23
Energy for us all, Energy for the FUTURE Energy Absolute

Energy Absolute · 2021. 1. 26. · EV Business, 1,506 , 45% Charging Stations 426 13% Bio Diesel & PCM 73 2% New Power Projects 126 4% THB 3,354 mil. Investment Plan Progress / Target

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Energy Absolute · 2021. 1. 26. · EV Business, 1,506 , 45% Charging Stations 426 13% Bio Diesel & PCM 73 2% New Power Projects 126 4% THB 3,354 mil. Investment Plan Progress / Target

Energy for us all, Energy for the FUTURE

Energy Absolute

Page 2: Energy Absolute · 2021. 1. 26. · EV Business, 1,506 , 45% Charging Stations 426 13% Bio Diesel & PCM 73 2% New Power Projects 126 4% THB 3,354 mil. Investment Plan Progress / Target

E@ at Glance

Credit Rating

Corporate rating : A

CG Rating

Excellent

Market Capitalization (as of 21.01.21)

Approximately THB 236.855 bil. (US$ 7.90 bil.)Somphote

Ahunai (CEO), 43.61%

Domestic Fund, 11.35%

Foreign Juristic, 18.90%

Others, 26.15%

As at 20 March 2020

Shareholder Structure

Total Board Members = 11

Independent

Directors = 6 (55%)

Executive

Directors = 2 (18%)

Other

Non - Executive = 3 (27%)

A

2

Page 3: Energy Absolute · 2021. 1. 26. · EV Business, 1,506 , 45% Charging Stations 426 13% Bio Diesel & PCM 73 2% New Power Projects 126 4% THB 3,354 mil. Investment Plan Progress / Target

Q3

/20

20

9M

/20

20

Net ProfitTotal Revenue

THB 3,801 mil.

decrease 7.69% YOY

THB 2,194 mil.

decrease 19% YOY

THB 12,738 mil.

increase 17% YOY

THB 6,912 mil.

decrease 2% YOY

EBITDA

THB 1,119 mil.

decrease 33% YOY

THB 3,720 mil.

decrease 14% YOY

Highlight of Operating Performance

3

Page 4: Energy Absolute · 2021. 1. 26. · EV Business, 1,506 , 45% Charging Stations 426 13% Bio Diesel & PCM 73 2% New Power Projects 126 4% THB 3,354 mil. Investment Plan Progress / Target

Renewable

Power

Energy

Storage

Electric

Vehicle

Palm Oil

Based

Charging

Network

(1) COD •Solar 278 MW•Wind 386 MW

(2) New Projects

(1) Amita Taiwan 400 MWh

(2) Amita Thailand 1 GWh (by 2020)

(1) MPV car : Mine(2) Ferry (3) Bus & Truck(4) Other Related

(1) B100 & Glycerin(2) Bio-PCM &

Green Diesel(3) Other Related

(1) Station(2) Equipment(3) Online App

4

Page 5: Energy Absolute · 2021. 1. 26. · EV Business, 1,506 , 45% Charging Stations 426 13% Bio Diesel & PCM 73 2% New Power Projects 126 4% THB 3,354 mil. Investment Plan Progress / Target

Our Performance

Page 6: Energy Absolute · 2021. 1. 26. · EV Business, 1,506 , 45% Charging Stations 426 13% Bio Diesel & PCM 73 2% New Power Projects 126 4% THB 3,354 mil. Investment Plan Progress / Target

921 982 1,860 1,504 1,278

2,696

4,642 3,118 3,047 2,766

2,611 2,419

7,923

7,796

64 55 106

13 77

180

196

4,118 4,109 4,761

4,175 3,801

10,842

12,737

-

2,000

4,000

6,000

8,000

10,000

12,000

14,000

16,000

Q3/2019 Q4/2019 Q1/2020 Q2/2020 Q3/2020 9M19 9M20

Mil.bt.

