Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
4723
4722
4720
3587
3586
3585
3584
3583
3582
3581 3
580
3579
3578
3576
3573
3570
35
44
3543
3542
3541
3533
352
9
3527
3526
HW118092
216
06
21608
21626
34072
34077
34078
34087
34088
37049
37050
3705
1
3705
2
37053
4
3
23
24
25
54
55
56
58
63
69
79
51
53
54
52
42
36
61
65
69
3
5
11
7
9
15
17
18
64
2557
4
6
10
8
73
2556
14
12
16
2481
2479
2477
2475
5
11
7
9
6
15
17
8
10
N.T.S.
SITE
Engineering and Construction Services
LOCATION PLAN
PLA
N
2
1
-
-
(RE
TAININ
G W
ALL N
OT S
HO
WN F
OR C
LA
RIT
Y)
DATE:
DRAWING NUMBER:
LIST OF DRAWINGS
COVER
BRIDGE REHABILITATION -BR#157
ENGINEERING AND CONSTRUCTION SERVICESMICHAEL D'ANDREA, M.E.SC., P. ENG. - CHIEF ENGINEER AND EXECUTIVE DIRECTOR,
N
ISLINGTON AVE. OVER HUMBER RIVERIS
LIN
GT
ON A
VE.
ISLIN
GT
ON A
VE.
HUMBER RIVER
HUMBER RIVER
JANUARY, 2019
CONTRACT No. 19ECS-TI-08BETENDER SUBMISSION
TRANSPORTATION INFRASTRUCTURE - DIRECTOR, DESIGN AND CONSTRUCTION FRANK CLARIZIO, P. ENG.
157-S0494-16
157-S0494-15
157-S0494-14
157-S0494-13
157-S0494-12
157-S0494-11
157-S0494-10
157-S0494-09
157-S0494-08
157-S0494-07
157-S0494-06
157-S0494-05
157-S0494-04
157-S0494-03
157-S0494-02
157-S0494-01
BELL UTILITY PROTECTION DETAILS
STANDARD AND MISCELLANEOUS DRAWINGS - 2
STANDARD AND MISCELLANEOUS DRAWINGS - 1
APPROACH SLAB
PARAPET WALL WITH RAILING
EXPANSION JOINT - 2
EXPANSION JOINT - 1
GENERAL REPAIR
DECK REPAIR
PIER REPAIR
ABUTMENT REFACING
STRUCTURAL STEEL REPAIR
BEARING REPLACEMENT & DETAILS
CONSTRUCTION STAGING
GENERAL ARRANGEMENT - 2
GENERAL ARRANGEMENT - 1
157-ESC0494-02
157-ESC0494-01
ENVIRONMENTAL NOTES
WORK AREA
TRAFFIC STAGING - STAGE 3
TRAFFIC STAGING - STAGE 2
TRAFFIC STAGING - STAGE 1
PAVEMENT MARKINGS
NEW CONSTRUCTION PLAN
REMOVALS PLAN
ALIGNMENT DATA AND CONTROL
157-TS0494-07
157-TS0494-06
157-TS0494-05
157-TS0494-04
157-TS0494-03
157-TS0494-02
157-TS0494-01
157-E0494-04
157-E0494-03
157-E0494-02
157-E0494-01
TEMPORARY PEDESTRIAN CROSSOVER LAYOUT
TEMPORARY RECONFIGURATION - 3
STREET LIGHT REMOVAL/INSTALLATION AND
TEMPORARY RECONFIGURATION - 2
STREET LIGHT REMOVAL/INSTALLATION AND
TEMPORARY RECONFIGURATION - 1
STREET LIGHT REMOVAL/INSTALLATION AND
2
E
4
A
5
2
1
2
3
C
D
B
6
6
G
G
G
6
M
13
14
N
15
P
FE
NC
E T-2
19.1
30-1
SE
DIM
EN
T C
ON
TR
OL
SE
E S
HE
ET E-0
2
SH
EE
T E-0
1 A
ND F
OR N
OTES
T-2
19.1
30-1 F
OR L
AY
OU
T S
EE
SE
DIM
EN
T C
ON
TR
OL F
EN
CE
GR
AV
EL C
OFFE
RD
AM
TE
MP
OR
AR
Y P
EA
CO
NT
RA
CT
OR
SL
OP
E T
O B
E D
ETE
RMIN
ED B
Y T
HE
GR
AV
EL A
ND G
RA
NU
LA
R M
ATE
RIA
L .
