MEMREnergy and Mineral Resources for Peolple’s Prosperity 1
MINISTRY OF ENERGY AND MINERAL RESOURCES REPUBLIC OF INDONESIA
ENERGY AS THE STRATEGIC RESOURCES TO FULFILL NATION’S GROWTH AND PROSPERITY, AND THE ROLE
AND PROSPECT OF GEOTHERMAL
Indonesia International Geothermal Convention and Exhibition (IIGCE) 2014 “Enhancing Geothermal Development to Meet Energy Demand Through Policy Breakthrough”
Jakarta , 4 June 2014
By:Minister of Energy and Mineral Resources
MEMREnergy and Mineral Resources for Peolple’s Prosperity 2
CONTENTS
I. INDONESIAN ARCHIPELAGO
3
II. BACKGROUND
4
III.GEOTHERMAL POTENTIAL RESOURCES
5
IV.POLICY AND LEGAL FRAMEWORK
7
V. CHALLENGES IN GEOTHERMAL
DEVELOPMENT
10
VI.INVESTMENT OPPORTUNITIES
11
VII.CONCLUSION
12
MEMREnergy and Mineral Resources for Peolple’s Prosperity 3
Republic of IndonesiaRepublik Indonesia
Flag National emblemMotto: "Bhinneka Tunggal Ika" (Old Javanese)
"Unity in Diversity"National ideology: PancasilaAnthem: Indonesia Raya
Capitaland largest city
Jakarta6°10.5′S 106°49.7′E
Official languages Indonesian
Area - Land 1,904,569 km2 (15th)
735,358 sq mi - Water (%) 4.85
Population - 2011 census 237,424,363 (4th) - Density 124.66/km2 (84th)
322.87/sq miGDP (nominal)
- Total $946.391 billion (16th) - Per capita $3,816(105th)
I. INDONESIAN ARCHIPELAGO
Source : Wikipedia (2013)
MEMREnergy and Mineral Resources for Peolple’s Prosperity 4
Oil
20 %
Gas30 %
Coal 33 %
NRE17 %
Gov. Reg. NO. 5/2006
CURRENT ENERGY CONDITION
II. BACKGROUND
Oil 49,7 %
Gas 20,1 %
Coal24,5 %
NRA5,7%
INDONESIA AS NET OIL IMPORTER
TOTAL PRIME ENERGY: 1176 JUTA BOE
CURRENT CONDITION 2025
Note:NRE = New and Renewable EnergyNEP = National Energy PolicyNEB = National Energy Board
MEMREnergy and Mineral Resources for Peolple’s Prosperity 5
PLTP SIBAYAK: 12 MW
PLTP GUNUNG SALAK: 377 MWPLTP WAYANG WINDU: 227 MW
PLTP KAMOJANG: 200 MW
PLTP DARAJAT: 270 MW PLTP DIENG: 60 MW
PLTP LAHENDONG: 80 MW
Note:
Installed
Ready to be developed
Detail Survey
Preliminary Survey
PLTP ULUBELU: 110MW
PLTP ULUMBU: 5 MW
No IslandNumber of
LocationTotal Installed
1 Sumatera 93 12.837 1222 Java 71 9.757 11343 Bali-Nusa Tenggara 33 1.872 7,54 Kalimantan 12 145 5 Sulawesi 70 3.153 806 Maluku 30 1.071 7 Papua 3 75 Total 312 28.910 1.343,5
Source: Geological Agency, MEMR (2013)
III. GEOTHERMAL POTENTIAL RESOURCES (1/2)
MEMREnergy and Mineral Resources for Peolple’s Prosperity 6
6
ACEH 2 WKP Jaboi: 70 MW Seulawah Agam: 130 MW
NORTH SUMATERA 5 WKP Sibayak – Sinabung: 130 MW Sibual – Buali: 750 MW Sipaholon Ria-ria: 75 MW Sorik Marapi: 200 MW Simbolon Samosir : 155 MW
JAMBI 1 WKP Sungai Penuh: 70
MW SOUTH SUMATERA 2 WKP Lumut Balai: 250 MW Rantau Dedap: 106 MW
BANTEN 2 WKP Kaldera Danau Banten: 115 MW G. Endut: 80 MW
WEST SUMATERA 4 WKP Bukit Kili: 83 MW Gn Talang: 35 MW Liki Pinangawan: 400 MW Bonjol: 200 MW
LAMPUNG 4 WKP Gn.Rajabasa: 91 MW Suoh Sekincau: 230 MW Waypanas – Ulubelu: 556
MW Way Ratai :105 MW
WEST JAVA 10 WKPCiater - Tgkban Perahu: 60 MW Cibeureum–Parabakti: 485 MWCibuni: 140 MWCisolok Cisukarame: 45 MWGn. Tampomas: 50 MWGn. Tgkuban Perahu: 100 MWKamojang-Darajat: 1465 MWKaraha Cakrabuana: 725 MWPangalengan: 1106 MWG. Ciremai: 150 MW
CENTRAL JAVA 5 WKP Baturaden: 175 MW Dataran Tinggi Dieng: 780 MW Guci: 79 MW Gn. Ungaran: 100 MW Umbul Telomoyo : 72 MW EAST JAVA 3 WKP
