& ecology and environment, inc. International Specialists in the Environment The McKinstry Creek & Riparian Area NYSDOT Rt. 219 Mitigation Project Engineering for Ecosystem Restoration Workshop Module 2: June 14-16, 2010 PLANTING TECHNIQUES AND INNOVATIVE BIOENGINEERING METHODS TO ENHANCE FUNCTION OF STREAMS AND RIPARIAN AREAS University at Buffalo The State University of New York

Engineering for Ecosystem Restoration Workshop Module 2 ... Summer Workshop/Week 2...Engineering for Ecosystem Restoration Workshop . Module 2: June 14-16, 2010 . PLANTING TECHNIQUES

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Engineering for Ecosystem Restoration Workshop Module 2 ... Summer Workshop/Week 2...Engineering for Ecosystem Restoration Workshop . Module 2: June 14-16, 2010 . PLANTING TECHNIQUES

& ecology and environment, inc.International Specialists in the Environment

The McKinstry Creek & Riparian Area NYSDOT Rt. 219 Mitigation Project

Engineering for Ecosystem Restoration Workshop

Module 2: June 14-16, 2010

PLANTING TECHNIQUES AND INNOVATIVE BIOENGINEERING METHODS TO ENHANCE

FUNCTION OF STREAMS AND RIPARIAN AREAS

University at Buffalo

The State University of New York

Page 2: Engineering for Ecosystem Restoration Workshop Module 2 ... Summer Workshop/Week 2...Engineering for Ecosystem Restoration Workshop . Module 2: June 14-16, 2010 . PLANTING TECHNIQUES

& ecology and environment, inc.International Specialists in the Environment

Mitigation Planning

Assessment

Conceptual Design

Final Design

Construction

Mitigation Monitoring

Page 3: Engineering for Ecosystem Restoration Workshop Module 2 ... Summer Workshop/Week 2...Engineering for Ecosystem Restoration Workshop . Module 2: June 14-16, 2010 . PLANTING TECHNIQUES

& ecology and environment, inc.International Specialists in the Environment

NYSDOT Region 5 - Route 219 Extension Stream Mitigation Projects

• McKinstry Creek– 2200-feet Channel Realignment and

Riparian Restoration 2007

Page 4: Engineering for Ecosystem Restoration Workshop Module 2 ... Summer Workshop/Week 2...Engineering for Ecosystem Restoration Workshop . Module 2: June 14-16, 2010 . PLANTING TECHNIQUES

& ecology and environment, inc.International Specialists in the Environment

Route 219 at Route 39 Springville, NY

Page 5: Engineering for Ecosystem Restoration Workshop Module 2 ... Summer Workshop/Week 2...Engineering for Ecosystem Restoration Workshop . Module 2: June 14-16, 2010 . PLANTING TECHNIQUES

& ecology and environment, inc.International Specialists in the Environment

Route 219 - Cattaraugus Creek Bridge Crossing

Page 6: Engineering for Ecosystem Restoration Workshop Module 2 ... Summer Workshop/Week 2...Engineering for Ecosystem Restoration Workshop . Module 2: June 14-16, 2010 . PLANTING TECHNIQUES

& ecology and environment, inc.International Specialists in the Environment

Candidate Stream Screening and Evaluation

Report

Page 7: Engineering for Ecosystem Restoration Workshop Module 2 ... Summer Workshop/Week 2...Engineering for Ecosystem Restoration Workshop . Module 2: June 14-16, 2010 . PLANTING TECHNIQUES

& ecology and environment, inc.International Specialists in the Environment NYSDEC Lake Erie Basin

Lake Erie NYS Watershed Map (NYSDEC)

Cattaraugus Creek Watershed

Page 8: Engineering for Ecosystem Restoration Workshop Module 2 ... Summer Workshop/Week 2...Engineering for Ecosystem Restoration Workshop . Module 2: June 14-16, 2010 . PLANTING TECHNIQUES

& ecology and environment, inc.International Specialists in the Environment

Integrated Planning –Assessment, Design andRegulatory Compliance

• Research• Field Assessment• Data Analysis

– Scoring • QA/QC• Conceptual

Planning/Design • Final Design

– Review– Specification

• Project Planning– Contract Services– Procurement

• Construction– Oversight– Regulatory

Compliance• Monitoring • Lessons Learned

Page 9: Engineering for Ecosystem Restoration Workshop Module 2 ... Summer Workshop/Week 2...Engineering for Ecosystem Restoration Workshop . Module 2: June 14-16, 2010 . PLANTING TECHNIQUES