3500 W
IDE A
CC
ESS R
OA
D W
ITH
C.L. S.
AB
UT. B
RG
S.
C.L.
N.
AB
UT. B
RG
S.
C.L. PIE
R
C.L. ISLINGTON AVE.
35636
35636
RE
HA
BILIT
ATE
D
EXIS
TIN
G
HUMBER RI
VER
FLOW
10060
10060
49°
N
4790
4000
2000
3/7/2019
5:3
5:15 P
MP
RIN
TE
D:
LAST
UP
DATE
D:
3/7/2019 11:2
7:3
5
AM
CA
DD
FIL
E
NA
ME:
O:\
Toro
nto\Proj\11
70755\08
Desig
n and
Develo
pment\
Structural\
Working
Dra
wings\06-Out
Dra
wing\Year 1\
Site 15
7\2019-03-06 (A
ddendu
m
5)\
157-S0494-01.dgn
Construction Services
Engineering &
EXECUTIVE DIRECTOR
CHIEF ENGINEER and
MICHAEL D'ANDREA, P.ENG
CONSULTANTS
Bridge, Structures & Expressways
Transportation Infrastructure
Acting Manager,Design & Construction
JODIE ATKINS, P.ENG
Transportation InfrastructureDirector, Design & Construction
FRANK CLARIZIO, P.ENG.
58
T.L.C.
SFY03-06-19 ADDENDUM 5
DATE INITIALREVISIONSNo. SIGNEDDIGITAL INFORMATION
Engineering & Construction Services
ISSUED FOR TENDER01-25-19 SFY
1:75 -
SECTION 2
EAST WEST
SOUTH NORTH
PLAN
2
1:250
1
-
-
(RETAINING WALL NOT SHOWN FOR CLARITY)
1
-
ELEVATION 1:250
NEW CONCRETE
PROTECTION SYSTEM
NEW ASPHALT
LEGEND:
REMOVAL
GENERAL ARRANGEMENT - 1
DESIGN BASED ON ORIGINAL DRAWINGS. SEE CONSTRUCTION NOTES ALSO.
NO INTENTIONAL ORDER OR SEQUENCE OF ITEMS LISTED BELOW.
OTHERS AS SHOWN AND/OR SPECIFIED IN CONTRACT.
WORK IS NOT LIMITED TO ITEMS LISTED BELOW.
S01157-S0494-01
CENTERLINEC.L.
VERTICALVERT
HORIZONTALHORI
NORTH WESTNW
SOUTH WESTSW
SOUTH EASTSE
NORTH EASTNE
LIST OF ABBREVIATIONS:
OTHERWISE NOTED.
ALL EXPOSED CONCRETE EDGES TO BE CHAMFERED 20x20 UNLESS G5.
LEVEL 2 UNLESS OTHERWISE STATED.
ALL PROTECTION SYSTEMS SHALL BE DESIGNED TO PERFORMANCE G4.
G30.5 (LATEST EDITION); GALVANIZED TO ASTM A123.
WELDED WIRE MESH REINFORCEMENT SHALL BE TO CSA STANDARDS
STANDARD DRAWINGS SS12-1 UNLESS INDICATED OTHERWISE.
ALL HOOKS SHALL BE IN ACCORDANCE WITH THE STRUCTURAL
HOOK DIMENSIONS.
BEND DIAMETERS, WHILE STIRRUPS AND TIES SHALL HAVE MINIMUM
BAR HOOKS SHALL HAVE STANDARD HOOK DIMENSIONS USING MINIMUM
STEEL SHALL BE CLASS B.
UNLESS SHOWN OTHERWISE, TENSION LAP SPLICES FOR REINFORCING
SPECIFIED.
HAVE A MINIMUM YIELD STRENGTH OF 500 MPa UNLESS OTHERWISE
STAINLESS REINFORCING STEEL SHALL BE TYPE 316LN,DUPLEX 2205 AND
BAR MARKS WITH PREFIX 'S' DENOTE STAINLESS STEEL BARS.
SPECIFIED.
