2016
Energy
People
Challenges
2
1 DIETSWELL Company
2 DIETSWELL Solutions
Rig design
Offshore
Well bay / drilling pad design, drilling studies
Rig refurbishment / technical support
Other engineering services
3 They trust us
3
16 Years of existence
1st European company API Q2 certified
500+ Client references
4 Business lines dedicated to the client
DIETSWELL (founded in 2000) is a publicly-listed company specialized in the provision of solutions to the Energy industry.
DIETSWELL provide innovative, bespoke and cost effective solutions with the flexibility required to solving increasingly complex onshore and offshore
operational challenges.
Over the years, DIETSWELL developed four branches to meet the needs of the industry stakeholders.
DIETSWELL in a nutshell
4
5 years steady growth…
0
10
20
30
2011 2012 2013 2014 2015
Turnover (M€)
…solid shareholders profile
42%
23%
4%
31%TRUFFLECapital
DIETSWELLManagement
OtherInvestors
Financial Figures
Certifications
ISO 9001 and ISO 14001
New API Q2 certification
5
InspectionsTechnical Audit
Rig Intake CommissioningDrilling operations surveyors
EngineeringWell / Rig design
Onshore & Offshore
Technical AssistanceIntegrated Project Services
ConsultancyRecruitment
Four Business Lines
Drilling OperationsIntegrated Project
Project ManagementRevamping Program
Always dedicated to the client
6
Pierre LaborieChairman
Jean-Claude BOURDON
Executive Vice President
Jean-Philippe MOLLON
Wei ZHANG Skander CHEBIL Julien WARNAN
Dominique MICHELVice President
Nicolas CHEVALIERBusiness
Development
Organization Chart
7
Worldwide Presence
UNITED ARABE EMIRATES - Abu [email protected]: +971 (0) 2 65 88 128
France – Guyancourt (HQ)[email protected]: +33 1 39 30 02 66
UNITED STATES - [email protected]: +1 832 696 9298
BRAZIL / LATAM - Rio de [email protected]: +55 21 3298 1024
GABON - [email protected]
ALGERIA - Hydra AlgersNadjet MadenePhone: +213 21 694307 TUNISIA - La Soukra – Ariana
[email protected]: +216 71 942 449
CONGO - [email protected]: +242 05 553 25 25
8
• ONSHORE and OFFSHORE engineering specialist
150+ references in the industry
16 years of existence as DIETSWELL, heir of French engineering offices
• DIETSWELL SOLUTIONS capacities and skills revolve around several axes,
from Well engineering to Interface with production and Well servicing
Rig definition and design
Offshore
Well bay / drilling pad design, drilling studies
Rig refurbishment / Technical support
Other engineering projects
DIETSWELL Solutions
9
• Core in-house multidisciplinary competences
• Access to unique pool of experts through other business lines
Drilling fluids, completion, well, operational managers…
Expertise
Well engineering
Drilling engineering
Architecture / naval architecture
Structural
Piping
Electricity / instrumentation
Naval architecture or facilities design
Drafting
Scheduling
Estimating
Procurement
QHSE
10
• DIETSWELL Solutions offers include the following services…
• …and covers all the project value chain
Services
Detailed engineering
Construction
supervision and follow-up
Commissioning
Procurement
FEED
Pre-FEED
Feasibility and preliminary
study
- Consultancy - Project Services- Project
Management
11
RIG DESIGN
MODULAR PLATFORM WORKOVER RIG
MODULAR PLATFORM P&A RIG
FMWR
SEDLAR 160
