61
ENGINEERING & CONSTRUCTION DEFINED BY SERVICE AND EXPERTISE VERSION 4.0 elsewedyelectric.com @elsewedyelectric

ENGINEERING & CONSTRUCTION

  • Upload
    others

  • View
    11

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ENGINEERING & CONSTRUCTION

ENGINEERING & CONSTRUCTIOND E F I N E D B Y S E R V I C E A N D E X P E R T I S E

V E R S I O N 4 . 0

elsewedyelectric.com @elsewedyelectric

Page 2: ENGINEERING & CONSTRUCTION

TABLE OF CONTENTS

W W W . E L S E W E D Y E L E C T R I C . C O M

4 - 6. POWER GENERATION

7 - 11. THERMAL POWER PLANT

12 - 14. SOLAR POWER PLANT

15 - 16. WIND POWER PLANT

17 - 18. HYDRO POWER PLANT

19 - 21. TRANSMISSION AND DISTRIBUTION

22. EQUIPMENT

23 - 26. OVERHEAD TRANSMISSION LINES

27. ELECTRICAL SUBSTATIONS

28 - 31. OFF LINE AND LIVE LINE INSTALLATIONS

32 - 35. POWER DISTRIBUTION

36 - 38. RURAL ELECTRIFICATION

39. CLIENTS & STANDARDS

40 - 41. CIVIL AND PUBLIC WORK

42 - 45. ROADS, BRIDGES & PORTS

46 - 49. INDUSTRIAL & POWER

50. LOGISTICA WAREHOUSE

51 - 55. COMMERCIAL

56 - 57. GOVERNMENT PROJECTS

2

58. MONUMENT RESTORATION

Page 3: ENGINEERING & CONSTRUCTION

ENGINEERING & CONSTRUCTION

POWERGENERATION

MONUMENT RESTORATION

TRANSMISSIONAND DISTRIBUTION

WE HAVE EXECUTED A TOTAL OF 261 PROJECTS ACROSS 23 COUNTRIES

CIVIL ANDPUBLIC WORK

Our engineering & construction business has an unparalleled experience in delivering turn-key projects on fast track basis, centred on our expert engineering team in delivering

complex projects and supported by our project management and construction capability.

W W W . E L S E W E D Y E L E C T R I C . C O M

3

Page 4: ENGINEERING & CONSTRUCTION

W W W . E L S E W E D Y E L E C T R I C . C O M

POWER GENERATIONT H E R M A L , S O L A R , W I N D & H Y D R O P O W E R P L A N T S

4

Page 5: ENGINEERING & CONSTRUCTION

POWER GENERATIONI N T R O D U C T I O N

At Elsewedy Electric we believe the EPC (Engineering, Procurement and Construction) model is the best way to deliver complex or time-critical projects. We can help with initial

conception, project management, engineering, procurement, construction, testing, start-up and operation of even the largest power plants or installations. Short lines of communication

and complete project accountability mean that we can deliver projects within budget and on schedule.

We offer a full range of services from “Tailor Made” solutions adapted to each project, to “Turnkey” Projects, to meet all of our customers’ satisfaction.

OUR TRACK OF REFERENCE AND PROJECTS ARE LOCATED IN DIFFERENT COUNTRIES

W W W . E L S E W E D Y E L E C T R I C . C O M

Ethiopia KSA Tanzania Ghana Cameroon UAE Iraq Malaysia

Angola Zambia Kenya Mozambique Equatorial Guinea

Rwanda

The projects we executed, the challenges we have taken, the records we have broken and the quality assured, shows our firm stability and strengths

EngineeringCapabilities

StrongAlliance

EfficientWork Force

International Quality& Safety Standards

5

Page 6: ENGINEERING & CONSTRUCTION

POWER GENERATION

I N T R O D U C T I O N

Elsewedy Electric in a very short period of time, became one of the top EPC firms in the region, and became a trusted company for the MENA region governments, and African

Governments; and eligible for their energy projects.

LAST DECADE ELSEWEDY ELECTRIC PSP’S ACCOMPLISHMENTS:

Africa: Elsewedy Electric PSP finalized and finished more than 57 EPC projects, Among a wide range of countries, in various fields.

Asia: Due to the success of Elsewedy Electric PSP in Africa, We found the ground ready to start building our success story in Asia.

With more than 6 EPC projects in different fields, from south-east Asia to the middle east. Elsewedy Electric PSP started achieving success in a very short period of time, with a strong

foot in the market.

W W W . E L S E W E D Y E L E C T R I C . C O M

57 PROJECTSWorld Wide

43 PROJECTSin Egypt

PROJECTS IN14 Different Country

23 GIGAWATTDelivered

Tanzania Egypt UAE

6

Page 7: ENGINEERING & CONSTRUCTION

POWER GENERATIONT H E R M A L P O W E R P L A N T

W W W . E L S E W E D Y E L E C T R I C . C O M

THERMAL POWER PLANTThermal power plants convert heat energy into electrical energy.

SIMPLE CYCLEPOWER PLANT

COMBINED CYCLEPOWER PLANT

DIESEL ENGINEPOWER PLANT

We can undertake all engineering, procurement and construction of the power plant including mechanical Balance of Plant (BOP) and electrical BOP, from heat

exchanger, compressors, pumps, valves, pipes to HVAC, fire protection, steam sampling, heat tracing and communication systems.

7

Page 8: ENGINEERING & CONSTRUCTION

POWER GENERATIONT H E R M A L P O W E R P L A N T T Y P E S

W W W . E L S E W E D Y E L E C T R I C . C O M

A LOW-CAPITAL COST SOLUTION FOR POWER

GENERATIONOur work involves the design, supply, construction

and commissioning.

COMBINED CYCLE IS THE MOST EFFICIENT TYPE

OF POWER PLANTIt can attain over 60% efficiency and offers lower

operating costs and fuel consumption. We have extensive

experience in construction and engineering of combined

cycle, having built the biggest combined cycle plant in

Egypt and many plants in Africa and the Gulf. We can

manage the EPC of civil works and site preparation, EPC

of all balance of plant equipment and systems, erection

works and testing and commissioning.

In this type of power plant, a diesel engine drives an

alternator to convert mechanical energy into electrical

energy. Despite the high price of generation due to the

cost of diesel, diesel power stations are popular in

situations of low demand, or where coal and water

supplies are hard to access. They are also used as a

standby for hospitals, radio stations, cinemas and

telephone exchanges.

SIMPLE CYCLE POWER PLANT COMBINED CYCLE POWER PLANT DIESEL ENGINE POWER PLANT

8

Page 9: ENGINEERING & CONSTRUCTION

PROJECT LOCATION

EGYPT

BENI SUEF PROJECTC O M B I N E D C Y C L E P O W E R P L A N T

PROJECT SUMMARY

A project owned by Upper Egypt Electricity Production Company subsidiary of Egyptian

Electricity Holding Company and located in Egypt. This project was achieved by the

consortium of Siemens AG & ELSEWEDY ELECTRIC and it included Engineering,

procurement, construction, testing, commissioning, start-up and civil works for 4x 1200

MW (SCCP5-8000H 4 x (2+1), WCT, Combined Cycle Power Plant.

SCOPE OF WORK

ü Elsewedy PSP Scope of work includes the EPC of Civil works and Site preparation.

ü EPC of all Balance of Plant Equipment and Systems.

ü All Erection Works.

ü Testing & commissioning of Plant equipment and Systems.

9

Page 10: ENGINEERING & CONSTRUCTION

ATTAQA PROJECT

S I M P L E C Y C L E P O W E R P L A N T

PROJECT LOCATION

EGYPT

PROJECT SUMMARY

A project owned by Upper Egypt Electricity Production Company subsidiary of Egyptian

Electricity Holding Company and located in Egypt. This project was achieved by the

consortium of Siemens AG & ELSEWEDY ELECTRIC and it included Engineering,

procurement, construction, testing, commissioning, start-up and civil works for 4x 1200

MW (SCCP5-8000H 4 x (2+1), WCT, Combined Cycle Power Plant.

SCOPE OF WORK

ü Elsewedy PSP Scope of work includes the EPC of Civil works and Site preparation.

ü EPC of all Balance of Plant Equipment and Systems.

ü All Erection Works.

ü Testing & commissioning of Plant equipment and Systems.

The scope of work includes the civil, electrical, mechanical, piping, and structural,

architectural, engineering; as well as advanced specialties, including integrated automation Processes.

