ENERGY PRESENTATION

Joint Portfolio Committees on Minerals and Energy

Page 2: ENERGY PRESENTATION Joint Portfolio Committees on Minerals and Energy

OUTLINE

Energy Legal FrameworkUnderstanding key players in the sectorPublic entities reporting to the MinisterOther Key PlayersEnergy Security MasterplanStatus of ESMP ProjectsChallengesPerformance over the last cycleThe Electricity SceneEnergy Security PolicyInterventionsRenewable energyEnergy efficiencySocioeconomic Indicators

Page 3: ENERGY PRESENTATION Joint Portfolio Committees on Minerals and Energy

ELECTRICITY VALUE CHAIN

Page 4: ENERGY PRESENTATION Joint Portfolio Committees on Minerals and Energy

• Petroleum Products Act 2003, No.120 of 1977• Gas Act 2001, No. 48 of 2001• Gas Regulator Levies Act, 2002, No. 75 of 2002• Petroleum Pipelines Act, 2003, No.60 of 2003• Petroleum Pipelines Levies Act, 2004, No. 28 of

2004• National Energy Act, 2008, No.34 of 2008• Central Energy Fund Act, Act No.38 of 1977• Electricity Regulation Act• National Nuclear Regulator Act• Nuclear Energy Act• National Radioactive Waste Disposal Institute Act

ENERGY LEGAL FRAMEWORK

Page 5: ENERGY PRESENTATION Joint Portfolio Committees on Minerals and Energy

CEF Group – iGas, Strategic Fuel Fund (SFF), Oil Pollution Control of South Africa, South African National Energy Research Institute (SANERI), African Exploration, CEF Carbon, Petroleum Agency of South Africa (PASA), South African Supplier Development Agency (SASDA), Energy Development Corporation (EDC) AND Petroleum and Gas Corporation of South Africa

SANEDI (To be Established in terms of National Energy Act of 2008; incorporating SANERI)

NECSA (South African Nuclear Energy Corporation)

NNR (National Nuclear Regulator)

NERSA (National Energy Regulator of South Africa)

EDI HOLDINGS (distribution industry restructuring)

PUBLIC ENTITIES REPORTING TO MINISTER

Page 6: ENERGY PRESENTATION Joint Portfolio Committees on Minerals and Energy

Sasol – Owns Two Refineries in Sasolburg and Secunda Engen – One Refinery in DurbanBP – Co-owns Refinery with Shell in DurbanShell – Co-owns Refinery with BP in DurbanTotal – Co-owns Sasolburg Refinery with SasolChevron –Owns Refinery in Cape TownPetroSA – Owns Refinery in Mossel BayAll belong to association called SAPIA (South African Petroleum Industry

Association)

Eskom – vertically integrated state owned electricity monopoly

UNDERSTANDING THE KEY PLAYERS

Page 7: ENERGY PRESENTATION Joint Portfolio Committees on Minerals and Energy

Transnet – Pipelines, Rail, Ports NAAMSA, Fuel Retailers Associations

Nuclear Fuels Corporation (NUFCOR)

Pebble Bed Modular Reactor Company (PBMR)

Organised Labour

Key Depts: DPE, Treasury, DoT, DWAEA, DTI

OTHER KEY ROLEPLAYERS

Page 8: ENERGY PRESENTATION Joint Portfolio Committees on Minerals and Energy

• The Energy Security Master Plan on liquid fuels was approved by Cabinet in September 2007

• The Master plan sought to allow for the making of well-informed choices in respect of energy supply, energy carriers, demand sector strategies, as well as energy transformation approaches, cognisant of the need to minimize negative impacts on the environment and the economy

• In the short-term– the Master Plan focuses on developing supply chain solutions to

South Africa’s liquid fuels supply challenges, management of liquid fuels demand and emergency response tactics.

• In the medium to long-term– the approach is broader and begins to integrate supply, demand,

macroeconomics, geopolitics and climate change

ENERGY SECURITY MASTER PLAN (ESMP) LIQUID FUELS

Page 9: ENERGY PRESENTATION Joint Portfolio Committees on Minerals and Energy

• Proposed refinery at Coega – Feasibility stage• Proposed Coal to Liquid plant by Sasol – Feasibility stage• Transnet constructing Pipeline• Oil companies building storage capacity• Not sufficient progress on Clean fuels• Strategic Stocks Policy not revised

STATUS OF ESMP PROJECTS

Page 10: ENERGY PRESENTATION Joint Portfolio Committees on Minerals and Energy

• Refining Capacity cannot meet demand – Huge import bill• Port infrastructure needs to be upgraded – Limited room for unplanned

incidents at ports• Ability to supply inland market is challenged• Inadequate storage infrastructure to supply demand – e.g. Airports• Rail infrastructure needs to play a bigger role• Human and Financial Capacity in the Department must be enhanced • Alignment of State Departments and Entities

CHALLENGES – LIQUID FUELS

Page 11: ENERGY PRESENTATION Joint Portfolio Committees on Minerals and Energy

• Promulgation of Energy Act, 2008 No 34 of 2008 – Integrated Energy Planning, Energy Efficiency, Energy Research

• Ratlou Integrated Energy Centre in North West launched bringing the number to 6 nationally – Kuruman, Matatiele, Mutale, Eshane

• 4387 Licence applications processed (Retail, Wholesale licences)• Implementation Plan for the ESMP• Planning for National Integrated Energy Modelling system started • Planning for World Cup Fuel Supply – Airports identified as areas

requiring focus

PERFORMANCE FROM PREVIOUS CYCLE

Page 12: ENERGY PRESENTATION Joint Portfolio Committees on Minerals and Energy

• “blackouts” and “brownouts” continue

Used to be municipalities mainly, now also Eskom (January 2008) Recovery plan in place for short-medium term, with NERT in place

as per Cabinet decision• Intensified energy efficiency• Cogeneration and renewable energy IPPs