MODULAR LAND RIG ON ARTIFICIAL ISLAND
PLATFORM RIG
WALLET MAST
12
Rig location: North Sea
Client / Prospect: TALISMAN SINOPEC
Rig type: Modular
Start / Finish: 2015
Key Points:
• Plug and Abandonment
• Small Footprint: 23x18m
Modular Platform Workover Rig
TECHNICAL DATARated Depth 4000mFootprint 23x18mPower generation Platform providedDrawworks 250mT, 1250HPTop Drive CANRIG 6027AC 250mT, 600HP, 30.000lb-ft
continuous torqueDerrick / Mast Bootstrap 320mTMud pumps 2 x NOV 10P-130, 1300HP, 514 GPM @ 3900PSIStorage capacities 1500bbls mud tanksWell control system BOP 13-5/8” x 5000PSIPipe handling system Catwalk 2-7/8” to 9-3/4”
13
Rig location: Gulf of Guinea
Client / Prospect: PERENCO
Rig type: Modular
Start / Finish: 2016
Key points:
• Adjustable to be used on 8 different platforms
• Small footprint (24x20m)
• Integrated mud tanks substructure
• Compact and easy to move
• Only requires a 7 tonnes platform crane to install platform crane
Modular Platform P&A Rig
TECHNICAL DATATotal weight 490 mTonQuantity of Lifts 60Rated Depth 2500mPower generation 3x CATERPILLAR C32Drawworks PREP DL2-1000A-3B, 1000HPTop Drive TESCO 250E EMI 400, 250T, 400HPDerrick / Mast LOADMASTER Bootstrap, 140ft, 250.000lbsMud pumps 3x Gardner Denver PZ7 3280PSI @ 2940lpm, 600HPStorage capacities - Mud: 1000bbls
- Fuel: 25m3
- Water 19m3
Well control system BOP 13-5/8”, 10000PSI
14
TECHNICAL DATARated workover Depth 7300mWater Depth Depending on the platform, 190m on Sabratha PlatformPower Generation 4 x Caterpillar 3412, 970HP 1800RPM + 1 x 120kW 1800RPM (Emergency)Drawworks 250mT, 1250HPTop Drive CANRIG 6027AC 250mT, 600HPDerrick / Mast 320mTMud pumps 2 x 1000HP Storage capacities - Mud Tank: 240m3
- Base Oil: 30m3
- Drillwater: 35m3
- Fuel: 15m3
Well control system BOP 11", one 5000PSI annular BOP, one double and one single rams 10000PSI
Accommodation Depending on the platform, 117 persons on Sabratha Platform
Client: ENI
Location: Bahr Essalam field, Libya
Rig type: Independent modular platform rig (1250HP)
SoW: Detailed engineering / Construction follow up
Year: 2003 / 2004 (90,000 Man-hours)
Key points:
• Small footprint (12m x 30m)
• Self erection with its own crane 15mT@20m
• Independent power plant
• Zero discharge rig
• ABS, DNV, BV, Lloyd’s classified
FMWR: Fast Moving Workover Rig
15
TECHNICAL DATARated Drilling Depth 3000mPower Generation 4 x 1000HPHydraulic Mast Power 1000HPTop Drive 500HPDerrick / Mast 160mTMud pumps 2 x 1000HPStorage capacities Mud: 200m3
Well control system BOP 11 ” 5000PSI
Client: DIETSWELL CONTRACTING
Construction: TIMOLOR, Lorient, France, 3C Metal Int. DubaÎ
Location: Tunisia
Rig type: Trailer hydraulic rig
SoW: Concept / Engineering / Construction follow up
Year: 2006 / 2007 (10,000 Man-hours)
Key points:
• SEDLAR stands for Self Elevating Drilling LAnd Rig
• Patented hydraulic telescopic mast
• Very compact rig
• Easy moving
• Range 2 / Range 3 drill pipes
SEDLAR 160
Hydraulic mast principle
16
TECHNICAL DATARated Drilling Depth 2100m (TVD) - 5200m (MD)Water Depth 9mPower Generation 4 x C175-16 2950HP, 1200RPM + 1x 640HP, 1800RPM (Emergency)Drawworks 3000HPTop Drive NOV TDS 8S 750t, 1150HP, 1500000lbs - 40000ft.lbs@150RPM
Derrick / Mast Bootstrap mast, 156’ x 30’ x 30’, 1300000lbsMud pumps 3 x 12 P160, 1600HP, 7500PSIStorage capacities - Mud Tank: 760m3