REINFORCING STEEL SHALL BE GRADE 400W UNLESS OTHERWISE
REINFORCING STEEL:G3.
UNLESS NOTED OTHERWISE.
CLEAR COVER TO REINFORCING STEEL:G2.
ALL CONCRETE ----------- 35 MPa
CLASS OF CONCRETE:G1.
GENERAL NOTES:
LIVE LOAD - CSA S06-14 CL-625-ONT.D2.
CANADIAN HIGHWAY BRIDGE DESIGN CODE, 2014.
DESIGN IN ACCORDANCE WITH CSA S6D1.
DESIGN CODE:
CONCRETE BEHIND THE PLATES AT WEST PIER HEAD.
REMOVE ALL 3 EXISTING ARMOUR STEEL PLATES AND 25mm THICK P
REMOVE 4 EXISTING LIGHT POLE BASES AND LIGHT POLES.N
ALONG TOP EDGE OF ARMOUR PLATE AT WEST HEAD OF THE PIER.
REMOVE DETERIORATED AND CRACKED CONCRETE OF WATER DRIP M
SUBMERGED IN THE WATER USING TEMPORARY COFFERDAM.
REMOVE DETERIORATED AND LOOSE CONCRETE AT PIER SURFACE L
THE STEEL SURFACES.
AND SANDBLAST STEEL SURFACES IMMEDIATELY PRIOR TO RE-COATING
REMOVE EXISTING COATING ON STEEL COMPONENTS OF DECK DRAIN K
STEEL SURFACES.
SANDBLAST STEEL SURFACES IMMEDIATELY PRIOR TO RE-COATING THE
REMOVE EXISTING COATING ON STEEL COMPONENTS OF BEARINGS AND J
SURFACES IMMEDIATELY PRIOR TO RE-COATING THE STEEL SURFACES.
FRAMES AND LATERAL BRACING AND SANDBLAST STRUCTURAL STEEL
REMOVE EXISTING COATING ON GIRDERS, DIAPHRAGMS, CROSS I
ABUTMENTS.
JACK THE SUPERSTRUCTURE AND REMOVE EXISTING BEARINGS AT H
RETAINING WALLS AND PIER.
ABUTMENT WALLS, BALLAST WALLS, BEARING SEATS, WINGWALLS,
REMOVE DELAMINATED AND DETERIORATED CONCRETE FROM FACE OF G
SOFFIT.
PROVIDE PROTECTION FOR THE EXISTING BELL UTILITIES AT INTERIOR F
PROTECT EXISTING BELL DUCTS WITHIN EAST SIDEWALK.
REMOVE EXISTING APPROACH SLABS AND SIDEWALK ON GRADE AND E
REMOVE EXPANSION JOINTS ON DECK AND SIDEWALKS.D
RELOCATE EXISTING UTILITIES EMBEDDED IN THE PARAPET WALLS.
REMOVE EXISTING PARAPET WALLS AND RAILING AND TEMPORARILY C
SIDEWALKS.
REMOVE DETERIORATED CONCRETE FROM DECK TOP, SOFFIT AND B
APPROACH SLABS.
REMOVE EXISTING ASPHALT AND WATERPROOFING FROM DECK AND A
SCOPE OF WORK - REMOVAL:
INSTALL RIP RAP STONE PROTECTION15
CONSTRUCT 4 NEW LIGHT POLE BASES AND LIGHT POLES.14
INSTALL 3 NEW ARMOUR PLATES AT WEST PIER HEAD.13
CONSTRUCT TEMPORARY COFFERDAM FOR PIER REPAIR.12
SOFFIT AND REMOVE AFTER COMPLETION OF CONSTRUCTION.
INSTALL PROTECTION FOR THE EXISTING BELL UTILITIES AT INTERIOR 11
RE-COAT EXISTING STEEL COMPONENTS OF DECK DRAIN.10
RE-COAT EXISTING STEEL COMPONENTS OF BEARINGS.9
RE-COAT EXISTING STEEL GIRDERS. 8
INSTALL NEW ABUTMENT BEARINGS.7
REPAIR CRACKS AT ABUTMENTS, RETAINING WALLS AND THE PIER.
WINGWALLS, RETAINING WALLS AND PIER. REFACE ABUTMENT WALLS.
