9
ENKA IN GEORGIA Engineering for a Better Future

ENKA IN GEORGIAman-hours without a lost-time incident Area-81 of SCPX project is completed without a lost-time incident, reaching 3,000,000 man-hours British Petroleum Georgia Safety

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ENKA IN GEORGIAman-hours without a lost-time incident Area-81 of SCPX project is completed without a lost-time incident, reaching 3,000,000 man-hours British Petroleum Georgia Safety

ENKA IN GEORGIA

Engineering for a Better Future

Page 2: ENKA IN GEORGIAman-hours without a lost-time incident Area-81 of SCPX project is completed without a lost-time incident, reaching 3,000,000 man-hours British Petroleum Georgia Safety

2 of 9

PROJECTSin georgia

Page 3: ENKA IN GEORGIAman-hours without a lost-time incident Area-81 of SCPX project is completed without a lost-time incident, reaching 3,000,000 man-hours British Petroleum Georgia Safety

3 of 9Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]

Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349

Project Location Client CommenceDate Completion Date Contract

Price Details

SCPX Early Works &Facilities Project

ENKA - Bechtel JV

Multiple Locations –Georgia

South Caucasus Pipeline Company(SCP Co.-Consortium between BP (Technical Operator), SOCAR, TPAO, Petronas, Lukoil and NICO)

February 2014 October 2019 US$ 878,000,000 Early works, the construction of compressor stations Georgia 1 & 2 and the pressure reduction, and metering facility

SCPX Early Works &Facilities Project

CIMTAS Pipe - CİMTAŞ Module & Shipyard

Multiple Locations –Georgia

ENKA - Bechtel (USA) JV 2015 2017 Euro 36,759,763 Piping Layout and Spool Fabrication, Engineering, Procurement and Fabrication of Steel Structure for Compressor Station Georgia-1 & 2 (CSG-1 & CSG-2) and the Pressure Reduction and Metering Facility (AREA 81)

Namakhvani Hydro Power Plant Cascade Project

ENKA - Clean Energy Group

Namakhvani -Georgia Georgian Government 40 Months US$ 750,000,000 Develop, construct, own and operate

Gardabani 2-Unit 1(System 6FA)

CIMTAS Ningbo

Gardabani - Georgia GE Energy Products Europe May 2018(Shipment Date)

Euro 41,000 Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing

Gardabani 2-Unit 2(System 6FA)

CIMTAS Ningbo

Gardabani - Georgia GE Energy Products Europe May 2018(Shipment Date)

Euro 41,000 Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing

Poti Port Petroleum Products Storage &Handling Terminal Project

KasktaşPoti - Georgia

ÜSTAY Construction-Contracting and Trading Company

December 2001 December 2002 US$ 1,000,000 Soil Improvement Works

Projects ın Georgıa

Page 4: ENKA IN GEORGIAman-hours without a lost-time incident Area-81 of SCPX project is completed without a lost-time incident, reaching 3,000,000 man-hours British Petroleum Georgia Safety

4 of 9Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]

Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349

Location: Georgia Client: South Caucasus Pipeline Company Ltd. Consortium

between BP (Technical Operator), SOCAR, TPAO, Petronas, Lukoil and NICO)

Construction Period: Feb 2014 – Oct 2019 Project Value: US$ 878 Million Project Description:A joint venture between Bechtel and ENKA was awarded the SCPX Early Works and Facilities contract and responsible for the construction of two Compressor Stations (CSG-1 and CSG-2) and a Pressure Reduction and Metering Station (AREA 81) at three different locations within Georgia, and for all related early civil works and facilities. The early works stage for Compressor Station 2 (CSG-2) includes the construction of a 15 km access road between the existing Millennium Highway and the compressor station. The Bechtel-ENKA Joint Venture’s scope of works also includes the supply and fabrication of all structural steel and fabrication of all piping including the pipeline connection sections to the South Caucasus Pipeline.SCPX – Area 81 Project was awarded with the Merit prize by British Safety Council in “International Safety Awards 2018”

SCPX Early Works and Facilities Project - Georgia

Not by ENKAPartially by ENKAFully by ENKA

Main Work Item Quantity Unit FEED Engineering Procurement Transport & Logistic Fabrication Construction

