DIESIS – Design of an Interoperable European federated Simulation network for critical InfraStructures
ENEA/UBC meeting May, 8th 2009
Paolo Palazzari, ENEA
DIESIS Presentation 2
Structure
1. DIESIS Overview
2. Federated Simulation of CIs
3. The DIESIS Ontology paradigm
4. Conclusion
DIESIS Presentation 3
DIESIS Main Data
• DIESIS is a research project funded by the European Commission within FP7
• DIESIS is a Design Study for a specific research infrastructure (e-Infrastructure)
• Instrument: STReP
• Start date: February 1, 2008
• Duration: 24 months
• Maximum EC contribution: 1.173.000 Euros
• Person power: 142 PM
• Partners (beneficiaries): 5
DIESIS Presentation 4
Fraunhofer Institut für Intelligente Analyse- und Informationssysteme
Fraunhofer Institute for Intelligent Analysis and Information Systems
Erich Rome (Co-ordinator)
Consorzio Campano di Ricerca per l'Informatica e l'Automazione Industriale
Campanian Consortium for Research in Informatics and Industrial Automation
Vincenzo Masucci
Ente per le Nuove Tecnologie, l'Energia e l'Ambiente
Italian National Agency for New Technologies, Energy and the Environment
Sandro Bologna
Imperial College London
Erol Gelenbe
De Nederlandse organisatie voor toegepast natuurwetenschappelijk onderzoek
Netherlands Organisation for Applied Scientific Research
Eric Luiijf
DIESIS Consortium
DIESIS Presentation 5
DIESIS main objectives
• To establish the basis for a European modelling and simulation e-Infrastructure called EISAC byperforming a design study
• To demonstrate
• a technical proof-of-concept
• a business proof-of-concept
EISAC = European Infrastructure Simulation and Analysis Centre
DIESIS Presentation 6
DIESIS: Technical proof of concept
• Coupling three infrastructure simulators using DIESIS concepts
QoS based communication protocols
federated simulation bridges
semantically interoperable federation
• Federate simulation bridges
modelling dependencies
dynamic coupling of simulators at runtime
time synchronisation
Federated Simulation of CIs
TelecommunicationNetwork Simulator
Power NetworkSimulator
FloodSimulator
Railway TrafficSimulator
Couplings(“Bridges”, “Interconnections”)
DIESIS Presentation 8
DIESIS communication infrastructure across Europe
CC: Comm Ctrl
CE: Comm Elem
FC: Federation Ctrl
DIESIS Presentation 9
DIESIS Middleware
Network Support Layer
Communications Layer
Simulator 2
Simulator n
Simulator 1
Simulation Layer
DIESIS Middleware Layer
I/O Data Management
Scenario Configuration and Management
Time/Event Synchronization
Federation Setup and Management
Ontologies
3
DIESIS Ontology paradigm
• The objective is to design and develop a Knowledge Base System (KBS) based on the ontological formalism that will:
enable the dynamic binding among different Critical Infrastructures (CI) simulator models;
provide the possibility to discover (inter)dependencies among different CIs;
allow CIs vulnerability & risk analysis.
The DIESIS KBS
9
The DIESIS KBS
• The main KBS components are:
the Meta Knowledge ONTology (MKIONT);
the Federation ONTology (FONT);
the Infrastructure ONTology (IONT);
the Gateways that are located between the DIESIS middleware and the simulators:
• Simulator Model;
• Associative Table.
Basic Service NetworkFlooding
ElectricityTelecommunication
Railway
Water
Power Node
Power Line
Protection Device
Set amperage
Disconnect
Shutdown
Telco Office
Shutdown
Shutdown
PSTN Node
Set voltage level
Switch power
Experimentator Set water level
Measuring point Flood position
Set voltage level
Fuel delivered
Cut off
PSTN Link
Cutoff
Realisation of a Data Link: Information in KBS
• Relation “Power Supply”: …, {P05m, TO24}, {P06m, TO24}, {P07m, TO24}, …
• Ontologies: SONTP, IONTP, FONT, IONTT, SONTT
• Ontology transformation rules
Realisation of a Data LinkP
ow
er simu
latorT
elC
o s
imu
lato
r
Link „Set voltage level“
Wrapper PowerWrapper TelCo
Tel
Co
sim
ula
tor
inte
rfac
e
TO24
P05m
P07m
P06m
Middleware
PowerNode.Voltage = Node.u_un
TO25
TO23
Po
wer sim
ulato
r in
terface
BrigdeSONTP à
IONTP
BrigdeIONTP à
IONTT
P04m
P08m
BrigdeIONTT à
SONTT
if (Office.PowerSupplyOK) Office.Connected = true;else Office.Connected = false;
if (P05m.Voltage > 85% OR P06m.Voltage > 85% OR P07m.Voltage > 85%) Office.PowerSupplyOK = true;else Office.PowerSupplyOK = false;
DIESIS Presentation 16
Conclusion
• DIESIS is a twofold design study for the EISAC, consisting of
technical proof-of-concept
“business case” / business proof-of-concept
• The proposed EISAC should serve as a platform for joint CIP research
DIESIS Presentation 17
Conclusion (2)
• Benefits
cost reductions for setting up CI simulator federations
• re-use of existing simulators and models
• provision of validated data and databases
• standards for interoperability
additional benefits
• know-how in set-up and running federated CI simulations
• management and analysis tools
• M&S on CI community building
• more …
Thank you for your attention!
ENEA People in DIESIS
Sandro Bologna
Elisa Castorini
Giovanni Dipoppa
Paolo Palazzari
Silvia Ruzzante
Alberto Tofani