56
ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO . Web site : www.egcoegypt.com Email : egco @ egcoegypt.com More than twenty years of experience

ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO

  • Upload
    kiara

  • View
    27

  • Download
    0

Embed Size (px)

DESCRIPTION

ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO. Web site : www.egcoegypt.com Email : egco @ egcoegypt.com. More than twenty years of experience. ENGINEER GENERAL CON.CO.(EGCO). ENGINEER GENERAL CON.CO.(EGCO) :. ENG.ABDEL MOUTY AMER. - PowerPoint PPT Presentation

Citation preview

Page 1: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO

ENGINEER GENRAL CON.CO. (EGCO)ENG.ABDEL MOETY AMER & CO.

Web site : www.egcoegypt.comEmail : egco @ egcoegypt.com

More than twenty years of experience

Page 2: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO

ENG.ABDEL MOUTY AMER.

ENGINEER GENERAL CON.CO.(EGCO):

EGCO, OUR COMPANY, HAS BEEN ESTABLISHED IN 1985, BY A VERY HIGH QUALIFIED GROUP OF CIVIL, MECHANICAL, ELECTRICAL AND ARCHITECTURAL ENGINEERS.

WE HAVE A VERY GOOD EXPERIENCE OVER 20 YEARS IN THE CONSTRUCTION OF PROJECTS FOR WATER SUPPLY AND WASTE WATER FACILITIES.

WE ARE WORKING HARD TO KEEP A GREAT COORDINATION BETWEEN OUR PROFESSIONAL EMPLOYEES AND THE MANAGEMENT OF OUR DEPARTMENTS,

MAINTAINING THE HIGHTEST STANDARD OF QUALITY.SO WE INVITE YOU TO TAKE A LOOK AT OUR BROCHURE, WISHING ALL PROGRESS

AND SUCCESS FOR EGCO.COMMITMENT TO QUALITY, SERVICE, FUNCTION AND VALUE REMAINS AT THE HEART

OF EVERYTHING WE DO.ENG.ABDEL MO ُُُُETY AMER

CHAIRMAN OF THE BOARD

Page 3: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO
Page 4: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO

CHAIRMAN AND MANAGINGDIRECTOR

CHAIRMAN AND MANAGINGDIRECTOR

PUBLICRELATION

PUBLICRELATION LEGAL

AFFAIRS

LEGALAFFAIRS EXECUTIVE

SECRETARY

EXECUTIVE

SECRETARY

GENERAL PROJECTS MANAGER

GENERAL PROJECTS MANAGER

SECRETERIASECRETERIALL

SECRETERIASECRETERIALL

ADMINISTRATIVE

MANAGER

ADMINISTRATIVE

MANAGER

ITMANAGER

ITMANAGERTECHNICA

LMANAGER

TECHNICAL

MANAGER

EXECUTIVEEXECUTIVEMANAGER

EXECUTIVEEXECUTIVEMANAGER

FINANCIALMANAGER

FINANCIALMANAGER

QUALITY CON-TROL

MANAGER

QUALITY CON-TROL

MANAGER

INTERNAL PREVIEW

INTERNAL PREVIEW

DOCUMENTATIONCONTROL

DOCUMENTATIONCONTROL

QUALITY CONTROL

QUALITY CONTROL

STORES ACCOUNTS

STORES ACCOUNTS

AUDITING TENDERS

RESEARCH

AUDITING TENDERS

RESEARCH

CASHIERCASHIER

SUB-CONTRACTORS

CASHADVANCE

SUB-CONTRACTORS

CASHADVANCE

CONTRACTS,OFFERS &

PROJECTS COSTS

CONTRACTS,OFFERS &

PROJECTS COSTS

GENERALLEDGER

GENERALLEDGER

BANKS &INVESTMENT

S

BANKS &INVESTMENT

S

HUMAN RESOURCES

AND TRAINING

HUMAN RESOURCES

AND TRAINING

PURCHASINGPURCHASING

STORAGESTORAGE

MECHANICAL EQUIPEMENTS MANAGERS

MECHANICAL EQUIPEMENTS MANAGERS

SITE ENGINEERMANAGERS

SITE ENGINEERMANAGERS

PLANNING PLANNING

CONTRACTSTENDERS

RESEARCH

CONTRACTSTENDERS

RESEARCH

INFORMATIONSTATICS

INFORMATIONSTATICS

EXECUTIVE WORKS

PREVIEW

EXECUTIVE WORKS

PREVIEW

Page 5: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO

Sr.Quality ( Item )Quantity

1Excavator ( Komatsu ) PC 200/22

2Excavator ( Komatsu ) PC 200/32

3Excavator ( Komatsu ) PC 120/55

4Excavator ( Komatsu ) PC 120/62

5Loader ( Komatsu ) WA 3502

6Loader ( Komatsu ) W 602

7Loader ( Komatsu ) WA 401

8Crane FMC ( 18 Ton )2

9Moving mixer 1m 34

10Well point system with accessories32

11Jet pump 4 inch6

12Deep well pump (Ferbank ) 30 H.P 100 m3/h with accessories20

13Generator ( Komatsu ) 230 K.V.A4

14Generator ( Helwan ) 60 K.V.A3

15Distribution panels for operation pumps3

16Air compressor( Atlas )3

Page 6: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO

Sr.Quality ( Item )Quantity

17Concrete Vibrator ( Honda5 ) 5.5 H.P8

18Submersible pump (Tesromi ) 220 Volt13

19Dewatering pump ( kobbota )6

20Truck ( 3 Ton )6

21Water truck6

22Diesel truck3

23Welding Machine Doeits 400 Amb3

24Mercedes Car ML 3201

25Peugeot car GLX 4051

26Mitsubishi Lancer1

27Mitsubishi truck car ( 5 Ton )1

28Pick up Chevrolet car8

29Dogan car SLX 16001

30Shaheen car 14001

31Computer Network 1

32Personal Computer22

33Printer8

Page 7: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO
Page 8: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO
Page 9: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO

