22

ENGINEERING ORDER N° IM A319/A320-54/1439webapp.ifrskeyes.com/GED/AMSFSKUPRD/(1439) IM-A319-A320-54-14… · Preparation - Subtask 541022 ... Access to the cockpit and cabin is available

  • Upload
    lethu

  • View
    228

  • Download
    2

Embed Size (px)

Citation preview

ENGINEERING ORDER N° IM A319/A320-54/1439

Engineering Management Pudahuel, Santiago, Chile

WORK ORDER : …………….

ITEM NUMBER : …………….

ISSUE DATE:

REV:

PAGE:

Jul-06-2015

1 2 OF 22

Form R145-38 Rev 0

19) PART LIST

ITEM QTY PART NUMBER DESCRIPTION REMARK

NOT REQUIRED

20) TOOL LIST

ITEM QTY PART NUMBER DESCRIPTION REMARK

NOT REQUIRED

ENGINEERING ORDER N° IM A319/A320-54/1439

Engineering Management Pudahuel, Santiago, Chile

WORK ORDER : …………….

ITEM NUMBER : …………….

ISSUE DATE:

REV:

PAGE:

Jul-06-2015

1 3 OF 22

Form R145-38 Rev 0

21) REFERENCE TABLE FOR SKY FLEET

Table I – Accomplishment – Task 541022-832-801-001: Inspection of the Corner Fittings

MSN Compliance time (whichever occurs later, A, B, or C) Interval

Config. 001 (0447; 1400; 1523). Config.: 002 (2119; 2129; 2214; 2249; 2251; 2283; 2378; 2380; 2436; 2460; 2548).

A Within 15 000 FC or 22 500 FH, whichever occurs first since aeroplane first flight.

Within 15.000 FC or 22.500 FH, whichever occurs first since last inspection.

B Within 5 000 FC or 7 500 FH after March 28th 2014, without exceeding 40 750 FC or 60 750 FH, whichever occurs first since aeroplane first flight.

C Within 750 FC or 750 FH, whichever occurs first after March 28th 2014.

Table II – Total Hours and Elapsed Time

Task 541022-832-801-001: Inspection of the Corner Fittings

Get Access 1.00

Do a detailed Inspection of Forward Corner Fittings of Pylon AFT Secondary Structure LH. 2.00 Close-Up 1.00 TOTAL MANHOURS 8.00 ELAPSED TIME (HOURS) 4.00

Task 541022-832-802-001: Inspection of the Lower and Medium Spars

Get Access 2.00

Do a detailed Inspection of the Lower and Medium Spars of the LH Pylon 2.00 Close-Up 2.00 TOTAL MANHOURS 12.00 ELAPSED TIME (HOURS) 6.00

ENGINEERING ORDER N° IM A319/A320-54/1439

Engineering Management Pudahuel, Santiago, Chile

WORK ORDER : …………….

ITEM NUMBER : …………….

ISSUE DATE:

REV:

PAGE:

Jul-06-2015

1 4 OF 22

Form R145-38 Rev 0

22) REVISION RECORD

N° REVISION ITEM DESCRIPTION DATE

0

ALL

Original release

Sep 05, 2014 (J.M.)

1 ALL Engineering Order updated by revision 03 of

SB A320-54-1022 and is added FAA AD 2015-09-03, See Summary.

Jul 06, 2015 (J.G.)

ENGINEERING ORDER N° IM A319/A320-54/1439

Engineering Management Pudahuel, Santiago, Chile

WORK ORDER : …………….

ITEM NUMBER : …………….

ISSUE DATE:

REV:

PAGE:

Jul-06-2015

1 5 OF 22

Form R145-38 Rev 0

GENERAL INSTRUCTIONS

WARNING: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS INCLUDED IN THE

REFERENCED PROCEDURES.

CAUTION: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP ELECTRICAL WIRING IN A

SATISFACTORY CONDITION (ELECTRICALLY AND MECHANICALLY SERVICEABLE). WHEN YOU DO

MAINTENANCE WORK, REPAIRS OR MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING,

COMPONENTS AND THE WORK AREA AS CLEAN AS POSSIBLE. TO DO THIS:

PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC; AS NECESSARY ON WIRING AND

COMPONENTS.

REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND OTHER CONTAMINATION.

THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION AND DAMAGE TO THE ELECTRICAL

WIRING INSTALLATION.

IF THERE IS CONTAMINATION, REFER TO ESPM 20-55-00.

ENGINEERING ORDER N° IM A319/A320-54/1439

Engineering Management Pudahuel, Santiago, Chile

WORK ORDER : …………….

ITEM NUMBER : …………….