10

Page 11: ENGINEERING & CONSTRUCTION

MAHMOUDIA PROJECTS I M P L E C Y C L E P O W E R P L A N T

PROJECT LOCATION

EGYPT

PROJECT SUMMARY

A project owned by Middle Delta Electricity Production Company (MDEPC) and located

in Egypt. This project was achieved Elsewedy Electric PSP and the project involves the

design, supply, construction and commissioning of Mahmoudia Simple Cycle Power

Plant Project. The Simple Cycle is based on Two AE 94.2 gas turbines.

SCOPE OF WORK

Elsewedy PSP as the main EPC Contractor for the Power Plant is responsible for the

engineering, procurement, manufacturing, supply and transportation of materials and

equipment, installation, and construction, testing and commissioning, on-load testing,

startup and putting into service Mahmoudia Power Plant.

The scope of work includes the civil, electrical, mechanical, piping, and structural,

architectural, engineering; as well as advanced specialties, including integrated automation Processes.

11

Page 12: ENGINEERING & CONSTRUCTION

POWER GENERATIONS O L A R P O W E R P L A N T

RISING TO THE CHALLENGEPROVIDING CLEAN ENERGY SOLUTIONS TO MEET INCREASING ENERGY DEMAND

Our solar technology utilizes the energy of the sun to generate clean, carbon free electricity and thermal energy. The most commonly used form of solar technology is photovoltaic (PV)

solar, which is scalable in size and is adaptable to be used in different applications and situations. Depending on the location, use and size of your energy requirements, our well trained

technical team will advise you which system and technology is best suited for your requirements.

Powered by the expected growing demand for clean Energy in Egypt & MEA region, Elsewedy Electric had the clean Energy sector established that is responsible for the wind and solar

energy complete solutions. Elsewedy Electric integrated and utilized all capacities within the group to provide specialized, complete and full service to the solar energy market using our

diversified portfolio of products.

Our solar technology utilizes the energy of the sun to generate clean, carbon free electricity and thermal energy. The most commonly used form of solar technology is photovoltaic (PV)

solar, which is scalable in size and is adaptable to be used in different applications and situations. Depending on the location, use and size of your energy requirements, our well trained

technical team will advise you which system and technology is best suited for your requirements.

W W W . E L S E W E D Y E L E C T R I C . C O M

12

Page 13: ENGINEERING & CONSTRUCTION

POWER GENERATIONS O L A R P O W E R P L A N T

Track Installer: An outstanding capability to mobilize and activate remote sites at record time. Development of a pertinent modular plan of installing,

commissioning and startup of PV-50MWac in 6 Months.

Robust Project Management Package: capitalizing on the outstanding track-record projects, encompassing: Generation, Transmission, and Distribution portfolio, we have developed an

integrated execution package of PV generation, with a spectrum ranging from Panel installation, DC cabling, inverter installation, connection, and commissioning,

AC cabling, transformer installation and connection, and connection to HT grid.

Engineering: Providing an integrated engineering package, addressing civil works, electromechanical, firefighting, telecommunication,

PV plant monitoring and operation, DC side installation, and Grid connection.

Procurement: with a strong expertise on value-added engineering, excellent mechanisms for the localization of various project components,

DC side, and equally AC side; hence rendering the cost optimization dimension.

W W W . E L S E W E D Y E L E C T R I C . C O M

PROVIDE TURNKEY SOLAR POWER SOLUTIONS FOR UTILITY, COMMERCIAL AND REMOTE SOLAR APPLICATIONS

Design Installation Project Management

Financing Operation Maintenance

13

Page 14: ENGINEERING & CONSTRUCTION

BENBAN PROJECTS O L A R P O W E R P L A N T

PROJECT LOCATION

EGYPT

PROJECT SUMMARY

Elsewedy Electric reached the full commercial operation successfully for its two solar photovoltaic (PV) power plants developed as part of EGYPT’s Round II of the Renewable Energies

Feed-in-Tariff (FIT) program for solar and wind energy projects launched by the Government of EGYPT.

Elsewedy Electric, jointly and equally with ÉLECTRICITE DE FRANCE’s EDF RENEWABLES, developed, financed, built, own and will operate the two projects located in Benban, Kom Ombo,

Aswan Province, approx. 830km south-Cairo. The projects capacity is 130 (2x65) MWp. The estimated annual 290 GWh of electricity produced by both projects will power more than 140,000

households while avoiding more than 120,000 tons of CO2 a year.

14

Page 15: ENGINEERING & CONSTRUCTION

POWER GENERATIONW I N D P O W E R P L A N T

COMPLETE WIND SOLUTIONSElsewedy Electric is offering complete wind solutions: manufacturing and developing wind farms and selling electricity to third parties with a strategy of owning early stage gearless

turbine technology that makes wind farms cheaper to maintain. In addition to, offering a wide product range to meet the demand of the renewable wind energy around the world. Our

EPC services’ spectrum by our highly skilled experts covers all aspects of state of the art wind power technologies from assessment of site and wind resource, wind farm engineering,

procurement and logistics, construction and grid connection. Moreover, our services extend to the test, commissioning and O&M services.

In addition to our technical expertise, we strong financial capabilities and resourcing, supporting our readiness in meeting our client›s targets economically. This is reinforced by our top

quality and cost effective components, not to mention our long term cooperation with numerous renowned suppliers.

Our tower factory is a state-of-art facility which was designed exclusively for tower manufacturing and deploys the last technology in tower fabrication. The layout allows a lean production

process from material reception until sections storage assuring the high standard of quality of our towers. Our location close to the ports nearby the Red Sea and excellent connection to

the ports in Alexandria permits us to delivery towers to EMEA and the Americas.

CAPABILITIES UP TO 10-12 SECTIONS PER WEEKWe offer services for wind farms to the region. These services are towers maintenance, repair and special works. Although,

we might extend these services according to customers’ needs and by deploying all.

W W W . E L S E W E D Y E L E C T R I C . C O M

15

Page 16: ENGINEERING & CONSTRUCTION

GABAL ELZAYT JICA PROJECTW I N D F A R M S

PROJECT SUMMARY

Continuing operating with international EPC contractors, we have cooperated with Gamesa as their sub-contractor for carrying out the civil works package of the wind farm project financed

by JICA with a capacity of 220MW. Gamesa is assigned to perform the supply, installation, commissioning, start up and testing for 110 G80 wind turbine generators with 2 MW of nominal

power and 60 m hub height on turnkey basis.

PROJECT LOCATION

EGYPT

16

Page 17: ENGINEERING & CONSTRUCTION

POWER GENERATIONH Y D R O P O W E R P L A N T

HYDROAs part of our commitment to clean energy we have extended our expertise to dam construction. Dams provide a largely untapped source of energy but require specialist expertise and

careful project management. Elsewedy Electric’s EPC model has become the favored choice for the region’s latest hydro projects.

The scope covers the engineering, civil works as well as the procurement, installation and commissioning of all hydro-mechanical, electromechanical and electrical equipment.

The construction of a RCC (roller compacted concrete) gravity dam, spillway, roller compacted concrete saddle dam, diversion tunnel, water conveying system, power tunnels,

powerhouse, switchyard, a bridge on, Owner facilities, temporary facilities and access roads.

W W W . E L S E W E D Y E L E C T R I C . C O M

17

Page 18: ENGINEERING & CONSTRUCTION

PROJECT LOCATION

TANZANIACONCEPTUAL PHOTO

JULUIS NYERERE PROJECT2 , 1 1 5 M W H Y D R O P O W E R

PROJECT SUMMARY

Juilis Nayyra hydro project is a joint venture to provide an affordable, reliable and sustainable energy mix for

Tanzania’s future. We are managing the project on an EPC basis, covering engineering and civil works as

well as hydro-mechanical, electromechanical and electrical equipment. The project includes construction of

a roller compacted concrete 131-meter-high gravity dam, spillway, saddle dams, diversion tunnel, three

power tunnels, powerhouse, 400kV switchyard and a bridge on the Rufiji river.

ü US $2.9 billion contract.

ü 6,307 GWh annual generation.

ü 36 months from start to completion plus 6 months mobilization.

ü Social projects worth over US $116million.

