▪ Presentation .p04
▪ Intecsa-Inarsa in the world .p05
▪ Organization chart .p06
▪ Quality and environmental management. .p07
▪ Quality certificates .p08
▪ Recent awards .p09
▪ Building and Urban Planning .p10
▪ Main References .p11
GENERAL PRESENTATIONINTECSA-INARSA .p03
BUILDINGMAIN REFERENCES .p12
URBAN PLANNINGMAIN REFERENCES .p18 CONTACT .p28
Chapter 01. Chapter 02. Chapter 03.
Slide 3BUILDING AND URBAN PLANNING //
GENERALPRESENTATION
1Intecsa-Inarsa
Slide 4BUILDING AND URBAN PLANNING //
Presentation
Engineering and technical consulting since 1965
1965Establishmentof INTECSA
1998Acquisition & Merger of INTECSA by INARSA
2007Acquisitionby SNC Lavalin Group
2014INTECSA-INARSA returns to be a spanish companyHeadquarters : C/ Julián Camarillo, 53, 28037 Madrid, Spain.
Intecsa-Inarsa is a Spanish company specialising in consultancy and engineering with private capital, whichwas founded in 1965 on the basis of a limited number of technicians with wide experience in design andexecution of building work. Progressive growth has allowed the company to become one of the leading andmost diverse Spanish consultancy and engineering companies with powerful and prestigious internationalprojection.
The constant updating and ongoing innovation make it possible to offer made-to-measure solutions based onlatest-generation technology. Our company has been operating for fifty years in the sectors of Engineeringfor Linear Transport Works, Land Engineering, Underground Works and Structures; Port Engineering, MarineEnvironment and Coasts; Consultancy and Engineering of Water; Building Engineering and Urban Planningand Project Management.
Intecsa-Inarsa's technical team, trained and certified in a range of disciplines, is in permanent contact withUniversities and Research Centres which puts it on the front line of Technological Development, and offersanything from Feasibility Studies to Detailed Engineering.
Slide 5BUILDING AND URBAN PLANNING //
Intecsa-Inarsa in the world
HEADQUARTERS: MADRID
Julián Camarillo 53 Street, Madrid 28037Tlf: +34 915.67.38.00
Fax: +34 915.67.38.01/2/3/4/[email protected]
Branch Office: SAUDI ARABIA
Granada Business Park. Tower A4, 12th Floor, Office # 1230 East Ring Road, RiyadhTlf: +966 115 118 118, Ext. 8012
+966 115 118 111, +966 115 118 [email protected]
Branch Office: PANAMÁ
Manuel Maria Icaza St.PH PROCONSA 1 Building, 10B Floor.
Tlf: 507 693 66 [email protected]@intecsa-inarsa.es
Branch Office: COLOMBIA
93 Street # 18-28Office 404, Bogotá (Colombia)
Tlf: 571 645 12 [email protected]
Branch Office: ECUADOR
C.C. Comercial Laguna Plaza,Office 408, Vía a la Costa Km. 12,5
Guayaquil (Ecuador)Tlf: 593 97 908 55 50
Branch Office: PERU Branch Office: CHILE
La Concepción Street, 191. Planta 6, Office 25, Santiago de Chile (Chile)
Tlf: +56 2 2903 3394Tlf: +56 9 7742 4492
Permanentoffices
Countries where there have been projects
Branch Office: MURCIA
Street: Madre Paula Gil Cano s/nEdif. Torre Jemeca 3º-4ªpta, 30009 - Murcia Tlf: +34 968 22 50 06, Fax: +34 679 956 495
Branch Office: MEXICO
Homero St. 906, 6th Floor,Polanco, Delegation Miguel HidalgoCiudad de México, Distrito Federal.
México. Tlf: +525 552 575 [email protected]
Narciso de la Colina St. Nº421Office 1002.
Miraflores District, Lima (Peru)Tlf: 51-1 24 29 005 / (01) 284 – 2508
Slide 6BUILDING AND URBAN PLANNING //
OrganigramaIntecsa-InarsaCEO
Deputy General Manager
C.F.O.
Human Resources Manager
Proposals and Contracting Dept.
Tunnelsand Structures Department
Executive Vice PresidentInternational Expansion
Legal Department
Quality Management
IT Support Dept.
Subcontracting Dept.