CONCRETE PATCH REPAIR BALLAST WALLS, BEARING SEATS, 6
SLABS.
INSTALL NEW ASPHALT AND WATERPROOFING ON DECK AND APPROACH 5
RECONSTRUCT CONCRETE APPROACH SLABS.4
SIDEWALKS.
RECONSTRUCT EXPANSION JOINT ASSEMBLIES ON DECK AND 3
UTILITIES OUTSIDE THE PARAPET WALLS.
RECONSTRUCT PARAPET WALLS AND RAILING, REINSTALL EXISTING 2
CONCRETE PATCH REPAIR DECK TOP, SOFFIT AND SIDEWALK.1
SCOPE OF WORK - NEW CONSTRUCTION:
LIGHTS. METHOD OF SUPPORT TO BE DETERMINED BY CONTRACTOR.
TEMPORARILY SUPPORTED TO MAINTAIN OPERATION OF STREET
ELECTRICAL CONDUITS, CABLES/WIRES AND BOXES TO BE R5.
SIDEWALKS DURING REMOVAL AND CONSTRUCTION.
TO ENSURE NO DAMAGE TO THE EXISTING BELL DUCTS WITHIN
THE CONTRACTOR SHALL COORDINATE WITH THE UTILITY COMPANIES R4.
RAMS) AND/OR THROUGH SAWCUT SHALL NOT BE PERMITTED.
DOCUMENTS. THE USE OF HYDRAULIC MOUNTED BREAKERS (HOE
CARRIED OUT BY USING CHIPPING HAMMERS AS PER THE CONTRACT
ALL CHIPPING OF CONCRETE ON THE DECK SOFFIT SHALL TO BE R3.
ADMINISTRATOR.
CONCRETE REPAIR SHALL BE DETERMINED ON SITE BY CONTRACT
REMOVE ALL DETERIORATED AND UNSOUND CONCRETE . EXTENT OF R2.
REINFORCING STEEL, WHICHEVER IS LESS.
REMOVALS SHALL BE 20mm DEEP OR TO THE FIRST LAYER OF
UNLESS OTHERWISE NOTED SAWCUT AT THE LIMITS OF CONCRETE R1.
REMOVAL NOTES:
COATING STRUCTURAL STEEL SYSTEMOPSS 911
FALSE WORK CLEARANCESOPSD-3390.150
LIGHTING POLE BASE DETAILS (MODIFIED)OPSD-3360.200
ASPHALT MEMBRANE WITH PROTECTION BOARD
BRIDGE DECK WATERPROOFING HOT APPLIED OPSD-3370.101
REQUIREMENT
WALLS, ABUTMENT, BACKFILL MINIMUM GRANULAR OPSD-3101.150
BARRIER
FENCE, CHAIN-LINK INSTALLATION-CONCRETE OPSD-972.131
FENCE, CHAIN-LINK COMPONENT-GATEOPSD-972.102
CONNECTION
GUIDE RAIL SYSTEM, STEEL BEAM STRUCTURAL OPSD-912.430
AND PERMANENT
I-LOCK CONNECTION, INSTALLATION - TEMPORARY
GUIDE RAIL SYSTEM, CONCRETE BARRIER PRECAST OPSD-911.140
CONCRETE SIDEWALK OPSD-310.010
ONTARIO PROVINCIAL
PRODUCTION
SPECIFICATION FOR CONCRETE MATERIAL
AMENDMENT TO OPSS MUNI 1359 MATERIAL TS 1350
WALLS WITH CONCRETE PARAPETS
STANDARD ALUMINUM RAILING FOR SIDEWALKS AND T-900.01-2
CONCRETE CURB AND GUTTERT-600.05-1
LOCATION AND DETAIL OF JOINTS FOR SIDEWALKT-310.010-1
SEDIMENT CONTROL FENCET-219.130-1
IDENTIFICATION PLAQUE
STRUCTURES AND EXPRESSWAYS BRONZE T-216.03
CITY OF TORONTO
APPLICABLE STANDARD DRAWINGS:
1
1
1
1
1
1
REMOVED AFTER CONSTRUCTION.
COFFERDAM, SEDIMENT CONTROL FENCE AND ACCESS ROAD TO BE C8.