NONAMEPOSITION

YEARS OF

EXPERI-ENCE

QUALIFICATION

YEARS WITH THE FIRM

1Abdel Moety Mohamed Amer

Chairman of the board.36B.Sc. of Mechanical Eng. Cairo Univ. 1968

19 Years

2Ahmed El Sayed AmerGeneral Executive Manager

19B.Sc. of Science, 198516 Years

3Abdel Moneim ZayedTechnical Dept. Manager29B.Sc. of Mechanical Eng. 19756 Years

4Mohsen El ShabrawiProject Manager21B.Sc. of Civil Eng. 19833 Years

5Helal Aziz SharobimMaintenance Engineer27B.Sc. of Mechanical Eng. 19776 Years

6Mostapha EL TabeiChemical Engineer26B.Sc. of chemical Eng. 19788 Years

7Ahmed Sabry Nour-Eldeen

Project Manager21B.Sc. of Civil Eng. 19836 Years

8Ahmed Mohamed ElbiehSite Engineer16B.Sc. of Civil Eng. 19871 Year

9Baher Mikhaeil Shenouda

Site Engineer15B.Sc. of Civil Eng. 19884 Years

10Fathy Elsaid AlmoursySite Engineer6B.Sc. of civil Eng. 19974 months

11Mohamed Bayomi Ramadan

Computer Engineer9B.Sc. of Science Technology 1995 3 Years

12Ahmed Adel MahmoudTechnical Dept. Engineer1B.Sc. of civil Eng. 200318

months

13Sameh Nabil Abdel HadiSite Engineer3B.Sc. of civil Eng. 20006 months

Page 10: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO

NONAMEPOSITION

YEARS OF

EXPERI-ENCE

QUALIFICATIONYEARS WITH

THE FIRM

14Hassan Moh. Mohei El DinAccountant16Faculty of Commerce 198510 Years

15Mohamed OmarFinancial Manager26Faculty of Commerce 197510 Years

16Ali Abdel Al SalehFinancial & Admin.10Faculty of Commerce 907 Years

17Ibrahim Abdel HalimAccountant10Faculty of Commerce 914 Years

18Magdy Abou El MagdAccountant9Faculty of Commerce 19921 months

19Mohamed Seliman EliwaAccountant4Faculty of Commerce 19854 Years

20Onsi Anwar AliPersonnel20Technical Commercial High School 1881

5 Years

21Safwat Abdel naieem Financial & Admin.9Technical Commercial High School 1881

7 Years

22Osama Anwar AliAdmin. Manager20Faculty of Commerce 198520

23Hisham Abdel moniem

HelalAccountant1Faculty of Commerce 20031

24Amal Abdel MegeedAccountant4Faculty of Commerce 20001

25Heba Ali MouradSpecial Secretary4Faculty of Agriculture 20001

26Ebtihal Gamal EldeenGeneral Secretary10Faculty of Law 19932

27Yasmien Saleh MahmoudReceptionist2Faculty of Law 20021

Page 11: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO

NONAMEPOSITIONYEARS OF EXPERI-ENCE

QUALIFICATIONYEARS

WITH THE FIRM

28Fouad Nabil SobhySurveyor8Industrial High School 19933 Years

29Ezzat Khalaf Hassan Surveyor5High School for Area measurements 19964 Years

30Ahmed Abdel HafizSurveyor4Technical Industrial high school 1997 4 Years

31Mohamed Roshdy Ahmed Surveyor4High School for Area measurements 19974 Years

32Taha Bassiouny MohamedSurveyor4Technical Industrial high school 1997 4 Years

33Moustafa A. Fatah El

WakeelTechnical Supervisor13Technical Industrial high school 19887 Years

34Hazem Abdalla El MougiTechnical Supervisor13Technical high School 19883 Years

35Ibrahim El Sayed BayoumyTechnical Supervisor12Technical Industrial high school 19895 Years

36Mohamed El SherbiniTechnical Supervisor9Technical Industrial High School 19927 Years

37Ramadan ShaabanTechnical Supervisor10Technical Industrial high school 19917 Years

38Maged Abdel MoneimTechnical Supervisor7Technical Industrial high school 945 Years

39Mohsen Aboul LeilTechnical Supervisor18Agriculture Science high school 19944 months

40Nabil Aboul LeilStore Keeper15Technical Commercial high school 19866 Years

41Mohamed Badr El Din Purchasing Representative12Technical Commercial high school 19895 Years

42Mohamed Ibrahim MoustafaStore Keeper14Agriculture Science high school 19875 Years

43Ali El Sayed AliStore Keeper14Agriculture Science high school 1987 5 Years

44Aref Sabry SharafStore Keeper8Faculty of letter 19934 Years

Page 12: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO

NONAMEPOSITIONYEARS OF

EXPERI-ENCE

QUALIFICATIONYEARS

WITH THE FIRM

45Wael Ahmed El SheikhPlumber9Technical Industrial high school 19924 Years

46Attia Mansour AhmedPlumber6Carpentry high school 19967 Years

47Essam Abdel MoetyPlumber9Technical commercial high school 936 Years

48Abdel Nasser Abdel

KhalekPlumber--5 Years

49Amgad El ShahatPlumber--4 Years

50Mosaad Sallamcarpenter9Preparatory School 19924 Years

51Gamal HusseinElectrician21Industrial High School 19807 Years

52Wagih MansourElectrician16Industrial High School 19855 Years

53Hesham TahaElectrician14Technical Industrial High School 19875 Years

54Hassan Abdel AzimElectrician-Industrial High School 1979 5 Years

55Khaled Galal El DinElectrician4Technical Industrial High School 19973 Years

56Alaa Abdel GawaadTechnician--5 Years

57Mohamed MekkiMechanic--1 Year

58Atif Abdel HamidMechanic--9 Years

59Mahmoud Hafez MahmoudMechanic--6 Years

60Emad El Sayed AttiaMechanic-Primary school 19825 Years

Page 13: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO
Page 14: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO

NOPERIODNAME & LOCATIONDESCRIPTION OF PROJECTOWNERCOST PER

MILLION

11985- 1986

POTABLE WATER PIPES AT: MEET MAZAH & MEET ALI VILLAGES

DAKAHLIA GOVERNORATE-

EGYPT.

SUPPLY AND INSTALL OF ASBESTOS CEMENT PIPES LINE, DIAMETERS 150 MM &

200 MM INCLUDING VALVES, SPECIAL PIECES, VALVES CHAMBERS AND HOUSE

CONNECTIONS.

MINISTRY OF RECONSTRUCTION AND HOUSING AT DAKAHLIA GOVERNORATE.

1.5

21985-1986

SEWAGE DRAINAGE NETWORK AT 10TH OF

RAMADAN AREA - GAMASSA CITY.

DAKAHLIA GOVERNORATE-

EGYPT.

SUPPLY AND INSTALL OF VITRIFIED CLAY PIPES WITH RIGID JOINTS, DIAMETERS FROM

175 MM UP TO 600 MM INCLUDING THE INSTALLATION OF SQUARE AND CIRCULAR PLAIN CONCRETE MANHOLES, BASED ON

WELL-POINT SYSTEM DEWATERING.

MINISTRY OF RECONSTRUCTION AND HOUSING AT DAKAHLIA GOVERNORATE.

2.0

31985-1986

SEWAGE PUMPING STATION AND SUPPLY OF MECHANICAL AND

ELECTRICAL EQUIPMENTS AT THE

10TH OF RAMADAN AREA - GAMASSA CITY

. DAKAHLIA GOVERNORATE –

EGYPT.

SUPPLY AND CONSTRUCTION OF SEWAGE PUMPING STATION INCLUDING EXCAVATION WORKS, PLAIN & REINFORCED CONCRETE

WORKS, PUMPS-ROOM, BUILDINGS AND FINISHINGS.

PLUS OF SUPPLY AND ERECTION OF MECHANICAL AND ELECTRICAL

EQUIPMENTS, BASED ON WELL–POINT SYSTEM DEWATERING.

MINISTRY OF RECONSTRUCTION AND HOUSING AT DAKAHLIA GOVERNORATE.

2.0

Page 15: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO

NOPERIODNAME & LOCATIONDESCRIPTION OF PROJECTOWNERCOST PER

MILLION

41986-1987

POTABLE WATER PIPES LINE AT NEW EZBET EL SAIIDIA

VILLAGE.DAKAHLIA

GOVERNORATE.EGYPT.

SUPPLY AND INSTALL OF ASBESTOS CEMENT PIPES LINE, DIAMETERS 150

MM & 200 MM INCLUDING VALVES, SPECIAL PIECES, VALVES CHAMBERS

AND HOUSE CONNECTIONS.

MINISTRY OF RECONSTRUCTI

ON AND HOUSING AT

DAKAHLIA GOVERNORATE

.

1.5

51986-1987

SEWAGE DRAINAGE NETWORK AT 5TH

AREA – GAMASSA TOURIST AREA.

DAKAHLIA GOVERNORATE-

EGYPT.

SUPPLY AND INSTALL OF VITRIFIED CLAY PIPES WITH RIGID JOINTS,

DIAMETERS FROM 175 MM UP TO 450 MM INCLUDING THE INSTALLATION OF

SQUARE AND CIRCULAR PLAIN CONCRETE MANHOLES, BASED ON

WELL-POINT SYSTEM DEWATERING.

MINISTRY OF RECONSTRUCTI

ON AND HOUSING AT

DAKAHLIA GOVERNORATE

.

1.5

61986- 1987

SEWAGE PUMPING STATION AND

SUPPLY OF MECHANICAL AND

ELECTRICAL EQUIPMENTS AT 5TH AREA - GAMASSA CITY. DAKAHLIA GOVERNORATE-

EGYPT.

