    AX324 - Engineering HVAC Cheklist

    PLANT ROOM/SUBSTATION No._________________________

    Shop Drawing No._____________________________________

    ENGINEER'S NAME:____________________________________

    START DATE:_________________________________________

    a) GENERAL:

    No. QUERY REPLY

    1 Is the drawing first issue of re-submittal?

    2 If re-submittal, has previous revisions been commented/coded?

    3 If yes to above, have you read and seen commented drawings?

    4 Name of Electrical Engineer assigned to Plant Room:

    5 If first submission, what is the number of Contract Issue Drawing?

    (including revision)

    6 What is the single line diagram used as reference?

    7 Have you got a copy of Architectural Layout with beams overlaid and site

    measurements of levels on?

    8 Have any drawings been produced for areas outside the Plant Room?

    9 If yes, can you co-ordinate the services at entry and exit to Plant Room?

    10 If no to above, have you resolved the problem with Engineer responsible

    for area outside Plant Room? (attach any relating documentation).

    11 If no, contact your Manager.

    Manager's Signature:____________________ Date:_______________

    12 Is there any issues that require an SCR to be raised?13 If yes, attach the relevant Documentation.

    14 Have the SCR been answered?

    15 If yes, can you incorporate answer/reply?

    16 If no to above, contact your Manager.

    Manager's Signature:____________________ Date:_______________

    17 If no to Point No.14, then area clouded and noted refering to SCR.

    b.1) EQUIPMENT: SILENCE ATTENUATORS

    No. QUERY REPLY

    1 Have any been selected?

    2 If no, attach relevant documents to support size indicated.

    3 Can all attenuators be accommodated in Plant Room?

    4 If no, attach Documentation to HVAC Engineer responsible for area outside

    the Plant Room so that he can accomodate it.

    187801033.xls.ms_office_11/12/2013 Page 1 of 3

  • 8/14/2019 Eng'ng-HVAC Checklist.xls

    2/3

  • 8/14/2019 Eng'ng-HVAC Checklist.xls

    3/3

    AX324 - Engineering HVAC Cheklist

    b.5) EQUIPMENT: FANS (Fresh Air, Extract, Smoke Extract)

    No. QUERY REPLY

    1 Have these been selected?

    2 If no, attach Documentation supporting sizes used.

    3 Can soung attenuators be fitted?

    4 Have sound attenuators been selected?

    5 Attach Documentation supporting sizes used.

    b.6) EQUIPMENT: FCU's

    No. QUERY REPLY

    1 Have these been selected?

    2 If no, attach Documentation supporting sizes used.

    3 Attach document that states Handing Required and Transmittal to C.E.D.

    4 Are invert levels marked up on drawing?

    Drawing commented by HMRT Eng'r.:_________________________ Date:_______________

    Completion date & given to CAD for cadding ( f i rst issue):_______________

    Date returned from CAD for checking:_______________

    Drawing commented alongside HMRT Eng'r.:____________________ Date:_______________

    Date final commented drawing to CAD:_______________

    HMRT signature..... Thermo signature.. JAM signature...