IS RESPECTIVELY 131.20m AND 132.14M.
DURING CONSTRUCTION. WATER LEVEL FOR 2 YEAR AND 10 YEAR FLOOD
IT IS CONTRACTOR'S RESPONSIBILITY TO MONITOR WATER LEVEL C7.
NO WORKING PLATFORM IS PERMITTED IN THE HUMBER RIVER.C6.
OR WASH-WATER SHALL FALL BELOW SOFFIT.
CONSTRUCTION. NO MATERIAL INCLUDING SEDIMENTS, DEBRIS, WASTES
NECESSARY MEASURES TO PROTECT HUMBER RIVER BELOW DURING
THE CONTRACTOR SHALL PROVIDE DEBRIS PLATFORM AND OTHER C5.
REQUIRED BY RELEVANT AUTHORITIES PRIOR TO CONSTRUCTION WORK.
PRECAUTIONARY MEASURES OR ARRANGE TO DIVERT AS MAY BE
WITHIN THE WORK AREA. CARRY OUT ALL NECESSARY PROTECTION AND
THE CONTRACTOR SHALL CHECK AND IDENTIFY ALL EXISTING UTILITIES C4.
STRUCTURE.
LISTED IN CONTRACT DOCUMENTS) FOR DETAILS OF THE EXISTING
THE CONTRACTOR SHALL REFER TO THE REFERENCE DRAWINGS (AS C3.
FOR TRAFFIC AND CONSTRUCTION STAGING, SEE STAGING DRAWINGS.C2.
FOR APPROVAL.
REQUIRED TO MATCH THE EXISTING STRUCTURE SHALL BE SUBMITTED
ADMINISTRATOR AND THE PROPOSED ADJUSTMENT OF THE WORK
WORK. ANY DISCREPANCIES SHALL BE REPORTED TO THE CONTRACT
WORK SHOWN ON THE DRAWINGS PRIOR TO COMMENCEMENT OF THE
ELEVATIONS OF THE EXISTING STRUCTURE THAT ARE RELEVANT TO THE
THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS, DETAILS AND C1.
CONSTRUCTION NOTES:
DESIGN DRAWN CHECKED
NUMBER
DRAWINGSCALE
CONTRACT No.
DATE
BRIDGE REHABILITATION - BR#157
AS NOTED SHEET
ISLINGTON AVE. OVER HUMBER RIVER
JANUARY, 2019
CONTRACT No. 19ECS-TI-08BESFY D. WEI
E
4
A
5
2
1
2
3
C
D
B
6
6G
G
G
6
M
13
14N
15
P
FENCE T-219.130-1
SEDIMENT CONTROL
SEE SHEET E-02
SHEET E-01 AND FOR NOTES
T-219.130-1 FOR LAYOUT SEE
SEDIMENT CONTROL FENCE
GRAVEL COFFERDAM
TEMPORARY PEA
CONTRACTOR
SLOPE TO BE DETERMINED BY THE
GRAVEL AND GRANULAR MATERIAL .
3500 WIDE ACCESS ROAD WITH
C.L. ISLINGTON AVE.
10060 10060
1830 8230 1830 8230
REHABILITATEDEXISTING
BELL UTILITIES
C
BB
B
A
2
1
8
1110
15
1
K
F
I
HYDRO
TORONTO
HYDRO
TORONTO
N
1425
14
225 D
EC
K
602
2 % 2 %
WATERPROOFING
90mm ASPHALT AND
DUCTS TO BE PROTECTED
EXISTING BELL UTILITY
PROTECTED
TO BE
BELL DUCTS
6
7
9
9
3
8
D C
J
G
IH
G
J
L
12
M 13
N
14
DURING CONSTRUCTION
TO BE MAINTAINED AT ALL TIME
MINIMUM NAVIGABLE CLEARANCE
15
(TYP.)
RETAINING WALL FOOTING
ABUTMENT FOOTING (TYP.)
EXISTING GRAVEL
2
FENCE (TYP.)
SEDIMENT CONTROL
ACCESS ROAD
GRAVEL COFFERDAM
TEMPORARY PEA
C.L. S. ABUT. BRGS. C.L. N. ABUT. BRGS.C.L. PIER
C.L. IS
LIN
GT
ON A
VE.
