Purpose:
The purpose of this position is to plan, coordinate and manage the engineering and design of the
client projects and mainly in charge of Piping Group.
Core Accountabilities
1) Leadership
• Provides leadership and assistance to his team members.
• Provides technical direction and work-related advice.
• Demonstrates an overriding commitment to health, safety, environmental responsibility.
• Oversees, reviews, and directs the actions of his team members assignments and
pro!ects.
• "stablish Design "ngineering Proced#res.
• $eviews and approves the work proced#res, and sched#les prepared by Pro!ect %eam for
engineering gro#p.
• &ss#mes responsibility for the performance of all tasks needed for the timely and
s#ccessf#l completion of the pro!ects, in accordance with the clients specifications, and all
contract#al terms and conditions.
• 'oordinates engineering matter with the client and s#bcontractors.
• $eviews and approves engineering doc#ments i.e. drawings, specifications and
re(#isitions.
• nterprets designs, drawings and specifications* and provides technical advice to
'onstr#ction Department, +&+' Department eplaining re(#irements of engineering and
design specifications consistent with good constr#ction practice.
• anages the comm#nication and facilitates interdepartmental cooperation and shared
work.
• &pproves lesson and learnt.
• $eviews and approves re(#ired manpower assignment and forecast for each pro!ect.
/) "stablishment of 0oals
8/11/2019 Engineering Manager Responsibility
http://slidepdf.com/reader/full/engineering-manager-responsibility 2/2
• Defines pro!ect scope and ob!ectives.
• "ns#res that engineering work proceeds in accordance with the (#ality ass#rance plan.
• "stablishes eval#ative process for eval#ating progress and achievements toward the
pro!ect goals. %his process incl#des both team and individ#al progress and performance
reviews.)
• $eviews stat#s of all engineering works, and directs the respective gro#p leaders to take
necessary meas#res so as to ens#re compatibility with the overall sched#le.
• $eviews and approves all ma!or change orders and periodically reviews change order
controls to determine their ade(#acy and whether change orders are eec#ted in a timely
manner.
• &ttends periodical meetings with the client to review progress, disc#sses ma!or 'hanges in
the work and resolves problems raised between the client and '&"L.
• Obtains the clients approval for field design changes.
• $eviews all non-conformance and concession reports.
• Prepares the disposition plan for non-conformance items, in coordination with the +&+'
Department and a#thori2es disposition after approval by the client.
• $eports changes#pplemental work to the 'ontrol Department. Prepare description of
change proposal.
3) Doc#ment 'ontrol
• Plans and directs receiving, distrib#tion, and filing of drawings and specifications thro#gh
the Doc#ment 'ontrol 0ro#p.
• &ss#res development of complete engineering records for the pro!ect record.
• &ss#res that the latest drawings and other engineering doc#ments are maintained and
accessible to all personnel in the office and that s#bcontractors have the latest revisions.
• 'oordinates t#rnover proced#re efforts among all parties concerned, incl#ding compilation
of the doc#ments re(#ired for facilities t#rnover to the client.