SUPPLY AND CONSTRUCTION OF SEWAGE PUMPING STATION INCLUDING EXCAVATION WORKS, FOUNDATIONS,

PLAIN & REINFORCED CONCRETE BUILDINGS, ISOLATIONS, FINISHINGS

AND OUTSIDE FENCE.PLUS OF SUPPLY AND ERECTION OF

MECHANICAL AND ELECTRICAL EQUIPMENTS FOR THE STATION, BASED ON WELL-POINT SYSTEM DEWATERING.

MINISTRY OF RECONSTRUCTI

ON AND HOUSING AT

DAKAHLIA GOVERNORATE

.

1.5

Page 16: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO

NOPERIODNAME & LOCATIONDESCRIPTION OF PROJECTOWNERCOST PER

MILLION

71986-1987

SEWAGE PUMPING STATION AND SUPPLY OF MECHANICAL AND

ELECTRICAL EQUIPMENTS AT 2ND

AREA -GAMASSA CITYDAKAHLIA

GOVERNORATE-EGYPT.

SUPPLY AND CONSTRUCTION OF SEWAGE PUMPING STATION INCLUDING EXCAVATION

WORKS, FOUNDATIONS, PLAIN & REINFORCED CONCRETE BUILDINGS,

ISOLATIONS, FINISHINGS AND OUTSIDE FENCE.

PLUS OF SUPPLY AND ERECTION OF MECHANICAL AND ELECTRICAL

EQUIPMENTS FOR THE STATION, BASED ON WELL-POINT SYSTEM DEWATERING.

MINISTRY OF RECONSTRUCTION AND HOUSING AT DAKAHLIA GOVERNORATE.

1.5

81987-1988

SEWAGE DRAINAGE NETWORK AND

DEWATERING FOR INDUSTRIAL AREA AT NEW DAMIETTA CITY.

DAMIETTA GOVERNORATE-

EGYPT.

SUPPLY AND INSTALL OF GRP, PVC AND PRE-STRESS PIPES, DIAMETERS FROM 200

MM UP TO 1000 MM INCLUDING SUPPLY AND INSTALL OF SQUARE AND CIRCULAR

CONCRETE MANHOLES, BASED ON WELL-POINT SYSTEM DEWATERING.

ARAB CONTRACTOR-

TANTA BRANCH.AUTHORITY OF

RECONSTRUCTION OF NEW

DAMIETTA CITY.

5.5

91988

POTABLE WATER PIPES LINE DIAMETER 1000

MM AND DEWATERING AT NEW DAMIETTA

CITY.DAMIETTA

GOVERNORATE-EGYPT.

SUPPLY AND INSTALL OF PRE-STRESS CONCRETE PIPES, DIAMETER 1000 MM.

PLUS OF SUPPLY AND INSTALL OF VALVES CHAMBERS AND SPECIAL PIECES, BASED ON

WELL-POINT SYSTEM DEWATERING.

ARAB CONTRACTOR-

TANTA BRANCH.AUTHORITY OF

RECONSTRUCTION OF NEW

DAMIETTA CITY.

4.5

Page 17: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO

NOPERIODNAME & LOCATIONDESCRIPTION OF PROJECTOWNERCOST PER

MILLION

101989-1990

SEWAGE DRAINAGE NETWORK AND

DEWATERING AT DELENGATE CITY

(PART 1).EL BEHERA

GOVERNORATE-EGYPT.

SUPPLY AND INSTALL OF VITRIFIED CLAY PIPES WITH RIGID JOINTS, DIAMETERS FROM

200 MM UP TO 500 MM.PLUS OF SUPPLY AND INSTALL OF SQUARE

AND CIRCULAR CONCRETE MANHOLES BASED ON WELL-POINT SYSTEM

DEWATERING.

ARAB CONTRACTORS- ALEX BRANCH.

FOR THE (NOPWASD).

3.0

111990-1991

SEWAGE DRAINAGE NETWORK AND

DEWATERING AT DELENGATE CITY

(PART 2).EL BEHERA

GOVERNORATE-EGYPT.

SUPPLY AND INSTALL OF VITRIFIED CLAY PIPES WITH RIGID JOINTS, DIAMETERS FROM

200 MM UP TO 500 MM.PLUS OF SUPPLY AND INSTALL OF SQUARE

AND CIRCULAR CONCRETE MANHOLES, BASED ON WELL-POINT SYSTEM

DEWATERING.

ARAB CONTRACTORS – ALEX BRANCH.

FOR THE (NOPWASD).

3.5

121991-1992

SEWAGE DRAINAGE NETWORK AND

DEWATERING AT KHANKA CITY.

GREAT CAIRO-EGYPT.

SUPPLY AND INSTALL OF VITRIFIED CLAY PIPES WITH RIGID JOINTS, DIAMETERS FROM

200 MM UP TO 600 MM.PLUS OF SUPPLY AND INSTALL OF SQUARE

AND CIRCULAR CONCRETE MANHOLES, BASED ON WELL-POINT SYSTEM

DEWATERING.

ARAB CONTRACTORS – ALEX BRANCH.

FOR THE (NOPWASD).

2.0

Page 18: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO

NOPERIODNAME & LOCATIONDESCRIPTION OF PROJECTOWNERCOST PER

MILLION

131992-1993

SEWAGE DRAINAGE NETWORK AND

DEWATERING AT DAMANHOUR CITY

(PART 1).EL BEHERA

GOVERNORATE-EGYPT.

SUPPLY AND INSTALL OF VITRIFIED CLAY PIPES WITH RIGID JOINTS, DIAMETERS FROM

200 MM UP TO 750 MM.PLUS OF SUPPLY AND INSTALL OF SQUARE

AND CIRCULAR CONCRETE MANHOLES, BASED ON WELL-POINT SYSTEM

DEWATERING.

ARAB CONTRACTORS- ALEX BRANCH.

FOR THE (NOPWASD).

3.0

141992-1993

SEWAGE DRAINAGE NETWORK AND

DEWATERING AT DAMANHOUR CITY

(PART 2).EL BEHERA

GOVERNORATE-EGYPT.

SUPPLY AND INSTALL OF VITRIFIED CLAY PIPES WITH RIGID JOINTS, DIAMETERS FROM

200 MM UP TO 750 MM.PLUS OF SUPPLY AND INSTALL OF SQUARE

AND CIRCULAR CONCRETE MANHOLES, BASED ON WELL-POINT SYSTEM

DEWATERING.

ARAB CONTRACTORS – ALEX BRANCH.

FOR THE (NOPWASD).

3,0

151992- 1994

GRAVITY PIPES LINEDIAMETER 1400 MM

AND DEWATERING AT DAMIETTA

GOVERNORATE-EGYPT.

SUPPLY AND INSTALL OF GRP PIPES, DIAMETER 1400 MM TO JOIN THE PARTIAL

STATION AND THE MAIN STATION.PLUS OF SUPPLY AND INSTALL OF VALVES

CHAMBERS INCLUDING THE SPECIAL PIECES, BASED ON THE WELL- POINT

SYSTEM DEWATERING.

ARAB CONTRACTORS – ALEX BRANCH.

FOR THE (NOPWASD).

8.5

Page 19: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO

NOPERIODNAME & LOCATIONDESCRIPTION OF PROJECTOWNERCOST PER

MILLION

161992-1993

FORCE MAIN PIPES LINE FOR THE SEWAGE

DRAINAGE AND DEWATERING AT

RASSEL BAR. DAMIETTA

GOVERNORATE-EGYPT.

SUPPLY AND INSTALL OF DUCTILE CAST-IRON PIPES LINE, DIAMETER 900 MM.

PLUS OF SUPPLY AND INSTALL OF VALVES CHAMBERS, SPECIAL PIECES, BASED ON

WELL-POINT SYSTEM DEWATERING.

ARAB CONTRACTORS- TANTA BRANCH.

FOR THE (NOPWASD).

