Engineers India Limited 1 st February, 2013 PROJECT MANAGEMENT AND RISK MITIGATION PRACTICES AND ITS IMPACT ON CONTROL SYSTEM INTEGRATORS 1st February 2013

Engineers India Limited - aia-india.org 2013/Presentation/Mr. P. Mahajan... · Engineers India Limited 1st February, 2013 PROJECT MANAGEMENT AND RISK MITIGATION PRACTICES AND ITS

Embed Size (px)

Citation preview

Page 1: Engineers India Limited - aia-india.org 2013/Presentation/Mr. P. Mahajan... · Engineers India Limited 1st February, 2013 PROJECT MANAGEMENT AND RISK MITIGATION PRACTICES AND ITS

Engineers India Limited

1st February, 2013

PROJECT MANAGEMENT AND RISK

MITIGATION PRACTICES AND ITS IMPACT ON

CONTROL SYSTEM INTEGRATORS

1st February 2013

Page 2: Engineers India Limited - aia-india.org 2013/Presentation/Mr. P. Mahajan... · Engineers India Limited 1st February, 2013 PROJECT MANAGEMENT AND RISK MITIGATION PRACTICES AND ITS

SYSTEM INTEGRATION

° Bringing together of the component sub-systems into one system and ensuring

that the sub-systems function together as a system.

° System integration is also about adding value to the system, capabilities that are

possible because of integration between sub-systems.

° Control system integration is the process of linking together different computing

systems, hardware systems and software applications physically or functionally

to act as a coordinated whole which helps us to efficiently monitor, better predict

and control complex processes.

° Therefore system integration is about bringing together discrete systems utilizing

a variety of techniques such as computer application integration, business

process management and manual programming.

Page 3: Engineers India Limited - aia-india.org 2013/Presentation/Mr. P. Mahajan... · Engineers India Limited 1st February, 2013 PROJECT MANAGEMENT AND RISK MITIGATION PRACTICES AND ITS

SYSTEM INTEGRATION

Page 4: Engineers India Limited - aia-india.org 2013/Presentation/Mr. P. Mahajan... · Engineers India Limited 1st February, 2013 PROJECT MANAGEMENT AND RISK MITIGATION PRACTICES AND ITS

4

STAKE-HOLDERS OF SYSTEM INTEGRATION

Manuf.

# 1

Manuf.

# 2

System

Integrator

Manuf.

# 3

Client

Page 5: Engineers India Limited - aia-india.org 2013/Presentation/Mr. P. Mahajan... · Engineers India Limited 1st February, 2013 PROJECT MANAGEMENT AND RISK MITIGATION PRACTICES AND ITS

SYSTEM INTEGRATOR

Page 6: Engineers India Limited - aia-india.org 2013/Presentation/Mr. P. Mahajan... · Engineers India Limited 1st February, 2013 PROJECT MANAGEMENT AND RISK MITIGATION PRACTICES AND ITS

SYSTEM INTEGRATOR

° A Company or a person that specialises in bringing together component sub-

systems into a whole and ensuring that those sub-systems function together.

° System Integrator in automation industry typically provide the product and

application experience in implementing complex automation solutions

° Often, system integrators are aligned with Automation vendors, joining their

various system integrator programs for access to development products,

resources and technical support

° System integrators are often viewed as the engineering arm for small

manufacturers, handling their automation system installation, commissioning and

long term logistics requirements

° A system integrator traditionally realize approximately 50% of revenue from

consulting services and 40% of revenue from IT services in design,

implementation and post transaction consulting

Page 7: Engineers India Limited - aia-india.org 2013/Presentation/Mr. P. Mahajan... · Engineers India Limited 1st February, 2013 PROJECT MANAGEMENT AND RISK MITIGATION PRACTICES AND ITS

LIFE TIME ACTIVITIES OF SYSTEM

INTEGRATOR

° Business Development

° Project Management

° Requirement definition and specification

(Ambiguity, conflict , new developments)