International
C.M. Peru
B.D.M. Chile
C.M. Colombia
Director C. America/MexicoOperations Director
Railwaysand RoadsDepartment
Ports / Coastsand LogisticsDepartment
Water andEnvironmentDepartment
Safety and Health Dept.
B.D.M. Ecuador
B.D.M. Panama
Director MEA
B.D.M. Mea
Slide 7BUILDING AND URBAN PLANNING //
Quality and environmental management
INTECSA-INARSA'S environmental experience in all kinds of building has beenrecognised for decades and its designs include systems which respect theenvironment and with high energy efficiency.
INTECSA-INARSA'S experts accompany their customers in such global matters as:
• LEED (Leadership in Energy and Environmental Design)• High Environmental Quality (HQE, from the French abbreviation)• BREEAM (BRE Environmental Assessment Method)• MINERGIE• PAASIVHAUS.
INTECSA-INARSA contributes unbeatable knowledge to the design and operationof facilities including environmental parameters. Furthermore, it has dealt withnumerous projects of considerable energy efficiency and exemplary landscapeintegration.
The powerful commitment related with sustainable development is put intoeffect for all kinds of project.
Slide 8BUILDING AND URBAN PLANNING //
Quality certificates
From the point of view of Quality, in November 1994, INTECSA-INARSA obtainedthe Certificate of Company Registration No. ER-0244/1/94 from AENOR, the SpanishAssociation for Standardisation and Certification, accrediting the recognition of theQuality Assurance System applied in the company with the UNE-EN ISO 9001Regulation.
It likewise obtained the corresponding European Certification, the Quality SystemCertificate from EQNET (European Network for Quality Assessment andCertification), with the identical accreditation number.
From the environmental point of view, in August 1998, the Certificate of CompanyRegistration No. CGM-98/051 was obtained from AENOR, which accredits that theEnvironmental Management System applied to Intecsa-Inarsa is adapted toregulation UNE-EN ISO 14001. It likewise obtained the corresponding EuropeanCertificate from EQNET with the same accreditation number.
In 2006, INTECSA-INARSA integrated its Quality Management and EnvironmentalManagement Systems. Likewise, in 2011, the System for Prevention of OccupationalRisks was implemented according to the standards of rule OHSAS 18001-2007..
Slide 9BUILDING AND URBAN PLANNING //
Recent awards
Finalist at The Fleming Awards 2014 by British Geotechnical Association:-”Barcelona High Speed Railway Tunnel Project – Protecting World Heritage Buildings”.(Barcelona, Spain). Highest budget consultancy contract awarded by ADIF.
Best Civil Public Work 2013 by Madrid College of Civil Engineers:- “Railway Access to Barajas airport” Project (Madrid, Spain).
Aqueduct of Segovia Award 2011:- “General System Regeneration and Reuse of Urban Wastewater”
(Murcia, Spain)
Prize of the Madrid Civil Engineers Association to the technical office of the “Best PublicWork in Madrid. 2012”:- “Refurbishment of the Serrano street and construction of 3 underground parking lots”
(Madrid, Spain)
SNC Lavalin 2013 Awards of excellence:- “SR99 Alaskan Way Tunnel en Seattle”
(Seattle, USA). Øexcavation = 17.50 m (World Record)
Fidic Awards 2014:- “Burying of M-30 Highway and Madrid-Río”, (Madrid, Spain)
Slide 10BUILDING AND URBAN PLANNING //
Our Story
Main Clients
INTECSA-INARSA´s building and urban planning specialists provide services related with the mainstudies developed by other departments (infrastructures, industrial, water and environment) andalso for specific clients in urban planning, architecture and Integrated Project Management. Theyalso work in technical engineering fields, from geotechnical to structural design, mechanical,electrical, security, etc. and organization, management and control of projects. The teamcapacities comprise technical and management support and ensure the achievement of allquality goals, cost and time of completion.
