18th National Award for Excellence in

Energy Management 2017

Page 2: Energy Management 2017 - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Metal/9. JSW... · SEC, JSW Steel, Vijayanagar 6.61 Gcal/TCS Gap in SEC 1.14 Gcal/TCS

Growth of JSW Steel, Vijayanagar

Barren Land

Inadequate Water Source, No Electricity

Poor Infrastructure, Road And Rail Connectivity

Non Availability Of Coking Coal, Low Quality Iron Ore

Lack of skilled people To Build / Operate

India’s

largest

Steel Plant

This is what we got

And this is what we made of it

2006

3.8

2004

2.5

1999

0.8

2001

1.6

2009

6.8

2011

10

2016

12

2020

16*

Page 3: Energy Management 2017 - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Metal/9. JSW... · SEC, JSW Steel, Vijayanagar 6.61 Gcal/TCS Gap in SEC 1.14 Gcal/TCS

JSW : Process Flow

Page 4: Energy Management 2017 - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Metal/9. JSW... · SEC, JSW Steel, Vijayanagar 6.61 Gcal/TCS Gap in SEC 1.14 Gcal/TCS

Management Systems @ Vijayanagar

ISO-9001 : 08

1999 2000 2001 2002 2004 2007 2009

ISO 9002:94

ISO14001:96

HSM

Corex-1& 2

SMS-1PP-1

HSM

, Co

rex-

1, S

MS-

1, P

P-1

OHSAS18001:99

ALLDIVISIONS

Re-registration

ISO-9001

OHSAS18001

ISO-14001

Re-registration

ISO-9001 : 08

OHSAS-18001:07

ISO-14001 : 04

2011

Re-registration

ISO-9001 : 08

OHSAS-18001 :07

ISO-14001 : 04

TS – 16949 INITIATED

2013

Re-registration

ISO-9001 : 08

ISO-14001 : 04

TS – 16949 Certification-

CRM

OHSAS-18001 :07

Re-registration

ISO-14001 : 04

TS – 16949 Certification –HSM & CRM2

OHSAS-18001 :07

SA 8000 Initiated

2016

SA 8000:2014 Certification

Re-registration to Revised Standards ISO 9001:15, and

ISO 14001:15 to 46 Units

SOBIS Portal

ISO/IEC 17025:2005

Accreditation –SMS,HSM & CRM

Labs

Imp

lem

en

tati

on

In P

rogr

ess

(

Acr

oss

pla

nt)

ISO

50

00

1

Adoption of management Systems focusing towards improvement in all facets of Operation

2017

Page 5: Energy Management 2017 - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Metal/9. JSW... · SEC, JSW Steel, Vijayanagar 6.61 Gcal/TCS Gap in SEC 1.14 Gcal/TCS

Energy Policy

Page 6: Energy Management 2017 - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Metal/9. JSW... · SEC, JSW Steel, Vijayanagar 6.61 Gcal/TCS Gap in SEC 1.14 Gcal/TCS

Energy Management System

Identify Opportunities,

Plan

Management

Energy Policy

Energy TeamEnergy Coordinators

PLAN

DO

CHECK

ACT

Execute Action Plan

Review and Improve

Recognize Achievement

Measure MonitorAnalysisAudits

Continual Improvement

HOD DWM Board Analysis

EMC Monitoring

Online Measurement

Heat RecoveryTRTWHRB

External Audit

DMD – Energy Review(Monthly )

PRESIDENT –Energy Review(Weekly)

HOD - Energy Gap (Daily)-DWM

RHF, WHRB CH4 Recovery WHR-Coke Drying

Page 7: Energy Management 2017 - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Metal/9. JSW... · SEC, JSW Steel, Vijayanagar 6.61 Gcal/TCS Gap in SEC 1.14 Gcal/TCS

Daily Energy Report

Page 8: Energy Management 2017 - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Metal/9. JSW... · SEC, JSW Steel, Vijayanagar 6.61 Gcal/TCS Gap in SEC 1.14 Gcal/TCS