9,00

171995-1997

SEWAGE DRAINAGE NETWORK AND

DEWATERING AT EZBET EL BORG CITY.

DAMIETTA GOVERNORATE-

EGYPT.

SUPPLY AND INSTALL OF VITRIFIED CLAY PIPES WITH RIGID JOINTS, DIAMETERS FROM

175 MM UP TO 750 MM.PLUS OF SUPPLY AND INSTALL OF SQUARE

AND CIRCULAR PLAIN CONCRETE MANHOLES, BASED ON WELL -POINT

SYSTEM DEWATERING.

ARAB CONTRACTORS- TANTA BRANCH.

FOR THE (NOPWASD).

9.0

181995-1997

SEWAGE DRAINAGE NETWORK, FORCE

MAIN PIPELINES AND DEWATERING AT

HORANI CITY.DAMIETTA

GOVERNORATE-EGYPT.

SUPPLY AND INSTALL OF VITRIFIED CLAY PIPES WITH RIGID JOINTS, DIAMETERS FROM

175 MM UP TO 600 MM FOR THE SEWAGE DRAINAGE NETWORK.

PLUS OF SUPPLY SQUARE AND CIRCULAR PLAIN CONCRETE MANHOLES, FLEXIBLE

CAST IRON FORCE MAIN PIPES LINE DIAMETERS FROM 150 MM UP TO 200 MM,

VALVES CHAMBERS AND ITS SPECIAL PARTS.

EL NASR COMPANY FOR BUILDINGS AND

CONSTRUCTIONS.FOR THE

(NOPWASD).

13.0

Page 20: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO

NOPERIODNAME & LOCATIONDESCRIPTION OF PROJECTOWNERCOST PER

MILLION

191996

SEWAGE PUMPING STATIONS AT HORANI CITY (1, 2). DAMIETTA

GOVERNORATE-EGYPT.

SUPPLY AND CONSTRUCTION OF SEWAGE PUMPING STATIONS INCLUDING

EXCAVATION WORKS, FOUNDATIONS, PLAIN & REINFORCED CONCRETE WORKS, WELLS, BUILDINGS, FINISHING AND OUTSIDE FENCE.

EL NASR COMPANY FOR BUILDINGS AND

CONSTRUCTIONS.FOR THE

(NOPWASD).

3.0

201997

SUPPLY AND ERECTION FOR MECHANICAL AND

ELECTRICAL EQUIPMENTS FOR SEWAGE PUMPING

STATIONS AT HORANI CITY.

DAMIETTA GOVERNORATE-EGYPT.

SUPPLY AND ERECTION OF MECHANICAL AND ELECTRICAL EQUIPMENTS INCLUDING

PUMPS, DISTRIBUTION BOARDS, GENERATOR UNITS, VALVES & SPECIAL

PIECES IN VALVES CHAMBERS.

EL NASR COMPANY FOR BUILDINGS AND

CONSTRUCTIONS.FOR THE

(NOPWASD).

3.0

211997-2001

GRAVITY PIPE NETWORKS AND DEWATERING AT

BALTIME CITY. KAFREL SHEIKH GOVERNORATE

EGYPT.

SUPPLY AND INSTALL OF VITRIFIED CLAY PIPES WITH FLEXIBLE JOINTS, DIAMETERS

FROM 175 MM UP TO 750 MM.PLUS OF SUPPLY AND INSTALL OF SQUARE & CIRCULAR CONCRETE MANHOLES, BASED

ON WELL-POINT & DEEP-WELL SYSTEMS DEWATERING.

INDUSTRIAL & ENGINEERING

PROJECTS COMPANY.FOR THE

(NOPWASD)

42.0

Page 21: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO

NOPERIODNAME & LOCATIONDESCRIPTION OF PROJECTOWNERCOST PER

MILLION

221998-2001

SEWAGE PUMPING STATIONS (1,2) AT

BALTIME CITY. KAFREL SHEIKH GOVERNORATE

EGYPT.

SUPPLY AND CONSTRUCTION OF ENGINEERING WORKS FOR PUMPING

STATIONS INCLUDING EXCAVATION WORKS, FOUNDATIONS, PLAIN & REINFORCED

CONCRETE WORKS, WELL WORKS, BUILDINGS, FINISHING AND OUTSIDE FENCE.

INDUSTRIAL & ENGINEERING

PROJECTS COMPANY.FOR THE

(NOPWASD).

6.0

231999-2000

PILES FOR CROSSING CANAL OF MAHMOUDIA

AT ABOU HOMOSS-ZAWYETTE GHAZAL.

EL BEHERA GOVERNORATE-

EGYPT.

SUPPLY AND CONSTRUCTION OF 16 M LENGTH OF PILES FROM IRON PIPES,

DIAMETER 600 MM.PLUS OF CONSTRUCTION OF REINFORCED

CONCRETE COLUMNS AND RETAINING WALLS OF AN IRON BRIDGE TO SUPPORT

FLEXIBLE CAST IRON PIPES.

INDUSTRIAL & ENGINEERING

PROJECTS COMPANY.FOR THE

(NOPWASD).

3.0

241999-2001

SEWAGE DRAINAGE NETWORK AND

DEWATERING AT EL MAASARA & HELWAN.

CAIRO GOVERNORATE-EGYPT.

SUPPLY AND INSTALL OF VITRIFIED CLAY PIPES WITH FLEXIBLE JOINTS, DIAMETERS

FROM 200 MM UP TO 500 MM.PLUS OF CONSTRUCTION OF SQUARE &

CIRCULAR CONCRETE MANHOLES, BASED ON DEEP- WELL SYSTEM DEWATERING.

ARAB CONTRACTORS –

HELWAN BRANCH.

GREAT CAIRO RECONSTRUCTIO

N AUTHORITY

9.0

Page 22: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO

NOPERIODNAME & LOCATIONDESCRIPTION OF PROJECTOWNERCOST PER

MILLION

251999-2000

POTABLE WATER PIPES LINE AT EAST

KANTARA CITY-EGYPT.

SUPPLY AND INSTALL OF GRP PIPES, DIAMETER 500MM.

PLUS OF CONSTRUCTION OF CONCRETE CHAMBERS, SPECIAL PIECES, UNDER

CROSSING ABOVE CANALS AND DRAINAGES.

ENGINEERING INDUSTRIAL PROJECTS COMPANY.

SOUTH SINAI RECONSTRUCTIO

N AUTHORITY.

20.0

261999-2002

SEWAGE DRAINAGE NETWORK AND

SEWAGE PUMPING STATIONS AT

BATANOUN CITY.MOUNIFIA

GOVERNORATE-EGYPT.

SUPPLY AND INSTALL OF VITRIFIED CLAY PIPES WITH FLEXIBLE JOINTS, DIAMETERS

FROM 200 MM UP TO 750 MM INCLUDING THE SUPPLY AND INSTALL OF SQUARE AND

CIRCULAR CONCRETE MANHOLES.PLUS OF CONSTRUCTION OF SEWAGE

PUMPING STATIONS INCLUDING THE CIVIL WORKS, BASED ON THE DEEP WELL SYSTEM

DEWATERING.

ENGINEERING AND INDUSTRIAL

PROJECTS COMPANY.FOR THE

(NOPWASD).

10.0

272001-2002

IRRIGATION PIPE LINES AT AHMED DAWOUD CANAL – DEWIDAR

AREA.NORTH SINAI

GOVERNORATE-EGYPT.

SUPPLY AND INSTALL OF GRP PIPES, DIAMETER 700 MM, 1200MM, 1400MM,

1600MM, 1800 MM AT DIFFERENT DEPTHS UP TO 8M.

ENGINEERING & INDUSTRIAL PROJECTS COMPANY.

NORTH SINAI IRRIGATION AUTHORITY.

2,00

Page 23: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO

NOPERIODNAME & LOCATIONDESCRIPTION OF PROJECTOWNERCOST PER

MILLION

282002-2004

FORCE MAIN PIPELINE FOR SEWAGE

DRAINAGE STATIONS AT BALTIME.