Other revenue

Other Businesses

Power

BiodieselGlycerin

Total Revenue of 3Q/2020Revenue for Q3/2020 period decreased from Wind Power

Total Revenue decreased 7% YoY

Biodiesel25%

Power73%

Others2%

Biodiesel37%

Power61%

Others2%

9M/2020

• Amount of revenue contributed from power business dropped

YoY because weak wind speed

• Stronger demand of B100 as required to use

B10 caused the revenue from biodiesel increased 39% YoY

9M/2019

6

Page 7: Energy Absolute · 2021. 1. 26. · EV Business, 1,506 , 45% Charging Stations 426 13% Bio Diesel & PCM 73 2% New Power Projects 126 4% THB 3,354 mil. Investment Plan Progress / Target

Renewable Power Production664 MWEA Solar Lampang

(90 MW)

EA Solar Nakornsawan(90 MW)

EA Solar Phitsanulok(90 MW)

EA Wind Hadkanghun(126 MW)

(Songkla & Nakornsri tammarat)

EA Wind Hanuman(260 MW)

(Chaiyaphum)EA Solar Lopburi(8 MW)

Output Production

140 162 155 175 149

465 479277 219 198 146 157

542 501

417 381 353 321 306

980

0

200

400

600

800

1000

Q3/19 Q4/19 Q1/20 Q2/20 Q3/20 9M19 9M20

Mil. kWh

Solar

Wind

7

Page 8: Energy Absolute · 2021. 1. 26. · EV Business, 1,506 , 45% Charging Stations 426 13% Bio Diesel & PCM 73 2% New Power Projects 126 4% THB 3,354 mil. Investment Plan Progress / Target

Gross Profit of 3Q2020

Gross Profit Margin Q3/19 Q3/20

Biodiesel Business -5% 11%

• Higher demand of CPO from the government measurement announcing B10 to be used as regular diesel

Power BusinessSolarWind

80%76%

80%55%

• Solar farms had received good sun irradiation and produced more electricity.• Due to the 3nd quarter had low wind speed, so the wind farms showed weaker

performance than the same previous year.

Total GPM 56% 46%2,503 2,436 1,861 1,687

6,167 5,623

(43)

67 89

140

(15)

320

(95) (126) (65) (97) (230) (235)

2,365 2,377 1,885 1,730

5,922 5,708

(1,000)

-

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

9,000

10,000

Mil.bt.

Power BU.

Biodiesel BU.

Others BU.

Q3/19 Q4/19 Q2/20 Q3/20 9M19 9M20

Note: Total Revenue and Net Profit are excluded Accounting Gain, Other Income, Gain/Loss from exchange rate.

8

Page 9: Energy Absolute · 2021. 1. 26. · EV Business, 1,506 , 45% Charging Stations 426 13% Bio Diesel & PCM 73 2% New Power Projects 126 4% THB 3,354 mil. Investment Plan Progress / Target

Financial Cost and Payment Profile

Total Interest Bearing Debt

Current portion of

Debentures & ST-Debt

26%

Debentures28%

LT-Debt46% 43,049

Mil.Bt.4,000

1,500 1,500 3,000

4,000

2,272

5,215

3,506

3,355

2,660

2,074

1,386

6,272 6,715

3,506

4,855

2,660

5,074

1,386

-

4,000

-

3,000

6,000

9,000

2021 2022 2023 2024 2025 2026 2027 2028 2029

Mil.Bt.Bond LT-Loan

Interest Rate

Short Term Debt: 1.50 – 4.53%

P/N: 1.41 – 3.50%

Long Term Debt: 3 – 3.8%

Bond: 2.37 – 3.61%

D/E 1.81

Net D/E 1.41

On 16th October 2019, EA issued THB 3 billion 7-year bond to ADB with 2.744% interest and was certified by CBI to be green bond.

On 10th July 2020, EA issued bond worth THB 2.2 billion - Tranche 1 : 2-year bond worth THB 500 million with 2.62% interest - Tranche 2 : 3-year bond worth THB 1,000 million with 2.94% interest- Tranche 3 : 5-year bond worth THB 700 million with 3.30% interest

9

Page 10: Energy Absolute · 2021. 1. 26. · EV Business, 1,506 , 45% Charging Stations 426 13% Bio Diesel & PCM 73 2% New Power Projects 126 4% THB 3,354 mil. Investment Plan Progress / Target

BIO Business volume increase 14% with 9% GPM

10

Selling price (Baht/litre)

Biod

iese

l

Volume (Mil.litres)

Glyc

erin

e

20.17

17.69

28.96

15

20

25

30

2018 2019 2020E 2021B

158

193 188

050

100150200250

2018 2019 2020E 2021B

24.99

15.98 16.64

010203040

2018 2019 2020E 2021B

12 14 16

050

100150200250

2018 2019 2020E 2021B

Selling price (Baht/kg) Volume (Mil.Kgs)