35636 35636
REHABILITATEDEXISTING
HU
MBER RIV
ER
FLO
W
10060
10060
49°
N
135
ELE
VA
TIO
N I
N M
ET
RES (
m)
145
140
130
125
C.L. N. ABUT. BRGS.C.L. PIERC.L. S. ABUT. BRGS.
35636 35636
REHABILITATEDEXISTING
TRAIL
W. HUMBER
W.L. EL. 130.40
EXP.FIX. FIX.
EXP.
1.6 %
H.W.L. EL. 132.71
EL. 131.50
100
EQ.
100
EQ.
200
50
3198
4
2000 1200
1500
800
2400
2742
500
T/F
EQ.
EQ.
50
THE GAPS BEHIND THE PLATEARMOUR PLATE TO ALLOW GROUTING WATER DRIP ALONG TOP EDGE OF REMOVE AND RECONSTRUCTION
100
100
3/7/2019
5:3
5:17 P
MP
RIN
TE
D:
LAST
UP
DATE
D:
3/6/2019 11:3
8:5
1 A
M
CA
DD
FIL
E
NA
ME:
O:\
Toro
nto\Proj\11
70755\08
Desig
n and
Develo
pment\
Structural\
Working
Dra
wings\06-Out
Dra
wing\Year 1\
Site 15
7\2019-03-06 (A
ddendu
m
5)\
157-S0494-07.d
gn
Construction Services
Engineering &
EXECUTIVE DIRECTOR
CHIEF ENGINEER and
MICHAEL D'ANDREA, P.ENG
CONSULTANTS
Bridge, Structures & Expressways
Transportation Infrastructure
Acting Manager,Design & Construction
JODIE ATKINS, P.ENG
Transportation InfrastructureDirector, Design & Construction
FRANK CLARIZIO, P.ENG.
500
700±
250±
4000
500
(TYP.)
T.L.C.
02-25-19 ADDENDUM 1 SFY
SFY03-06-19 ADDENDUM 5
DATE INITIALREVISIONSNo. SIGNEDDIGITAL INFORMATION
Engineering & Construction Services
ISSUED FOR TENDER01-25-19 SFY
1:10 -
SECTION 2
1:10 -
SECTION 3
-
3
-
1
1:200
PLAN - PIER
1
-1:100
RIP RAP PROTECTION
--
2 2
1:100
NORTH SOUTH
PART ELEVATION - ARMOUR PLATE REPAIR AT PIER HEAD
PLAN - WATER DRIP REMOVAL
WEST EAST
-
-
WATER DRIP REMOVAL
4
4
WEST EAST
-
-
5
5
PLAN - WATER DRIP RECONSTRUCTION
WATER DRIP RECONSTRUCTION
N.T.S.
N.T.S.
N.T.S.
N.T.S.
157-S0494-07
PIER REPAIR
S07
1
2
COFFERDAM SHALL BE 131.50
CONSTRUCTION. MINIMUM ELEVATION AT TOP OF
ARMOUR PLATE REPLACEMENT AND RIP RAP STONE
TEMPORARY COFFERDAM IS USED FOR PIER REPAIR, STEEL 2.
SHEET S09.
FOR CONCRETE PATCH REPAIR AND CRACK INJECTION, SEE 1.
NOTES:
2
EDGE OF ARMOUR PLATE
G
SAW CUT 10mm DEEP
200 EMBEDMENT LENGTH
ADHESIVE ANCHOR 25M WITH
INSTALL HIT RE500 EPOXY
ARMOUR PLATES
INSTALLATION OF ALL NEW
GAPS WITH SIKA 212 AFTER
ARMOUR PLATES. GROUT ALL
REMOVING ALL EXISTING
AREA TO BE REMOVED AFTER
ANCHOR (TYP.)
EPOXY ADHESIVE
INSTALL HIT RE500
GALVANIZATION REPAIR AFTER WELDING.4.
PIERS.
ANCHOR LOCATIONS IF CONFLICT WITH REBARS TO AVOID DAMAGING REBAR IN THE
LOCATIONS PRIOR TO INSTALLATION NEW ARMOUR PLATES. SLIGHTLY ADJUST
SCAN AND MARK EXISTING REBAR LOCATIONS ON THE PIER AROUND NEW ANCHOR 3.