18

Page 19: ENGINEERING & CONSTRUCTION

W W W . E L S E W E D Y E L E C T R I C . C O M

TRANSMISSION AND DISTRIBUTIONI N T R O , T Y P E S & P R O J E C T S R E F E R E N C E S

19

Page 20: ENGINEERING & CONSTRUCTION

TRANSMISSION AND DISTRIBUTIONI N T R O D U C T I O N

Elsewedy Electric is the partner of choice for power utilities in the Middle East and Africa. Between February 2018 and February 2019 alone, we installed over 1200 kilometers of 500 kV

overhead transmission lines and over 18 substations between 66KV and 500KV. We support our customers throughout the entire energy supply process, from generation to transmission

and distribution, managing the design, engineering, procurement, construction testing and commissioning. We have already delivered highly successful OHTLs, substations, distribution

networks and many other projects

W W W . E L S E W E D Y E L E C T R I C . C O M

Egypt KSA Kuwait Yemen Ethiopia Sudan Rwanda Mozambique Libya Algeria

Equatorial

Guinea

Ghana Niger Cameroon AngolaMauritania Zambia

Our end-to-end service starts with route planning and choice of technology. We source and (if necessary) adapt the components required. We then carry out design and engineering

studies before embarking on construction. Our in-house engineering team starts working from the earliest stages to optimize cost while maintaining quality. Every phase is closely project

managed before testing and commissioning. Only when we are completely satisfied do we hand over the finished installation to you.

We are currently pursuing residential and infrastructure projects in the Middle East, Gulf states and Europe. We have identified infrastructure projects as an opportunity for governments

during the global financial downturn. They provide a low-risk, high-return way to boost employment and keep the wheels of the economy turning.

20

Page 21: ENGINEERING & CONSTRUCTION

TRANSMISSION AND DISTRIBUTIONI N T R O D U C T I O N

Elsewedy Electric T&D is an international organization specialized in the design, supply, installation, testing and commissioning of overhead transmission lines and substations on a

turnkey basis for utilities and industries.

EE T&D maintains international presence through a large global network of offices, agents and partners, as well as through professional management, centralized in Egypt’s

headquarters.

We have an extensive experience in implementing turnkey transmissions and distribution networks and substations projects, as well as rural electrification and street lighting projects.

ELSEWEDY ELECTRIC T&D PROVIDES THE FOLLOWING ACTIVITIES:EET&D is a leading company in the Arab nation and the African countries in the design, construction, management and maintenance of electrical power transmission and distribution

networks up to 500 KV as well as all kinds of electrical contracting services on turn-key basis.

This includes the construction of overhead transmission lines and underground cables, power transmission and distribution network, substations as well as the design, construction,

management, operation and maintenance of diesel and gas power generation plants small size up to 35MW and wind farms.

We are an ISO 9001, ISO 14001, and OHSAS 45001 certified company and pride ourselves on our safe working practices and environmentally friendly solutions.

We also offer long-term project structured financing, deferred payment options and public-private partnerships with long-term financing.

W W W . E L S E W E D Y E L E C T R I C . C O M

21

Page 22: ENGINEERING & CONSTRUCTION

TRANSMISSION AND DISTRIBUTIONE Q U I P M E N T

WE OFFER A WIDE RANGE OF HIGH, MEDIUM AND LOW VOLTAGE MATERIALS AND EQUIPMENT

Where possible, we use our own materials to ensure optimum quality. Our procurement and quality teams ensure strict control over all aspects of supply and delivery, giving you the best

possible materials for your requirements at the keenest price with the fastest delivery time.

Our Engineering, Procurement & Construction (EPC) service includes meticulous project management to meet your deadline and budget.

W W W . E L S E W E D Y E L E C T R I C . C O M

22

Page 23: ENGINEERING & CONSTRUCTION

TRANSMISSION AND DISTRIBUTIONO V E R H E A D T R A N S M I S S I O N L I N E S

We offer complete EPC solutions for transmission lines with a wide range of configurations and voltages (UP TO 500 KV).

We comply with all international and client standards and are supported by a network of leading global and local manufacturers. We combine the shortest construction time with the

highest standards of execution.

W W W . E L S E W E D Y E L E C T R I C . C O M

500KV

1,600KM

In Egypt & ME

2,200KM

In The Last 10 Years

3,700KM

Running In 1 Year

1,000KM

In Africa

1,500KM

Substations In Africa

49

Substation In Egypt & ME

36

Substations In The Last 10 Years

85

First Substation In New Capital & Biggest Substation

In ME

S1

23

Page 24: ENGINEERING & CONSTRUCTION

TRANSMISSION AND DISTRIBUTIONO H T L P R O J E C T S R E F E R E N C E S

BENI SUEF - NILE CROSSING TOWER PROJECT 358KM 500 KV OHTL

500 KV OHTL Project located at Bani Suef Power Plant, Tammy Amdid - West

Damietta, Tammy Amdid - Badr, Opening of Abu Qir - Kafr El Zayat, Abu Matamir –

Damanhour (DC, QUAD Conductors) on turnkey basis.

• A total of 358km

• 2140m3 of reinforced concrete

• 255 tons of reinforced steel bars

• 413, 280 safe working hours

• Project duration 14 months

• Tallest Transmission Tower in the MENA Region

• Nile crossing towers fully designed by EETD’s in-house Engineering team

• Standing at 145M, EETD’s Nile Crossing Tower is higher than the greatest pyramid

(139M)

ü Client : Egyptian Electricity Transmission Co.

500KV SINGLE CIRCUIT OHTL ABO QUIR-BADR 342 KMS

Design, manufacturing, supply and construction for “ABU QUIR-BADR Single Circuit

500kV OHTL Contract Package” for ABU QUIR-BADR Project three lots total length

approx. (342km) on turnkey basis.

ü Client : Egyptian Electricity Transmission Co.

24

W W W . E L S E W E D Y E L E C T R I C . C O M

Page 25: ENGINEERING & CONSTRUCTION

TRANSMISSION AND DISTRIBUTIONO H T L P R O J E C T S R E F E R E N C E S

CONSTRUCTION OF OHTL & UG CABLE FOR INTERCONNECTION OF QATIF-2

LINE 2, 115 / 13.8KV SUBSTATION

Engineering, design, procure, supply & deliver all equipment & material to work site

Construct, install, test, commission & put into service the overhead transmission line &

underground cable circuits for the interconnection of Qatif-2, Line 2, 115/13.8KV

substation.

ü Client : National Grid, Saudi Arabia

QUADRUPLE BUNDLE 500 KV DOUBLE CIRCUIT OHTL BORG AL ARAB /

MARSA MATROUH WITH AN APPROXIMATELY 255 KM

Design, supply, construction, installation and testing of all components (towers,

conductors, insulators, accessories, ground wire, OPGW and civil works) and warranty

of the Equipment under the full responsibility of the Contractor.

ü Client: Egyptian electricity transmission company (EETC)

25

W W W . E L S E W E D Y E L E C T R I C . C O M

Page 26: ENGINEERING & CONSTRUCTION

TRANSMISSION AND DISTRIBUTIONO H T L P R O J E C T S R E F E R E N C E S

PROCUREMENT OF 132KV OVERHEAD LINES FROM LS MFEZ TO CHAWAMA FROM CHAWAMA TO CHILANGA

Design, Engineering, Installation, Testing & Commissioning on turnkey basis for the following:

• Construct 18 Km, 132kV double circuit monopole line with OPGW to Chawama Substation.

• Construct 7.5 Km, 132kV single circuit line with conductor and OPGW, from Chawama to Chilanga Substation.

• Decommission existing 33kV lines from Chilanga to Chawama substation (Approx. 10 Km)

ü Client : ZESCO Limited

26

W W W . E L S E W E D Y E L E C T R I C . C O M

Page 27: ENGINEERING & CONSTRUCTION

TRANSMISSION AND DISTRIBUTIONE L E C T R I C A L S U B S T A T I O N S

We provide turnkey solutions for every variety of substation and voltage level (up to 500 kV). We cover GIS and AIS equipment supply, installation, testing and commissioning. Our scope

extends to system studies, substation automation, control and protection, telecommunication systems and all auxiliary services.