- Cement: 66m3
- Barite: 66m3
- Bentonite: 66m3
- Base Oil: 200m3
- Brine: 160m3
- Drillwater: 160m3
- Potable Water: 160m3
Well control system BOP 13 5/8” 5000PSI, Accommodation 150 persons on the process side of the island
Client: TECHNIP / NCOC
Location: Kalamkas Field, Caspian Sea, Kazakhstan
Rig type: Independent modular land rig
SoW: Concept Selection / Pre-FEED
Year: 2011 / 2013
Key points:
• Modular land rig installed on an artificial U-shaped island
• Island constructed in several phases over four seasons
• Equipment brought in the area through Volga
• Winterized modules assembled with SPMT and a 56mT@8m crane
• Skidding on 83m above 2 rows of 27 wells each
• Cutting re-injection / Zero discharge rig
Modular Land Rig on Artificial Island
17
TECHNICAL DATARated Drilling Depth 3000m (TVD) - 5800m (MD)Water Depth 110mCluster 15 wells, 3 x 5, 2,44m spacingRated Production 16 millions m3 per dayJacket 130m height, 20000mTPlatform 25m height, 22000mT
Drilling unit 4 modules, 10m height, 7000mT Operating weight, 3600mT Dry weight
Power Generation 4 x CATERPILLAR C175-16, 2600HPDrawworks 3000HPTop Drive TDS 8SA, 1150 HP Derrick / Mast 50m x 9m x 9m, 590mTMud pumps 3 x NOV P220, 2200 HP, 7500 PSI
Storage capacitiesMud: 730m3 Fuel: 320m3Base Oil: 160m3
5000 SacksCement: 130m3Barite: 195m3
Drill water: 160m3Bentonite: 65m3
Well control system BOP 18 3/4”, 5000PSIAccommodation 200 persons
Company: DAEWOO INTERNATIONAL
Client: DORIS ENGINEERING
Construction: Hyundai Heavy Industries, South Korea
Location: SHWE gas field, Myanmar
Rig type: Independent platform rig (3000HP)
SoW: FEED / Detailed engineering
Year: 2008 / 2010 (10,000 Man-hours)
Key points:
• Detailed engineering of a 3000HP drilling rig
• Very scarce space constraints
SHWE Platform Rig
18
TECHNICAL DATACapacity: 200mTOverhaul L x l x h : 19m x 9,25m x 46,6mTotal weight: 161,4mT
Substructure 37,2mTCylinders 9,4mTDrill floor 22,3mT
Mast 56,8mTTop Drive 8,2mT
Cable Reel 9,5mTMiscellaneous 18mT
Client: URALMASH
Location: Arctic Area, Russia
Rig type: Artic land rig
SoW: FEED
Year: 2008 / 2009 (4,000 Man-hours)
Key points:
• Design of a 200mT mast and substructure for arctic area
• Packages limited to 2,4m wide due to railroad transport
• Innovative “wallet mast” concept designed
• Meets Russian GOST Standards
Wallet Mast
19
OFFSHORE
• MODULAR DRILLING BARGE
• STAD
• MULTIPURPOSE SEMISUBMERSIBLE
• INTERFACE JACKET - JACK-UP
• DEEPWATER RISER PRESERVATION SOLUTION
• FLOATING SUPPORT FOR WIND TURBINE
• NORTH SEA AREA JACKET DESIGN CONTROL
• R&D PROJECTS ENGINEERING
20
TECHNICAL DATARated Drilling Depth 4200m
Water Depth 50m
Overhaul L x l x h 62m x 40m x 3m
Power Generation 6000HP SCR
Well control system BOP 13 5/8” 5000PSI
Hydraulic Mast Power 1200HP
Top Drive 700HP
Derrick / Mast 250mT
Mud pumps 2 x 1200HP
Client: TULLOW OIL
Location: Lake Albert, Uganda
Rig type: Trailer rig on modular drilling barge
SoW: Pre-FEED, FEED
Year: 2007 / 2008 (20,000 Man-hours)
Key points:
• Design of a drilling barge consisting in container-size floating modules assembled on site
• Land rig equipped with heave compensation system
• Spread mooring calculation (8 x 9mT anchors)
• Study of barge construction alternative according to local constraints