BRIDGE DECK FOR INSTALLATION.
NEW ARMOUR PLATES SHALL BE HOT DIP GALVANIZED AND DROPPED DOWN FROM 2.
NEW ARMOUR PLATES SHALL CONFORM TO CSA G40.21M 300W GRADE.1.
NOTES:
DESIGN DRAWN CHECKED
NUMBER
DRAWINGSCALE
CONTRACT No.
DATE
BRIDGE REHABILITATION - BR#157
AS NOTED SHEET
ISLINGTON AVE. OVER HUMBER RIVER
JANUARY, 2019
CONTRACT No. 19ECS-TI-08BESFY D. WEI
PROTECTION FROM SCOUR
EXTENT OF RIP RAP STONE
WRAPPED WITH GEOTEXTILE
TEMPORARY COFFERDAM
FOOTING FOOT PRINT
NORMAL WATER LEVEL
PIER FACE
RIVER BED
DIAMETER 400mm OF GRAVEL
STONE RIP RAP WITH AVERAGE
WRAPPED IN GEOTEXTILE
WITH PEA GRAVELS
TEMPORARY COFFERDAM
BOTTOM OF ARMOUR PLATE
SAW CUT 10mm DEEP ALONG SIDES AND
EDGES OF ARMOUR PLATES
RECONSTRUCT THE DRIP
SEATS AND
DAMAGING BEARING
REBARS WHILE NOT
REMOVE DRIP SALVAGE
ANCHORS FOR EACH PLATE
INSTALL 3 ROWS x 3 COLUMNS OF
PLATES
INSTALLATION OF ALL NEW ARMOUR
GAPS WITH SIKA 212 AFTER
EXISTING ARMOUR PLATES. GROUT ALL
DETERIORATED CONCRETE BEHIND ALL
REMOVE 25mm THICK CONCRETE AND HEIGHT
PLATES OF SAME WIDTH AND
THICK GALVANIZED NEW STEEL
ARMOUR PLATES WITH 10mm
REPLAE ALL THREE EXISTING
C.L. PIE
R
WATER DRIP
EXISTING WATER DRIP
REMOVE PORTION OF
10mm THICK STEEL PLATE
REMOVAL LIMIT
EXISTING DEPTH FOR THE CHANNEL
25mm THICK CONCRETE REMOVAL LIMIT
PLATE (10mm THICK)
STEEL REMOVAL
C.L. PIE
R
WATER DRIP
10M T&B
(TYP.)
10M DOWEL
NEW CONCRETE USING FORM AND PUMP
SIKA 212 FILL
PLATE
NEW STEEL ARMOUR
COVER
MIN. 40mm CONCRETE 10M DOWEL
10M
(TYP.)
THROUGH EXISTING REBARS
REBAR. DO NOT DRILL
DOWEL ADHESIVE FOR 10M
DRILLED HOLE FILL WITH
15mm DIA. 150mm DEEP
N
6000 6000
3066
8
3/7/2019
5:3
5:19 P
MP
RIN
TE
D:
LAST
UP
DATE
D:
3/6/2019 12:0
9:2
1 P
M
CA
DD
FIL
E
NA
ME:
O:\
Toro
nto\Proj\11
70755\08
Desig
n and
Develo
pment\
Structural\
Working
Dra
wings\06-Out
Dra
wing\Year 1\
Site 15
7\2019-03-06 (A
ddendu
m
5)\
157-S0494-13.d
gn
Construction Services
Engineering &
EXECUTIVE DIRECTOR
CHIEF ENGINEER and
MICHAEL D'ANDREA, P.ENG
CONSULTANTS
Bridge, Structures & Expressways
Transportation Infrastructure
Acting Manager,Design & Construction
JODIE ATKINS, P.ENG
Transportation InfrastructureDirector, Design & Construction
FRANK CLARIZIO, P.ENG.
90
250
6000
APPROACH SLAB
CLEAR COVER50±10mm
AS
PH
ALT
250
APPROACH SLABROAD PAVEMENT
DRAWINGS
PAVEMENT SEE ROAD
JOINT SEALING COMPOUND
WITH HOT-POURED RUBBERIZED
20x40 mm DEEP SAWCUT FILLED
SL
AB
AP
PR
OA
CH
SUB-BASE
GRANULAR
FIBRE BOARD
20mm ASPHALT IMPREGNATED
20M
250
SIDEWALKMATCH EXISTING
20M
250
SIDEWALKMATCH EXISTING
1530
1446 50 104 250
550
2% 2%
2% 2%
150
150
2% 2%
T.L.C.