OPGWWe are the leading optical ground wires manufacturer in the Middle East. We produce HV & EHV cables up to 500 KV and offer integrated solutions for power transmission, power

generation, substations and infrastructure. We make any design with stainless steel or aluminum coated stainless steel tube (center or lateral) for OHTL of 66 kV, 132 kV, 220 kV, 400 kV

or 500 kV. (this is not T&D’s scope – we install OPGW in our projects but don’t manufacture them - unless you are referring as a Group)

LAYING METHODS

W W W . E L S E W E D Y E L E C T R I C . C O M

Caterpillar

Machines-cable

Pushers

Manual

Assistance

Continuous End

Pulling

Motorized RollersNose/End Pulling Combination Of

Two Or More

27

Page 28: ENGINEERING & CONSTRUCTION

TRANSMISSION AND DISTRIBUTIONO F F L I N E A N D L I V E L I N E I N S T A L L A T I O N S

Live line installation of OPGW to improve communication infrastructure is essential when the power line cannot

be shut down, for example because a communication link between substations has to be kept operational. We

have developed an installation method that overcomes this challenge.

We can: Replace ground wire with an (OPGW) to provide signal exchange and broadband communication

Extend and upgrade an existing OPGW below the top of the tower Repair z defective OPGW.

TESTING & COMMISSIONING We carry out testing and commissioning from LV to HV substations and the mobile power station balance plant.

All required testing equipment and tools are available and calibrated.

We also have trained operation and maintenance personnel during test and startup activities.

SCOPE OF WORKTesting and commissioning for: (500KV, 220KV, 66KV HV switchgears, GIS, AIS)

protection relays/systems, power transformers, the SAS system, the substation RTU and the telecom system.

28

Page 29: ENGINEERING & CONSTRUCTION

TRANSMISSION AND DISTRIBUTIONO P G W P R O J E C T S R E F E R E N C E S

CONSTRUCTION OF 60/30KV SUBSTATIONS

Design, Engineering, Material Supply, Supervision of Construction Works,

Testing & Commissioning of:

• 60/30KV AIS substation

• Lot 6: TAMDA Substation 60/30kV - 2 x 40 MVA

• Lot 10: MILA Substation 60/30 kV - 2 x 40 MVA

ü Client : SONELGAZ

W W W . E L S E W E D Y E L E C T R I C . C O M

NEW CAPITAL S1 SUBSTATION 500/220/66/22 KV

(FAST TRACK PROJECT 3 MONTHS T&C)

• 500/220/66/22 GIS Substation

• First substation in the New Capital and the biggest substation in the ME

• 2,400,000 safe working hours

• Project duration 11 months

29

Page 30: ENGINEERING & CONSTRUCTION

TRANSMISSION AND DISTRIBUTIONO P G W P R O J E C T S R E F E R E N C E S

ENGINEERING, SUPPLY, CONSTRUCTION, INSTALLATION, COMMISSIONING,

TESTING AND WARRANTY OF 8 X 500 AND 220 KV GIS SUBSTATIONS

Engineering, Supply, Construction, Installation, Commissioning, Testing and

Warranty of 8 x 500 and 220KV GIS Substations:

• Etay El Baroud Substation 500/220/22kV

• West Maghagha Substation 500/220/22kV

• Kafr El Zayat ext. Substation 500/220/22kV

• Wadi El Natroun Substation 500/220/22kV

• East Assuit Substation 500/220/22kV

• East Banha Substation 500/220/22kV

• Samanoud Substation 500/220/22kV

• Abu El Matamir Substation 500/220/22kV

ü Client : Egyptian Electricity Transmission Co.

W W W . E L S E W E D Y E L E C T R I C . C O M

MRGF-1 PROJECT

Design, supply, installation, testing and commission on turnkey basis the following:

• MELKAWAKANA Substation 230/132kV.

• MELKAWAKANA YOUGOSLAV Substation 230/132/33kV & 132/66/15kV.

• RAMO Substation 230/132/33kV.

• GODE Substation 230/132/33kV.

• GEFERSA Substation 230/132kV, upgrading, 4x125MVA.

• KHALITI Substation 230/132kV, upgrading, 3x125MVA.

• GIS Mobile Substation 230/132kV.

• HARRAR Substation 132/33/15kV.

• FIK Substation 132/33/15kV.

• SHAKISO Substation 132/33/15kV.

• FINOTE SELAM Substation 66/33kV.

ü Client : Ethiopian Electric Power Corporation

30

Page 31: ENGINEERING & CONSTRUCTION

TRANSMISSION AND DISTRIBUTIONO P G W P R O J E C T S R E F E R E N C E S

GHANA FUND PROJECT CONTRACT NO.ECG/ELSW/01/08 P-24-08

Design, supply, installation, testing and commission on turnkey basis the following:

• Gbawe Ajaman complete with cable works.

• Construction of 50 KM, 2x40 MVA, 33KV Overhead line

• Darkuman 33/11KV indoor Substation

• Gbawe Adjaman 33/11KV Outdoor Substation

ü Client : ECG (Electricity company of Ghana Ltd.)

W W W . E L S E W E D Y E L E C T R I C . C O M

110 EL KAYAN 220/22KV GIS (FAST TRACK PROJECT 2 MONTHS)

• 220/22 kV GIS Substation

• Total project duration 8 months

• 220 Egyptian workers

• 422, 400 safe working hours

31

Page 32: ENGINEERING & CONSTRUCTION

TRANSMISSION AND DISTRIBUTIONP O W E R D I S T R I B U T I O N

20,000 KM IN THE LAST 10 YEARSWe deliver to the market power distribution, managing the design, engineering, procurement, construction

testing and commissioning. We have already delivered highly successful distribution networks and many

other projects to countries as diverse as Ghana, Algeria, Mozambique, Zambia and Equatorial Guinea.

SCOPE OF WORKDesign, supply, installation, testing and commission of the following on turnkey basis for:

Network using underground cables, Electrical supply to all equipment including telephone, TV security

systems and street lighting system &

MV switchgear with all auxiliaries and civil works.

32

Page 33: ENGINEERING & CONSTRUCTION

TRANSMISSION AND DISTRIBUTION

P O W E R D I S T R I B U T I O N P R O J E C T S R E F E R E N C E S

MOSTAKBAL CITY PACKAGE 5 - EGYPT

Infrastructure EPC project consisting of 13 NO MV distribution panels and

a massive number of underground MV cables

ü Client : Mostakbal City

W W W . E L S E W E D Y E L E C T R I C . C O M

COMPOUND AL NIABA AL AMA – EGYPT

Supply, installation, testing and commissioning of the electrical

works for the whole site. The work includes:

• Kiosks

• LV distribution boards

• Lighting equipment

• Cables

• Communication networks

• CCTV

• Earthing systems

ü Client : National Company for General Contracting & Supplies

33

Page 34: ENGINEERING & CONSTRUCTION

TRANSMISSION AND DISTRIBUTIONP O W E R D I S T R I B U T I O N P R O J E C T S R E F E R E N C E S

POWER DISTRIBUTION - SUDAN

Design, supply, installation, testing and commission of the following on turnkey basis:

• Manufacture & install 52,823 concrete poles of 11 ft. height & 136,661 concrete

poles of 9 ft. height

• Supply & install 2,890 transformers (100&200KVA) & 76 transformers of 1000KVA

• Supply & install 16,000 km of aluminum wire of size 1*185, 1*95 and 1*70 mm2

• Supply & install 2,606 kms wires aluminum cable 1*120, 1*95

• Supply & install 19km of MV underground cables 3*70 & 173km under ground

cables of size 3*185 mm2

• Supply & install 3,500kms of wire ABC cables 4*70 mm2

• Construct 5x33/11KV substations at various locations

ü Client : National Company for Electricity

W W W . E L S E W E D Y E L E C T R I C . C O M

SUPPLY OF DISTRIBUTION MATERIALS - ETHOPIA

Supply and delivery the following:

• Lot1. Supply of Distribution Transformers 33kV and 15kV three phase network.

• Lot2. Supply of Medium and Low Voltage 33kV and 15kV Switch Gear

• Lot3. Supply of AAAC conductor, Supply of ABC cables.

• Lot4. Supply of Overhead Line accessories

• Lot5. Supply of Insulator 33kV and 15kV

• Lot6. Supply of Hard wares

ü Client : Ethiopian Electric Power Corporation - EEPCo

34

Page 35: ENGINEERING & CONSTRUCTION

TRANSMISSION AND DISTRIBUTIONP O W E R D I S T R I B U T I O N P R O J E C T S R E F E R E N C E S

SUPPLY & INSTALLATION OF MATERIAL FOR THE CONSTRUCTION OF 30KV

TRANSMISSION LINE “NYANKORA-NASHO” - ROWANDA

Supply & installation of the following electrical equipment on turkey basis:

• 33KV medium voltage OHTL with a total length of 40kms

• 11KV low voltage OHTL with a total length of 8kms

• 6 Pc’s 200KVA transformers

• 40kms OPGW connection

ü Client : ELECTROGAZ & RECO

W W W . E L S E W E D Y E L E C T R I C . C O M

35

Page 36: ENGINEERING & CONSTRUCTION

TRANSMISSION AND DISTRIBUTIONR U R A L E L E C T R I F I C A T I O N

INFRASTRUCTURE SOLUTIONS FOR SMART LIGHTING AND MANAGEMENT

IT can contribute to a safer community.