ISSUE DATE:

REV:

PAGE:

Jul-06-2015

1 6 OF 22

Form R145-38 Rev 0

ACCOMPLISHMENT INSTRUCTIONS MEC LICENSE

& SIGNATURE

INSPECTOR &

SIGNATURE

Task 541022-832-801-001: Inspection of the Corner Fittings

Preparation - Subtask 541022-941-001-001 - Job Set-Up

A. The following items shall be considered as the basic Aircraft configuration before you start a maintenance task:

(1) Aircraft on the ground resting on landing gear (the ground safety locks and

the wheel chocks are in position on the landing gear). (2) Engine shut down, thrust reversers closed and locked. (3) Aircraft in clean configuration. (4) Parking brake applied. (5) Aircraft electrical network de-energized. (6) Hydraulic systems depressurized. (7) Access to the cockpit and cabin is available. (8) All circuit breakers are in closed position. (9) All controls in NORM, AUTO or OFF position.

M

I

B. Make sure that the aircraft is electrically grounded (Refer to AMM Task 12-34-24-869-002).

M

I

C. Put the access platform(s) in position. M

D. Remove the panels of the LH pylon 475AL, 476AR refer to AMM 06-41-54, Page Block 001.

M

Procedure - Subtask 541022-220-001-001 - Do a detailed Inspection of Forward Corner Fittings of Pylon AFT Secondary Structure LH.

E. Do a Detailed Inspection of the corner fittings. Refer to Fig. A-FBAAA and Fig. A-FFAAA.

CRACKS WERE FOUND IN LH PYLON CORNER FITTINGS YES NOT

a. If no crack is found on the corner fitting:

Do the inspection again at the interval given in Table I – Accomplishment, refer to TASK 541022-832-801 001 Inspection of the Corner Fittings

b. If crack is found on the corner fitting:

Do TASK 541022-832-802 001 Inspection of the Lower and Medium Spars. Refer to step K.

I

F. Please fill in the inspection report, refer to Fig. A-FRAAA Sheet 01 I

ENGINEERING ORDER N° IM A319/A320-54/1439

Engineering Management Pudahuel, Santiago, Chile

WORK ORDER : …………….

ITEM NUMBER : …………….

ISSUE DATE:

REV:

PAGE:

Jul-06-2015

1 7 OF 22

Form R145-38 Rev 0

ACCOMPLISHMENT INSTRUCTIONS MEC LICENSE

& SIGNATURE

INSPECTOR &

SIGNATURE

Subtask 541022-942-001-001 - Close-Up

G. Make sure that the work areas are clean and clear of tools and other items of equipment.

M

H. Install the panels of the LH pylon 475AL, 476AR refer to AMM 06-41-54, Page Block 001.

M

I

I. Remove the access platform(s). M

J. Restore the systems and the aircraft to normal operating conditions. M

ENGINEERING ORDER N° IM A319/A320-54/1439

Engineering Management Pudahuel, Santiago, Chile

WORK ORDER : …………….

ITEM NUMBER : …………….

ISSUE DATE:

REV:

PAGE:

Jul-06-2015

1 8 OF 22

Form R145-38 Rev 0

ACCOMPLISHMENT INSTRUCTIONS MEC LICENSE

& SIGNATURE

INSPECTOR &

SIGNATURE

Task 541022-832-802-001 - Inspection of the Lower and Medium Spars

Preparation - Subtask 541022-941-003-001 - Job Set-Up (conf. 001) Preparation - Subtask 541022-941-003-002 - Job Set-Up (conf. 002)

K. The following items shall be considered as the basic Aircraft configuration before you start a maintenance task:

(1) Aircraft on the ground resting on landing gear (the ground safety locks and

the wheel chocks are in position on the landing gear). (2) Engine shut down, thrust reversers closed and locked. (3) Aircraft in clean configuration. (4) Parking brake applied. (5) Aircraft electrical network de-energized. (6) Hydraulic systems depressurized. (7) Access to the cockpit and cabin is available. (8) All circuit breakers are in closed position. (9) All controls in NORM, AUTO or OFF position.

M

I

L. Make sure that the aircraft is electrically grounded (Refer to AMM Task 12-34-24-869-002).

M

I

M. Put the access platform(s) in position. M

N. Remove the LH pylon Aft Lower fairing; per corresponding Task, refer to AMM Task 54-56-00-000-001 (conf. 002) or Task 54-56-00-000-002 (conf. 001).

M

Procedure - Subtask 541022-220-003-001 - Do a detailed Inspection of the Lower and Medium Spars of the LH Pylon

O. Do a Detailed Inspection of the Lower and Medium Spar. Refer to Fig. A-FBCAA and Fig. A-FFAAA.

DAMAGE WERE FOUND IN LH SPARS YES NOT

a. If no damage is found:

Accomplish Engineering Order IM-A319/A320-54-1488 at or before 5.000FC/7.500FH, whichever occurs first.

b. If damage is found such as crack or deformation:

Contact Engineering department before next flight for that engineering department Contact Airbus.

I

P. Please fill in the Inspection report, refer to Fig. A-FRBAA Sheet 01 I

ENGINEERING ORDER N° IM A319/A320-54/1439

Engineering Management Pudahuel, Santiago, Chile

WORK ORDER : …………….

ITEM NUMBER : …………….

