RealizesENGINEERING
SUPPLYINSTALLATION
MAINTENANCEWherever the HIGH VOLTAGE Project is located
HV
SCOPE OF SUPPLY AND SERVICES
The scope of SALTEC covers the engineering activities from the very beginning, up to the commissioning of the new power line at the end of the entire project.
Consultancy services carried out by SALTEC can be offered.
DesignProduct supply
Civil works Installation Documentation Start-up
PRODUCT SUPPLY
The entire material which is needed for the project will be provided by SALTEC.
For materials being supplied directly from special manufacturers, delivery controls will be executed by us in order to ensure the requested quality.
For any HV parts SALTEC carries out the factory acceptance tests in the presence of our personnel exclusively.
All HV materials, such as high voltage cables,
terminations for outdoor, switchgear and
transformer applications as well as HV joints
with and without screen separation
Phase and ground wires with integrated optical
fibers
Link boxes, bonding cables, optical fiber cables
and accessories
DTS systems for temperature monitoring of
cables and overhead lines
All auxiliary materials, e.g. for steel- and civil
works, as well as the relevant parts for the
power distribution at substations
MATERIALS SUPPLIED BY SALTEC
In front of a project the utility company needs to know which techniques and procedures which are optimal in order to transmit the required energy.
SALTEC provides the full range of engineering and design works to offer the most efficient and economic solution.
DESIGN
Calculations (ampacity, statics)
Drawings (components, designs)
Feasibility studies, respecting the applicable laws for the works on site
Consideration of national and international Standards (IEC 62067/60840)
Starting with the Engineering, so the technical part…
DESIGN
Up to the commercial part, which means…
DESIGN
Considering economic aspects.
Comparison between different techniques.
Looking for a future-oriented solution.
…Up to 500 kV, with a max. cross section of 3200 mm²
SINGLE CORE XLPE CABLES
…Up to 220 kV, with a max. cross section of 1000 mm²
THREE CORE XLPE CABLES
Up to 500 kV
Terminations (outdoor, switchgear, transformer), oil filled and dry type
Joints with anti corrosion protection housing or shrinkage sleeve
ACCESSORIES
CIVIL WORKS
For the civil works in the scope of a project a lot of coordination between the
several parties is needed in advance as well as during the execution of the
relevant works, in order to cover the full range of Project Management, e.g.:
Fixing the route of the HV line, together with the customer
and responsible authorities and/or agencies
Getting the permissions for the necessary accesses and
digging works, both from public and from private property
owners
Evaluation of any required material, such as concrete, steel
etc.
QHSE (Quality/Health/Safety/Environment regulations)
according to national and international PM Standards
Time Management of all running processes and involved
companies in order to keep the overall time schedule for an
on-time-commissioning of the new line
Execution of work will be carried out preferably by local
subcontractors to SALTEC
The project management contains the responsibility for this
sector as well.
CIVIL WORKS
PROJECT RZHEVSKAYA
St. Petersburg, first 330 kV cable in Russia
21 km, 1200 mm², two circuits in parallel
30 pcs. Joints, 18 pcs. Terminations
Moscow 220 kV. 78 km, 2000 mm², three circuits. 108 pcs. Joints, ., 108 pcs. Joints, incl. VALCAP
PROJECT PAVLOVSKAYA
The installation works for any HV material will be executed by our own experienced and internationally certified personnel.
The processes running in parallel are being coordinated by our Project Management, to keep the negative impacts between the several crafts as low as possible.
INSTALLATION
INSTALLATION
Providing the required working platforms and conditions for the ongoing processes/works
Availability of necessary equipment, tools, materials and personnel
Short termed reaction time in case of any arising, unforeseeable events and issues
Flexibility of installation staff concerning any influences from third parties
Installation of HV parts in a clean surrounding, in order to ensure the high quality standards needed
PROJECT OCHAKOVO
Moscow 220 kV.
3,0 km, 1200 mm², two circuits in parallel.
8 pcs. Joints, 7 pcs. Terminations.
PROJECT VOSTOCHNAYA
St. Petersburg 330 kV + 110 kV
Completely inside substation.
13 km de 330 kV, 1600 mm² y 400 mm², 42 Terminations (incl. optical fibers )
6,5 km de 110 kV, 500 mm², 54 pcs. Terminations
110 kV City Cable 5,64 km 21 pcs. Joints, 8 pcs. Terminations incl. optical fibers and VALCAP
PROJECT SOFIYSKAYA
110 kV, single core cable
11,8 km, three cross sections
9 pcs. Joints, 32 pcs. Terminations
PROJECT ZAVOD ILICH
At the end of the project the commissioning procedure needs to be preparedand executed afterwards.
The relevant parties have to provide all necessary documentation in order toget the new HV line in service. This procedure will be initialized andmonitored by SALTEC.
DOCUMENTATION ADN COMMISSIONING
DOCUMENTATION ADN COMMISSIONING
Requesting and collecting all documents needed for the completion of the
works, to be provided for the final customer / authorities / national grid
company before and after commissioning
Preparing the site acceptance test (SAT) according to the valid standards, to be
signed later by all responsible parties
Witnessing the tests on site before putting the new line under voltage.
Handing over the complete as-built-
report after the successful SAT
Coordination with international
classification companies is common
practice