Parameters UOMTarget as per BP (A)

Avg TillJune 17

July 2017

Avg Till July 17 (B)

Variance of SEC (C=B-A)

Total dry solid fuel rate in BF1 Kg/Tp 572 570 567 569

0.007Total dry solid fuel rate in BF2 Kg/Tp 564 565 570 566

Total dry solid fuel rate in BF3 Kg/Tp 533 531 534 532

Total dry solid fuel rate in BF4 Kg/Tp 526 527 531 528

Total solid fuel rate in Cx (Wet) Kg/Tp 974 1009 1008 1009 0.049

Solid Fuel rate i.e

Kg/Tp 57 58.8 58.8 58.8 0.009(Coke breeze & Anthracite) SP

Sinter Plant 2 WHRS steam Gen TPH

55

10.2 10.3 10

0.006Sinter Plant 3 WHRS steam Gen TPH 15.5 22.9 17

Sinter Plant 4 WHRS steam Gen TPH 12.7 12.6 13

LD Gas recovery Nm3/Tls 89 96.7 95.1 96 0.013

CPP#2 WHR power generation MW 26 29 28 29 0.006

Misc (Sp Gases, Power ) Gcal/Tcs

0.148Sp Power (Excl O2, DRI & CDQ) MW 661 649 638.3 646

LS to HM Ratio Ton/Ton 1.041 1.022 1.024 1.023

LPG Consumption TPD 23.33 21.8 23.7 22.3

Specific energy consumption Gcal/Tcs 6.537 6.743 6.72 6.737 0.200

Crude Steel production Tons/day 31,361 30,882 30,460 30,777 584

CO2 Emission TCO2/TCS 2.501 2.647 2.694 2.659 0.158

EOC Report, Vijayanagar

Page 9: Energy Management 2017 - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Metal/9. JSW... · SEC, JSW Steel, Vijayanagar 6.61 Gcal/TCS Gap in SEC 1.14 Gcal/TCS

Energy Coordinators Responsibilities

Department coordinator will establish an improved data recording, collection

and analysis system to keep track of energy consumption in coordination with

EMD.

Developing baselines to quantify energy impacts in coordination with EMD.

Evaluate the operating performance of facility systems and equipment to

determine improvement potential in coordination with EMD.

Monitor all the energy parameter and will communicate to concerned within the

time for corrective measure.

Identity energy saving opportunities and implementation with help of

management based on feasibility.

Page 10: Energy Management 2017 - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Metal/9. JSW... · SEC, JSW Steel, Vijayanagar 6.61 Gcal/TCS Gap in SEC 1.14 Gcal/TCS

Energy Consumption Over YrsSustenance With Increased Throughput

6.89 6.61 6.62 6.62 6.61

7.808.40

9.309.90

11.10

0.0

2.0

4.0

6.0

8.0

10.0

12.0

FY 13 FY 14 FY 15 FY 16 FY 17

SEC Gcal/Tcs Crude Steel Mtpa

Page 11: Energy Management 2017 - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Metal/9. JSW... · SEC, JSW Steel, Vijayanagar 6.61 Gcal/TCS Gap in SEC 1.14 Gcal/TCS

Si No

Project SavingFunds

Investment in Rs Crs

Potential Savings (Gcal)

Potential Savings

(Gcal/TCS)

Potential CO2

reduction (TCO2)

1 BF Gas Supply to CPP 3 & 4 Coal Saving 2.42 1,305,600 0.167 635,447

2 Coke dry quenching in CO 3 & 4 Coal Saving 837 2,028,605 0.260 805,061

3Sinter cooler waste heat recovery in SP 2, 3 & 4

Coal Saving 71.3 465,071 0.060 173,866

4Hot stove waste heat recovery from BF 3 & 4

Fuel gas saving

14.6 81,506 0.010 16,312

5 Coke oven gasline to JSWEL Coal Saving 0.012 105,264 0.013 24,578

6 De-Aerator at 3*25TPH boilerEfficiency Improvement

0.2 1,085 0.0004 -

Total 925.532 3,987,131 0.510 1,655,264

Projects Implemented 2013-14

Page 12: Energy Management 2017 - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Metal/9. JSW... · SEC, JSW Steel, Vijayanagar 6.61 Gcal/TCS Gap in SEC 1.14 Gcal/TCS