Process Buildings 20,900 m²Non-process Buildings 2,700 m²

Concrete works 74,000 m³

Steel works 14,500 ton

Pipe works 7,400 ton

Page 5: ENKA IN GEORGIAman-hours without a lost-time incident Area-81 of SCPX project is completed without a lost-time incident, reaching 3,000,000 man-hours British Petroleum Georgia Safety

5 of 9Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]

Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349

Client : Bechtel – ENKA JV Construction Period : 2015-2017 Project Value : Euro 37 Million ÇİMTAŞ’s Scope of Works : Piping Layout and Spool Fabrication, Engineering, Procurement and

Fabrication of Steel Structure for Compressor Station Georgia-1 & 2 (CSG-1 & CSG-2) and thePressure Reduction and Metering Facility (AREA 81)

Scope Details :Pipe Spool : 5,700 tonsSteel Structure : 8,400 tons

South Caucasus Pıpelıne (SCPX)

Page 6: ENKA IN GEORGIAman-hours without a lost-time incident Area-81 of SCPX project is completed without a lost-time incident, reaching 3,000,000 man-hours British Petroleum Georgia Safety

6 of 9Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]

Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349

Namakhvani HPP Cascade - Georgia

On April 25, 2019, the Build-Operate Agreement was signed with the Government of Georgia for the development, construction, ownership and operation of the Namakhvani Cascade HEPP Project in Georgia, where 90% of it is owned by ENKA.

Namakhvani Cascade HEPP Project consists of two separate hydroelectric power plants, namely Namakhvani HEPP (333 MW) and Tvishi HEPP (100 MW) on the Rioni River of Georgia and a total investment of 750 million US Dollars is projected. After the plant is operative, with the 15-year Power Purchase Agreement, the production will be done under the state guarantee for the eight months period between September and April of the year. Following the completion of the necessary permits, the construction of the project will begin and the plant is planned to be commissioned in 2023.

Location : Kutaisi - GeorgiaScope : EPC, Lump Sum TurnkeyCommencement : 2019Completion : 2023Client : Clean Energy Group Georgia

Page 7: ENKA IN GEORGIAman-hours without a lost-time incident Area-81 of SCPX project is completed without a lost-time incident, reaching 3,000,000 man-hours British Petroleum Georgia Safety

7 of 9Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]

Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349

Human Resources(SCPx Project)

TechnicalStaff 49

AdministrativeStaff 44

Craft 653

Total 746

21%

2%

7%

23%

34%

12%

1%

% of Construction Machinery & Equipment &

Marine fleet LIFTING EQUIPMENT

CONCRETE PRODUCTION AND MATERIAL PREPERATION

EARTH MOVING MACHINES

TRANSPORTATION EQUIPMENT

ENERGY GENERATION AND DISTRIBUTION EQUIPMENT

SUPPORT EQUIPMENT

OTHER MACHINERY,FACILITIES FOR CONSTRUCTION SITES

Resources ın Georgia

Page 8: ENKA IN GEORGIAman-hours without a lost-time incident Area-81 of SCPX project is completed without a lost-time incident, reaching 3,000,000 man-hours British Petroleum Georgia Safety

8 of 9Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]

Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349

ENKA received the 2018 ENR Global Best Project Award under Power / Industrial Category for its SCPX

Area 81 Project, located in Georgia

SPCX – Area 81 Project has been awarded with the Merit prize by British Safety Council in “International

Safety Awards 2018”; which clearly demonstrates the project’s commitment to the health, safety and

wellbeing of its workforce

Compressor Stations Georgia-1 and Compressor Stations Georgia-2 sites of SCPX project both achieved

6,000,000 man-hours without a lost-time incident

Area-81 of SCPX project is completed without a lost-time incident, reaching 3,000,000 man-hours

British Petroleum Georgia Safety Award 2017 was presented to ENKA-Bechtel JV in recognition of good

overall safety performance

Award & Achıevements

Page 9: ENKA IN GEORGIAman-hours without a lost-time incident Area-81 of SCPX project is completed without a lost-time incident, reaching 3,000,000 man-hours British Petroleum Georgia Safety

İNŞAAT VE SANAYİ A.Ş.Balmumcu Mahallesi, Zincirlikuyu Yolu No: 10, 34349

Beşiktaş / İstanbul

T: +90 (212) 376 10 00 (pbx); F: +90 (212) 272 88 69W: www.enka.com