References
Building and Urban planning
Experience
Publics
Privates
Activities / Services:Design, construction projects, control and supervision of work:
• Residential and office buildings • Hotels and residences• Research and teaching centers• Shopping malls • Hospitals • Intelligent Buildings• Airport terminals, railway stations and maritime terminals• Rehabilitation• Energy optimization
Services• Architectural and engineering construction design for different types of
buildings. • Consulting and research work Feasibility studies, Layout plans,
Technical/ Economics Audits, Land acquisition, Regulations, Negotiation of building permits
• Control and supervision of construction work.• Project and construction management
• Ministry of Public Works• Local Spanish Administrations• CSIC (Spain)• INSS (Spain)
• Zone Franche Île Mandji (Gabon)• CyLOG (Spain)• PLAZA (Spain)
• National and International Construction Companies• Real State Developers
Slide 11BUILDING AND URBAN PLANNING //
MAIN
REFERENCES
IN BULDING
AND URBAN
PLANNING
▪ Year: 2012▪ Client: Spanish National Social Security Institute (INSS)▪ Location: Málaga, SPAIN▪ Description: Construction Design and works supervision for the headquarters of the Social Security in the city of Málaga
(Spain). Top quality standards design with high energy efficiency consumtion. Total 23,000 sqm
INSS MALAGA
▪ Year: 2007
▪ Client: Complutense University in Madrid
▪ Location: Madrid, SPAIN
▪ Description: Preliminary studies of the current building condition and its facilities and complet rehabilitation project of the
Faculty of Medicine at the UCM, more than 100.000 sqm. Historic monument building, high level of protection.
FACULTY OF MEDICINE COMPLUTENSE UNIVERSITY IN MADRID (UCM)
▪ Year: 2007
▪ Client: CSIC
▪ Location: Madrid, SPAIN
▪ Description: New headquarters for the National center for Phisics and Mathmatics Research. Provided with the most
updated facilities for the research, study and teaching activities.
CONSTRUCTION PROJECT FOR THE INSTITUTE OF PHYSICS AND MATHEMATICS AT THE UAM
▪ Year: 2009 - 2010
▪ Client: Presidency of the Republic of Gabon
▪ Location: Port Gentil, GABON
▪ Description: An organization and urban planning project is proposed. It´s a swampy area near the sea. The project
provides the Parcel "F" of new accesses and infrastructures.
ORGANIZATION AND URBAN PLANNING PROJECT OF PARCEL “F” IN ILE MANDJI –PORT GENTIL, GABON
▪ Year: 2006 - 2007
▪ Client: Consorcio Urbanístico Los Molinos Buenavista
▪ Location: Getafe, Madrid, SPAIN
▪ Description: Masterplan, infrastructures construction project and supervision of the works for the new urban area of
Buenavista.
URBAN PLANNING PROJECT OF PP-03 “BUENAVISTA“ SECTOR
Slide 12BUILDING AND URBAN PLANNING //
BUILDING
2Main References
Slide 13BUILDING AND URBAN PLANNING //
2 BUILDING
PROVINCIAL HEADQUARTERS OF THE GENERAL SOCIAL SECURITY AND SOCIAL
SECURITY TREASURY BUILDING IN MALAGA
DESIGN OF ARCHITECTURAL AND ENGINEERING FOR BUILDING, CONTROL AND SUPERVISION OF CONSTRUCTION OF THE PROVINCIAL HEADQUARTERS OF THE GENERAL SOCIAL SECURITY AND SOCIAL SECURITY TREASURY BUILDING IN MALAGA.
Client: NATIONAL SOCIAL SECURITY INSTITUTE.
Activities carried out:
• Full Architectural and Engineering Design of the building.
• Control and supervision of construction work.
Relevant technical information:
• The building is primarily for administrative work; it has an attached nurseryschool in an annex and garage in the basement. Advanced technology in civilworks below ground because of the shallow water table, and the design andoperation of the active and passive energy systems.
• Project area: 23,800 m2
• Budget: 39,176,440 €
Slide 14BUILDING AND URBAN PLANNING //
2 BUILDING
FACULTY OF MEDICINE OF THE COMPLUTENSE UNIVERSITY MADRID.
DESIGN OF ARCHITECTURAL AND ENGINEERING FOR BUILDING, CONTROL AND SUPERVISION OF CONSTRUCTION OF THE PROVINCIAL HEADQUARTERS OF THE GENERAL SOCIAL SECURITY AND SOCIAL SECURITY TREASURY BUILDING IN MALAGA.
Client: COMPLUTENSEUNIVERSITY.
Activities carried out:
• Full Architectural and Engineering Design of the building.
Relevant technical information:
• The building is protected by Patrimonio (Heritage) as a landmark on theUniversity of Madrid Campus. Renovation is expected to be phased torecover items of interest and provide the building with modern facilities forteaching and research.
