1
assuranceconsulting.com.au THE STEPS IN THE AUDIT PROCESS: ENERGY EFFICIENCY PROJECT ST MICHAEL’S COLLEGE & ELC THE CHALLENGE: St Michael’s wanted to invesgate ways to reduce their increasing electricity costs. THE SOLUTION: In May 2016 St Michael’s engaged Assurance Consulng to conduct an Electrical Energy Efficiency Audit for the College & Early Learning Centre (ELC) to idenfy exactly where & how St Michaels could save energy & money. STEP 1: Collect & analyse energy consumpon data STEP 2: Walk through Audit STEP 3: Calculate energy consumpon & savings potenals STEP 4: Create integrated soluons STEP 5: Present findings & soluons STEP 6: Implement Soluons THE INTEGRATED SOLUTION LED Lighng Solar PV System Power Factor Correcon Circuit Timers Tariff Adjustments Behavioural Change Even aſter one month of power supply subsequent to project compleon, the savings predicted by Michael are already flowing through by showing a substanal decrease in our electricity expenditure. It has been an absolute pleasure dealing with Assurance Consulng. - Steve Pardy Finance Manager, St. Michaels College, Nov 2016 The Solar PV Systems were installed during the September School holidays with the remainder of the project installed soon aſter. Implemented by Assurance Solar & Electrical as part of a total turn key soluon for the School. Project completed on me & within budget, with minimum impact on school operaons.

ENERGY EFFICIENCY PROJECT ST MICHAEL’S COLLEGE & ELC

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ENERGY EFFICIENCY PROJECT ST MICHAEL’S COLLEGE & ELC

assuranceconsulting.com.au

THE STEPS IN THE AUDIT PROCESS:

ENERGY EFFICIENCY PROJECTST MICHAEL’S COLLEGE & ELC

THE CHALLENGE:St Michael’s wanted

to investigate ways to reduce their increasing

electricity costs.

THE SOLUTION:In May 2016 St Michael’s

engaged Assurance Consulting to conduct an Electrical Energy Efficiency Audit for the College & Early Learning Centre (ELC) to identify exactly where & how St Michaels could save energy &

money.

STEP 1: Collect &

analyse energy consumption data

STEP 2: Walk through

Audit

STEP 3: Calculate energy consumption &

savings potentials

STEP 4: Create integrated

solutions

STEP 5: Present findings

& solutions

STEP 6: Implement Solutions

THE INTEGRATED SOLUTION

LED LightingSolar PV System

Power Factor

Correction

Circuit TimersTariff AdjustmentsBehavioural Change

Even after one month of power supply subsequent to project completion, the savings predicted by Michael are already flowing through by showing a substantial decrease in our electricity expenditure. It has been an absolute pleasure dealing with Assurance Consulting.

- Steve PardyFinance Manager, St. Michaels College, Nov 2016

The Solar PV Systems were installed during the

September School holidays with the remainder of the

project installed soon after.

Implemented by Assurance Solar &

Electrical as part of a total turn key solution

for the School.

Project completed on time & within budget, with minimum impact on school operations.