Can reduce energy consumption, cost, and maintenance, all while positively contributing to the environment.

Integrated lights will be able to send a real time data on lighting status and parameters.

Processing and data handling are performed by the base station.

Information collected transmits to the main server where it can be utilized for real time monitoring and management.

Remote street lights control are performed from the Cloud Platform

UTILITY SCALE SOLAR STREET LIGHTINGElsewedy Electric operates in a diversified Line of Business and product range.

We contribute our organization, market, industrial and manufacturing experience to a profound client.

• Go Green with our environment friendly Solar Street Lights with zero carbon emission.

• Almost no running cost and hence negligible O&M cost.

• Solar street lights can be easily erected in almost any location. and environmental offering.

Our Line of Business within the solar industry varies from garden lighting to 100’s of MW solar plants (CSP and PV).

• Power outages and surges have no impact on our independent solar lighting.

• Disruption minimized from the reduced wiring.

• Elsewedy Electric offers a wide variety of solar lighting configuration and styles to meet your exact specific requests and needs.

36

Page 37: ENGINEERING & CONSTRUCTION

TRANSMISSION AND DISTRIBUTIONR U R A L E L E C T R I F I C A T I O N P R O J E C T S R E F E R E N C E S

OUTDOOR STREET LIGHTING PROJECT P-07-2007 & P-41-2009 - GHANA

Design, supply, installation, testing and commissioning of the following on turnkey

basis (400kms):

• 54km at KOFORUDIA

• 55km at TAMALE

• 60km at CAPE COAST

• 33.5km at SEKONDI TOWNSHIP

• 34.02km at SUNYANI

• 32.13km at HO

• 54.4km at WA

• 23.49km at BOLGATANGA

• 49km at TAKORADI TOWNSHIP

ü Client : Ministry of Energy

W W W . E L S E W E D Y E L E C T R I C . C O M

RURAL ELECTRIFICATION & SERVICE CONNECTION - YEMEN

Supply & installation of the following on turnkey basis:

• 378kms of 11KV AAC OHTL conductor

• 263 nos. 11/0.415KV distribution transformer

• 2412kms of XLPE cable

• 29,767 service connections & construction of 5MVA, 33/11KV outdoor substation

ü Client : General Authority for Rural Electricity (GARE) & Rural Energy Access

Project (REAP)

37

Page 38: ENGINEERING & CONSTRUCTION

TRANSMISSION AND DISTRIBUTIONR U R A L E L E C T R I F I C A T I O N P R O J E C T S R E F E R E N C E S

PROJECT FOR ELECTRIFICATION OF TOWNS; TEGUTE,NUKUMEKIN, RIO CAMPO, CAPO SAN JUAN, NZANAYONG & EVINAYONG CITY - EQ GUINEA

Design, supply, installation, testing and commission of the following on turnkey basis:

• Supply & install 800 steel poles of 9m & 1020 street lighting poles of 8m height

• Supply & install 32 kiosks 400KVA & 630KVA

• Supply & install 34kms of MV cable 3*1*150mm2 & 12kms of 3*150mm2 size

• Supply & install 140kms of underground LV cables of various sizes

• Supply & install 35kms ABC cable 3*70+1*54.6mm2

• Supply & install 3,100 three & single phase meters

• Supply & install two generators 1000KVA with all required civil works & spare parts

ü Client : Ministry of Mining, Industry & Energy

W W W . E L S E W E D Y E L E C T R I C . C O M

38

Page 39: ENGINEERING & CONSTRUCTION

TRANSMISSION AND DISTRIBUTIONC L I E N T S & S T A N D A R D S

W W W . E L S E W E D Y E L E C T R I C . C O M

SOME OF OUR CLIENTS

• Electricity Distribution Company (EDC) Egypt

• Egyptian Electricity Transmission Company (EETC)

• Electric Power Systems (EPS) Egypt

• PHARAOH GOLD MINES NL-SUKARI Egypt

• National Electricity Corporations (NEC) Sudan

• SONEL GAS Algeria

• Ethiopian Electric Power Corporation (EEPCO)

• Electrical Company of Ghana (ECG)

• Ministry of Infrastructure Rwanda

• Saudi Electricity Company

• Public Electricity Corporation (PEC) Yemen

• Electric Authority of Mozambique

• ZESCO Limited Zambia

• Mostakbal City

• Canal Sugar Company

OUR STANDARDS

• IEC - International Electrotechnical Commission

• DIN - German Standard Institute

• VDE - Association of German Electrical Engineers

• BS - British Standards

• EN - European Standards

• NFPA - National Fire Protection Association

• NEC - National Electrical Code (NFPA 70)

• IEEE - Institute of Electrical & Electronic Engineers

• NEMA - National Electrical Manufacturers Association

• ICEA - Insulated Cable Engineers Association

• INETA - International Electrical Testing Association

• ANSI - American National Standard Institute

39

Page 40: ENGINEERING & CONSTRUCTION

W W W . E L S E W E D Y E L E C T R I C . C O M

CIVIL AND PUBLIC WORKI N T R O , S E C T O R S & P R O J E C T S R E F E R E N C E S

40

Page 41: ENGINEERING & CONSTRUCTION

CIVIL AND PUBLIC WORKI N T R O D U C T I O N

Elsewedy Electric civil work segment is popular for its excellence, quality and commitment. Our commitment to the highest quality within the set time schedules has been our key driver

towards growth, positive fame and reliability. We are now recognized as one of Egypt’s top reputable turnkey contractors. Through a program of alliances with major international

contractors, we are able to undertake multidisciplinary projects of high scale and complexity.

During the past 5 years, we acquired such remarkable positioning in a very short time and in several markets, nationally and internationally. Apart from the Egyptian market, and gained a

strong foothold in various markets including Nigeria, Algeria, Chad and Mozambique. However, we are always looking forward for more achievements; thus, always planning to expand

our presence and sustain the operations across Africa and Middle East.

Moreover, the diversity of our operations and services, as we carry out projects in different sectors such as Infrastructure, Bridges, Ports, Commercial Buildings, Hospitals, Governmental

buildings, Educational Facilities….. etc. Thanks to our result-oriented, tailor-made, customer-focused services, we established sustainable long-term relationships with our customers and

were able to win their trust and loyalty. We became the number one choice for most of our customers when it comes to selecting a one-stop-shop for their construction projects.

Being a customer-focused contractor, we believe that customers’ satisfaction is its priority and secret to success. In addition, we pay special attention to our customers’ needs in order to

fulfill them through meeting highest standards of quality, conforming to requirements, preventing errors and exceeding expectations. The key to success is represented in our customer

satisfaction, being environmentally friendly, as well as acting responsibly and safely towards our society

W W W . E L S E W E D Y E L E C T R I C . C O M

Foundation Works

Substation Control Building

Trenches for Cables

Administration Building

41

Page 42: ENGINEERING & CONSTRUCTION

CIVIL AND PUBLIC WORK

R O A D S , B R I D G E S & P O R T S

The infrastructure is the cornerstone of any social and economic development of a country. Knowing that, the Egyptian Government has recently directed its focus to establishing and

developing infrastructure networks across the Republic.

Accordingly, the Government started investing on infrastructure development projects. In the same context, and from our deep keenness on the prosperity and well-being of our country,

we pay great deal of attention to such national projects. Thanks to our deep-seated know-how and long experience in the construction industry, we have carried out a number of national

infrastructure projects across the Arab Republic of Egypt and abroad.

SCOPE OF WORKWe are always keen on participating of the continuous infrastructure development in Egypt.

We move forward successfully for the construction of several bridges and tunnels and known of its remarkable capabilities in delivering such complex projects. had delivered several

projects in such terms such as Cairo Alex road bridges (6th Sector), mohamed bin Zayed Bridge in Cairo Capital, Ismailia Bridges, Mahala Bridge, Ain Sokhna road tunnels Remaya

Square interchange and other several projects.