• Design of all facilities (Camps, harbors)
• Definition of required fleet: anchor handling barge, tugs, transport barges, crew boats, work boats
• Complete logistic study with on site surveys
Modular Drilling Barge
21
TECHNICAL DATARated Drilling Depth 8500mWater Depth 800m – max 1500mOverhaul L x l x h 82,5m x 57m x 26,5mPower Generation 4 x Caterpillar C175-16, 2590HPDrawworks NOV ADS-30D, 3000HPTop Drive NOV 8SADerrick / Mast Bootstrap Mast LEE C MOORE xS-Mast, 49m x 10m x 10m,
590mT (1300000lbs)Mud pumps 3 x National 14P-220, 2200HP 7500PSIStorage capacities - Mud Tank: 1400m3
- 8000 Sacks- Bulk Mud/Cement: 480m3
- Base Oil: 810m3
- Drillwater: 2520m3
- Freshwater: 810m3
- Fuel: 2540m3
- Ballast: 5940m3
Well control system BOP 18 3/4” 5000PSI
Accommodation 158 persons
Client: TOTAL
Location: Moho Nord, Congo
Rig type: Semisubmersible TAD
SoW: Pre FEED / FEED
Year: 2011 (8,000 Man-hours)
Key points:
• Drilling of 24 wells, 8500m extended reach in 800m of water from a TLP
• Simultaneous operations Drilling / Coiled tubing
• Overhead clearance above BOP floor allows transfer of coiled tubing injector head
• U-shaped structure for enhanced operations
STAD: Semi-sub. Tender Assisted Drilling
22
SEMISUB.Rated Drilling Depth 7700mWater Depth 2300mDrawworks 3000HPTop Drive 680mTDerrick / Mast SHL: 680mT (1,500,000lbs)
Clear height: 61mMud pumps 4 x 2200HP, 7500PSIWell control system 2 x Subsea BOP 18“ ¾,
2 x 10000PSI annular BOP,7 x 15000PSI rams BOP.
Riser tensionners 1090mT (2,400,000lbs)Risers 104 x 75’, 21’OD
STAD Rated Drilling Depth 8500mWater Depth 800mDrawworks 3000HPTop Drive 680mTDerrick / Mast SHL: 590mT (1300000lbs)
Clear height: 49mWell control system BOP 18 3/4”
1 x 10000PSI annular BOP,3 x 10000PSI Ram BOP
UNIT TECHNICAL DATAOverall L x l x h 100m x 65m x 40mPower 4 x 4400HPMud pumps 4 x 2200HP, 7500PSIAccommodation 180 persons
SoW: Conceptual study
Year: 2013 / 2014
Multipurpose Semi-Submersible
Key points:
• Versatile semisubmersible able to operate in two modes:
1. Conventional semisubmersible
2. Semisubmersible tender assisting drilling
23
TECHNICAL DATARated Drilling Depth 6000 mWater Depth 70 mBOP Stack 15000 PSIWellheads 15000 PSI
Client: TECHNIP
Location: North Sea
Rig type: Jack-Up
SoW: Interfaces for Wellbay
Year: 2012 / 2014 (5,000 Man hours)
Key points:
• Interface between jacket wellbay and jack-up
• Integration of HPHT well constraints
• Integration of well services equipment
• Detail engineering and construction follow up
• Hook up management
Interface Jacket – Jack-Up
24
Client: Non disclosed
Location: Offshore Africa
Type: Riser element and associated system
SoW: Basic, FEED and detailed engineering
Construction follow up and offshore commissioning
Year: 2013 / 2016 (15,000 Man-hours)
Key points:
• Specific riser element for exploration drilling in deepwater harsh environment:
From scratch design, manufacturing and commissioning
• Associated Riser preservation solution to be integrated on the drilling rig:
FEED design including RFQ to potential suppliers and selection
Deepwater Riser Preservation Solution
TECHNICAL DATAMax. Surface current 3m/sWater Depth 1450m
25
Project: Floater: DIETSWELL
Wind Turbine: 2B-Energy (Partner)
Location: Offshore
Type: Tripod floating support