° Feasibility Analysis

° System Architecture Development

° System Design

° Engineering Design

° Cost Engineering

° Quality Reviews

Contd. next page

Page 8: Engineers India Limited - aia-india.org 2013/Presentation/Mr. P. Mahajan... · Engineers India Limited 1st February, 2013 PROJECT MANAGEMENT AND RISK MITIGATION PRACTICES AND ITS

LIFE TIME ACTIVITIES OF SYSTEM

INTEGRATOR

° Ordering and Receipts

° Software Development

° Hardware Manufacturing

° Factory Acceptance Test

° Implementation including Installation

° Loop Checks

° Calibration

° Site Acceptance Test

° Turn over package / documentation

° Logistic Support / Annual Maintenance Contracts

° Invoicing and Cash Management

Contd. from previous page

Page 9: Engineers India Limited - aia-india.org 2013/Presentation/Mr. P. Mahajan... · Engineers India Limited 1st February, 2013 PROJECT MANAGEMENT AND RISK MITIGATION PRACTICES AND ITS

9

Some measures that can be taken to prevent problems in an

integrated system network:

° Ensure correct installation and topology doc. of network.

° Only use qualified and approved network components.

° Consider use of a mix of components from different

manufacturers.

° Check network normal operation parameters.

° On-line reporting of network communication problems.

° Analyse and test weak points through Failure Mode and Effect

Analysys (FMEA), take precautions (as specified).

° Analyse (and test if required) effects of changes in

configuration by new FMEA.

SYSTEM INTEGRATION ISSUES

Page 10: Engineers India Limited - aia-india.org 2013/Presentation/Mr. P. Mahajan... · Engineers India Limited 1st February, 2013 PROJECT MANAGEMENT AND RISK MITIGATION PRACTICES AND ITS

COST CONTROL & CASH MANAGEMENT

Page 11: Engineers India Limited - aia-india.org 2013/Presentation/Mr. P. Mahajan... · Engineers India Limited 1st February, 2013 PROJECT MANAGEMENT AND RISK MITIGATION PRACTICES AND ITS

RESPONSIBILITY OF CLIENT

° Project Budget

° System Integration Definition (Technical)

° Responsibility Definition

° Project Schedule

° System / Equipment Supplier

° Project Control Mechanism

° Selection of System Integrator

° Conflict Resolution

° Team Management

° Acceptance Criteria

° Cash Flow Management

Page 12: Engineers India Limited - aia-india.org 2013/Presentation/Mr. P. Mahajan... · Engineers India Limited 1st February, 2013 PROJECT MANAGEMENT AND RISK MITIGATION PRACTICES AND ITS
Page 13: Engineers India Limited - aia-india.org 2013/Presentation/Mr. P. Mahajan... · Engineers India Limited 1st February, 2013 PROJECT MANAGEMENT AND RISK MITIGATION PRACTICES AND ITS

PROJECT PERFORMANCE ANALYSIS

Page 14: Engineers India Limited - aia-india.org 2013/Presentation/Mr. P. Mahajan... · Engineers India Limited 1st February, 2013 PROJECT MANAGEMENT AND RISK MITIGATION PRACTICES AND ITS

SYSTEM INTEGRATOR

Page 15: Engineers India Limited - aia-india.org 2013/Presentation/Mr. P. Mahajan... · Engineers India Limited 1st February, 2013 PROJECT MANAGEMENT AND RISK MITIGATION PRACTICES AND ITS

PROJECT RISKS

° System Requirements

° Technology Capability / Technology Supplier

° Budget and fund Management

° Project Schedule

° Modeling and Simulation Accuracy

° Environment, Safety and Health

° Stakeholder, Legal and Regulatory issues

Page 16: Engineers India Limited - aia-india.org 2013/Presentation/Mr. P. Mahajan... · Engineers India Limited 1st February, 2013 PROJECT MANAGEMENT AND RISK MITIGATION PRACTICES AND ITS

ARE YOU SURE OF SYSTEM REQUIREMENTS ?