W W W . E L S E W E D Y E L E C T R I C . C O M

42

Page 43: ENGINEERING & CONSTRUCTION

CIVIL AND PUBLIC WORKR O A D S , B R I D G E S & P O R T S P R O J E C T S R E F E R E N C E S

PORT OF SOKHNA CONTAINER TERMINAL BASIN 2 - ONSHORE PORT ANDTERMINAL WORKS

In cooperation with DP World, RME was awarded an EGP 1.6 billion project for the

Construction of Onshore yard works for a new container terminal to the southwest of

the existing Basin 1 terminal. The construction is for terminal pavement and terminal

buildings for operations and administrative use for the new Basin 2 terminal and the

existing Basin 1 terminal.

SOKHNA PORT-BASIN 1 - IRON OXIDE PELLETS TERMINAL CIVIL WORKS (A)

In cooperation with DP World, RME has been awarded the turnkey construction of the

iron oxide Pellets Terminal. This Import Terminal is needed in order to import the raw

materials of Iron Oxide Pellets. The terminal will be located in Sokhna Port and the

project execution period is to last for 7 months.

W W W . E L S E W E D Y E L E C T R I C . C O M

PORT OF ALGIERS CONTAINER TERMINAL – REFURBISHMENT WORKS

In cooperation with one of the international ports key developers such as Dp World,

RME has been awarded the upgrading & rehabilitation works for port of Algier

container terminal where RME is the main contractor. RME is responsible for

rehabilitating the 30h a container terminal at Algiers currently operated by DP-World.

Work Includes: Ship-to- Shore (STS) crane foundation works along quay wall, Apron

refurbishment behind quay walls, Reconstruction of the yard including gall services

and utilities. The through put forecast of the terminal is 18,500 TEU Containers as

well as 123,600m² for General Cargo.

RING ROAD EXPANSION

RME has been awarded the construction works of the Ring Road Expansion Project

from Al Mariouteya with a length of 4.1 km, In addition to El Marj sector with a length

of 2.2 km to be completed in 12 months

43

Page 44: ENGINEERING & CONSTRUCTION

CIVIL AND PUBLIC WORKR O A D S , B R I D G E S & P O R T S P R O J E C T S R E F E R E N C E S

SAFIR BRIDGE

RME has been assigned by the Engineering authority of the armed forces for the

construction of Safir Bridge located in Heliopolis area, the bridge consists of 2 ways,

roads for cars with a total length of 250 m and 27 m width and up to 9 m height and

delivered in only 87 days.

HEGAZ BRIDGE

RME has been assigned by the Engineering authority of the armed forces for the

construction of Hegaz Bridge located in Heliopolis area, the bridge consists of

2 ways, roads for cars with a total length of 350 m and 27 m width and up to 9 m

height and delivered in only two months.

W W W . E L S E W E D Y E L E C T R I C . C O M

CAIRO – ALEXANDRIA RAILWAY UPGRADE

RME has been assigned by the Egyptian Railways the Renewal works of 29 km of

siding tracks, 17 km of mainline and the renewal of station yard’s turnouts for main lines

and sidings including single and double slips, Common crossing and Scissors. The

project duration is 24 months.

CAIRO ALEX ROAD BRIDGES

Being famed for high quality and dedication, and having acquired noticeable experience

in the area of bridges construction, RME has been selected to carry out the construction

of 4 crossing bridges at Cairo - Alexandria Road. This project is considered amongst the

biggest transportation projects in Egypt. Thus, it requires highly professional qualifications

and expertise to achieve the best results.

44

Page 45: ENGINEERING & CONSTRUCTION

CIVIL AND PUBLIC WORKR O A D S , B R I D G E S & P O R T S P R O J E C T S R E F E R E N C E S

ALGERIA NEW AUTOROUTE

Based on its the formidable fame even outside the Egyptian market, we were

contracted by Cojaal, a Japanese large consortium, to carry out construction of 46

bridges and 8 culverts in Setif, Algeria. Despite the aggressive geographical nature of

the project’s location, we were proved qualified by successfully executing the project

within 30 months and at the highest quality standards and safety regulations.

NAGAA HAMMADI BARRAGE

At the very beginning of its operations, RME was able to leave a positive impression

as a highly qualified contractor. RME was sub-contracted by Vinci-Bilfinger Berger and

OCI JV to carry out civil construction works for one of the largest water structure

projects operated by the Egyptian Government in cooperation with KFW.

W W W . E L S E W E D Y E L E C T R I C . C O M

MAHALA BRIDGE

Knowing how critical the selection of the companies on which Egypt’s development

rely, the Egyptian. Armed Forces chose RME to carry out the construction of El Shun

Bridge with a total of 950m length and 12m width in a period of six months.

REHABILITATION & CONSTRUCTION OF MAPUTO CITY COASTAL PROTECTION

In cooperation with MCA Mozambique, M.CoutoAlves, S.A & M. CoutoAlves, Vias,

S.A, RME was assigned to carry out the execution of rehabilitation and construction of

Maputo city coastal protection. This project was concerned with obtaining new

configuration system in Maputo’s South Coast as well as developing criterion for in

both south and south west zones. RME’s role was represented in the construction of 7

groynes system, nourishments of sand between groynes, toe of protection and

rehabilitation of existing sea walls, groynes and revetments.

45

Page 46: ENGINEERING & CONSTRUCTION

CIVIL AND PUBLIC WORKI N D U S T R I A L & P O W E R

ONE-STOP SHOP FOR ALL YOUR CONSTRUCTION NEEDS

As for the Industrial Sector, we enjoy wide experience in various construction projects, such as establishing power generation projects, cement factories, petrochemical utilities, electrical

substations as well as Oil & Gas establishments.

We are glad and proud of our effective and sustainable partnership with various steel structure manufacturers.

Furthermore, we are keen on developing our mechanical erection capabilities to serve all projects and to enable our clients with complete turnkey basis for both civil works as well as

electromechanical installations.

W W W . E L S E W E D Y E L E C T R I C . C O M

46

Page 47: ENGINEERING & CONSTRUCTION

CIVIL AND PUBLIC WORKI N D U S T R I A L & P O W E R P R O J E C T S R E F E R E N C E S

LEKELA 250 MW WIND FARM

Continuing cooperating with Siemens-Gamesa Renewable Energy, RME is

assigned for carrying out the civil works package of the wind farm project for 96 wind

turbines generators (WTG'S) with total 250 MW located in Ras Gharib

JICA, KFW, FIEM WIND FARMS

Sub-contracted by international EPC contractor, Gamesa, RME has successfully

delivered the civil works of a wind farm project with a capacity over 350MW. In

cooperation with Gamesa, RME handles the civil construction works of the technical

foundations as well as the hardstands in addition to the design and construction of

the farms road works.

W W W . E L S E W E D Y E L E C T R I C . C O M

ELECTRIC TRAIN (LRT) DEPOT

National Authority of Tunnels (NAT) has awarded GAMA-RME Consortium the

construction works for (LRT) the main line train fence and workshop buildings which

consists of 26 buildings at Badr City. The LRT is designed to accommodate 340,000

passengers daily and contribute in reducing traffic on the Cairo-Ismailia highway by

about 30 percent.

BENBAN SOLAR PARK

RME was appointed by TSK/ENVIROMENA JV to carry out the construction works

of four plots in Benban Project with a total capacity of approximately 200MW. The

Benban Photovoltaic Solar Park is a national project aimed at increasing Egypt’s

electricity generating capacity through the development of solar PV project. RME is

proud to be the first contractor to deliver its plots and to start connecting its

generated capacity to the grid.

47

Page 48: ENGINEERING & CONSTRUCTION

CIVIL AND PUBLIC WORKI N D U S T R I A L & P O W E R P R O J E C T S R E F E R E N C E S

BENI SUEF COMBINED CYCLE 4800 MW POWER PLANT

Managed by SIEMENS – ELSEWEDY consortium, the Beni Suef Combined-Cycle

Power Plant is the largest power plant in Egypt and the MENA region with a capacity

of 4800 MW. For a period of 18 months, RME was responsible for all the civil works

of the power blocks in addition to the civil, architectural and MEP works for the

utilities and facilities in the site as well as GIS area.

EXTENSION OF ATTAQA POWER PLANT

RME was selected to execute the civil works of ATTAQA 650 MW simple cycle gas

turbine units. RME proved itself capable of completing the project within an

extremely short time frame, delivering the project just 5 months.

