16
IOM AFGHANISTAN Enhancement of Disaster Risk Management Capacity Strengthening Preparedness and Resilience at the National, Provincial and Community Levels Humanitarian Assistance Programme

Enhancement of Disaster Risk Management Capacity · SMDM capacity assessment in SMDM HQ and 8 provinces has been completed; IOM AFGHANISTAN ANDMA and IOM staff assess landslide damage

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Enhancement of Disaster Risk Management Capacity · SMDM capacity assessment in SMDM HQ and 8 provinces has been completed; IOM AFGHANISTAN ANDMA and IOM staff assess landslide damage

IOM AFGHANISTAN

Enhancement of Disaster Risk Management Capacity

Strengthening Preparedness and Resilience at the National, Provincial and Community Levels

Humanitarian Assistance Programme

Page 2: Enhancement of Disaster Risk Management Capacity · SMDM capacity assessment in SMDM HQ and 8 provinces has been completed; IOM AFGHANISTAN ANDMA and IOM staff assess landslide damage

IOM AFGHANISTAN

Page 3: Enhancement of Disaster Risk Management Capacity · SMDM capacity assessment in SMDM HQ and 8 provinces has been completed; IOM AFGHANISTAN ANDMA and IOM staff assess landslide damage

IOM AFGHANISTAN

Page 4: Enhancement of Disaster Risk Management Capacity · SMDM capacity assessment in SMDM HQ and 8 provinces has been completed; IOM AFGHANISTAN ANDMA and IOM staff assess landslide damage

IOM AFGHANISTAN

Geographical Coverage

Components 1-3: 10 Provinces

1. Central level (Kabul)

2. Balkh

3. Faryab

4. Helmand

5. Jawzjan

6. Baghlan

7. Bamyan

8. Takhar

9. Sar-e-Pul

10. Herat

Partner(s)

Afghanistan National Disaster Management Authority (ANDMA)

National Disaster Management Commission (NDCM)

Ministry of Rural Rehabilitation and Development (MRRD)

Ministry of Water and Energy

NGOs

iMMAP/Selected technical consultancy (hazard mapping)

Duration 36 months

Estimated budget USD $9.9 million

Page 5: Enhancement of Disaster Risk Management Capacity · SMDM capacity assessment in SMDM HQ and 8 provinces has been completed; IOM AFGHANISTAN ANDMA and IOM staff assess landslide damage

IOM AFGHANISTAN

Page 6: Enhancement of Disaster Risk Management Capacity · SMDM capacity assessment in SMDM HQ and 8 provinces has been completed; IOM AFGHANISTAN ANDMA and IOM staff assess landslide damage

IOM AFGHANISTAN

Component 1: National Disaster Management Information System (NDMIS)

Operationalize ANDMA Emergency Operations Center (EOC) through equipment, software and staff training

1. ANDMA EOC has: i) an operational database; ii) a web-based

interactive data and information sharing portal; and iii) a public

website.

2. ANDMA EOC and ten provincial ANDMA offices are equipped with

necessary IT equipment, software and network connection.

3. Standard Operating Procedures (SOPs) for Disaster Risk

Management Information workflow, training manual for ToT and

rapid assessment guidelines including relevant forms are developed.

Page 7: Enhancement of Disaster Risk Management Capacity · SMDM capacity assessment in SMDM HQ and 8 provinces has been completed; IOM AFGHANISTAN ANDMA and IOM staff assess landslide damage

IOM AFGHANISTAN

Component 1 continued

1. DRM practitioners (end users of NDMIS) are trained in:

Disaster Management Information System information

management.

Standard Operating Procedures for disaster

management information workflow.

Basic system infrastructure and database maintenance.