• Eskom financing model being developed Nersa will make tariff determination soon and pricing rising to long

run marginal cost Additional support to Eskom being considrered by National

Treasury• Improved regulatory environment

Electricity Regulation Act operational from October 2006 New proposed regulations – integrated resource planning, new

generation capacity, energy efficiency and demand side management

THE ELECTRICITY SCENE

Page 13: ENERGY PRESENTATION Joint Portfolio Committees on Minerals and Energy

• Demand projections (assumption of 2.5% sales growth) indicate a need for power as indicated below;

• South Africa remains in the the top 7% of greenhouse gas emitters in the world

• Nuclear will play a central role on the supply side from 2015 (LTMS); Considering nuclear plant lead times, earliest can only be 2018; Decisions are urgently required

• Only 76% of households have access to electricity;• Free Basic Energy rollout does not provide the intended poverty relief

THE ELECTRICITY SCENE

Page 14: ENERGY PRESENTATION Joint Portfolio Committees on Minerals and Energy

Energy White Paper position provides for diversification of energy mix, including coal, nuclear, gas and renewable energy

Recall that Cabinet decision requires:

Eskom to do 70% of new generation, andIndependent Power Producers (IPP) will do 30%By 2013, the RE share of generation capacity must be 10 000GWh

Nuclear energy policy approved by Cabinet:

Framework for prospecting, mining, milling and use of nuclear materials for energy useRadioactive waste management policy and strategy approved

Establishes radioactive waste governance frameworkEstablishment of a Cabinet Committee to oversee implementation

ENERGY SECURITY POLICY

Page 15: ENERGY PRESENTATION Joint Portfolio Committees on Minerals and Energy

• Cabinet adopted Long term mitigation scenarios (LTMS):

Growth without constraints Peak, Plateau and Decline (from 2035) in respect of GHG emissions

Start now scenario – 27% nuclear by 2030 Scale up scenario – 50% nuclear by 2050

By 2013, the RE share of generation capacity must be 10 000GWh

• These scenarios must guide our mitigation plans Even on scale up scenario, this would be inconsistent with the

decrease in GHG emissions required by “Science” This will likely put pressure on the RSA position post

Copenhagen 2009

ENERGY SECURITY POLICY

Page 16: ENERGY PRESENTATION Joint Portfolio Committees on Minerals and Energy

•Eskom build program (nuclear decision finalization?)

•Independent Power Producers (IPPs)

•Renewable energy IPPs ( feed-in tariff)

•Energy efficiency and demand side management

•National Electricity Response Plan

INTERVENTIONS

Page 17: ENERGY PRESENTATION Joint Portfolio Committees on Minerals and Energy

17

100MW of wind farms planned across the country

REFSO project support is limited to projects under R100 million. subsidy rate is now R1million per MW. To date projects with total installed capacity of 24 MW have been subsidised to date at a total cost of R15m

Initiative to install over 500 000 solar water heaters

The Solar Water Heating programme has an enegy diversity and demand side management capability. At present, about 1000 systems have been implemented and plans and over 1.75 m planned for the next MTEF period

The financing framework for Biofuels has been established. Research into 2nd generation biofuels programme is currently underway

NERSA has approved REFIT for Wind , Small Hydro Schemes, Landfill

and Solar Concentrated Power.

RENEWABLE ENERGY

Page 18: ENERGY PRESENTATION Joint Portfolio Committees on Minerals and Energy

18

– Energy Efficient Lighting programme has been implemented in government buildings and households in select municipalities

– Involves exchange of incandescent lighting with compact fluorescent lighting (CFLs)

– To date over 20 million CFLs have been replaced

– Power Conservation Program to start in 2010• Facilitates trading in energy savings

– Pilot Projects:• 2010 Host Cities, involving CFLs and traffic lights

ENERGY EFFICIENCY

Page 19: ENERGY PRESENTATION Joint Portfolio Committees on Minerals and Energy

19

• Designated National Authority (DNA)

– Responsible for registering Clean Development Mechanism (CDM) projects

– CDM is an intiative under the UN Framework Convention on Climate Change (mitigates against climate change)

– 15 projects registered and over 120 in the pipeline;

– Tradeable Renewable Energy Certificate (TRECs) implementation framework is being finalised, to enable benefits to be derived from climate change benefits associated with renewable energy sources.

ENERGY EFFICIENCY

Page 20: ENERGY PRESENTATION Joint Portfolio Committees on Minerals and Energy

SOCIO-ECONOMIC INTERVENTIONS

Challenges

• Universal access to energy (electricity and thermal energy)

• Funding to align with universal access target of 2014 for human settlements

• Skills capacity related to accelerated program for 2014

• Also opportunity for job creation: Expanded Public Works

• Structuring of “poverty tariff” to cushion the poor as prices rise

• Increased access to Free Basic Energy (including alternative non-grid carriers)

Page 21: ENERGY PRESENTATION Joint Portfolio Committees on Minerals and Energy

National Backlog

0

100,000

200,000

300,000

400,000

500,000

600,000

700,000

800,000

900,000

Backlog

No

. o

f u

nele

ctr

ifie

d h

ou

seh

old

s

Limpopo

Mpumalanga

Gauteng

North West

Kwa-Zulu Natal

Free State

Eastern Cape

Northern Cape

Western Cape

BACKLOG AS AT 2007

Page 22: ENERGY PRESENTATION Joint Portfolio Committees on Minerals and Energy