SlNo

Project SavingFunds

Investment in Rs Crs

Potential Savings (Gcal)

Potential Savings

(Gcal/TCS)

Potential CO2

reduction (TCO2)

120TPH BF gas fired process steam boiler

Coal Saving 11.5 60,586 0.006 43,467

2DRIEG in GMS-1 for Mixed gas generation

Improvement in power generation at CPP 1

0.4 180,222 0.019 71,522

3DRI gas line to power plant SBU I, SBU II, CPP3 and CPP4 for maximum utilization

Reduction in DRI Flare & equivalent Coal saving

70 459,022 0.049 182,165

Total 81.9 699,830 0.074 297,154

Projects Implemented 2014-15

Page 13: Energy Management 2017 - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Metal/9. JSW... · SEC, JSW Steel, Vijayanagar 6.61 Gcal/TCS Gap in SEC 1.14 Gcal/TCS

SlNo

Project SavingFunds

Investment in Rs Crs

Potential Savings (Gcal)

Potential Savings

(Gcal/TCS)

Potential CO2

reduction (TCO2)

1Conversion of Corex GH into LD Gas holder

Increased LD Gas recovery

13.4 228902 0.02 95991

2Dynamic Pressure set point for HP Oxygen PRV

Oxygen saving

Nil 168087 0.02 36047

3Nitrogen injection in vaporized LPG

LPG Savings 0.0 52560 0.01 13074

4Installation of Top recovery turbine @ Blast Furnace 1

Electricity Generation

0.4 85042 0.01 35663

Total 13.8 534591 0.05 180775

Projects Implemented 2015-16

Page 14: Energy Management 2017 - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Metal/9. JSW... · SEC, JSW Steel, Vijayanagar 6.61 Gcal/TCS Gap in SEC 1.14 Gcal/TCS

SlNo

Project SavingFunds

Investment in Rs Crs

Potential Savings

(Gcal)

Potential Savings

(Gcal/TCS)

Potential CO2

reduction (TCO2)

1Condensate heat recovery system @ 60 TPH boiler

Electricity Generation

0.34 8906 0.0014 1861

2Optimum utilization of oxygen by load management

Oxygen saving

Nil 4104 0.0004 880

2Increased DRI consumption due to up gradation of Gas mixing station

Reduced DRI flaring

1.52 15587 0.001 -

3Interconnection of 60 TPH and 20 & 25 TPH steam network

Reduction of Steam import

3.00 31600 0.003 22692

4VFD Drives for CEP & ID fan of CPP 4

Power Saving 2.57 6048 0.001 -

Total 7.43 66245 0.01 25433

Projects Implemented 2016-17

Page 15: Energy Management 2017 - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Metal/9. JSW... · SEC, JSW Steel, Vijayanagar 6.61 Gcal/TCS Gap in SEC 1.14 Gcal/TCS

6.61

5.47

3.03.54.04.55.05.56.06.57.0

SEC, JSW Steel, Vijayanagar

Global Bench Mark ( JFE )

SEC in Gcal/TCS

Global Best in SEC

Global Bench Mark ( JFE ) 5.47 Gcal/TCS

SEC, JSW Steel, Vijayanagar 6.61 Gcal/TCS

Gap in SEC 1.14 Gcal/TCS

Note : JFE SEC Source CSR REPORT 2016

Actions planned to meet global Best

Strategy Impact

1) TRT for BF 2 0.02

2) HSM waste heat recovery for process steam 0.05

3) Automatic process control system at ASU 0.02

4) SP WHRS for coke drying 0.09

5) Optimisation of Solid fuels 0.20

6) Off Gas recovery system for new SMS 0.04

7) Rebuilding of CO 1& 2 0.18

8) Improving the gas utilization 0.13

9) Improve % of hot charging in Mills 0.01

10) Charge mix in SMS EAF 0.18

11) Quality Raw material 0.12

12) Increase energy efficiency of HPT & energy efficient fan blade in CT of CPP

0.05

13) Methane recovery replacing LPG using COG 0.01

14) Improving the productivity 0.05

Overall Impact 1.15

Page 16: Energy Management 2017 - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Metal/9. JSW... · SEC, JSW Steel, Vijayanagar 6.61 Gcal/TCS Gap in SEC 1.14 Gcal/TCS