KAFREL SHEIKH GOVERNORATE

EGYPT.

SUPPLY AND INSTALL OF GRP PIPES, DIAMETER 600MM INCLUDING THE

CONSTRUCTION OF VALVES CHAMBERS, THE SPECIAL PIECES, UNDER CROSSINGS,

ABOVE CANALS AND DRAINAGES.

ENGINEERING & INDUSTRIAL PROJECTS COMPANY.FOR THE

(NOPWASD).

12,00

292002-2003

DEVELOPMENT OF IRRIGATION LINES AT EL HAMAMI CANAL-

ABOU HOMOSS.BEHIRA

GOVERNORATE-EGYPT.

SUPPLY AND INSTALL OF PLASTIC PIPES, DIAMETERS FROM 315MM UP TO 500 MM

INCLUDING THE CONSTRUCTION OF VALVES CHAMBERS AND THE SPECIAL PIECES.

ENGINEERING & INDUSTRIAL PROJECTS COMPANY.

BEHIRA GOVERNORATE

IRRIGATION AUTHORITY.

6,00

302002-2003

DEVELOPMENT OF IRRIGATION AT

KHAWALID CANAL-SIDI SALEM.

KAFREL SHEIKH GOVERNORATE-

EGYPT.

SUPPLY AND INSTALL OF PLASTIC PIPES, DIAMETERS FROM 315 MM UP TO 500 MM

INCLUDING THE CONSTRUCTION OF VALVES CHAMBERS AND SPECIAL PIECES.

ENGINEERING & INDUSTRIAL PROJECTS COMPANY.

KAFREL SHEIKH GOVERNORATE.

13,00

Page 24: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO

NOPERIODNAME & LOCATIONDESCRIPTION OF PROJECTOWNERCOST PER

MILLION

312003-2006

GRAVITY PIPE NETWORKS, SEWAGE PUMPING STATIONS, DEWATERING AND

FORCE MAIN PIPELINE FOR SEWAGE DRAINAGE

STATIONS AT TABLOUHA VILLAGE.

MENOFYA GOVERNORATE

EGYPT.

SUPPLY AND INSTALL OF VITRIFIED CLAY PIPES WITH FLEXIBLE JOINTS, DIAMETERS

FROM 175 MM UP TO 800 MM INCLUDING THE SUPPLY AND INSTALL OF SQUARE AND

CIRCULAR CONCRETE MANHOLES.PLUS OF CONSTRUCTION OF SEWAGE

PUMPING STATIONS INCLUDING THE CIVIL WORKS, BASED ON THE DEEP WELL

SYSTEM DEWATERING.PLUS SUPPLY AND INSTALL FORCE MAIN OF PIPE LINES, INCLUDING THE CONSTRUCTION

OF VALVES CHAMBERS, THE SPECIAL PIECES, UNDER CROSSINGS AND OVER

CROSSINGS.

EL NASR COMPANY FOR BUILDINGS AND

CONSTRUCTIONS.

FOR THE (NOPWASD).

12,00

Page 25: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO
Page 26: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO

Construction of sewage drainage network at the

5th area, Gamassa Touristic city, to protect the city from pollution as well as encouraging resorting and tourism.

SEWAGE DRAINAGE NETWORKS AT 5TH AREA AT GAMASSA TOURIST CITY, DAKAHLIA GOVERNORATE.

PROJECT DESCRIPTION:

EGCO SERVICES :

Supply and installation of vitrified clay pipes with rigid joints, diameters from 175 mm up to 450 mm, length of 8000 m and depths up to 6,50 m.

Supply and installation of 320 square & circular plain concrete manholes, internal diameters of 1,20 m & 1,50 m and depths up to 6,50 m.

The construction was based on the well-point system dewatering according to the high water level at this area.

MAIN CONTRACTOR :

Engineer General Con. Co.

OWNER :

Authority of Reconstruction and

Housing at El Dakahlia Governorate.

COST:1.5 Million EGP.

Page 27: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO

Construction of sewage drainage network for the industrial area at Damietta city to complete the existing drainage project at the city.

SEWAGE DRAINAGE NETWORK AT THE INDUSTRIAL CITY , NEW DAMIETTA CITY

PROJECT DESCRIPTION:

EGCO SERVICES : Supply and installation of GRP & PVC pipes, diameters from 175 mm up to 600 mm , length of

10000 m and depths up to 8,50 m.

Supply and installation of 400 square and circular plain concrete manholes, internal diameters from 1,20 m up to 1,50 m and depths up to 8,50 m.

The construction was based on the well-point system dewatering according to the high water level at this area.

MAIN CONTRACTOR :

Arab contractors – Tanta branch

OWNER :

National Organization for Potable Water and

Sanitary Drainage.

COST:5.5 Million EGP.

Page 28: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO

CONSTRUCTION OF A POTABLE WATER PIPES LINE NETWORK, DIAMETER OF 1000 MM, FOR THE NEW DAMIETTA CITY, TO COMPLETE THE EXISTING SERVICES AT THE CITY.

WATER PIPELINES AT NEW DAMIETTA CITY,DAMIETTA GOVERNORATE.

PROJECT DESCRIPTION:

EGCO SERVICES :

Supply and installation of pre-stress reinforced concrete pipes, diameter of 1000 mm and length of 1200 m including bends and plugs, etc.

Supply and installation of sluice, wash and air valves chambers including special pieces, valves and dismantling pieces.

MAIN CONTRACTOR :

Arab contractors – Tanta branch

OWNER :

National Organization for Potable Water and Sanitary Drainage

COST:

4.5 Million EGP.

The construction was based on the well-point system dewatering according to the high water level at this area.

Page 29: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO

CONSTRUCTION OF SEWAGE DRAINAGE NETWORK AT EL DELENGAT CITY TO COMPLETE THE EXISTING NETWORK AT EL BEHIRA GOVERNORATE.

SEWAGE DRAINAGE NETWORK AND DEWATERING AT EL DELENGAT CITY,EL BEHIRA,(PART ONE)

PROJECT DESCRIPTION:

EGCO SERVICES : Supply and installation of vitrified clay pipes with rigid joints, diameters from 175 mm up to

375 mm, length of 8500 m and depths up to 6,50 m.

Supply and installation of 340 square and circular plain concrete manholes, internal diameters from 1,20 m up to 1,50 m and depths up to 6,50 m.

The construction was based on the well-point system dewatering according to the high water level at this area.

MAIN CONTRACTOR :Arab contractors – Alex branch.

OWNER :

National Organization for Potable Water and Sanitary Drainage

COST:

3 million EGP

Page 30: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO

CONSTRUCTION OF THE SECOND PART OFSEWAGE DRAINAGE NETWORK AT EL DELENGAT CITYTO COMPLETE THE EXISTING NETWORK AT EL BEHIRAGOVERNORATE

SEWAGE DRAINAGE NETWORK AND DEWATERING AT EL DELENGAT CITY, EL BEHIRA, (PART TWO)

PROJECT DESCRIPTION:

EGCO SERVICES:

Supply and installation of vitrified clay pipes with rigid joints, diameters from 175 mm up to 375 mm, length of 8500 m and depths up to 4.50 m.

Supply and installation of 320 square and circular plain concrete manholes, internal diameters of 1,20 m & 1,50 m and depths up to 4,50 m.

The construction was based on the well-point system dewatering.

MAIN CONTRACTOR :

Arab contractors – Alex branch

OWNER :

National Organization for Potable Water and Sanitary Drainage.

3.5 million EGP.

COST:

Page 31: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO

Construction of sewage drainage network at El Khanka City to complete the existing network at Great Cairo.

SEWAGE DRAINAGE NETWORK AND DEWATERIND AT EL KHANKA CITY, GREAT CAIRO.