Blawan – Ijen: 270 MW Gn. Iyang Argopuro: 295 MW Telaga Ngebel: 120 MW
BALI 1 WKP Tabanan: 276 MW
WEST NUSA TENGGARA 2 WKP Hu'u Daha: 65 MW Sembalun : 100 MW
EAST NUSA TENGGARA 5 WKP Atadei: 40 MW Sokoria: 30 MW Ulumbu: 199 MW Mataloko: 63 MW Oka Ile Ange : 40 MW
MALUKU 1 WKP Tulehu: 100 MW
NORTH MALUKU 2 WKP Jailolo: 75 MW Songa Wayaua: 140 MW
NORTH SULAWESI 2 WKP Kotamobagu: 410 MW Lahendong-Tompaso: 358 MW
GORONTALO 1 WKP Suwawa: 110 MW
CENTRAL SULAWESI 2 WKP Marana: 35 MW Bora Pulu : 152 MW
Total : 58 GWA
BENGKULU 2 WKP Tmbg Sawah-Hululais: 873 MW Kepahiyang : 180 MW
CENTRAL JAVA & EAST JAVA 1 WKP Gunung Lawu : 195 MW
SOUTH SUMATERA & LAMPUNG 1 WKP Danau Ranau: 210 MW
Lisence – Issued : 38 GWAsTender on Progress : 2 GWAsTender Preparation : 13 GWAsTender – Failed : 5 GWAs
III. GEOTHERMAL POTENTIAL RESOURCES (2/2)
MEMREnergy and Mineral Resources for Peolple’s Prosperity 7
Geothermal Potential
Preliminary Survey
ExplorationFeasibility
StudyExploitation Utilization
Government/ Local Gov./
Business EntitiesBusiness Entities
Geothermal Business Permit (IUP)
Determination of GWA
Tender Process
IUP Issuance
GEOTHERMAL BUSINESS PROCESS
Note: - GWA : Geothermal Working Area (concession)
IV. POLICY AND LEGAL FRAMEWORK (1/3)
MEMREnergy and Mineral Resources for Peolple’s Prosperity 8
Direktorat Jenderal Energi Baru, Terbarukan dan Konservasi EnergiKementerian Energi dan Sumber Daya Mineral
Law No. 27/2003 On Geothermal.
Government Regulation No. 59/2007 on Geothermal Bussiness Activities.
Presidential Regulation No. 04/2010 on Assignment to PT. PLN (Persero) to Accelerate The Development of Power Plant from Renewable Energy, Coal and Gas
Ministry Regulation of Minister of Energy And Mineral Resources1) MR No. 11/2008 on the Procedure for GWA Determination
2) MR No. 02/2009 on Guidelines for Geothermal Preliminary Survey Assignment (as amendment of MR. 05/2007)
3) MR No. 11/2009 on Guidelines for Implementation of Geothermal Business , jo. MR No. 18/2012
4) MR No. 21/2013 on Revision of MR No. 15/2010 on The List of Power Plant Acceleration Projects Using Renewable Energy, Coal, and Gas and Related Transmission
IV. POLICY AND LEGAL FRAMEWORK (2/3)
MEMREnergy and Mineral Resources for Peolple’s Prosperity 9
1. Improving and harmonizing regulations in Geothermal Business;
2. Developing a comprehensive pricing structure;
3. Provide fiscal incentives for geothermal development;
4. Joint agreement between Ministry of Energy and Mineral Resorces and Ministry of Forest;
5. Acceleration program in electricity generation, geothermal power is expected to contributed 4,965 MW;
6. Government guarantees on the feasibility of PT. PLN.
IV. POLICY AND LEGAL FRAMEWORK (3/3)
MEMREnergy and Mineral Resources for Peolple’s Prosperity 10
Land-use IssuesMost identified reservoirs lie underneath forestry areas. It is estimated that up to 70 percent of the potential geothermal resources are located within forestry areas (conservation forest, protected forest and production forest).
Solution:Improving and harmonizing regulations regarding geothermal (Amend Law No. 27/2003 on Geothermal).
PricingElectricity price from geothermal energy still considers has not reached its economic value;
Solution:Restructure the tariff model based on region and commercial on date (New MR for new geothermal energy tariff).
