T E S L A ’ S E N E R G Y S T O R A G E P R O D U C T S
60kWh - 100kWh 14 kWh 200kWh+
M O D E L S / X / 3
3
E N E R G Y S T O R A G E “ V A L U E S T R E A M S ”
3
BACKUP
CAPACITY FIRMING
GEN AND T&DINVESTMENT DEFERRAL
ANCILLARY SERVICES
MICROGRID
DEMAND RESPONSE
LOAD SHIFTING
PEAK SHAVING
4
Customer
Southern California Edison
Location
Ontario, CA
Project Size
20 MW / 80 MWh
Applications
Peaker plant replacement
Commissioned
2016. Three months from deployment to operation
4Confidential and Proprietary
UTILITY-SCALE STORAGE
5
Customer
Kauai Island Utility Cooperative (KIUC)
Location
Kauai, HI
Project Size
13MW Solar PV13MW / 52MWh storage
Applications
Solar energy firming and shifting
Commissioned
2017
5Confidential and Proprietary
UTILITY SOLAR + STORAGE
66
Customer
Vector Glen Innes
Location
Glen Innes, New Zealand
Project Size
1MW / 2 MWh
Applications
T&D Deferral
Commissioned
2016
UTILITY DISTRIBUTION SOLUTION STORAGE
7
- Defers or avoids T&D grid expenditures
- Reduces risk of unnecessary upgrades attributable to inaccurate load forecasts
- Extends T&D equipment lifetime
Load
Conventional T&D upgrade
Storage as a T&D upgradeMW
Years
T & D I N V E S T M E N T D E F E R R A L / A V O I D A N C E
88
CustomerJackson Family Wine
LocationAcross 6 wineries in California
Project Size4.1 MW / 8.3 MWh
Distributed Energy ResourceSome standalone, some with solar
ApplicationsLoad shiftingPeak Shaving
Commissioned2015
COMMERCIAL & INDUSTRIAL CUSTOMER STORAGE
99
CustomerCustomer
Green Mountain Power
Location
Homes across Vermont
Project Size
1.6 MW / 3.2 MWh
Applications
Backup powerPeak shavingReduce T&D costsGrid stability
Commissioned
2016 / 2017
AGGREGATED RESIDENTIAL
10
Planning (generation, transmission, & distribution)
Valuation
Procurement
Operations
Rate design
Interconnection
Grid processes and tariffs must be updated to accommodate
energy storage on the grid
B A R R I E R S T O S T O R A G E D E V E L O P M E N T