& ecology and environment, inc.International Specialists in the Environment

Stream Dynamics, Ecological Associations and Physical Energy

• Water– Budget – Volume– Velocity– Quality– Hydraulics

• Geology• Agronomy

• Anthropogenic Stressors

• Vegetation– Form– Density– Complexity– Stability– Nativity

Page 10: Engineering for Ecosystem Restoration Workshop Module 2 ... Summer Workshop/Week 2...Engineering for Ecosystem Restoration Workshop . Module 2: June 14-16, 2010 . PLANTING TECHNIQUES

& ecology and environment, inc.International Specialists in the Environment

Rosgen Natural Stream Classification

Page 11: Engineering for Ecosystem Restoration Workshop Module 2 ... Summer Workshop/Week 2...Engineering for Ecosystem Restoration Workshop . Module 2: June 14-16, 2010 . PLANTING TECHNIQUES

& ecology and environment, inc.International Specialists in the Environment

Stream Visual Assessment Protocol

• Stream Type• Reach Descriptions• Scoring Descriptions

National Water and Climate Center (NWCC)Technical Note 99–1http://www.nrcs.usda.gov/technical/ECS/aqatic/svapfnl.pdf

Page 12: Engineering for Ecosystem Restoration Workshop Module 2 ... Summer Workshop/Week 2...Engineering for Ecosystem Restoration Workshop . Module 2: June 14-16, 2010 . PLANTING TECHNIQUES

& ecology and environment, inc.International Specialists in the Environment

SVAP Application

– Data Research and Review• Existing, Historical, Pre-Settlement,

Anecdotal

– Preliminary Field Assessment– Calibrate SVAP– SVAP Field Assessment– QA/QC

Page 13: Engineering for Ecosystem Restoration Workshop Module 2 ... Summer Workshop/Week 2...Engineering for Ecosystem Restoration Workshop . Module 2: June 14-16, 2010 . PLANTING TECHNIQUES

& ecology and environment, inc.International Specialists in the Environment

SVAP Environmental Conditions

• Landscape Position• Soils• Hydrology• Geology• Channel Morphometry• Erosion• Sediment Loading• Riparian Ecological Characterization

– Flora and Faunal Surveys and Species Associations

Page 14: Engineering for Ecosystem Restoration Workshop Module 2 ... Summer Workshop/Week 2...Engineering for Ecosystem Restoration Workshop . Module 2: June 14-16, 2010 . PLANTING TECHNIQUES

& ecology and environment, inc.International Specialists in the Environment

SVAP Typical Results Reach A-1 SVAP Data Sheet Summary

Parameter and Result• Dominant Land Use Forest/Successional Shrubland• Stream Length Assessed 378 feet• Bankfull Width 31.5 feet• Water Depth 2-4 inches• Maximum Bankfull Depth 2 feet• Flood-prone Width 40 feet• Dominant Substrate cobble• Pool/Riffle/Run Ratio 12:40:48• Gradient .29• Sinuosity Occasional bends• Rosgen Stream Type F3

Page 15: Engineering for Ecosystem Restoration Workshop Module 2 ... Summer Workshop/Week 2...Engineering for Ecosystem Restoration Workshop . Module 2: June 14-16, 2010 . PLANTING TECHNIQUES

& ecology and environment, inc.International Specialists in the Environment

Cattle Interviews re: Manure Presence

Page 16: Engineering for Ecosystem Restoration Workshop Module 2 ... Summer Workshop/Week 2...Engineering for Ecosystem Restoration Workshop . Module 2: June 14-16, 2010 . PLANTING TECHNIQUES

& ecology and environment, inc.International Specialists in the Environment

Channel Instability

Page 17: Engineering for Ecosystem Restoration Workshop Module 2 ... Summer Workshop/Week 2...Engineering for Ecosystem Restoration Workshop . Module 2: June 14-16, 2010 . PLANTING TECHNIQUES

& ecology and environment, inc.International Specialists in the Environment

Packard Bank Revetment/Yard Protection

Vinca minor groundcover

Page 18: Engineering for Ecosystem Restoration Workshop Module 2 ... Summer Workshop/Week 2...Engineering for Ecosystem Restoration Workshop . Module 2: June 14-16, 2010 . PLANTING TECHNIQUES

& ecology and environment, inc.International Specialists in the Environment

Hydraulic Modeling NYSDOT - McKinstry Creek, Mansfield Creek

• The Problem:– Expansion of State

expressway will impact wetlands. Client required to perform mitigation projects to improve fish habitat in two creeks.