W W W . E L S E W E D Y E L E C T R I C . C O M

SIEMENS PS SERVICES CENTER – RAMSIS II

RME has been awarded the turnkey construction of Siemens maintenance

Workshop (Ramsis II). The project entails activities to build a new training, repairing

and tooling facility for Siemens. This cooperation marks yet another successful

cooperation between Siemens Technologies & RME.

MOSTASMEREEN (220/66/11 KV) GIS SUB-STATION

GE & RME are working as a consortium for 26 months for the procurement and

installation of four independent substations located in Egypt.

Time frame for finishing Substation 220/66/11 KV in Mostasmereen is 8 months.

Energizing Substation 500/220 KV of Ismailya East is 20 months.

Substation 500/220 KV in Beni Suef will take 18 months to be completed.

Substation 500/220 KV of Tamy El Amdeed will be finished within 19 months.

.

48

Page 49: ENGINEERING & CONSTRUCTION

CIVIL AND PUBLIC WORKI N D U S T R I A L & P O W E R P R O J E C T S R E F E R E N C E S

EZZ DRI PLANT

DANIELI is ranked among three largest suppliers of equipment and plants to the metal

industry in the world. After a stoppage for about three years, DANIELI had to be so

careful upon choosing the reliable contractor to successfully resume and complete the

construction of EZZ DRI plant. Therefore, and based on its international fame as one

of the most accurate contractors, DANIELI chose RME to act as the main contractor in

charge of the project’s civil works. While DANIELI was facing a challenge in

completing the project around the table set for it, RME has proven a good track record

in achieving DANIELI standards in terms of resources allocation, Quality, Safety

working procedures and commitment to time tables. It is worth mentioning that the

Plant is located in Al Ein El Sokhna.

BMIC ASSUIT CEMENT FACTORY

Being known for its compliance with the highest standards of quality, RME was

assigned as the subcontractor for the execution and completion of the Building

Materials Industries Company S.A.E. (BMIC) Cement plant located in Assiut, Egypt.

W W W . E L S E W E D Y E L E C T R I C . C O M

ELCOSTEEL ROLLING MILL PLANT

As part of our continuing success in heavy civil construction projects, RME was

appointed by ELCO steel as the main contractor for all civil and utilities construction

for their new rolling mill plant in the SOKHNA area. RME achieved significant results

in terms of delivering the project in a very challenging time frame as well as in terms

of quality for the installation works which were managed by DANIELI. In addition,

RME was appointed to carry out the construction works of ELCO STEEL 220/33KV

GIS Substation.

SWAG WINDMILL FACTORY

Egypt is well-known for being one of the most recognized countries to produce power

from wind plants, especially in the area of Zaafarana in El Ain El Sokhna. Therefore,

the first Wind Mills tower manufacturing facility was built in this area of El Ain El-

Sokhna by the German Investor SWAG. From our keenness to protect our country and

help increase its prosperity and welfare, RME proudly worked as the main contractor

for the construction of the 15000m2 manufacturing unit in addition to all facilities and

utility buildings. RME was able to successfully complete the project in a period of 10

months. The first production of the plant was in early 2011.

49

Page 50: ENGINEERING & CONSTRUCTION

CIVIL AND PUBLIC WORKL O G I S T I C A W A R E H O U S E

LOGISTICA WAREHOUSE IS A LOGISTICS WAREHOUSE DEDICATED FOR PHARMACEUTICAL STORAGE

Such kind of storages requires special care and specific equipment during the construction time. Bearing this in mind, RME took responsibility for constructing a warehouse on an area of

11,500 m2 with 15m height.

Among this area, an area of 6,500 m2 will be dedicated for an air-conditioned Area and 5000 m2 to serve as a cold store designed to work at temperature varies between -20 and +5.

The warehouse also includes a 7m-high rack store, machine, utilities building, water tank and electrical substation.

W W W . E L S E W E D Y E L E C T R I C . C O M

50

Page 51: ENGINEERING & CONSTRUCTION

CIVIL AND PUBLIC WORKC O M M E R C I A L

RME IS BEST KNOWN FOR ITS HIGH-END FINISHING AND COMPLIANCE WITH TOP CONSTRUCTION STANDARDS.

From our keenness to contribute to our society’s development,

We serve various sectors as RME has conducted construction projects including educational facilities, shopping malls, hotels and restaurants and many others.

W W W . E L S E W E D Y E L E C T R I C . C O M

51

Page 52: ENGINEERING & CONSTRUCTION

CIVIL AND PUBLIC WORKC O M M E R C I A L P R O J E C T S R E F E R E N C E S

R5 MIXED USE DISTRICT – R5

RME is acting as the turnkey Contractor for the construction of Mixed-use district

project in New Cairo Capital. R5 project is one of our complex and mega projects with

approximately 800,000 sqm BUA consisting of 7 towers and 5 clusters.

SODIC EASTOWN

SODIC, RME's recurring partner, trustingly awarded RME the construction its new

Eastown Retail and Offices complex of total BUA 154,000 sqm which considered as

one of the commercial iconic schemes at the New Cairo.

W W W . E L S E W E D Y E L E C T R I C . C O M

OLYMPIC MULTI-SPORTS HALL PROJECT

RME is acting as the turnkey Contractor for the construction of the Olympic Multi-sports

Hall, the project is a multi- sports platform with total BUA of 40,000 sqm that is certified

to accommodate 15,000 spectators for Olympic Games of Handball, Basket Ball,

Volley Ball, Judo, Karate, Taekwondo, Boxing and Wrestling.

THE KNOWLEDGE HUB

The Knowledge Hub Universities is a multidisciplinary educational hub hosting

branches of world-class universities, each with programs in their areas of strength, to

prepare students for a global career by offering an intellectually stimulating, culturally

enriching, and innovative learning environment. RME was responsible for the

turnkey construction of the Knowledge Hub Universities.

52

Page 53: ENGINEERING & CONSTRUCTION

CIVIL AND PUBLIC WORKC O M M E R C I A L P R O J E C T S R E F E R E N C E S

ROYAL CITY MALL

RME has been awarded the Construction of Royal City Mall that is located on 120,000

m2 plot of land, Giza Governorate. The built up area of the mall is approximately

25,000 m2 and the building represents a landmark on the main axis of Sheikh Zayed

district where you can enjoy a 500m façade and a new modernized stile for a retail

complex.

NEW GIZA UNIVERSITY

Succeeding in executing the civil and electromechanical works in Phase 1 of the

construction of New Giza University in the highest quality and within the time-frame

agreed upon, RME was assigned with the same works for Phase 2. It is worth

mentioning that the areas of both phases, 1 and 2, are 20,000m2 and 20,660 m2,

respectively, while the project completion periods for both phases were, 8 and 10

months.

W W W . E L S E W E D Y E L E C T R I C . C O M

SODIC ALLEGRIA CUB HOUSE

RME has been awarded the turnkey construction of Sodic Allegria Club House, the

project work package comprises of one (1) building (G), of total BUA of 3,446 sqm,

built over one story underground basement with the same area. The NOC building

work package comprises of one (1) building (G), of total BUA of 169 sqm.

POINT 90 MALL

Located in New Cairo, Point 90 Mall Project was assigned to RME to carry out all

construction tasks and works due to its wide-fame as an experienced professional

contractor.

53

Page 54: ENGINEERING & CONSTRUCTION

CIVIL AND PUBLIC WORKC O M M E R C I A L P R O J E C T S R E F E R E N C E S

WESTOWN ENTERTAINMENT HUB

RME is entrusted with the execution and completion of this project. Acting as the main

contractor, RME is further responsible for remedying any defects related to the civil

works, MEP and infrastructure works pertaining to Westtown Entertainment Hub.

UPTOWN CAIRO PKG 53

Owned by the well-known Emaar, Uptown Cairo Project is a world-class residential

complex established in Egypt. Believing on RME’s wide experience and professional

know- how, RME was appointed to carry out the construction works of Village F (West)

“Sierras”, Phases 2 and 3 on a total area of 65,000 m2 comprising 11 buildings.

W W W . E L S E W E D Y E L E C T R I C . C O M

MAXIM MALL

Located in New Cairo, Maxim Mall is considered one of the greatest shopping centers

in Cairo. It is established on an area of 40,000m2 and encompasses 400 stores

including hypermarkets, food courts, international cafes and restaurants. RME was

glad to carry out the electromechanical works and finishing of this large establishment.