Page 11: Energy Absolute · 2021. 1. 26. · EV Business, 1,506 , 45% Charging Stations 426 13% Bio Diesel & PCM 73 2% New Power Projects 126 4% THB 3,354 mil. Investment Plan Progress / Target

Power Production Output

11

Solar 8 MW with 8 Baht/unit adder

Mil.Kwh

13.48 14.12 14.26 13.67

0

5

10

15

20

2018 2019 2020E P50

Solar 270 MW with 6.50 Baht/unit adder

588.27 613.13 624.34

592.89

0200400600800

2018 2019 2020E P50

Wind 260 MW with 3.50 Baht/unit adderWind 126 MW with 3.50 Baht/unit adder

468.84

502.06 490.83

0200400600800

2019 2020E P75

289.32 292.88

258.60 250.80

0100200300400500

2018 2019 2020E P75

Mil.Kwh

Mil.KwhMil.Kwh

Page 12: Energy Absolute · 2021. 1. 26. · EV Business, 1,506 , 45% Charging Stations 426 13% Bio Diesel & PCM 73 2% New Power Projects 126 4% THB 3,354 mil. Investment Plan Progress / Target

Our Energy storage business

Page 13: Energy Absolute · 2021. 1. 26. · EV Business, 1,506 , 45% Charging Stations 426 13% Bio Diesel & PCM 73 2% New Power Projects 126 4% THB 3,354 mil. Investment Plan Progress / Target

Energy Storage System : Core Technology for New Businesses

1 GWh

Phase I Final Target

50 GWh

EV Charging Station

Electric

Vehicle (EV)

Energy TradingSystem

Energy Storage System

(ESS)

Electric

Ferry (E-Ferry)

Electric

Bus (E-Bus)

13

Page 14: Energy Absolute · 2021. 1. 26. · EV Business, 1,506 , 45% Charging Stations 426 13% Bio Diesel & PCM 73 2% New Power Projects 126 4% THB 3,354 mil. Investment Plan Progress / Target

Progress of battery factory project

Building

Installing &

Commissioning

Testing

COD

By 1Q 2021

100%

Early 2021

14

Page 15: Energy Absolute · 2021. 1. 26. · EV Business, 1,506 , 45% Charging Stations 426 13% Bio Diesel & PCM 73 2% New Power Projects 126 4% THB 3,354 mil. Investment Plan Progress / Target

Process Flow Description

FORMATION 1 & 2 / DEGAS

W/H

CAPACITY CHECK

VOLATGE CHECK

CAPACITY RANKING

APPEARANCE INSPECTION

GRADE C

CAPACITY REWORKNG

NG

Electrode Manufacturing Cell Assembly Formation

Batch

pro

du

ction

Co

ntin

uo

us p

rod

uctio

n

MIXING

COATING

PRESSING

DRYING

CUTTING

W/H

STACKING

WELDING

SEALING

INJECTION

Mixing and

chemical

process

adjustment

Electrolyte and Lithium

transport method

adjustment

* Capacity in Phase I (1Gwh)

can reserve to 2-4Gwh

15

Page 16: Energy Absolute · 2021. 1. 26. · EV Business, 1,506 , 45% Charging Stations 426 13% Bio Diesel & PCM 73 2% New Power Projects 126 4% THB 3,354 mil. Investment Plan Progress / Target

Our Electric Vehicle business

Page 17: Energy Absolute · 2021. 1. 26. · EV Business, 1,506 , 45% Charging Stations 426 13% Bio Diesel & PCM 73 2% New Power Projects 126 4% THB 3,354 mil. Investment Plan Progress / Target

Our Product Development

2018 2019 2020

EV Car : MINE Mobility E-Ferry E-Bus

Battery Size: 30kwh

Capacity: ~ 5,000 Units/Year

Target : Commercial market

Business: Production & Sale

Battery Size: 800kwh

Volume: 27 Units

Fare Price: 20-25 Baht.Business: Transportation Service

Full Service: Q2 2021

Battery Size: 250-350kwh

Capacity : ~3,000 Units/Year

Size : 6-12 meters

Business: Production & Sale

Launch: Q1 2021

Next

ESS

To be used in power

system and charging

station.

18

Page 18: Energy Absolute · 2021. 1. 26. · EV Business, 1,506 , 45% Charging Stations 426 13% Bio Diesel & PCM 73 2% New Power Projects 126 4% THB 3,354 mil. Investment Plan Progress / Target

EA's Electric Vehicle Business Structure

NEX

Capital 1,674.45 M.THBRent +Domestic&Overseas sale+

After sale service+Autopart+Service

for all buses

Absolute AssemblyProduce, assemble all buses

and vans and sell to distributor

Mine Mobility Corp.