• The Solution:– Use the HEC-RAS

hydraulics model– Predict low flow depths

(fish passage); flood inundation area (100 year flood); sediment scour and sediment stability

– Use the SWAT model and Bank Stability model to predict overland runoff and bank erosion sediment loads

– Use the HEC-RAS SIAM module to predict sediment scour, deposition, and equilibrium

Page 19: Engineering for Ecosystem Restoration Workshop Module 2 ... Summer Workshop/Week 2...Engineering for Ecosystem Restoration Workshop . Module 2: June 14-16, 2010 . PLANTING TECHNIQUES

& ecology and environment, inc.International Specialists in the Environment

SVAP Review

Protocol• Stream Type• Regional Classification• Reach Descriptions• Scoring Descriptions

Assessment Parameters• Channel Form and Condition• Hydrologic Alteration• Riparian Zone• Bank Stability• Invasive Species• Nutrient Enrichment• Barriers to Fish Movement• In-Stream Fish Cover• Pools• Invertebrate Habitat

Page 20: Engineering for Ecosystem Restoration Workshop Module 2 ... Summer Workshop/Week 2...Engineering for Ecosystem Restoration Workshop . Module 2: June 14-16, 2010 . PLANTING TECHNIQUES

& ecology and environment, inc.International Specialists in the Environment

SVAP Findings

In Channel• W:D• Sinuosity• Structure

– LWD– Energy Dissipation

features

Off Channel• Bank Instability• Access

– Cattle/Equipment– PFRs

• Riparian Corridor– Encroachment – Floodplain Disconnect– Wetland Hydrology– Invasive Plant Species

Page 21: Engineering for Ecosystem Restoration Workshop Module 2 ... Summer Workshop/Week 2...Engineering for Ecosystem Restoration Workshop . Module 2: June 14-16, 2010 . PLANTING TECHNIQUES

& ecology and environment, inc.International Specialists in the Environment

McKinstry Watershed Slope and Drainage

Page 22: Engineering for Ecosystem Restoration Workshop Module 2 ... Summer Workshop/Week 2...Engineering for Ecosystem Restoration Workshop . Module 2: June 14-16, 2010 . PLANTING TECHNIQUES

& ecology and environment, inc.International Specialists in the Environment

McKinstry Upstream Watershed Land use and Delineation

Page 23: Engineering for Ecosystem Restoration Workshop Module 2 ... Summer Workshop/Week 2...Engineering for Ecosystem Restoration Workshop . Module 2: June 14-16, 2010 . PLANTING TECHNIQUES

& ecology and environment, inc.International Specialists in the Environment

Conceptual Design

Page 24: Engineering for Ecosystem Restoration Workshop Module 2 ... Summer Workshop/Week 2...Engineering for Ecosystem Restoration Workshop . Module 2: June 14-16, 2010 . PLANTING TECHNIQUES

& ecology and environment, inc.International Specialists in the Environment

Page 25: Engineering for Ecosystem Restoration Workshop Module 2 ... Summer Workshop/Week 2...Engineering for Ecosystem Restoration Workshop . Module 2: June 14-16, 2010 . PLANTING TECHNIQUES

& ecology and environment, inc.International Specialists in the Environment

ERR Plan View

Page 26: Engineering for Ecosystem Restoration Workshop Module 2 ... Summer Workshop/Week 2...Engineering for Ecosystem Restoration Workshop . Module 2: June 14-16, 2010 . PLANTING TECHNIQUES

& ecology and environment, inc.International Specialists in the Environment

Typical Bioengineering Techniques

Page 27: Engineering for Ecosystem Restoration Workshop Module 2 ... Summer Workshop/Week 2...Engineering for Ecosystem Restoration Workshop . Module 2: June 14-16, 2010 . PLANTING TECHNIQUES

& ecology and environment, inc.International Specialists in the Environment

Questions…..