2 of 9
PROJECTSin georgia
3 of 9Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
Project Location Client CommenceDate Completion Date Contract
Price Details
SCPX Early Works &Facilities Project
ENKA - Bechtel JV
Multiple Locations –Georgia
South Caucasus Pipeline Company(SCP Co.-Consortium between BP (Technical Operator), SOCAR, TPAO, Petronas, Lukoil and NICO)
February 2014 October 2019 US$ 878,000,000 Early works, the construction of compressor stations Georgia 1 & 2 and the pressure reduction, and metering facility
SCPX Early Works &Facilities Project
CIMTAS Pipe - CİMTAŞ Module & Shipyard
Multiple Locations –Georgia
ENKA - Bechtel (USA) JV 2015 2017 Euro 36,759,763 Piping Layout and Spool Fabrication, Engineering, Procurement and Fabrication of Steel Structure for Compressor Station Georgia-1 & 2 (CSG-1 & CSG-2) and the Pressure Reduction and Metering Facility (AREA 81)
Namakhvani Hydro Power Plant Cascade Project
ENKA - Clean Energy Group
Namakhvani -Georgia Georgian Government 40 Months US$ 750,000,000 Develop, construct, own and operate
Gardabani 2-Unit 1(System 6FA)
CIMTAS Ningbo
Gardabani - Georgia GE Energy Products Europe May 2018(Shipment Date)
Euro 41,000 Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
Gardabani 2-Unit 2(System 6FA)
CIMTAS Ningbo
Gardabani - Georgia GE Energy Products Europe May 2018(Shipment Date)
Euro 41,000 Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing
Poti Port Petroleum Products Storage &Handling Terminal Project
KasktaşPoti - Georgia
ÜSTAY Construction-Contracting and Trading Company
December 2001 December 2002 US$ 1,000,000 Soil Improvement Works
Projects ın Georgıa
4 of 9Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
Location: Georgia Client: South Caucasus Pipeline Company Ltd. Consortium
between BP (Technical Operator), SOCAR, TPAO, Petronas, Lukoil and NICO)
Construction Period: Feb 2014 – Oct 2019 Project Value: US$ 878 Million Project Description:A joint venture between Bechtel and ENKA was awarded the SCPX Early Works and Facilities contract and responsible for the construction of two Compressor Stations (CSG-1 and CSG-2) and a Pressure Reduction and Metering Station (AREA 81) at three different locations within Georgia, and for all related early civil works and facilities. The early works stage for Compressor Station 2 (CSG-2) includes the construction of a 15 km access road between the existing Millennium Highway and the compressor station. The Bechtel-ENKA Joint Venture’s scope of works also includes the supply and fabrication of all structural steel and fabrication of all piping including the pipeline connection sections to the South Caucasus Pipeline.SCPX – Area 81 Project was awarded with the Merit prize by British Safety Council in “International Safety Awards 2018”
SCPX Early Works and Facilities Project - Georgia
Not by ENKAPartially by ENKAFully by ENKA
Main Work Item Quantity Unit FEED Engineering Procurement Transport & Logistic Fabrication Construction
Process Buildings 20,900 m²Non-process Buildings 2,700 m²
Concrete works 74,000 m³
Steel works 14,500 ton
Pipe works 7,400 ton
5 of 9Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
Client : Bechtel – ENKA JV Construction Period : 2015-2017 Project Value : Euro 37 Million ÇİMTAŞ’s Scope of Works : Piping Layout and Spool Fabrication, Engineering, Procurement and
Fabrication of Steel Structure for Compressor Station Georgia-1 & 2 (CSG-1 & CSG-2) and thePressure Reduction and Metering Facility (AREA 81)
Scope Details :Pipe Spool : 5,700 tonsSteel Structure : 8,400 tons
South Caucasus Pıpelıne (SCPX)
6 of 9Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
Namakhvani HPP Cascade - Georgia
On April 25, 2019, the Build-Operate Agreement was signed with the Government of Georgia for the development, construction, ownership and operation of the Namakhvani Cascade HEPP Project in Georgia, where 90% of it is owned by ENKA.
Namakhvani Cascade HEPP Project consists of two separate hydroelectric power plants, namely Namakhvani HEPP (333 MW) and Tvishi HEPP (100 MW) on the Rioni River of Georgia and a total investment of 750 million US Dollars is projected. After the plant is operative, with the 15-year Power Purchase Agreement, the production will be done under the state guarantee for the eight months period between September and April of the year. Following the completion of the necessary permits, the construction of the project will begin and the plant is planned to be commissioned in 2023.
Location : Kutaisi - GeorgiaScope : EPC, Lump Sum TurnkeyCommencement : 2019Completion : 2023Client : Clean Energy Group Georgia
7 of 9Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
Human Resources(SCPx Project)
TechnicalStaff 49
AdministrativeStaff 44
Craft 653
Total 746
21%
2%
7%
23%
34%
12%
1%
% of Construction Machinery & Equipment &
Marine fleet LIFTING EQUIPMENT
CONCRETE PRODUCTION AND MATERIAL PREPERATION
EARTH MOVING MACHINES
TRANSPORTATION EQUIPMENT
ENERGY GENERATION AND DISTRIBUTION EQUIPMENT
SUPPORT EQUIPMENT
OTHER MACHINERY,FACILITIES FOR CONSTRUCTION SITES
Resources ın Georgia
8 of 9Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
ENKA received the 2018 ENR Global Best Project Award under Power / Industrial Category for its SCPX
Area 81 Project, located in Georgia
SPCX – Area 81 Project has been awarded with the Merit prize by British Safety Council in “International
Safety Awards 2018”; which clearly demonstrates the project’s commitment to the health, safety and
wellbeing of its workforce
Compressor Stations Georgia-1 and Compressor Stations Georgia-2 sites of SCPX project both achieved
6,000,000 man-hours without a lost-time incident
Area-81 of SCPX project is completed without a lost-time incident, reaching 3,000,000 man-hours
British Petroleum Georgia Safety Award 2017 was presented to ENKA-Bechtel JV in recognition of good
overall safety performance
Award & Achıevements
İNŞAAT VE SANAYİ A.Ş.Balmumcu Mahallesi, Zincirlikuyu Yolu No: 10, 34349