Energy Sector Corridor Improvement Program May 26, 2016

ENERGY SECTOR CORRIDOR IMPROVEMENT PROGRAM Randy C. Hopmann, P.E. Director of District Operations

May 26, 2016

Page 2: ENERGY SECTOR CORRIDOR IMPROVEMENT PROGRAM€¦ · Energy Sector Corridor Improvement Program May 26, 2016 . ... A public relations campaign was also launched in 2012 to raise public

Energy Sector Corridor Improvement Program May 26, 2016

Texas Energy Sector plays

2

Page 3: ENERGY SECTOR CORRIDOR IMPROVEMENT PROGRAM€¦ · Energy Sector Corridor Improvement Program May 26, 2016 . ... A public relations campaign was also launched in 2012 to raise public

Energy Sector Corridor Improvement Program May 26, 2016

Corridor improvements

Reinforce pavements on major corridors while drilling activity has normalized.

Texas A&M University Transportation Institute determined strengthening pavements will reduce overall repair and maintenance costs by approximately 700%.

Major Energy Sector corridors: – Primary corridors used by industry. – Connect active energy areas with

energy service providers.

3

Page 4: ENERGY SECTOR CORRIDOR IMPROVEMENT PROGRAM€¦ · Energy Sector Corridor Improvement Program May 26, 2016 . ... A public relations campaign was also launched in 2012 to raise public

Energy Sector Corridor Improvement Program May 26, 2016

Process to develop a corridor improvement program

Reinforcing pavements: – Strengthening pavement structures. – Adding shoulders to protect pavement edges. – Adding turn lanes at key intersections. – Constructing passing lanes on Super 2 corridors.

Districts have identified major corridors within energy areas and have prioritized projects on major corridors with improvement needs.

4

Page 5: ENERGY SECTOR CORRIDOR IMPROVEMENT PROGRAM€¦ · Energy Sector Corridor Improvement Program May 26, 2016 . ... A public relations campaign was also launched in 2012 to raise public

Energy Sector Corridor Improvement Program May 26, 2016

Process to develop a corridor improvement program

Districts have developed preliminary project scopes and estimates.

Workshops with oil and gas industry have been scheduled for early June to solicit feedback.

Website developed for Energy Sector Task Force in 2012 is being updated for upcoming Workshops. www.roadsfortexasenergy.com

A public relations campaign was also launched in 2012 to raise public awareness about the importance of driving safely in areas impacted by increased oil and gas activity. This campaign is still ongoing in 2016.

5

Page 6: ENERGY SECTOR CORRIDOR IMPROVEMENT PROGRAM€¦ · Energy Sector Corridor Improvement Program May 26, 2016 . ... A public relations campaign was also launched in 2012 to raise public

Energy Sector Corridor Improvement Program May 26, 2016

Safety statistics in Energy Sector areas (2010–2015)

6

0

100

200

300

400

500

600

700

2010 2011 2012 2013 2014 2015

Fata

litie

s

Reportable Motor Vehicle Traffic Fatalities in Energy Sector Regions 2010 - 2015

Barnett Shale Eagle Ford Shale Anadarko Basin Haynesville/Bossier Shale Permian Basin

Page 7: ENERGY SECTOR CORRIDOR IMPROVEMENT PROGRAM€¦ · Energy Sector Corridor Improvement Program May 26, 2016 . ... A public relations campaign was also launched in 2012 to raise public

Energy Sector Corridor Improvement Program May 26, 2016

Statewide Energy Sector implemented investments

7

Previous Energy Sector funding and activities: – $1.5 billion in multiple Energy Sector funding initiatives (HB 1025, Energy Sector

Supplemental funds, Proposition 1, Supplemental Safety, Supplemental Maintenance, etc.)

Repaired damaged pavement and addressed immediate safety needs.

Energy Sector Implemented Investments

Miles of pavement repaired 899

Miles of shoulders added or repaired 221

Miles of pavement rehabilitated 955

Intersections improved 8

Miles of narrow lanes widened 928

Page 8: ENERGY SECTOR CORRIDOR IMPROVEMENT PROGRAM€¦ · Energy Sector Corridor Improvement Program May 26, 2016 . ... A public relations campaign was also launched in 2012 to raise public

Energy Sector Corridor Improvement Program May 26, 2016

Pavement reinforcement and strengthening

8

Pavement design and reinforcement approach:

Methodologies developed by TxDOT Districts in conjunction with Texas A&M University Transportation Institute (TTI) and TxDOT’s Maintenance Division based on local material availability and industry standards.

Traffic projections and traffic loading (specifically heavy vehicles/trucks) remain critical components in design. Each project is engineered based on TTI best practices.

Number of well sites.

Anticipated truck traffic for each well site.

Updates on additional permitted well sites every six months from the Texas Railroad Commission (TRC).

Page 9: ENERGY SECTOR CORRIDOR IMPROVEMENT PROGRAM€¦ · Energy Sector Corridor Improvement Program May 26, 2016 . ... A public relations campaign was also launched in 2012 to raise public

Energy Sector Corridor Improvement Program May 26, 2016

Energy Sector corridor prioritization

9

Identified corridors prioritized across District boundaries by:

Identifying most-impacted areas based on previous experience .