• Project area: 105,670 m2
• Budget: 90,865,000 €
Slide 15BUILDING AND URBAN PLANNING //
2 BUILDING
INSTITUTE OF MATHEMATICAL AND PHYSICS SCIENCES
DESIGN, CONTROL AND SUPERVISION OF WORKS AND SAFETY AND HEALTH STUDY, OPERATING LICENSE FOR THE JOINT CENTRES FOR MATHEMATICAL SCIENCES AND THEORETICAL PHYSICS INSTITUTES
Client: COUNCILOF SCIENTIFIC RESEARCH.
Activities carried out:
• Full Architectural and Engineering Design of the building.
• Control and supervision of construction work.
• Health and Safety Study
• Operating License.
Relevant technical information:
• The building consists of three distinct parts. Flanking the sides of thebuilding are groups of offices set up in two blocks of 5 floors each; a thirdcontains the common areas shared by both and is situated between the twoblocks. This central part has a height of 2 floors and is built around acourtyard, the classrooms open onto it making a cloister.
• Project area: 13,450 m2
• Budget: 16,800,000 €
Slide 16BUILDING AND URBAN PLANNING //
2 BUILDING
POSTAL HANDLING CENTRE IN PALMA DE MALLORCA
BASIC AND CONSTRUCTION DESIGN AND TECHNICAL ASSISTANCE TO WORKS MANAGEMENT FOR THE POSTAL HANDLING CENTRE IN PALMA DE MALLORCA
Client: CORREOSY TELEGRAFOS.
Activities carried out:
• Full Architectural and Engineering Design of the building.
• Technical Assistance to Works Management
Relevant technical information:
• The mechanization of work in a mail processing centre required thecompletion of a new building to meets these needs. The purpose of theproject is to define the proper execution of a mail processing centre building.The building is located in the C'an Valero Industrial Estate at Palma deMallorca.
• Budget: 5,946,326 €
• Surface area: 5,837.46 m2
Slide 17BUILDING AND URBAN PLANNING //
2 BUILDING
HIGH-SPEED HUB SEVILLE AIRPORT.
RAILWAY STATION PROJECT DESIGN OF HIGH SPEED HUB SEVILLE AIRPORT
Client: RAILWAYS OF ANDALUCIA.
Activities carried out:
• Drafting of the Full Architectural and Engineering Design of the building.
Relevant technical information:
• Underground station with four high-speed tracks, 4 levels of undergroundparking, pavilion above ground with shopping areas, ticket offices, serviceareas and facilities, connection to the airport building.
• Budget: 15,000,000 €
Slide 18BUILDING AND URBAN PLANNING //
URBAN PLANNING
3Main References
Slide 19BUILDING AND URBAN PLANNING //
3 URBAN PLANNING
FUENTE LUCHE DEVELOPMENT- Alcobendas (Madrid)
MASTER PLAN AND URBAN ENGINEERING PROJECT, CONTROL AND SUPERVISION OF WORK AT FUENTE LUCHA
Client: ALCOBENDAS TOWNCOUNCIL.
Activities carried out:
• Masterplan and construction design, specific services: drinking waternetwork, sewage network, electricity network, lighting network, gasnetwork, open spaces and gardens systems, linear park and south park.Related actions.
Relevant technical information:
• Control of all urban works, road system, earthwork, network infrastructure(sanitation, drinking water, irrigation ...), paving, finishes, parks, gardens,etc.. Area affected: 65 has.
• Support in negotiations with utility companies in the drafting of agreements,etc..
• Support in negotiations with municipal departments and agencies. IncludesPublic Lighting Project for all the estate.
• Budget: 23,676,467.04 €
• Surface area: 65 has.
Slide 20BUILDING AND URBAN PLANNING //
3 URBAN PLANNING
VALDELASFUENTES ESTATE, ALCOBENDAS (MADRID)
MASTERPLAN, CONSTRUCTION DESIGN AND TECHNICAL SUPPORT FOR THE CONTROL OF THE URBAN ENGINEERING WORKS OF VALDELASFUENTES SECTOR.
Client: URBAN CONSORTIUM, VALDELASFUENTES.
Activities carried out:
• Masterplan, construction design and Geometric control, qualitative andquantitative assessment of town planning engineering works
Relevant technical information:
• Relationships with supplier companies, compatibility of the urbandevelopment and construction works, drafting urban planningdocumentation (files) of the building plots, the drafting of complementaryprojects and various areas of the neighbourhood, development ofconstructive solutions and procedures for on-site installation of various units.
