile Summary

    31/38

    Barboni Platform 2003-2004

    Baltim N Platform 2003 2005

  • 8/12/2019 Enppi Profile Summary

    32/38

    Baltim-N Platform 2003-2005OWNER:

    Belayim Petroleum Company (PETROBEL)

    CONTRACT TYPE:

    Lump Sum

    SCOPE OF SERVICE:

    Basic Engineering,Detailed Engineering & Procurement Services

    PROJECT DESCRIPTION:4 legs 9-slots Tubular Steel Frame Jacket. Fixed Offshore Productio

    Platform, Capacity 4.7 MMSCMD Gas.

    Gas & Condensate is Directed to Baltim East Existing Platform throu

    a 18" Gas Pipeline 20 Km and 4 Produced Water 20 KM.

    EGYPTIAN LINEAR ALKYL BENZENE PROJECT

  • 8/12/2019 Enppi Profile Summary

    33/38

    OWNER

    ECHEM / ELAB

    CONTRACT TYPE

    Lump-Sum

    SCOPE OF SERVICES(PHASE I) Professional Services - License selection, Basic

    Engineering Based on UOP License

    (PHASE II) Professional Services -

    Detailed Engineering through Consortium GS E&C Leader /

    Enppi / Petrojet

    EGYPTIAN LINEAR ALKYL BENZENE PROJECT

    20032005 Phase I / 20052008 Phase II

    EGYPTIAN LINEAR ALKYL BENZENE PROJECT

  • 8/12/2019 Enppi Profile Summary

    34/38

    EGYPTIAN LINEAR ALKYL BENZENE PROJECT

    20032005 Phase I / 20052008 Phase IIPROJECT DESCRIPTION

    The Plant capacity is 100,000 T/Y of LAB - (UOP)

    license.

    The main feeds for the complex are Kerosene/jet A-

    1 fuel from Alexandria Petroleum Company (APC)

    and reformat and Hydrogen from Alexandria

    National Refining & Petrochemicals Company

    (ANRPC)

    The Project facilities comprises the following units

    packages:

    - Process Units

    - Utilities

    - Storage Facilities

    - Service Buildings

    UHDE GRANULATION PLANT 2003 - 2005

  • 8/12/2019 Enppi Profile Summary

    35/38

    UHDE GRANULATION PLANT 2003 - 2005

    OWNER:

    Krupp, UHDE GmbHCONTRACT TYPE:

    Lump Sum

    SCOPE OF SERVICE:

    Detailed Engineering & Procurement Services

    PROJECT DESCRIPTION:

    The Project aims to fulfill the granulation process Requirements ofboth Suez Fertilizer Company & Alexandria Fertilizer Company.

    Granulation process aims to produce 1,200 T/D Ammonia and 1,925 T/

    Urea including utilities and off-sitefacilities.

    UHDE GRANULATION PLANT 2003 - 2005

  • 8/12/2019 Enppi Profile Summary

    36/38

    UHDE GRANULATION PLANT 2003 2005

    ETHYLENE AND POLYETHYLENE PLANTS - SIDPEC

  • 8/12/2019 Enppi Profile Summary

    37/38

    UTILITIES AND OFFSITE COMPLEX PROJECT 1997 - 2000

    ETHYLENE AND POLYETHYLENE PLANTS - SIDPEC

  • 8/12/2019 Enppi Profile Summary

    38/38

    UTILITIES AND OFFSITE COMPLEX PROJECT 1997 - 2000

    OWNERSidi Kerir Petrochemical Company (SIDPEC)

    CONTRACT TYPELump Sum Turnkey

    SCOPE OF SERVICESTurnkey Main Contractor

    PROJECT DESCRIPTIONThe Utilities And Offsite Plant Provides SIDPECs

    Two New Plants (Ethylene And Polyethylene) With

    Fire Fighting & Cooling Water, Compressed Air And

    de-mineralized Water. Moreover, The ComplexProvides Process Water Treatment.