Concentrating on completing entire corridors to complement the work already done by the Districts (i.e., SH 72, SH 302, SH 285, etc.).

Focusing on corridors crossing multiple Districts and providing direct Energy Sector connectivity from wells to market (ports), support facilities and material sources, etc.

Considering three-year average crash data along major routes indicating the largest number of fatal and incapacitating injuries within Energy Sector counties.

Page 10: ENERGY SECTOR CORRIDOR IMPROVEMENT PROGRAM€¦ · Energy Sector Corridor Improvement Program May 26, 2016 . ... A public relations campaign was also launched in 2012 to raise public

Energy Sector Corridor Improvement Program May 26, 2016

Eagle Ford Shale corridors

10

Eagle Ford Shale corridor priorities: SH 97 (LRD, SAT, YKM) SH 72 (CRP, YKM) US 83 (LRD, SAT) US 59 (LRD, CRP, YKM) SH 16 (SAT, LRD) SH 85 (LRD, SAT) US 183 (CRP, YKM) US181/SH123 (CRP, SAT)

Page 11: ENERGY SECTOR CORRIDOR IMPROVEMENT PROGRAM€¦ · Energy Sector Corridor Improvement Program May 26, 2016 . ... A public relations campaign was also launched in 2012 to raise public

Energy Sector Corridor Improvement Program May 26, 2016

Permian Basin corridors

11

Permian Basin corridor priorities: SH 302 (ODA) FM 652 (ELP, ODA) SH 158/US87 (ODA, SJT) US 67 (ODA, SJT) SH 176 (ODA, ABL) US 87 (SJT, ABL, LBB) US 285 (ODA) US 385/SH 214 (ODA, LBB) SH 349/US 87 (ODA, LBB) SH 137 (SJT) SH 350 (ABL)

Page 12: ENERGY SECTOR CORRIDOR IMPROVEMENT PROGRAM€¦ · Energy Sector Corridor Improvement Program May 26, 2016 . ... A public relations campaign was also launched in 2012 to raise public

Energy Sector Corridor Improvement Program May 26, 2016

Barnett Shale corridors

12

Barnett Shale corridor priorities: US 67 (FTW, BWD) US 84 (BWD, WAC) US 180 (BWD, FTW) US 281 (FTW, BWD) US 283 (ABL) US 377 (BWD, FTW) US 380 (FTW ) SH 16 (BWD) SH 114 (FTW)

Page 13: ENERGY SECTOR CORRIDOR IMPROVEMENT PROGRAM€¦ · Energy Sector Corridor Improvement Program May 26, 2016 . ... A public relations campaign was also launched in 2012 to raise public

Energy Sector Corridor Improvement Program May 26, 2016

Anadarko corridors

13

Anadarko corridor priorities: US 60 (AMA) SH 70 (AMA) US 83 (AMA) SH 152 (CHS) FM 1046 (CHS)

Page 14: ENERGY SECTOR CORRIDOR IMPROVEMENT PROGRAM€¦ · Energy Sector Corridor Improvement Program May 26, 2016 . ... A public relations campaign was also launched in 2012 to raise public

Energy Sector Corridor Improvement Program May 26, 2016

Haynesville-Bossier corridors

14

The Haynesville-Bossier play is one of the earliest Texas oil fields, dating back to the early 1900s. Majority of major corridors were strengthened over an extended period of time. Capacity and safety needs currently exist. Haynesville-Bossier corridor priorities: US 96/US59 (BMT, LFK, ATL) US 69/US 59/US 259 (TYL, BMT, LFK, ATL) SH 21 (LFK) US 59/US 84 (LFK, TYL) US 79 (TYL, ATL)

Page 15: ENERGY SECTOR CORRIDOR IMPROVEMENT PROGRAM€¦ · Energy Sector Corridor Improvement Program May 26, 2016 . ... A public relations campaign was also launched in 2012 to raise public

Energy Sector Corridor Improvement Program May 26, 2016

Priority 1 corridor funding needs

15

Note: Priority 2 Energy Sector corridor needs total an additional $1.25 Billion.

Energy Play Priority 1 Corridor Estimate

Eagle Ford Shale $ 569M

Permian Basin $ 676M

Barnett Shale $ 271M

Anadarko Basin $ 97M

Haynesville-Bossier $ 179M

Total $1.8 Billion

Page 16: ENERGY SECTOR CORRIDOR IMPROVEMENT PROGRAM€¦ · Energy Sector Corridor Improvement Program May 26, 2016 . ... A public relations campaign was also launched in 2012 to raise public

Energy Sector Corridor Improvement Program May 26, 2016

Priority 1 corridor improvements

16

Energy Sector corridor improvements

Miles of pavement strengthening / reinforcement 1,125

Miles of shoulders added 50

Miles of passing lanes added (Super 2) 521

Miles of lanes added or widened for safety 20

Total Miles to Improve 1,716

Page 17: ENERGY SECTOR CORRIDOR IMPROVEMENT PROGRAM€¦ · Energy Sector Corridor Improvement Program May 26, 2016 . ... A public relations campaign was also launched in 2012 to raise public

Energy Sector Corridor Improvement Program May 26, 2016 17

Questions?