SoW: Basic, Pre-FEED
Year: 2016
Key points:
DIETSWELL has partnered with 2B-Energy to propose to the renewable energy market a unique wind turbine unit:
• Downwind wind turbine with easy maintenance and intervention
• Tripod semi-submersible floater
• Remarkable hydrostatic and hydrodynamic behaviors
• Floating support and windmill installed at shore then towed to site
Floating Support for Wind Turbine
TECHNICAL DATASize 6MW
Rotor diameter 140 m
Draft 18 m
Mast height 87,5 m
Columns height 28 m
Column diameter 9 to 12 m
Column spacing 50 m
Broadening bottom of culumn 12 m
Displacement 5,400 tonnes
26
Client: Non disclosed
Location: North Sea
Type: Jacket
SoW: Design review
Year: 2013 (500 Man-hours)
Key points:
• Review of jacket and topside design:
Structure, Calculation note, Installation procedure
Seismic Surveys EngineeringClient: CGG Veritas
SoW: Engineering
Year: 2011 / 2013 (2,500 Man-hours)
Key points:
Design and engineering for several R&D projects for seismic surveys, both onshore and offshore
Jacket Design Control
27
WELL BAY / DRILLIND PADDRILLING STUDIES
• CLUSTER LAND RIG
• WELL BAY ON ARTIFICIAL ISLAND
• EXPLORATION DRILLING CAMPAIGN
• SELF ELEVATING STRUCTURE FOR A 35° SLANT RIG
28
TECHNICAL DATARated Drilling Depth 4500mPower Generation 3 x Caterpillar 3512B 1470HPDrawworks 1500HPTop Drive 700HP, 25000ft-lbRotary Table (Back-up) 27” ½, 600HPDerrick / Mast Bootstrap Mast, 45m Height, Hookload 285mTMud pumps 2 x triplex, 1300HP, 5000PSIStorage capacities - Mud Tank: 200m3
- Fuel: 105m3
- Drillwater: 65m3
- Service water: 65m3
- 1000 Sacks
Well control system BOP 11”, 5000PSI
Client: TOTAL CHINA
Location: Sulige South gas field, China
Rig type: cluster land rig
SoW: Rig selection, Engineering, Market Survey
and Rig builders Audit
Year: 2008 (2,300 Man-hours)
Key points:
• Design a cluster drilling rig with long skidding distance
• Shall integrate proven existing solutions available in China
• Only drill top holes sections, which implies frequent rig move
• Moving performances were a key element of the design
• Rig split into one skidding part which skids on every well, and one fixed part which only skids every 8 wells
• Winterization (3 - 4 winter months with average temperature ranging from +10°C and -20°C.)
Cluster Land Rig
29
TECHNICAL DATACellars configuration 6 cellars of 8 wells, 1 cellar of 6 wells, separated by 2m thickness walls, 1,5m depth54 Wells in 2 rows of 27 as follows:
Basis of Design:- 28 x 8” producers + 28 x 2” gas lift- 1 x 6” gas injector- 6 x 6” water injector- 1 x 6” cutting injector- 1 x 6” waste water injector
Spare slots for Full Field Development- 14 x 8” producers + 14 x 2” gas lift- 1 x 6” water injector- 1 x 6” cutting injector- 1 x 6” waste water injector
Insulation thickness 4” insulation thickness for 6” diameter pipe and above, 3” insulation thickness below
Client: TECHNIP
Location: Kalamkas field, Caspian sea, Kazakhstan
Well bay type: Cellar and skidding structure
SoW: Design of a wellbay
Year: 2012 / 2013 (500 Man-hours)
Key points:
• The design had to optimize random drilling
• No piping pre-installation has to be done for the flow lines
• Piping to be accessible and connectable to the manifolds at any time
• Flow lines shall not cross the cellars.