V. CHALLENGES IN GEOTHERMAL DEVELOPMENT
MEMREnergy and Mineral Resources for Peolple’s Prosperity 11
Recent Updates: Determined of 9 new WKPs with potential of 1.030 MW:
Graho Nyabu: 200 MW Gn. Talang – Bukit Kili: 65 MW Gn. Arjuno Welirang: 185 MW Gn. Pandan: 60 MW Gn. Wilis: 50 MW Songgoriti: 35 MW Gn. Gede Pangrango: 85 MW Gn. Hamiding: 265 MW Talaga Ranu: 85 MW
9 WKPs are going to be tendered in the near future; 12 Preliminary Survey Assignment on new prospect area.
VI. INVESTMENT OPPORTUNITIES
MEMREnergy and Mineral Resources for Peolple’s Prosperity 12
Indonesia holds tremendous geothermal power potential; Installed capacity of geothermal power plant is only1,343.5 MW; Optimum utilization will significantly reduce dependence on fossil fuel
and improve national energy security; Restructuring Geothermal Business to allow private participation in
geothermal development; Whilst some supporting policies are in place, acceleration of
geothermal development in Indonesia needs international support in terms of finance, technology, human resources as well as technical assistance.
VII. CONCLUSION
MEMREnergy and Mineral Resources for Peolple’s Prosperity 13
Go Green Indonesia !
www.ebtke.esdm.go.id
Thank You
Pegangsaan Timur Street No. 1A Cikini, Jakarta 10320; Phone/Fax : +6221-31924540e-mail: [email protected]
MINISTRY OF ENERGY AND MINERAL RESOURCES
DIRECTORATE GENERAL OF NEW RENEWABLE ENERGY AND ENERGY CONSERVATION
MEMREnergy and Mineral Resources for Peolple’s Prosperity 14
Direktorat Jenderal Energi Baru, Terbarukan dan Konservasi EnergiKementerian Energi dan Sumber Daya Mineral
Road Map of Geothermal Development until 2025 can be described in the following table :
Development Plan Installed (MW)
Development Plans (MW)
2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Addition power plant capacity (MW) 1.343,5 115,0 2,5 62,0 35,0 279,0 553,5 1.223,5 1.420,0 890,0 264,0 339,0 690,0 30,0 75,0
Total Development Capacity (MW) 1.343,5 1.341,0 1.343,5 1.405,5 1.440,5 1.719,5 2.273,0 3.486,5 4.926,5 5.816,5 6.080,5 6.419,5 7.109,5 7.139,5 7.214,5
ROADMAP OF GEOTHERMAL DEVELOPMENT UNTIL 2025
The development plans can be achieved with the following note: 1. To harmonized regulation across sectors (MEMR, Forestry, Finance, Local Government, etc.);2. Simplification of licensing in the geothermal sector; 3. Optimizing the geothermal potential at large fields managed especially PGE’s GWA; 4. The price of electricity from geothermal energy, fit to the economic development of the field; 5. The policies of national banking that support geothermal development;
GEOTHERMAL DEVELOPMENT POLICY AND STRATEGIES
MEMREnergy and Mineral Resources for Peolple’s Prosperity 15
Prominent development / leading program for geothermal sector for the last 6 years are :
1. 58 Geothermal Working Areas (GWA) has been stated consist of : 19 existing GWA; dan 39 GWA after Indonesian Law No 27 Years 2003.
2. Geothermal power plant Installed capacity reached 1,343,5 MW in 2014;
3. Total steam production from 2009 to 2014 reached 419,868,437 Tons;
4. Total electricity production from 2009 to 2014 reached 56,452,771 MWh;
5. Realization of Investment from 2009 to 2013 reached IDR. 21.16 Trillion;
6. Realization of Revenues of Government Shares Realisasi from 2009 to 2013 reached IDR 4.734,76 Billion, consist of: Component of Tax amount IDR 1,499.57 billion ; State revenue (non-tax revenue) amount IDR 2,045.78 billion.
PERFORMANCE ACHIEVEMENTS OF GEOTHERMAL ENERGY SECTOR
DEVELOPMENT YEARS 2009 – 2014
MEMREnergy and Mineral Resources for Peolple’s Prosperity 16
Note :Currency 1 USD = IDR 12.000*) Target
No. Indikator Kinerja SatuanTahun
2009 2010 2011 2012 2013 2014*
1. GWA Determination Amount GWA 5 3 5 8 6 6
2. Geothermal Power Plant Installed Capacity MW 1.189 1.189 1.226 1.336 1.343,5 1.405,5
3. Steam Production Thousands Ton 68.059,9 69.391,2 68.723,4 68.769,7 69.295,6 75.628,4
4. Electricity Production GWh 9.184 9.259 9.253,8 9.355,9 9.332,3 10.067,6
5. Realization of Investment IDR Billion 2.437 2.327 2.457 2.077 4.514 7.348
6. Revenues of Government Shares IDR Billion 821,15 803,36 898,46 1.140,00 1.071,79 579,65
PERFORMANCE ACHIEVEMENTS OF GEOTHERMAL ENERGY SECTOR
DEVELOPMENT YEARS 2009 – 2014