PROJECT DESCRIPTION:

EGCO SERVICES : Supply and installation of vitrified clay pipes with rigid joints, diameters from 175 mm up to

600 mm, length of 1200 m and depths up to 6,50 m.

Supply and installation of 48 square and circular plain concrete manholes, internal diameters of 1,20 m & 1,50 m and depths up to 6,50 m.

The construction was based on the well-point system dewatering according to the high water level at this area.

MAIN CONTRACTOR :

Arab contractors – Nasr City branch.

OWNER :

National Organization for Potable Water and

Sanitary Drainage.

COST:2.0 million EGP.

Page 32: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO

This project was constructed to join the partial stations with the main station by gravity pipes line, diameter of 1400 mm.

GRAVITY PIPELINES NETWORK, 1400 MM DIAMETER, AND DEWATERING AT RAS EL BAR, DAMIETTA GOVERNORATE.

PROJECT DESCRIPTION:

EGCO SERVICES : Supply and installation of GRP pipes, diameter of 1400 mm, to join the partial stations with the

main station.

Supply and installation of slow down and sluice valves chambers including the special pieces, valves and paddle pieces.

The construction was based on the well-point system dewatering according to the high water level at this area.

MAIN CONTRACTOR :Arab contractors – Tanta branch.

OWNER :National Organization for Potable Water and Sanitary Drainage.

COST:8.5 million EGP.

Page 33: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO

CONSTRUCTION OF GRAVITY PIPELINES, DIAMETER OF 900 MM, AT RAS EL BAR CITY, TO TRANSPORT SEWAGE TO THE TREATMENT STATION AND TO COMPLETE THE EXISTING SEWAGE DRAINAGE NETWORK AT THE CITY.

SEWAGE PUMPING STATIONS (1,2) AT BALTEEM, KAFR EL SHEIKH GOVERNORATE.

PROJECT DESCRIPTION:

EGCO SERVICES : Supply and installation of ductile cast iron pipes, diameter of 900 mm, depths from 2,50 m up

to 3,5 m and length of 9000 m.

Supply and installation of sluice, wash and air valves chambers including the special pieces, valves, paddle and dismantling pieces.

The construction was based on the well-point system dewatering according to the high water level at this area.

MAIN CONTRACTOR :

Arab contractors – Tanta branch.

OWNER :

National Organization for Potable Water and Sanitary Drainage

COST:9 million EGP.

Page 34: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO

Construction of the first part of gravity Pipes line at Ezbet El Borg according

To the need of a sewage drainagenetwork at this area .

GRAVITY PIPELINES AND DEWATERING AT EZBET EL BORG CITY, DAMIETTA GOVERNORATE.

PROJECT DESCRIPTION:

EGCO SERVICES:

Supply and installation of vitrified clay pipes with rigid joints, diameter from 175 mm up to 750 mm, length of 6000 m and depths up to 6,50 m.

Supply and installation of 400 square and circular concrete manholes, internal diameters of 1,20 m & 1,50 m and depths up to 6,50 m.

The construction was based on the well-point system dewatering according to the high water level at this area.

MAIN CONTRACTOR :

Arab contractors – Tanta branch.

OWNER :

National Organization for Potable Water and

Sanitary Drainage.

COST:

9.0 million EGP.

Page 35: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO

Construction of force mainpipelines, from GRP pipes,

diameter of 600 mm and lengthof 14000 m, to transport the sewagefrom the sewage drainage stations.

Including the construction of valveschambers, special pieces, valvesand dismantling pieces.

POTABLE WATER SUPPLY PIPE LINE, DIAMETER OF 500 MM, AT THE EAST EL TAFREAA AREA.

PROJECT DESCRIPTION:

EGCO SERVICES: Supply and installation of force main pipelines from GRP pipes,

diameter of 600 mm and length of 14000 m including excavation works, installation, test, washing, cleaning and transportation

Supply and installation of sluice, wash and air valves chambers valves including the special pieces, valves, dismantling and wall paddle pieces.

The construction was based on the well-point system dewatering for levels up to 3.50 m and on the deep-well system dewatering for levels more than 3.50 m.

MAIN CONTRACTOR :

Industrial and Engineering Projects Company

OWNER :

National Organization for Potable Water and Sanitary Drainage

12 million EGP

COST:

Page 36: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO

Construction of sewage drainage network at Batanoun, Menoufia Governorate according to the Government’s policy concerning supplying all villages and cities at Cairo by the Gravity pipes networks.

SEWAGE DRAINAGE NETWORK AND SEWAGE PUMPING STATIONS AT EL BATANOUN CITY.

PROJECT DESCRIPTION:

EGCO SERVICES :

Supply and installation of vitrified clay pipes with rigid joints, diameters from 175 mm up to 750 mm, length of 8000 m and depths up to 8.50 m.

Supply and installation of 320 square and circular concrete manholes, internal diameters of 1,20 m & 1,50 and depths up to 8.50 m.

Supply and construction of 4 sewage pumping stations including wells works, diameters from 3 m up to 8 m, plus of construction of extension buildings as workshops, generator room, storage, administration building and outside fences.

MAIN CONTRACTOR :

Industrial and Engineering Projects Company.

OWNER :

National Organization for Potable Water and Sanitary Drainage.

COST:

6 million EGP.

The construction was based on the deep-well system dewatering according to the high water level at this area.

Page 37: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO

Construction of sewage drainageNetwork At El Maasara and Helwanareas to complete the existing networkat the Great Cairo.

SEWAGE DRAINAGE NETWORK AND DEWATERING AT EL MAASARA AND HELWAN.

PROJECT DESCRIPTION:

EGCO SERVICES:

Supply and installation of vitrified clay pipes with flexible joints, diameters from 200 mm up to 550 mm, length of 6500 m and depths up to 6,50 m.

Supply and installation of 260 square and circular concrete manholes, internal diameters of 1,20 m & 1,50 m and depths up to 6,50 m

The construction was based on the deep-well system dewatering according to the high water level at this area.

MAIN CONTRACTOR :

Arab contractors – Helwan branch.

OWNER :National Organization for Potable Water and

Sanitary Drainage.

COST:

9.0 million EGP.

COST:

Page 38: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO

Construction of 2 sewage pumping stations to transport sewage to the treatment station to complete the existing network project at Balteem.

SEWAGE DRAINAGE NETWORK AT 10TH OF RAMADAN AREA, GAMASSA CITY, DAKAHLIA GOVERNORATE

PROJECT DESCRIPTION:

EGCO SERVICES :

Supply and installation of vitrified clay pipes with rigid joints, diameters from 175 mm up to 600 mm, length of 1200 m and depths up to 6,50 m.

Supply and installation of 320 square and circular plain concrete manholes, internal diameters of 1,20 m & 1,50 m and depths up to 6,50 m.

The construction was based on the well-point system dewatering according to the high water level at this area.

MAIN CONTRACTOR :

Engineer General Con. Co

OWNER :

Authority of Reconstruction and Housing at El Dakahlia Governorate

COST:2.0 million EGB.

Page 39: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO

Construction of sewage drainage network at Gamassa, Dakahlia Governorate to complete the network of the city.

SEWAGE PUMPING STATION AND SUPPLY OF MECHANICAL AND ELECTRICAL EQUIPMENTS AT THE 5 TH AREA AT GAMSSA CITY, DAKAHLIA GOVERNORATE

PROJECT DESCRIPTION:

EGCO SERVICES : Supply and installation of a well for the pumping station, internal diameter of 3 m including

the reinforced concrete works and the penetration until the well settles at the required level.

Construction of the extension buildings as the workshop, the generator building, storage, security room and outside fences.

Supply and erection of mechanical and electrical equipments including submersible pumps, generator unit, distribution boards, transformers, valves, special parts, dismantling pieces and the installation at the valves chambers.

MAIN CONTRACTOR :

Engineer General Con. Co.