Power Generation Vs Consumption

6%

94%

Import from JSWEL

Consumption from Captive Power

856MW57MW

Generation is 920 MW Complex Consumption is 913MW

Power Generated from fuel Gas & Waste Heat is 66.84%

of Complex consumption607 MW

Net Generation is 856 MW

29%

59%

3%8%1%

CPP- Gas

CPP-Coal

TRT

CDQ

SIP

Page 17: Energy Management 2017 - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Metal/9. JSW... · SEC, JSW Steel, Vijayanagar 6.61 Gcal/TCS Gap in SEC 1.14 Gcal/TCS

Best Practices Replicated on Energy Front through Associates

S.No

Name of associate / vendor

Name of service

provided to vendor

Per unit Energy consumed prior to implementing

Encon

Per unit energy consumed after

implementation of Encon

% improvement

Type of inputs / projects

provided to the vendor/

associate

1

LindeIndia Ltd,1800 Tpd

Electricity for Plant Operation

Specific power consumption

0.64KWH/NM3

Specific power consumption

0.61KWH/NM34.68

Power, water, LPG and Mixed gas.

2 JSWIGPLElectricity for Plant Operation

Loss of 1.5MT Argon

Loss of Argon Nil 15kwh SavingPower, water, LPG

and Mixed gas.

Page 18: Energy Management 2017 - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Metal/9. JSW... · SEC, JSW Steel, Vijayanagar 6.61 Gcal/TCS Gap in SEC 1.14 Gcal/TCS

Total waste used as fuel 65.54% of Total

Energy consumed

SlNo

Type of Waste Fuel usedQuantity of waste fuel used Annual

UOMEquivalent of

Conventional energy used (kWh of electricity )

Waste fuel as % of total

energy

1Coal fines and dust from RMHS, Corex

1962715 Tons 5070348 25.23

2 Granulated slag 7791015 Tons 3473494 17.28

3 Sludge 245788 Tons 268830 1.34

4 Flue Dust 244542 Tons 267468 1.33

5 Tar 122375 Tons 433410 2.16

6 Process steam from WHRS 394264 Tons 113351 0.56

7 Electricity from WHRS 238200 MWH 238200 1.19

8 TRT Power generation 181598.5 MWH 181599 0.90

9 Corex 4539135 Gcal 1891306 9.41

10 BF gas 11337150 Gcal 4723813 23.51

11 CO gas 6454803 Gcal 2689501 13.38

12 LD gas 1787936 Gcal 744973 3.71

Total 20096294

Recycling of waste

Page 19: Energy Management 2017 - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Metal/9. JSW... · SEC, JSW Steel, Vijayanagar 6.61 Gcal/TCS Gap in SEC 1.14 Gcal/TCS

Waste Utilization-Slag

As Agreegate

Crusher

Dry Pit Slag

850 TPD

PSC/GGBFS

Cement

11200 TPD

Slag Sand

Sand

314 TPD

GBF

10400 TPD

Iron Making Slag

Sand Blasting

PS Balls

50 TPD

As Aggregate

Crusher

876 TPD

EAF slag

Cement Plant

50 TPD

Iron Making

388 TPD

Bund Making

4627 TPD

Metallics

1172 TPD

Crushing

6160 TPD

Steel Slag

6241 TPD

76%Present 91%Future

Actions Planned:

1. Dry pit slag , EAF PS Balls & EAF Slag to be sold as aggregate

2. Steam aging of LD Slag ( +10 mm)

3. HMDS Slag to be used in Sinter making

4. LHF Slag for cement making

5. LD Slag fines for bund making 19

Page 20: Energy Management 2017 - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Metal/9. JSW... · SEC, JSW Steel, Vijayanagar 6.61 Gcal/TCS Gap in SEC 1.14 Gcal/TCS

Waste Utilization-Dust and Sludge

Iron makingGCP sludge

Cyclone dust

Sinter plantESP dust

DRIGCP sludge

SMSGCP sludgeMill scale

HSMMill scale

CRMOxide dustETP sludge

Coke ovenCDQ fines

LP MillsSludge

Mill scale

Cement PondPond sludge

Bag filter dust

SMSIron making

RMHSLCP

MPP

MSB

WWP

Basemix

SP

SMS

PP

SP

Processed at

Used at

Source

Page 21: Energy Management 2017 - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Metal/9. JSW... · SEC, JSW Steel, Vijayanagar 6.61 Gcal/TCS Gap in SEC 1.14 Gcal/TCS

Environmental Initiatives

1. Sewage Treatment by MBR

Treated sewage to meet potable water quality

Replaced 3000 m3/day of fresh water

MBR+ RO + Evaporator

4000 m3/day

Replace fresh water

2. ZLD at Coke Oven

Oil removal

Recovery of alkali

Reduces footprint by 25%

3. Ceramembrane

4. EAF Slag Atomisation

600 TPD PS Balls

Use in sand blasting

5. Peripheral Greenery Development

287 Acres. FY16: 213 Acre

Approved by MoEFCC

6. CO2 Injection in BOF

Water saving: 1000 m3/day

Page 22: Energy Management 2017 - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Metal/9. JSW... · SEC, JSW Steel, Vijayanagar 6.61 Gcal/TCS Gap in SEC 1.14 Gcal/TCS

8. Waste to Wealth Plant

• 1000 TPD Sludge &

Dust recycle

• Fe in Product: 63%

9. River Sand Alternative

• 800 TPD capacity

• Included in IS 383-2016

First

in

India

First

in

India

• 650 TPD capacity

• Mill scale use inSecondary coolant in SMS

Value Addition Through Innovative Solid Waste Management

7. Mill Scale Briquetting plant

First in

India

Page 23: Energy Management 2017 - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Metal/9. JSW... · SEC, JSW Steel, Vijayanagar 6.61 Gcal/TCS Gap in SEC 1.14 Gcal/TCS

2.91

2.76

2.81

2.68

2.60

FY 13 FY 14 FY 15 FY 16 FY 17

TRT in Blast Furnace 3 & 4

Fuel Gas flare reduction

WHRS at SP & BF Stoves

Gas fired Process Boiler

Optimum Utilization of DRI Gas

CO2 Emission, T CO2/TCS

TRT in Blast Furnace 1

Increased LD Gas recovery

EAF, DRI &

BRM-2

Page 24: Energy Management 2017 - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Metal/9. JSW... · SEC, JSW Steel, Vijayanagar 6.61 Gcal/TCS Gap in SEC 1.14 Gcal/TCS

18 193539 41

76

FY13 FY14 FY15

LPG Cons in TPD

TPD Crs/Annum

High LPG Cons due to

Capacity addition

Challenge & Thought process

Increase of LPG by 84% against 11%

production increase.

Return COG usage along with LPG

Food for thought

Value stream analysis

Why LPG

It is opted as fuel for most of the

applications due to its cleanliness,

reliability and not solely on heating value.

Nitrogen injection in vaporized LPG

Heating17%

Pilot41%

Oxy Fuel

Cutting42%

Understanding Needthrough Value stream

analysis

Project -1

Page 25: Energy Management 2017 - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Metal/9. JSW... · SEC, JSW Steel, Vijayanagar 6.61 Gcal/TCS Gap in SEC 1.14 Gcal/TCS

Static Mixing

Nitrogen injection in vaporized LPG

LPG-N2 Gas Mixing Station

Gas Mixing Station Logic

In House ideaDevelopment

Static mixing designed & Logic developed without external help

Injection of gaseous nitrogen in vaporised done beyond OEM

Implemented without taking shutdown in a

record time period of 12days with support of visionary leadership.