ISSUE DATE:

REV:

PAGE:

Jul-06-2015

1 9 OF 22

Form R145-38 Rev 0

ACCOMPLISHMENT INSTRUCTIONS MEC LICENSE

& SIGNATURE

INSPECTOR &

SIGNATURE

Subtask 541022-942-003-001 - Close-up (conf. 001) Subtask 541022-942-003-002 - Close-up (conf. 002)

Q. Make sure that the work areas are clean and clear of tools and other items of

equipment.

M

R. Install the removed Aft Lower Fairing, per corresponding Task, refer to AMM

Task 54-56-00-400-001 (conf. 002) or Task 54-56-00-400-002 (conf. 001).

M

I

S. Remove the access platform(s).

M

T. Restore the systems and the aircraft to normal operating conditions.

M

ENGINEERING ORDER N° IM A319/A320-54/1439

Engineering Management Pudahuel, Santiago, Chile

WORK ORDER : …………….

ITEM NUMBER : …………….

ISSUE DATE:

REV:

PAGE:

Jul-06-2015

1 10 OF 22

Form R145-38 Rev 0

ENGINEERING ORDER N° IM A319/A320-54/1439

Engineering Management Pudahuel, Santiago, Chile

WORK ORDER : …………….

ITEM NUMBER : …………….

ISSUE DATE:

REV:

PAGE:

Jul-06-2015

1 11 OF 22

Form R145-38 Rev 0

ENGINEERING ORDER N° IM A319/A320-54/1439

Engineering Management Pudahuel, Santiago, Chile

WORK ORDER : …………….

ITEM NUMBER : …………….

ISSUE DATE:

REV:

PAGE:

Jul-06-2015

1 12 OF 22

Form R145-38 Rev 0

ENGINEERING ORDER N° IM A319/A320-54/1439

Engineering Management Pudahuel, Santiago, Chile

WORK ORDER : …………….

ITEM NUMBER : …………….

ISSUE DATE:

REV:

PAGE:

Jul-06-2015

1 13 OF 22

Form R145-38 Rev 0

ENGINEERING ORDER N° IM A319/A320-54/1439

Engineering Management Pudahuel, Santiago, Chile

WORK ORDER : …………….

ITEM NUMBER : …………….

ISSUE DATE:

REV:

PAGE:

Jul-06-2015

1 14 OF 22

Form R145-38 Rev 0

ENGINEERING ORDER N° IM A319/A320-54/1439

Engineering Management Pudahuel, Santiago, Chile

WORK ORDER : …………….

ITEM NUMBER : …………….

ISSUE DATE:

REV:

PAGE:

Jul-06-2015

1 15 OF 22

Form R145-38 Rev 0

ENGINEERING ORDER N° IM A319/A320-54/1439

Engineering Management Pudahuel, Santiago, Chile

WORK ORDER : …………….

ITEM NUMBER : …………….

ISSUE DATE:

REV:

PAGE:

Jul-06-2015

1 16 OF 22

Form R145-38 Rev 0

ENGINEERING ORDER N° IM A319/A320-54/1439

Engineering Management Pudahuel, Santiago, Chile

WORK ORDER : …………….

ITEM NUMBER : …………….

ISSUE DATE:

REV:

PAGE:

Jul-06-2015

1 17 OF 22

Form R145-38 Rev 0

ENGINEERING ORDER N° IM A319/A320-54/1439

Engineering Management Pudahuel, Santiago, Chile

WORK ORDER : …………….

ITEM NUMBER : …………….

ISSUE DATE:

REV:

PAGE:

Jul-06-2015

1 18 OF 22

Form R145-38 Rev 0

ENGINEERING ORDER N° IM A319/A320-54/1439

Engineering Management Pudahuel, Santiago, Chile

WORK ORDER : …………….

ITEM NUMBER : …………….

ISSUE DATE:

REV:

PAGE:

Jul-06-2015

1 19 OF 22

Form R145-38 Rev 0

ENGINEERING ORDER N° IM A319/A320-54/1439

Engineering Management Pudahuel, Santiago, Chile

WORK ORDER : …………….

ITEM NUMBER : …………….

ISSUE DATE:

REV:

PAGE:

Jul-06-2015

1 20 OF 22

Form R145-38 Rev 0

ENGINEERING ORDER N° IM A319/A320-54/1439

Engineering Management Pudahuel, Santiago, Chile

WORK ORDER : …………….

ITEM NUMBER : …………….

ISSUE DATE:

REV:

PAGE:

Jul-06-2015

1 21 OF 22

Form R145-38 Rev 0

Deviation Record Sheet Paragraph Observation Action Authorized by Performed by

ENGINEERING ORDER N° IM A319/A320-54/1439

Engineering Management Pudahuel, Santiago, Chile

WORK ORDER : …………….

ITEM NUMBER : …………….

ISSUE DATE:

REV:

PAGE:

Jul-06-2015

1 22 OF 22

Form R145-38 Rev 0

DISCREPANCY FOUND PARAGRAPH CORRECTIVE ACTION DETAIL MEC LICENSE

& SIGNATURE

INSPECTOR &

SIGNATURE

1

2

3

4

5

6