Page 17: Engineers India Limited - aia-india.org 2013/Presentation/Mr. P. Mahajan... · Engineers India Limited 1st February, 2013 PROJECT MANAGEMENT AND RISK MITIGATION PRACTICES AND ITS

WHO IS OUR BEST TECHNOLOGY SUPPLIER ?

Page 18: Engineers India Limited - aia-india.org 2013/Presentation/Mr. P. Mahajan... · Engineers India Limited 1st February, 2013 PROJECT MANAGEMENT AND RISK MITIGATION PRACTICES AND ITS

DO WE HAVE COMPETENCE TO DO SYSTEM

INTEGRATION ?

Page 19: Engineers India Limited - aia-india.org 2013/Presentation/Mr. P. Mahajan... · Engineers India Limited 1st February, 2013 PROJECT MANAGEMENT AND RISK MITIGATION PRACTICES AND ITS

DO WE HAVE COMPETENCE TO DO SYSTEM

INTEGRATION ?

Page 20: Engineers India Limited - aia-india.org 2013/Presentation/Mr. P. Mahajan... · Engineers India Limited 1st February, 2013 PROJECT MANAGEMENT AND RISK MITIGATION PRACTICES AND ITS

DO WE HAVE COMPETENCE TO DO SYSTEM

INTEGRATION ?

Page 21: Engineers India Limited - aia-india.org 2013/Presentation/Mr. P. Mahajan... · Engineers India Limited 1st February, 2013 PROJECT MANAGEMENT AND RISK MITIGATION PRACTICES AND ITS

DO WE HAVE COMPETENCE TO DO SYSTEM

INTEGRATION ?

Page 22: Engineers India Limited - aia-india.org 2013/Presentation/Mr. P. Mahajan... · Engineers India Limited 1st February, 2013 PROJECT MANAGEMENT AND RISK MITIGATION PRACTICES AND ITS

RISK MITIGATION

Page 23: Engineers India Limited - aia-india.org 2013/Presentation/Mr. P. Mahajan... · Engineers India Limited 1st February, 2013 PROJECT MANAGEMENT AND RISK MITIGATION PRACTICES AND ITS

RISK MITIGATION METHODOLOGY

Page 24: Engineers India Limited - aia-india.org 2013/Presentation/Mr. P. Mahajan... · Engineers India Limited 1st February, 2013 PROJECT MANAGEMENT AND RISK MITIGATION PRACTICES AND ITS

RISK MITIGATION METHODOLOGY

° Continuous monitoring and controls of Technical Baseline

° Management of changes to the Technical Baseline

° Management of programmatic Baseline;

- Work Scope

- Project Schedule

- Cost

Page 25: Engineers India Limited - aia-india.org 2013/Presentation/Mr. P. Mahajan... · Engineers India Limited 1st February, 2013 PROJECT MANAGEMENT AND RISK MITIGATION PRACTICES AND ITS

25

Risk Mitigation

Identify Risks

Analyze & Assign Risk

Prioritization of

repose measures

Contingency

planning

Mitigation

Monitoring

•Risk Identification

•Risk Analysis

•Prioritization of

response measures

•Contingency planning

•Mitigation

•Monitoring

RISK MITIGATION METHODOLOGY

Page 26: Engineers India Limited - aia-india.org 2013/Presentation/Mr. P. Mahajan... · Engineers India Limited 1st February, 2013 PROJECT MANAGEMENT AND RISK MITIGATION PRACTICES AND ITS

26

Overload - too many packets!

3

•Competent

•Competitive

•Intuitive

•Team Player

•Effective Project Manager

•Cost & Quality Consciousness

•Communication effectiveness

DOOR TO BE BEST SYSTEM INTEGRATOR