TWIN TOWERS NEW ADMINISTRATION & SHOW ROOM BUILDINGS

Arabian Group is one of the new Egyptian developers established in 1990. For its very

first investment, Arabian Group choose RME as their main contractor to carry out the

construction of a new administration & retail complex. The project is located in 6th of

October city and include TOYOTA show rooms, two new administration buildings in

addition to two medical center towers. The project total duration was 36 months.

54

Page 55: ENGINEERING & CONSTRUCTION

CIVIL AND PUBLIC WORKC O M M E R C I A L P R O J E C T S R E F E R E N C E S

(M) PORIUM

RME undertakes the construction works of Civic Center and Pool Facility of Villages F,

M, L, K & J (west) at Marassi, North Coast. In this project, RME is responsible for the

turnkey construction of facility management building, Mosque, Retail Shopping

Building, Generator Room, four (4) Pool Facility Buildings and Anchor Shop.

Furthermore, RME is entrusted with all infrastructure works, Roads, Parking Areas as

well as fences and gates.

THE STRIP SHOPPING MALL

RME acts as the turnkey contractor for the Strip Mall. This project is owned by

AUTOVILLE, which is a unique one-stop destination for car enthusiasts and their

families. It is located on Dahshour Road and beautifully designed by renowned

architects Skidmore, Owings & Merrill LLP. The projects’ period was 16 months.

W W W . E L S E W E D Y E L E C T R I C . C O M

AL JAZY MALL

RME has been expanding its footprints in Egypt throughout our years of service; you

can see our diversified array of projects everywhere. RME responsible for executing

the Civil Works for Al Jazy Mall which is expected to be one of the landmarks of New

Cairo very soon to be joining our series of Commercial modernization.

HYPER ONE MARKET – ELSOLYMANIA

Being one of the mega FMCG chains in Egypt, RME carries out the civil and

electromechanical works for the construction of Hyper One Solimanya. RME

understands the importance of time to such a great store as Hyper One, thus, we are

highly committed to the delivery date of the project at the highest quality of

construction works. The project is located in Cairo-Alexandria Desert Road and is built

on a total area of 30,000 m².

55

Page 56: ENGINEERING & CONSTRUCTION

CIVIL AND PUBLIC WORKG O V E R N M E N T P R O J E C T S

Among its comprehensive construction services, ROWAD Modern Engineering provides construction services for commercial, corporate and administrative buildings. Over the years,

RME established a firm foothold in the area of commercial and special buildings both nationally and internationally.

THANKS TO OUR EXPERTISE AND MODERN TECHNOLOGIES,We are able to build commercial and special facilities that comply with local & international markets’ standards.

In addition, we excel in conducting projects of any size and anywhere in the MENA region.

W W W . E L S E W E D Y E L E C T R I C . C O M

56

Page 57: ENGINEERING & CONSTRUCTION

CIVIL AND PUBLIC WORKG O V E R N M E N T P R O J E C T S R E F E R E N C E S

ALGIERS METRO CONTROL BUILDING

Based on their previous fruitful cooperation in Egypt, Vinci has developed its

sustainable relation with RME by appointing RME as its sole subcontractor in the

construction operations of this project. Assigned with the construction of the control

Buildings, transformers buildings, workshop buildings & the complex buildings of

Algiers Metro.

THE DUTCH EMBASSY (CAIRO, EGYPT)

RME successfully completed the full rehabilitation project to the Dutch Embassy in

Cairo. In addition, RME was responsible for the construction of two new adjacent

buildings as part of a new expansion of the Embassy. Such buildings were completed

in a manner that resembles the architectural designs of the old building. Furthermore,

RME completed the construction of an underground car park for the diplomatic

delegate. In cooperation GLAUSER International the project, which was located in El-

Zamalek area of Cairo, RME acted as a main contractor of the project.

W W W . E L S E W E D Y E L E C T R I C . C O M

MINISTERIAL BUILDINGS PROJECT

With the history of timely delivery, and a Reliable contractor reputation, RME was

awarded the completion of the Construction of 4 Ministerial Buildings on a turnkey

basis contract. The project represents one of Egypt’s important projects’ in its modern

transformation and the development of Cairo New Capital.

THE BRITISH EMBASSY'S NEW VISA OFFICE (CAIRO, EGYPT)

Among RME’s portfolio of landmark projects, RME is a subcontractor in the project

concerned with the restoration and repair of the historical parts of the British Embassy

as well as the construction of the new Visa Office. This project served as the kick-off to

RME in introducing its general contracting service to the market seeking for more

mega projects. The project was monitored and supervised closely by the Royal British

Foreign Ministry, which acted as the project consultant through its Engineering

Section.

57

Page 58: ENGINEERING & CONSTRUCTION

W W W . E L S E W E D Y E L E C T R I C . C O M

MONUMENT RESTORATION I N T R O & P R O J E C T S R E F E R E N C E S

58

Page 59: ENGINEERING & CONSTRUCTION

MONUMENT RESTORATION I N T R O D U C T I O N

WE HAVE SPECIAL DEDICATION TO MONUMENTS RESTORATION AND HISTORY PRESERVATION SERVICES.Throughout it growth journey, RME has left its noticeable mark in the field of historic building restoration.

We understand that monuments restoration is a very critical process that requires special care and attention, thus, we pride ourselves on our extensive expertise in various monument

restoration areas. Our services encompass stabilization, excavation, and cleaning of sites, risk control and management in ageing buildings as well as the comprehensive restoration of

different kinds of structures including wooden, marble and metal.

Moreover, monuments restoration needs special repair materials and equipment. Thanks to our years of experience working on various restoration projects, we were able to build up wide

professional experience and know-how with regards to the most suitable equipment to be used. In addition, we are keen on using the highest quality of materials and equipment to

achieve the best results contributing to preserving our precious history and monuments.

In cooperation with governmental bodies and international consultants, we carry out deep, sweeping architectural and historical research in advance with the aim to ensure the historical

structures are accurately and diligently restored. It is worth mentioning that RME has worked on the restoration of 15 antiquity sites so far.

W W W . E L S E W E D Y E L E C T R I C . C O M

59

Page 60: ENGINEERING & CONSTRUCTION

MONUMENT RESTORATION P R O J E C T S R E F E R E N C E S

EL EINY SCHOOL & MOSQUE

Located behind El-Azhar Mosque and established in 1411, El Einy School & Mosque

is an antique building comprising a mosque and a school for El-Azhar student.

Contently, RME took responsibility for repairing such historical building which required

restoration works from several aspects. Among such works, RME was required to

protect this establishment and prevent its collapse by injecting its walls with a new

mortar, which RME carefully selected to be compatible with the original materials of

the building. In addition, RME was accountable for restoring the building to its first

condition as well as many other responsibilities including restoration and treatment of

decorated and non-decorated timber, grout restoration, metal, marble and stone

materials repair in addition to the replacement of the damaged stones with other new

good ones.

MOHAMED ALI PALACE

We have been always dedicated to portray our Egyptian historical significance and

culture, thus, restoring Mohamed Ali Palace is one of our challenges in progress,

which we promise to deliver at its best. We do restoration of stones, doors and

windows, repair of marble columns, granite columns and the decorated ceiling.

W W W . E L S E W E D Y E L E C T R I C . C O M

EL SET WASEELA HOUSE

Located in El- Azhar district, El Set Waseela House was established in 1664 and

belonged to Waseela Khatun. This architectural piece of art is divided into two parts

from the inside, one comprising the reception and the other including the internal

rooms. Proudly, RME has successfully restored the whole building to its original

condition displaying the different architectural art that distinguish this building.

Furthermore, RME was able to fill the undesirable spaces, repair the damaged parts,

stones, red bricks, decorated timber as well as the decorated ceiling.

AHMED IBN SHAABAN MOSQUE

Located in El-Batneya area in Old Cairo, this beautiful mosque was established by

Judge Ahmed Hafiz Pacha who ruled Egypt during the period from 1590 until 1584.

Through several steps, RME was able to restore the great building to its first condition.

These steps included restoration of stones, timber doors and windows, iron windows,

repair of marble columns, granite columns as well as the decorated ceiling.

60

Page 61: ENGINEERING & CONSTRUCTION

W W W . E L S E W E D Y E L E C T R I C . C O M

@elsewedyelectric

SCAN THE QR CODEST O D O W N L O A D O U R

E&CPRESENTATION

CORPORATEMAGAZINE

CORPORATEWEBSITE