Page 8: Enhancement of Disaster Risk Management Capacity · SMDM capacity assessment in SMDM HQ and 8 provinces has been completed; IOM AFGHANISTAN ANDMA and IOM staff assess landslide damage

IOM AFGHANISTAN

Achievements Component 1

1. Comprehensive capacity building plan for all project trainings

has been prepared with envisaged participation of IOM and

SMDM personnel;

2. Activity , “Develop & Test Proof of Concept” has been

completed;

3. Business case development for NDMIS and EOC is on-going;

4. SMDM capacity assessment in SMDM HQ and 8 provinces has

been completed;

Page 9: Enhancement of Disaster Risk Management Capacity · SMDM capacity assessment in SMDM HQ and 8 provinces has been completed; IOM AFGHANISTAN ANDMA and IOM staff assess landslide damage

IOM AFGHANISTANANDMA and IOM staff assess landslide damage in Badakhshan province

Page 10: Enhancement of Disaster Risk Management Capacity · SMDM capacity assessment in SMDM HQ and 8 provinces has been completed; IOM AFGHANISTAN ANDMA and IOM staff assess landslide damage

IOM AFGHANISTANANDMA and IOM staff unload tents for families displaced by an avalanche

Page 11: Enhancement of Disaster Risk Management Capacity · SMDM capacity assessment in SMDM HQ and 8 provinces has been completed; IOM AFGHANISTAN ANDMA and IOM staff assess landslide damage

IOM AFGHANISTAN

Component 2: Community-Based Disaster Risk Management (CBDRM)

50 communities/villages across ten provinces will be selectedthroughout the project implementation

1. Risk assessment, hazard mapping and action planning.

2. Awareness raising and disaster Early Warning Systems.

3. Community-based disaster risk management training:

a. 500 individuals are trained in disaster risk management.

b. 50 communities have action plans and training material on

disaster risk management, including search and rescue.

4. CBDRM SOPs, action plans and training materials for use of ANDMA

and the Ministry of Rural Rehabilitation and Development.

Page 12: Enhancement of Disaster Risk Management Capacity · SMDM capacity assessment in SMDM HQ and 8 provinces has been completed; IOM AFGHANISTAN ANDMA and IOM staff assess landslide damage

IOM AFGHANISTAN

Achievements Component 2

1. Around 50 villages in 8 provinces have been assessed form

which 16 villages will be selected for the first round of the

CBDRM component of the project;

2. Training modules for the first part of CBDRM component of the

project have been developed;

3. Community mobilizers and DRR coordinators for the project have been recruited.

Page 13: Enhancement of Disaster Risk Management Capacity · SMDM capacity assessment in SMDM HQ and 8 provinces has been completed; IOM AFGHANISTAN ANDMA and IOM staff assess landslide damage

IOM AFGHANISTAN

Component 3: Disaster Risk Management (DRM) Infrastructure

50 communities/villages across ten provinces will be selectedthroughout the project implementation

1. 50 communities have constructed DRM infrastructure.

2. 45,000 daily laborers employed in construction of DRM

infrastructure.

3. 50 communities have guidelines/manual for constructing and

maintaining DRM infrastructure.

4. One pilot multi-hazard mapping exercise will be conducted in Herat

province.

Page 14: Enhancement of Disaster Risk Management Capacity · SMDM capacity assessment in SMDM HQ and 8 provinces has been completed; IOM AFGHANISTAN ANDMA and IOM staff assess landslide damage

IOM AFGHANISTAN

Achievements Component 3

1. 50 communities in 8 provinces, in close coordination with

ANDMA and other concerned government offices have been

assessed for infrastructure protection projects;

Page 15: Enhancement of Disaster Risk Management Capacity · SMDM capacity assessment in SMDM HQ and 8 provinces has been completed; IOM AFGHANISTAN ANDMA and IOM staff assess landslide damage

IOM AFGHANISTANA ‘gabion’ flood protection wall in Paktya province

Page 16: Enhancement of Disaster Risk Management Capacity · SMDM capacity assessment in SMDM HQ and 8 provinces has been completed; IOM AFGHANISTAN ANDMA and IOM staff assess landslide damage

IOM AFGHANISTAN