Upload
gauravyex11
View
1.348
Download
3
Tags:
Embed Size (px)
Citation preview
Gaurav Katre M Tech 1st Year
Energy Conservation with Bruckner machinery
Be the First in Finishing
German Company
Run by Leonberg Family
Tailor-made Lines
Complete system for Textile Finishing
Bruckner
Continuous Increase in Energy Prices
Market is Competitive
Future investment in energy saving is important
Optimized energy efficiency production lines
ITMA ASIA 2010Power Frame Stenter Eco- Heat Eco- Air
Initiatives
POWER-FRAME stenter
New Generation StenterHighest PerformanceMinimum energy consumptionSplit flow SystemPatented Venturi nozzle: optimum mixture of
circulating and fresh airHomogenous air distribution : alternating air flow in
the thermo zones.Robust and low-maintenance chains
POWER-FRAME stenter
Save Hard cash with ECO Heat
Heat the fresh air or water by exhaust air
1. Air to Air : Heat of exhaust gases is used to heat the fresh air It can reduces process heat demand by 12 to 15% In case of dry heat setting it is upto 30%.
2. Air to Water: Water can be heated up to 900C Can be used directly to process/boiler feed water.
ECO Heat System
Line Diagram of Air / Air heating
Line Diagram of Air / Water heating
Incoming Water
Out going Water
Air In
Air Out
Energy savings of up to 35% depending on the process
Very short pay back time
Retrofit to older lines and machines supplied by other producers
Integrated into the stenter roof structure
Low floor space
Advantages of ECO Heat recovery
Combined Air/Air and Air/Water system.
ECO Air System Self-cleaning scrubber
zones
Electro static filter system
Offers air filtration in two stages through:Ionization Zone Collection Zone
This system filters air with 99% of efficiency
Available with integrated automatic cleaning unit
More efficient than devices only with ionization zone
Available in several sizes
High removal efficiency for aerosols and noxious gases
Low cost of operation
Robust design in stainless steel
Compact dimensions
Easy maintenance with compact filter modules: easy to remove and easy to clean
Advantages of Eco – Air
Temperature inside stenter 2200CExhaust Air Temperature 1400CHeat recovery system can recover 700C
Energy saving of up to approx. 20 %with 140°C dryer temperature
Energy saving of up to approx. 35 % with 190°C dryer temperature
Eco – Heat Statistic
Lucky Tex domiciled in KarachiOwing weaving mills, finishing, dyeing and drying
facilities as well as stitching unitTotal capacity of 225,000 meters /dayThree Bruckner Power Frame Stenters installed at
Lucky Tex for drying and heat-setting of woven fabrics Lucky Tex has installed ECO-HEAT back-pack – heat
recovery air/air integrated into the top of the dryer Integrated into the roof of the dryer Annual costs associated with stenter operations,
almost 60% of total annual costAlmost 25% cost reduction with a Bruckner heat
recovery
Case Study : Lucky Tex Processing Mill, Pakistan
Case Study : Lucky Tex Processing Mill, Pakistan
Bureau of Energy Efficiency (BEE) is implementing a BEE-SME Programme to improve the energy performance in 25 selected SMEs clusters
Pali Textile Cluster is one of them
Today there are over 350 units in Pali
Production of all of these combined together crosses 5.5 million meter per day
Energy account for 30% on total cost
Project Report On Installation Of Waste Heat Recovery System In Stenter at Pali
Electricity consumption for stenter alone in textile dyeing and processing units , 50%
Over 20% for electricity consumption
30% fuel consumption in power process industries
Pay back period of less than one year
Potential
Report on Detailed Project Report On Installation Of Waste Heat Recovery System In Stenter (Pali Textile Cluster) by Bureau of Energy Efficiency, Detail Project Report No.: PAL/TXT/WHR/15
www.bruckner.com Ali Hasanbeigi , Energy-Efficiency Improvement Opportunities for
the Textile Industry , Ernest Orlando Lawrence Berkeley National Laboratory, September 2010
Amina Baqai, Brückner Stenters and ECO-HEAT back-pack – heat recovery unit on dryer lower the energy consumption and other inputs at Lucky Tex Processing Mills, Pakistan textile journal, October 2012
http/: splitflowpumps.com S. Petra Lehner, systems supplier Brückner presents efficient
solutions, Pakistan textile journal, March 2011 Energy Saving Technologies: Spotlight of Finishing Sector , by
fibre2fashion
References
Thank You