EV Car – Produce,

assemble, sell all

passenger EV

Producer

Distributor EV Now

Capital 50 M.THBDistribute EV Bus and hire AAB to

produce and assemble

Mine Mobility Research

R&D all electric vehicles

E Smart Transport

EV Ferry – Own and

operate mass transport

service and tourism

55%

100%

100%

75%

Support

EA

Mobility

Holding

99.99%

40%

100%

All

Buses

45%

EV

BusCRL

Transportation service and

tourism operator

99.99%

Page 19: Energy Absolute · 2021. 1. 26. · EV Business, 1,506 , 45% Charging Stations 426 13% Bio Diesel & PCM 73 2% New Power Projects 126 4% THB 3,354 mil. Investment Plan Progress / Target

The most modern quick charge technology Compatible with all EV Brands, E Bus and E Ferry

CCS Combo type2 (EU) Home Charge

AC charge & DC Fast charge (80% 12 mins)

22/150 kW AC/DC Combo Charger

20

Page 20: Energy Absolute · 2021. 1. 26. · EV Business, 1,506 , 45% Charging Stations 426 13% Bio Diesel & PCM 73 2% New Power Projects 126 4% THB 3,354 mil. Investment Plan Progress / Target

Sixs electric ferries are launched on 22 Dec 2020

Page 21: Energy Absolute · 2021. 1. 26. · EV Business, 1,506 , 45% Charging Stations 426 13% Bio Diesel & PCM 73 2% New Power Projects 126 4% THB 3,354 mil. Investment Plan Progress / Target

Battery Business1,223 36%

EV Business, 1,506 , 45%

Charging Stations426

13%

Bio Diesel & PCM

73 2%

New Power Projects

126 4%

THB 3,354 mil.

Investment Plan

Progress / Target

Bio Diesel & PCM 73 mil.THB to invest in small machinery and equipment

Battery Plant

(Thailand) 1,223 mil.THB. To start production in Q1/2021

EV Business 1,506 mil.THB. Comprise of EV Bus and E Ferry.

EV Charging 426 mil. THB. Currently, achieved around 500 stations in 53 provinces with more than 2,000 outlets installed and expanding to nationwide

New Power Projects

126 mil.THB. Under studying

Investment Plan in 2021

22

Capital Investment in 2021

Page 22: Energy Absolute · 2021. 1. 26. · EV Business, 1,506 , 45% Charging Stations 426 13% Bio Diesel & PCM 73 2% New Power Projects 126 4% THB 3,354 mil. Investment Plan Progress / Target

Disclaimer

This presentation contains summary information about Energy Absolute Public Company Limited (“EA” or “the Company”) and its subsidiaries as of 21January 2021 and, unless stated otherwise. The information does not purport to be complete or comprehensive.

This presentation contains forward looking statements that may be identified by use of words such as “anticipates,” “hopes,” “expects,” “estimates,”“intends,” “projects,”“plans”, “predicts,” “projects”, “aims” or other similar expressions that are used to identify such statements. Forward lookingstatements are based on certain assumptions and expectations of future events. No guarantee nor assurance is made that these assumptions andexpectations are accurate or will be realized. Such forward looking statements should be considered with caution, since actual results may differmaterially from those expressed or implied by such statements.

The information in this presentation were obtained from various external sources which has not verified through any independent source. Norepresentation or warranty, either express or implied, is made regarding the accuracy, completeness, correctness, reliability, or scope of theinformation and disclaim all responsibility and liability for the information (including, without limitation, liability for negligence).

This presentation is provided for the sole purpose of enhancing understanding of the Company and should not be construed as a legal, tax orinvestment recommendation or any other type of advice.

The Company does not provide any representation, warranty, endorsement, or acceptance, about opinion or statement of any analyst s or other thirdparties; or the use of any such opinion, or statement of any analysts or other third parties.

This document is strictly confidential and being given solely for your information and may not be shared, copied, reproduced or redistributed to anyother person in any manner.

Page 23: Energy Absolute · 2021. 1. 26. · EV Business, 1,506 , 45% Charging Stations 426 13% Bio Diesel & PCM 73 2% New Power Projects 126 4% THB 3,354 mil. Investment Plan Progress / Target

IR [email protected]

+6622482488 ext. 19531