• Project area: 68 has.
• Budget: 17,429,351.03 €
Slide 21BUILDING AND URBAN PLANNING //
3 URBAN PLANNING
BUENAVISTA ESTATE, GETAFE (MADRID)
URBAN ENGINEERING, CONTROL AND SUPERVISION OF WORK AT SECTOR PP-03 "BUENAVISTA" GETAFE
Client: CONSORTIUM LOSMOLINOS – BUENAVISTA.
Activities carried out:
• Masterplan and Urban Engineering design, control and supervision of work.
Relevant technical information:
• Urban Engineering Construction Project, specific municipal utilities projects:drinking water network, sewage network, electricity network, lightingnetwork, gas network, open spaces and gardens systems, linear park andsouth park. Related actions. Includes Public Lighting Project for all theestate. Control of all urban development works, road system, earthworks,network infrastructure (sanitation, drinking water, irrigation ...), paving,finishes, parks, gardens, etc.. Support in negotiations with utility companiesin the drafting of agreements, etc.. Support in negotiations with municipaldepartments and agencies.
• Project area: 120 has.
• Budget: 74,295,982.65 €
Slide 22BUILDING AND URBAN PLANNING //
3 URBAN PLANNING
ESPARTALES NORTH DEVELOPMENT, ALCALÁ DE HENARES (MADRID)
MASTERPLAN, URBAN ENGINEERING, CONTROL AND SUPERVISION OF THE CONSTRUCTION OF 115-A SECTOR NORTH ESPARTALES NORTE EN ALCALÁ DE HENARES
Client: CONSORTIUM LOSMOLINOS – BUENAVISTA.
Activities carried out:
• Masterplan, Urban Engineering, control and supervision of work.
Relevant technical information:
• Urban Engineering Construction Project, specific municipal utilities projects:drinking water network, sewage network, electricity network, lightingnetwork, gas network, open spaces and gardens systems, linear park andsouth park. Related actions. Includes Public Lighting Project for all theestate. Control of all urban development works, road system, earthworks,network infrastructure (sanitation, drinking water, irrigation ...), paving,finishes, parks, gardens, etc.. Support in negotiations with utility companiesin the drafting of agreements, etc.. Support in negotiations with municipaldepartments and agencies.
• Project area: 98.43 has.
• Budget: 46,148,821.77 €
Slide 23BUILDING AND URBAN PLANNING //
3 URBAN PLANNING
URBANIZACIÓN DEHESA VIEJA, SAN SEBASTIAN DE LOS REYES (MADRID)
MASTERPLAN AND URBAN ENGINEERING, CONTROL AND SUPERVISION OF WORK AT OP-1 DEHESA VIEJA
Client: CONSORCIO URBANÍSTICO OP-1 DEHESA VIEJA / OP-2TEMPRANALES.
Activities carried out:
• Masterplan Urban Engineering, control and supervision of work.
Relevant technical information:
• Urban Construction design, specific municipal services projects: drinkingwater network, sewage network, electricity network, lighting network, gasnetwork, open spaces and gardens systems, linear park and south park.Related actions. Includes Public Lighting Project for all the estate. Control ofall urban development works, road system, earthworks, networkinfrastructure (sanitation, drinking water, irrigation ...), paving, finishes,parks, gardens, etc.. Support in negotiations with utility companies in thedrafting of agreements, etc.. Support in negotiations with municipaldepartments and agencies.
• Project area: 120 has.
• Budget: 33,130,853.05 €
Slide 24BUILDING AND URBAN PLANNING //
3 URBAN PLANNING
PLOT "F" OF THE FREE TRADE ZONE ON ISLA MANDJI
PORT GENTIL, GABON
MASTERPLAN AND PRELIMINARY DESIGN OF PLOT "F" OF THE FREE TRADE ZONE ON ISLA MANDJI PORT GENTIL, GABON
Client: PRESIDENCY OF THEREPUBLIC OF GABON
Activities carried out:
• Masterplan and Detailed PreliminaryProject Design.