OWNER :Authority of Reconstruction and Housing at El Dakahlia Governorate

COST:

1.5 Million EGP

Page 40: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO

Construction of a sewage pumping station and supply of mechanical & electricalequipments at the 2nd area to complete the sewage drainage network at Gamassa city.

SEWAGE PUMPING STATION AND SUPPLY OF MECHANICAL & ELECTRICAL EQIPMENTS AT THE 2ND AREA, GAMASSA CITY, DAKAHLIA GOVERNORATE.

PROJECT DESCRIPTION:

EGCO SERVICES :

Supply and installation of a well for the pumping station, internal diameter of 4 m, including the reinforced concrete works and the penetration until the well settles at the required level.

Construction of administrative units at the station as the workshop, the generator building, storage, security room and outside fences.

Supply and erection of mechanical & electrical equipments including submersible pumps, generator unit, distribution boards, transformers, valves, special pieces, dismantling pieces and the installationation at the valves chambers

MAIN CONTRACTOR :

Engineer General Con. Co.

OWNER :

Authority of Reconstruction and

Housing at El Dakahlia Governorate..

COST:

2.0 million EGP

Page 41: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO

Construction of a sewage drainage Network at Damanhour (Part one)

to complete the existing networkat middle Delta.

SEWAGE DRAINAGE NETWORK AND DEWATERING AT DAMANHOUR CITY, EL BEHIRA, (PART ONE)

PROJECT DESCRIPTION:

EGCO SERVICES: Supply and installation of

vitrified clay pipes with rigid joints, diameters from 175 mm up to 750 mm, length of 10500 m and depths up to 8,50 m.

Supply and installation of 420 square and circular plain concrete manholes, internal diameters of 1,20 m & 1,50 m and depths up to 8,50 m.

The construction was based on the well-point system dewatering according to the high water level at this area

MAIN CONTRACTOR :

Arab contractors – Alex branch

OWNER :

National Organization for Potable Water and Sanitary Drainage. .

COST:

3.0 million EGP

Page 42: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO

construction of the second part of sewage drainage network at Damanhour City to complete the existing network project at El Behira Governorate.

SEWAGE DRAINAGE NETWORK AND DEWATERING AT DAMANHOUR CITY, EL BEHIRA, (PART TWO).

PROJECT DESCRIPTION:

EGCO SERVICES : Supply and installation of vitrified clay pipes with rigid joints, diameters from 175 mm up to

750 mm, length of 4800 m and depths up to 8,50 m.

Supply and installation of 190 square and circular plain concrete manholes, internal diameters of 1,20 mm and depths up to 8,50 m.

The construction was based on the well-point system dewatering according to the high water level at this area.

MAIN CONTRACTOR :

Arab contractors – Alex branch

OWNER :

National Organization for Potable Water and Sanitary Drainage.

COST:3.0 million EGP

Page 43: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO

Construction of 2 sewage pumping stations to transport sewage to the treatment station to complete the existing network project at Bal teem.

SEWAGE PUMPING STATIONS (1,2) AT BALTEEM, KAFR EL SHEIKH GOVERNORATE.

PROJECT DESCRIPTION:

EGCO SERVICES :

Supply and Construction of concrete wells, diameters of 12 m including the penetration for wells settlement at the required level.

Supply and construction of the extension buildings as the working building, generator building, storage, workshop, security room and the outside fences.

The construction was based on the well-point system dewatering according to the high water level at this area.

MAIN CONTRACTOR :

Industrial and Engineering Projects Company

OWNER :

National Organization for Potable Water and Sanitary Drainage

COST:6.0 million EGP.

Page 44: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO

Construction of the sewage pumping stations (1,2) and supply of mechanical & electrical equipments, to complete the sewage drainage network project at El Horaniy city.

Sewage pumping stations (1,2) at El Horaniy city, Damietta Governorate

PROJECT DESCRIPTION:

EGCO SERVICES :

Supply and Construction of reinforced concrete wells and the penetration until the wells settles at the required level.

Supply and construction of the extension buildings as the working building, generator building, storage, workshop, security room, the administration building and the outside fences.

MAIN CONTRACTOR :

El Nasr Company for Buildings and constructions.

OWNER :

National Organization for Potable Water and Sanitary Drainage.

COST:

3.0 million EGP.

Supply and erection of electrical and mechanical equipments at the stations including submersible pumps, generator unit, distribution board, transformers and special pieces, valves, dismantling pieces at the valves chambers

Page 45: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO

Construction of irrigation lines for the agriculture areas at north Sinai in accordance with the development scheme of this area.

AHMED DAOUD CANAL IRRIGATION PIPELINES AT EL DOWAIDAR AREA, NORTH SINAI.

PROJECT DESCRIPTION:

EGCO SERVICES :

Supply and installation of GRP pipes, diameters of 700 mm, 1200 mm and 1400 mm, depths from 4 m up to 7 m and length of 12000 m.

MAIN CONTRACTOR :

Industrial and Engineering Projects Company.

OWNER :

North Sinai Reconstruction

Authority.

COST:

2 million EGP.

Page 46: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO

Construction of a potable waterPipelines from El kantara East atEastEl Tafreaa Area to complete the

needs and the services at this area .

POTABLE WATER SUPPLY PIPE LINE, DIAMETER OF 500 MM, AT THE EAST EL TAFREAA AREA.

PROJECT DESCRIPTION:

EGCO SERVICES:

Supply and installation of GRP pipes, diameter of 500 mm, depths from 2,50 m up to 3,50 m and length of 25000 m.

Supply and installation of 65 sluice, wash and air valves chambers including special pieces, valves and dismantling pieces.

Supply and construction of under crossing roads and over crossing canals, using excavation for the roads and piles for the canals.

MAIN CONTRACTOR :

Industrial and Engineering Projects Company.

OWNER :

North Sinai Reconstruction Authority.

15 million EGP

COST:

Page 47: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO

In view of the need of "Abou Homuos city" for potable water supply, especially the east area of El Mahmoudia canal, it was necessary to construct an over crossing for ductile cast iron pipes, diameter of 600 mm.

PILES FOR OVER CROSSING CANAL AT EL MAHMOUDIA, ABOU HOMOUS AND ZAWIAT GHAZAL, EL BEHIRA GOVERNORATE..

PROJECT DESCRIPTION:

EGCO SERVICES : Supply and installation of 64 reinforced piles, diameter of 600 mm, length of 16 m including

tests of loading and pouring of the reinforced concrete into the piles.

Supply and construction of walls and reinforced concrete piles heads to hold the steel bridge.

MAIN CONTRACTOR :

Industrial and Engineering Projects Company

OWNER :

National Organization for Potable Water and

Sanitary Drainage..

COST:3 million EGP

Page 48: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO

Construction of a sewage drainage network at Balteem city to complete services at all villages and cities in Egypt.

GRAVITY PIPELINES NETWORK AND DEWATERING AT BALTEEM CITY, KAFR EL SHEIKH GOVERNORATE.

PROJECT DESCRIPTION:

EGCO SERVICES:

Supply and installation of vitrified clay pipes with flexible joints, diameters from 175 mm up to 750 mm, depths up to 8,50 m and length of 30000 m.

Supply and installation of 1200 square and circular concrete manholes, internal diameters of 1,20 m & 1,50 m and depths up to 8,50 m. 4

The construction was based on the well-point system dewatering for depths up to 3,50 m and on the deep well system dewatering for depths more than 3,50 m.

MAIN CONTRACTOR :

Industrial and Engineering Projects Company

OWNER :

National Organization for Potable Water and

Sanitary Drainage.

COST:

42.0 million EGP.

Demolition and reconstruction of water supply networks which facing the execution of the network project.

Page 49: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO

Construction of a sewage drainage network at El Horani city, DamiettaGovernorate, according to the Government policy to complete the construction of all

sewage drainage networks at all villages and cities in Egypt

Sewage Drainage network, force main pipelines and Dewaterimg at El Horani city, Damietta Governorate..