Project -1

Page 26: Energy Management 2017 - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Metal/9. JSW... · SEC, JSW Steel, Vijayanagar 6.61 Gcal/TCS Gap in SEC 1.14 Gcal/TCS

N2 Injection in

vaporized LPG

Fuel

substitution

0.0

5.0

10.0

15.0

20.0

25.0

30.0

35.0

40.0

45.0

50.0

0.5

0.6

0.7

0.8

0.9

1.0

1.1

Cru

de

ste

el

pro

du

ctio

n i

n M

TP

M

TCS in MTPM LPG in TPD

LP

G C

on

su

mp

tio

n in

TP

D

N2 injection started

Addition of new facilitiesDRI, CRM-2

Before N2 injection After N2 injection

18 19

35

24 21

39 41

76

5246

0

20

40

60

80

FY13 FY14 FY15 FY16 FY17

TPD Crs/Annum

LPG Savings TPD Rs Crs/Annum

Saving achieved 14 24-30

Nitrogen injection in vaporized LPG

Implemented idea taking risk, This self driven

project saving LPG beyond OEM

First time implementation on national level

Project -1

Page 27: Energy Management 2017 - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Metal/9. JSW... · SEC, JSW Steel, Vijayanagar 6.61 Gcal/TCS Gap in SEC 1.14 Gcal/TCS

-30000

-20000

-10000

0

10000

20000

30000

40000

1 8 15 22 29 36 43 50 57 64 71 78 85 92

To/From Buffer SMS Cons ASU Gen

Time in MinO

xyg

en

Flo

w in

Nm

3/H

r

Buffer

vessel

4*200 18

Bar

31

Bar

A

S

USMS

O2 from

Buffer

O2 to Buffer

O2 from

Buffer

O2 to Buffer

Oxygen Balance in Steel making

1St Cycle 2nd Cycle

Optimum utilization of oxygen

2712521344

98

175

0

50

100

150

200

0

10000

20000

30000

40000

50000

60000

2013-14 2014-15

Venting Nm3/Hr Liquid TPD

Supply set point 18Bar

Project -2

Page 28: Energy Management 2017 - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Metal/9. JSW... · SEC, JSW Steel, Vijayanagar 6.61 Gcal/TCS Gap in SEC 1.14 Gcal/TCS

High Pressure Oxygen Distribution

Demand 84275

ASU-1

CONV 1 & 2

CONV 3 & 4

CONV 1

CONV 2

CONV 3

Units – Nm3/Hr

Supply = 79775

15000

13000

23000

23000

5775

SM

S-2

15000

13000

23000

23000

SM

S-35775

Others LRS,HMPT Mills, etc

1500

AutoScarfing

3000

ASU-2

ASU-3

ASU-4

ASU-5

EAF

1995

2004

2006

2007

2012

SM

S-1

Optimum utilization of oxygen Project -2

Page 29: Energy Management 2017 - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Metal/9. JSW... · SEC, JSW Steel, Vijayanagar 6.61 Gcal/TCS Gap in SEC 1.14 Gcal/TCS

PlantFlow in

Nm3/Hr

Storage

volume in

NM3

Filling

time

ASU-1 15700 10400 40

ASU-2 13000 3250 15

ASU-3 23000 10400 27

ASU-4 23000 10400 27

ASU-5 5775 5200 54

Total 80475 39650 30

Solution Challenge

Interconnecting the HP oxygen lines i.e. 31 Bar.

Impractical considering different BOOoperators, Layout and feasibility of suchinterconnections

SS Ring Main of 18-20Bar with controlsystem.