• Top of skidding beams support has to be located no higher than 5m above the ground.
Well Bay on artificial island
30
Client: MGV, Millennium Geo-Venture
Location: Soufflenheim, France
Campaign type: Exploration
SoW: Engineering
Procurement
Operations follow up
Year: 2013 / 2014 (1,500 Man-hours)
Key points:
• Assist, a junior company, for its first drilling campaign
• Strong cost challenges
• Deal with local authorities
• Engineering and design (facilities, cellar, etc.)
• Procurement
• Consultancy concerning drilling operations
Exploration Drilling Campaign
TECHNICAL DATARated Drilling Depth 530mCasing Program 7’’ to TDWell control system BOP 3000PSI
31
TECHNICAL DATAFootprint L x l 23 m x 7 mCylinders stroke 1,45 m Cylinders working pressure 3350PSITotal weight: 65,3 mT
Client: PERENCO
Location: Gabon
Construction: 3C METAL INT., Pau, France
Type: Self elevating structure for slant rig
SoW: Basic and detailed engineering
Construction follow up
Year: 2009 / 2010
Key points:
• Design of a self elevating structure for a 35° slant rig
• Water rig originally designed to drill without BOPs
• Structure designed to lift the drilling truck by 3,7m to
allow installation of 11” or 7” BOP stacks.
Self elevating structure for a 35° slant rig
32
RIG REFURBISHMENT TECHNICAL SUPPORT
• DMM 1&2
• FORASLIM 1
• GAVIOTA
33
TECHNICAL DATARated Drilling Depth 4800m using 5” OD drillpipePower Generation 4 x CATERPILLAR D399, 1215HPDrawworks GARDEN DENVER 1100UE, 1500HPTop Drive CANRIG 1050 E 450mT, 1130HPDerrick / Mast PYRAMID Lo-Lift, 48,5m (160ft), 450mTMud pumps 2 x GARDEN DENVER PZ11, 1600HP, 5000PSIRotary Table GARDEN DENVER 27” ½, 275mT, 900HPStorage capacities - Active / Mixing Mud Tank: 100m3
- Reserve Mud Tank: 210m3
- Treatment Tank: 28m3
- Pre-Mixing Tank: 12m3
- Trip Tank: 8m3
- Rig Fuel Tank: 155m3
- Camp Fuel Tank: 20m3
- Water: 150m3
Well control system 1 x Annular BOP, HYDRIL 13 5/8”, 5000PSI,1 x Ram Type BOP, CAMERON ‘’U’’ Double 13 5/8”, 10000PSI
Accommodation 102 persons in main camp, 24 persons in mini camp
Client: DMM
Location: Hassi Messaoud, Algeria
Construction: USA, 1980
Type: Land rig
SoW: Engineering for refurbishment
Refurbishment follow up
Year: 2005 / 2006 (1,500 Man-hours)
Key points:
• Two rigs originally designed for workover operations
• Engineering for upgrade in drilling rigs: Stand pipe, shale shakers, mud tanks…
DMM 1&2
34
TECHNICAL DATARated Drilling Depth 2500m in 6 ½’’ ; 3000m in 4 ¾’’ ; 3500m in 3 3/8’’ Power Generation 1500HPDrawworks DRECO EH 600, 600HPTop Drive CANRIG 6017 E, 160mT
Derrick / Mast Bootstrap Mast DRECO 30,5m x 4,4m, 100mTMud pumps 4 x ELLIS WILLAMS W 200 A triplex, 5000PSI
Storage capacities - Active Mud Tank: 48m3
- Reserve Mud Tank: 32m3
- Water Storage: 32m3
- Fuel: 34m3
Well control system BOP 11” or 7 1/16", 5000PSI
Accommodation 32 persons
Client: AODS
Location: Lorient, France
Construction: 1993/1994
Type: Slim hole rig
SoW: Engineering for refurbishment
Refurbishment follow up
Year: 2007 (2,000 Man-hours)
Key points:
• Slim hole rig designed to drill small diameter holes to depths of 3500m with a small footprint (26 x 32m)
• Rig either transportable with 10mT trucks or helicopters (Total weight of 470mT)
• Engineering performed to support on site operations
FORASLIM 1
35