SFY03-06-19 ADDENDUM 5
DATE INITIALREVISIONSNo. SIGNEDDIGITAL INFORMATION
Engineering & Construction Services
ISSUED FOR TENDER01-25-19 SFY
1:100
PLAN
-
D
-
E
1:20
LONGITUDINAL SECTION
A
-
B
-
ADETAIL1:20 -
(JOINT BETWEEN APPROACH SLAB AND ROAD PAVEMENT)
N.T.S.
END JOINT DETAIL B
-
SECTION AT WINGWALL
WITH SIDEWALK WITH SIDEWALK
N.T.S. N.T.S.
SECTION BEYOND WINGWALL
1:25 -
DETAIL
1:25 -
DETAIL D E
S13
APPROACH SLAB
JAN 2013
STANDARD DRAWING
6000 mm APPROACH SLAB
SS116-1
'MODIFIED'
APPLICABLE STANDARD DRAWINGS:
CONSTRUCTION JOINTS
AT ACTIVE CRACKS GREATER THAT 2mm WIDE AND
DECK, WATERPROOFING HOT APPLIED ASPHALT MEMBRANEOPSD-3370.101
WITH PROTECTION BOARD
OPSD-3370.100 DECK, WATERPROOFING HOT APPLIED ASPHALT MEMBRANE
157-S0494-13
BARS MARK WITH PREFIX S DENOTE STAINLESS STEEL BARS.5.
SLAB TO BE IN ACCORDANCE WITH OPSD-3370.1000.
WATERPROOFING AT JOINT BETWEEN BRIDGE AND APPROACH4.
REINFORCING STEEL SHALL BE GRADE 400W.
2205 WITH A MINIMUM YIELD STRENGTH OF 500 MPA.
STAINLESS STEEL BARS SHALL BE TYPE 316 LN OR DUPLEX3.
HAND AND ZERO DEGREE SKEW.
LAYOUT OF REINFORCING STEEL WILL BE SIMILAR FOR LEFT2.
AS NOTED.
NOTES:
1
1
C.L. N. ABUT. BRGS.C.L. S. ABUT. BRGS.
S15M @ 150
TO SOUTH APPROACH SLAB
REINFORCING DETAILS SIMILAR
NORTH APPROACH SLAB
C.L. IS
LIN
GT
ON A
VE.
STAGING C.J. (TYP.)
15M @ 300 BUL
15M @ 300 BUL
15M @ 300 BUL
1-S15M TLL
4-15M @ 150 BUL
1-S15M TLL
4-15M @ 150 BUL
1-S15M TLL
4-15M @ 150 BUL
20M @ 150 BLL
DESIGN DRAWN CHECKED
NUMBER
DRAWINGSCALE
CONTRACT No.
DATE
BRIDGE REHABILITATION - BR#157
AS NOTED SHEET
ISLINGTON AVE. OVER HUMBER RIVER
JANUARY, 2019
CONTRACT No. 19ECS-TI-08BESFY D. WEI
20M
CLEAR COVER
15M 4-15M
20M
15M
S15M
CLEAR COVER
5mm ELASTOMER
S15M @ 150
BALLAST WALL
DOWELS FROM
S15M @ 150
TYPE 'A' BITUMINOUS
13 mm JOINT FILLER
S15M@300
S15M@300
S15M@300 S15M@300
15M
S15M@300
S15M@300
S15M@300 S15M@300
15M
LAP L
EN
GT
H
LAP L
EN
GT
H
(TYP. EARLIER STAGE)
MECHANICAL CONNECTOR
SPLICED DOWELS
LATER STAGE)
SPLICE DOWELS (AT
FORMWORKFILLER
LAP L
EN
GT
H
LAP L
EN
GT
H
(TYP. EARLIER STAGE)
MECHANICAL CONNECTOR
SPLICED DOWELS
FORMWORKFILLER
(AT LATER STAGE)
SPLICE DOWELS
N