PROJECT DESCRIPTION:

EGCO SERVICES:

Supply and installation of vitrified clay pipes with rigid joints, diameters from 175 mm up to 600 mm, depths up to 6,50 m and length of 12500 m.

Supply and installation of 500 square and circular concrete manholes, internal diameters of 1,20 m & 1,50 m and depths up to 6,50 m.

Supply and installation of ductile cast iron pipes, diameters of 150 mm & 200 mm and length of 6000 m including valves chambers, special pieces, valves and dismantling pieces.

MAIN CONTRACTOR :El Nasr for buildings and Constructions.

OWNER :National Organization for

Potable Water and Sanitary Drainage.

COST:13.0 million EGP.

Supply and construction of under crossing roads and over crossing canals including isolated iron pipes, diameters of 200 mm & 150 mm and the chambers on the crossing sides.

Page 50: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO

Supply and modification of Potable water network at Meetmazah and Meetali villages .

WATER PIPELINES AT MEETMAZAH AND MEETALI VILLAGES, DAKAHLIA GOVERNORATE.

PROJECT DESCRIPTION:

EGCO SERVICES:

Supply and installation of potable water network from Asbestos pipes, diameters of 150 mm & 200 mm and lenglh of 18000 m.

Supply and installation of valve diameters of 150 mm & 200 mm including special pieces of bends, tees and reducers, etc, along the network.

Joining the housing connections with the main network.

MAIN CONTRACTOR :

Engineer General Con. Co.

OWNER :

Authority of Reconstruction and Housing at El Dakahlia Governorate.

1.5 Million EGP.

COST:

Page 51: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO

Modification of the existing potable water network at El Saiidia village, Dakahlia Governorate .

POTABLE WATER PIPELINES AT NEW SAIIDIA VILLAGE, DAKAHLIA GOVERNORATE.

PROJECT DESCRIPTION:

EGCO SERVICES:

Supply and installation of potable water network from Asbestos pipes, diameters of 150 mm and 200 mm and length of 6500 m.

Supply and installation of valves, diameters of 150 mm & 200 mm including bends, tees and reducers, Etc.

Supply and installation of potable water pipes for the house connections.

MAIN CONTRACTOR :

Engineer General Con. Co.

OWNER :

Authority of Reconstruction and Housing at El Dakahlia Governorate.

2.0 Million EGP.

COST:

Page 52: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO

Construction of irrigation pipeline system at EL Hamami canal, Abou Homos, to save the waste water resulting from the use of old-fashioned irrigation system .

DEVELOPING OF THE IRRIGATION PROJECT AT EL HAMAMI CANAL, ABOU HOMOUS, EL BEHIRA GOVERNORATE.

PROJECT DESCRIPTION:

EGCO SERVICES:

Construction of irrigation pipeline system at EL Hamami canal, Abou Homos, to save the waste water resulting from the use of old-fashioned irrigation system.

Supply and installation of 240 valves chambers including valves, diameter of 250 mm.

Supply and construction of 38 irrigation stations, wells for pulling, places for the pumps and horizontal containers including excavation works and reinforced & plain concrete foundations, walls and ceilings.

MAIN CONTRACTOR :

Industrial and Engineering Projects Company.

OWNER :

Irrigation development Authority at the Ministry of the General affairs.

6 million EGP

COST:

Page 53: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO

Construction of irrigation pipeline system at El Khawaled canal, Sedy Salem, to save the waste water resulting from the use of old-fashioned irrigation system

DEVELOPMENT OF IRRIGATION PROJECT AT EL KHAWALED CANAL, SEDY SALEM, KAFR EL SHIEKH GOVERNORATE.

PROJECT DESCRIPTION:

EGCO SERVICES:

Supply and installation of plastic pipes, diameters of 315 mm, 355 mm, 400mm & 500 mm and length of 49000 m including excavation works, installationations and tests.

Supply and installation of 680 valves chambers including valves, diameter of 250 mm.

Supply and construction of 78 irrigation stations, wells for pulling, places for the pumps and horizontal containers including excavation works, reinforced & plain concrete foundations, walls and ceilings.

MAIN CONTRACTOR :

Industrial and Engineering Projects Company.

OWNER :

Irrigation development Authority at the Ministry of General affairs.

13.0 million EGP

COST:

Page 54: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO

Construction of a sewage drainage network at Tablouha city to complete services at all villages and cities in Egypt.

CONSTRUCTION OF GRAVITY PIPES NETWORK FOR TABLOUHA CITY WITH THE WELL POINT IN KAFR EL SHEIKH

PROJECT DESCRIPTION:

EGCO SERVICES : Supply and installation of vitrified clay pipes with flexible joints, diameters from 175 mm up to

750 mm, depths up to 8,50 m and length of 30000 m.

Supply and installation of 1200 square and circular concrete manholes, internal diameters of 1,20 m & 1,50 m and depths up to 8,50 m.

The construction was based on the well-point system dewatering for depths up to 3,50 m and on the deep well system dewatering for depths more than 3,50 m.

MAIN CONTRACTOR :

Industrial and Engineering Projects Company

OWNER :

National Organization for Potable Water and Sanitary Drainage.

COST:

30 million EGP.

Demolition and reconstruction of water supply networks which facing the execution of the network project.

Page 55: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO

Construction of 2 sewage pumping stations totransport sewage to the treatment station to complete the existing network project at Tablouha.

SEWAGE PUMPING STATIONS (1,2) AT TABLOHA, KAFR EL SHEIKH GOVERNORATE.

PROJECT DESCRIPTION:

EGCO SERVICES :

Supply and Construction of concrete wells, diameters of 12 m including the penetration for wells settlement at the required level.

Supply and construction of the extension buildings as the working building, generator building, storage, workshop, security room and the outside fences.

MAIN CONTRACTOR :

Industrial and Engineering Projects Company.

OWNER :

National Organization for Potable Water and Sanitary Drainage.

COST:

4 million EGP

The construction was based on the well-point system dewatering according to the high water level at this area.

Page 56: ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO

Supply and install upvc water pipes with diameter 355 mm of working pressure 10 ,16 bar length of 15 km including Wash, Air chambers and Tunnels . In addition to supply and build reinforced concrete ground tanks capacity of 4000 m3 within the factory and another 750 m3 capacity in pumping stations.In addition to the ordinary work including excavation , PC , RC ,and finishing the work and including the supply and install of Pumps ,generators, cranes, chlorination systems, water hammer systems , the earthing and fire alarm systems Inside Pumping stations.In addition to the supply and installation of internal water networks of diameters 160 mm , 110 mm and 63 mm for all the buildings inside the factory and connecting the ground tank to cement product water tanks and build Pump chambers for water transfer from the ground tank to the internal water networks.

Arabian Cement Project Water Transmission Pipe Line ( Kattamia - Ein ELsokhna road).

PROJECT DESCRIPTION:

EGCO SERVICES : Supply and install upvc water pipes with diameter 355 mm length of 15 km including Wash , air chambers and Tunnels ( Kattamia

– Ein El El sokhna road ) the Arab cement company – ( quarries road) .

Supply and install RC ground tank with capacity of 4000 m3 including all concrete works . inlet and outlet chambers and their Pipe works .

Supply and install all the ordinary works for the Pumping stations including ground tanks with capacity of 750 m3, Pumps chambers , Cranes , Gates , Garde room , Fence , and Generating chambers .

MAIN CONTRACTOR :

Engineer General Contracting Company

OWNER :

Arabian Cement Company

COST: 20 million EGP.

Consultant :

Arab Consulting Engineers – Reliance Heavy Industries

Supply and install the Mechanical and Electrical equipments for Pumping stations including Pumps , Generators , Cranes , Panel boards , Cables , Earthing systems , Water hummer systems , Fire alarm and Control system .

Supply and install PVC pipes for the internal water pipe network with diameters of (160,110,63 )mm with length of 2500 m including Chambers , Valves and Internal connections .