Relevant technical information:• DETAILED PRELIMINARY DESIGN FOR
MANAGEMENT, SUBDIVISION AND USE OF LAND
• DETAILED PRELIMINARY DESIGN FOR EARTHMOVING AND ROAD TRANSPORT. DEMOLITION
• DETAILED PRELIMINARY DESIGN FOR FOUNDATIONS, PAVING AND CIVIL WORKS
• DETAILED PRELIMINARY DESIGN FOR SIGNS, FURNITURE AND PLANTATIONS
• DETAILED PRELIMINARY DESIGN FOR SEWERAGE SYSTEM
• DETAILED PRELIMINARY DESIGN FOR DRINKING WATER SUPPLY AND HYDRANTS
• DETAILED PRELIMINARY DESIGN FOR TELECOMMUNICATIONS NETWORK
• DETAILED PRELIMINARY DESIGN FOR ELECTRICITY NETWORK
• DETAILED PRELIMINARY DESIGN FOR STREET LIGHTING NETWORK
• DRAFT PRELIMINARY DESIGN FRO GAS DISTRIBUTION
• DRAFT PRELIMINARY DESIGN FOR WASTEWATER TREATMENT PLANT (WWTP)
• DRAFT PRELIMINARY DESIGN FOR DRINKING WATER TREATMENT PLANT (WTP)
• DRAFT PRELIMINARY DESIGN FOR ELECTRICITY PRODUCTION.
• Project area: 922 has.
• Budget: 299,856,563.43 €
Slide 25BUILDING AND URBAN PLANNING //
3 URBAN PLANNING
PLOT "C" OF THE FREE TRADE ZONE ON ISLA MANDJI
PORT GENTIL, GABON
MASTERPLAN AND PRELIMINARY DESIGN OF PLOT "C" OF THE FREE TRADE ZONE ON ISLA MANDJI PORT GENTIL, GABON
Client: PRESIDENCYOF THE REPUBLIC OF GABON
Activities carried out:
• Masterplan and Preliminary Project Design.
Relevant technical information:• DETAILED PRELIMINARY DESIGN FOR MANAGEMENT, SUBDIVISION AND USE OF LAND
• DETAILED PRELIMINARY DESIGN FOR EARTHMOVING AND ROAD TRANSPORT.DEMOLITION
• DETAILED PRELIMINARY DESIGN FOR FOUNDATIONS, PAVING AND CIVIL WORKS
• DETAILED PRELIMINARY DESIGN FOR SIGNS, FURNITURE AND PLANTATIONS
• DETAILED PRELIMINARY DESIGN FOR SEWERAGE SYSTEM
• DETAILED PRELIMINARY DESIGN FOR DRINKING WATER SUPPLY AND HYDRANTS
• DETAILED PRELIMINARY DESIGN FOR TELECOMMUNICATIONS NETWORK
• DETAILED PRELIMINARY DESIGN FOR ELECTRICITY NETWORK
• DETAILED PRELIMINARY DESIGN FOR STREET LIGHTING NETWORK
• Project area: 382.24 has.
• Budget: 125,024,227.10 €
Slide 26BUILDING AND URBAN PLANNING //
3 URBAN PLANNING
ZARAGOZA LOGISTICS PLATFORM
MASTERPLAN AND URBAN ENGINEERING, CONTROL AND SUPERVISION OF WORK AT ZARAGOZA LOGISTICS PLATFORM
Client: PLAZA S.A.
Activities carried out:
• Masterplan and Urban Engineering Project, control and supervision of work.
Relevant technical information:• Urban Engineering Project, control and supervision of infrastructure works needed to provide
urban services to the Zaragoza Logistics Platform.
• General Systems:
• Basic road connection. Internal road structuring. General road system. Basic TechnicalInfrastructure SG. SG Green areas / protected areas / sports areas.
• Local Systems:
• Logistics operations. Railway activities. Industrial
• Specific equipment:
• Logistics facilities. Station and railway facilities. Motorway and conventional railway line.
• External connections:
• Pedrola-Platform.
• Support in negotiations with utility companies in the drafting of agreements, etc..
• Support in negotiations with municipal departments and agencies.
• Project area: 1298 has.
• Budget: 108,600,790.89 €
Slide 27BUILDING AND URBAN PLANNING //
Main Clients
Public administrations
Construction companies
Julián Camarillo, 53
28037 | Madrid | Spain
T +34 915 673 800
F +34 915 673 805
www.intecsa-inarsa.es
©2
01
7 In
te
csa-In
arsa. T
od
os lo
s d
ere
ch
os re
se
rvad
os.