TECHNICAL DATARated Drilling Depth 3000 m (TVD) Water Depth 100 mCluster 12 slotsPower generation Provided by topsideDerrick / Mast National, 147 ft, 1,000,000 lbsMud pumps 2 Garden Denver PZ11Storage capacities -Mud: 360 m3
- Fuel: 320 m3- Water Storage: 160 m3
- Bulk: 14,000ft3
Well control system BOP 13 5/8”, 10 000PSIAccommodation 45 persons
Client: ENAGAS
Location: Spain
Type: Platform Rig
SoW: Revamping and operation
Year: 2014 (~80,000 Man hours)
2015: operations
Key points:
• Refurbishment of a drilling platform rig installed on the Gaviota Platform
• Procurement, maintenance, engineering, piping, electrical and structure modifications, certification, commissioning
• Work over operations
Drilling Rig Revamping
36
OTHER ENGINEERING PROJECTS
• JACKING SYSTEM
• SAPROLITE GOLD CONCENTRATOR
• PRODUCED WATER TREATMENT UNIT
37
Client / Prospect Royal Atlantis Resort
Location: Dubaï
Construction: Dubaï
Type: Jacking system for sky bridge
Year: 2016
Key points:
• Concept engineering of a jacking system for a sky bridge for an hotel project in Dubaï
• Clamping on concrete wells for step by step
• Limits installation means to the minimum, and so the costs
• Allows for tighter schedule
Jacking System
TECHNICAL DATAWeight of bridge 1,200 tonnesQuantity of Jacks 16
38
TECHNICAL DATAFootprint L x l x h 20x13x12mPlant capacity 30mT/hourStructure weight 37,5mTEquipments weight 28,5mT
Client: NG²
Location: France
Construction: Spain
Type: Saprolite gold concentrator plant
SoW: Basic and detailed engineering
Construction follow up
Year: 2013 (1,500 Man-hours)
Key points:
• Design of a modular saprolite gold concentrator plant
• Modularization for inland water transport
• Integration of all equipment required
• Structure calculation
• Electric loads calculation
• Construction follow up
• The project has been performed in a “fast track”, concept, design and construction have been performed in 13 weeks only.
Saprolite Gold Concentrator
39
Client: OHT (Hydrocarbon extraction)
Sponsors: ENGIE / ENTREPOSE
Location: Germany / France
Construction: France
Type: Water Treatment Unit
SoW: Basic engineering
Detailed engineering and Construction follow up
Commissioning
Operation
Year: 2013 – 2016 (4,000 Man-hours)
Key points:
• Water treatment pilot unit based on a patented process using polymer for hydrocarbon extraction.
• Developed under a CITEPH Project led by OHT and sponsored by ENGIE and ENTREPOSE.
• Unit successfully tested on a produced water reinjection site in Hoogstede, Germany.
• Treatment of refining wastewater for a release in the wild according to legislation on the refinery of Petit-Couronne (ex-PETROPLUS, formerly SHELL) during dismantling operations performed by VALGO (Industrial sites remediation).
Produced Water Treatment Unit
TECHNICAL DATAOne static process: 2 x Random packing columns (2,5m³ each)One dynamic process: 1 Mixer (0,5m³) and 1 Rotary screenOne polymer regeneration processFootprint L x l x h 9 x 6 x 7mPlant capacity 20 m³/hourDry weight 19,5mT
40
They trust us
Julien WARNANBusiness Line ManagerMob: +33 6 77 27 86 [email protected]
Dominique MICHELVice PresidentMob: +33 6 11 52 01 [email protected]
Théo BOUREZBusiness Development EngineerMob: +33 6 30 53 76 [email protected]
Parc Ariane 3Immeuble le Naïade1 Rue Alfred Kastler
78280 Guyancourt Cedex France
Fax : +33 139 304 722Contact : [email protected]