Difficulty in ECR at 5 different oxygen plant, High investment, Shutdown of Plants and safety

Optimum utilization of oxygen Project -2

Page 30: Energy Management 2017 - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Metal/9. JSW... · SEC, JSW Steel, Vijayanagar 6.61 Gcal/TCS Gap in SEC 1.14 Gcal/TCS

Dynamic set-point control philosophy for each ASU independently

Proposal to have variable supply set point in a defined narrow range for PRV operation 18.0-18.6Bar, instead of fixed supply set point for effective utilization of Buffers

Buffer Pressure Set point to PRV

=> 27 Bar High set point

< 27 Bar with a

hysteresis of 6 BarLow set point

Optimum utilization of oxygen

2712521344

9569 9278

98

175

130

93

0

20

40

60

80

100

120

140

160

180

200

5000

15000

25000

35000

45000

55000

2013-14 2014-15 2015-16 2016-17

Venting Nm3/Hr Liquid TPD

0.02

Gcal/TCS0.001

Gcal/TCS

ASU participation in supplying oxygen based on its capability at that instant

Project -2

Page 31: Energy Management 2017 - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Metal/9. JSW... · SEC, JSW Steel, Vijayanagar 6.61 Gcal/TCS Gap in SEC 1.14 Gcal/TCS

LD Gas recovery

In contrast to Oxygen Generation and Buffer system, LD Gas will be

generated in batch wise process and ideally it will be supplied consistently by

utilizing Gas holder to consumers.

LD Gas was not fully recovered and fluctuating supply of LD Gas to network

was leading to delays in rolling mills due to limited Gas holder capacity.

OEM had suggested to install GH for Steel making unit-2, it was having

huge capex investment and area requirement.

If GH is commissioned at SMS-2 solving above all, Gas would have flaring

till its commissioning (higher lead time) and SMS-1 would remain handicapped

Project -3

Simulation used for explaining complex scenario effectively

Page 32: Energy Management 2017 - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Metal/9. JSW... · SEC, JSW Steel, Vijayanagar 6.61 Gcal/TCS Gap in SEC 1.14 Gcal/TCS

Power

plant

DDGV

GMS

LD-1

DN 2500

DN 1100

Mills

&

Boilers

LD-2

Mixed

Gasline

Corex

Gasline

DN 2500

Corex

GH

From

Corex 1&2

INLET

closed

OUTLET

CPP#1

GMS

2X60K BOOSTER

Control valve to

maintain GH level

Mix Gas

LD Gas

Corex Gas

BF Gas o Pressure & CV fluctuation

o Low Recovery due to controlled export

Proposed LD Line

Approx dist: 140Mtrs

Valve A Valve B

Conversion of Corex GH into LD GH Project -3

Page 33: Energy Management 2017 - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Metal/9. JSW... · SEC, JSW Steel, Vijayanagar 6.61 Gcal/TCS Gap in SEC 1.14 Gcal/TCS

70 73.0 74.085.4

93.2

FY 13 FY 14 FY 15 FY 16 FY 17

LD Gas Recovery Nm3/TLS

6165

3733

11 12 14

FY-16 Q-1

FY-16 Q-2

FY-16 Q-3

FY-16 Q-4

FY-17 Q-1

FY-17 Q-2

FY-17 Q-3

Mills Total Delay No of Hrs/Qtr

ImplementedImplemented

Conversion of Corex GH into LD GH Project -3

Savings– 0.02 Gcal/TCS

Page 34: Energy Management 2017 - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Metal/9. JSW... · SEC, JSW Steel, Vijayanagar 6.61 Gcal/TCS Gap in SEC 1.14 Gcal/TCS

SlNo

LocationArea in Acres

Solar Capacity

in MW

Estimated generation

in MW

1Raw Water Pond @Vidyanagar

265 76 12.87

2New Raw Water Pond @ Gonal

600 171 29.14

3 Vidyanagar Roof Top 12 3 0.49

4 V V Nagar Roof Top 7 2 0.28

5Shankar Hill Town Roof Top

10 2 0.40

6Industrial Shed Roof Tops (Mills)

125 31 5.31

Total 1018 285 48.50

Solar roof top projects in progress

Artist’s Impression Of a Floating Solar Power Plant

Mills Roof Top for Solar panel installation