Page 1: End User Manual For - oilweb.oilindia.in User Manual.pdf · SAP Upgrade Project Technical & Functional Upgrade End User Manual For SAP BUSINESS OBJECTS PLANNING AND CONSOLIDATION

SAP Upgrade Project Technical & Functional Upgrade

End User Manual

For

SAP BUSINESS OBJECTS PLANNING AND CONSOLIDATION 10.0 NW

Version No: 1.0 Date: 06.02.2014

Page 2: End User Manual For - oilweb.oilindia.in User Manual.pdf · SAP Upgrade Project Technical & Functional Upgrade End User Manual For SAP BUSINESS OBJECTS PLANNING AND CONSOLIDATION

SAP BUSINESS PLANNING AND CONSOLIDATION 10.0 NW

END USER MANUAL

Wipro Ltd. Page 2 of 28

© Wipro Limited, 2011, All Rights Reserved.

This document is proprietary to Wipro Infotech, a division of Wipro Limited.

You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in

any form or by any means, nor may you modify or create derivative works based on the text of any file, or any part

thereof for public, private or commercial use, without prior written permission from Wipro Limited.

TABLE OF CONTENTS

1 INTRODUCTION ...............................................................................................................3 2 BUSINESS PROCESS FLOW ...........................................................................................4

2.1 Budget Estimate (Initial Budget Activity) ..................................................... 4 2.2 BUDGET TRANSFER (Inter Cost Centre-Cost Element Budget Transfer) ........... 14 2.3 SPECIAL SANCTION (Supplementary Budget Request) ............................... 17

3 REPORT ANANLYSIS ....................................................................................................21 3.1 MONTHLY VARIANCE REPORTING ...................................................... 23 3.2 BUDGET ADJUSTMENT REPORT (TRACKING INTIAL BUDGET, TRANSFERS and

SUPPLEMENTARY SANCTIONS) .................................................................. 26 3.3 STATEMENT OF SAVINGS ................................................................. 28

Page 3: End User Manual For - oilweb.oilindia.in User Manual.pdf · SAP Upgrade Project Technical & Functional Upgrade End User Manual For SAP BUSINESS OBJECTS PLANNING AND CONSOLIDATION

SAP BUSINESS PLANNING AND CONSOLIDATION 10.0 NW

END USER MANUAL

Wipro Ltd. Page 3 of 28

© Wipro Limited, 2011, All Rights Reserved.

This document is proprietary to Wipro Infotech, a division of Wipro Limited.

You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in

any form or by any means, nor may you modify or create derivative works based on the text of any file, or any part

thereof for public, private or commercial use, without prior written permission from Wipro Limited.

1 INTRODUCTION

Open internet explorer and enter URL: http://cibp1.oilindia.in:8000/sap/bpc/web

Enter Login

User ID and

Password

Page 4: End User Manual For - oilweb.oilindia.in User Manual.pdf · SAP Upgrade Project Technical & Functional Upgrade End User Manual For SAP BUSINESS OBJECTS PLANNING AND CONSOLIDATION

SAP BUSINESS PLANNING AND CONSOLIDATION 10.0 NW

END USER MANUAL

Wipro Ltd. Page 4 of 28

© Wipro Limited, 2011, All Rights Reserved.

This document is proprietary to Wipro Infotech, a division of Wipro Limited.

You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in

any form or by any means, nor may you modify or create derivative works based on the text of any file, or any part

thereof for public, private or commercial use, without prior written permission from Wipro Limited.

2 BUSINESS PROCESS FLOW

2.1 Budget Estimate (Initial Budget Activity)

User will receive a mail when activity is initiated by finance team.

Start Page of

BPC

Click on EPM

Office Add-in

Excel

Page 5: End User Manual For - oilweb.oilindia.in User Manual.pdf · SAP Upgrade Project Technical & Functional Upgrade End User Manual For SAP BUSINESS OBJECTS PLANNING AND CONSOLIDATION

SAP BUSINESS PLANNING AND CONSOLIDATION 10.0 NW

END USER MANUAL

Wipro Ltd. Page 5 of 28

© Wipro Limited, 2011, All Rights Reserved.

This document is proprietary to Wipro Infotech, a division of Wipro Limited.

You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in

any form or by any means, nor may you modify or create derivative works based on the text of any file, or any part

thereof for public, private or commercial use, without prior written permission from Wipro Limited.

Either Click on Link “Open Activity” (Circled in Green above) or paste link (Circled in

Red above) in address bar of internet explorer.

You will be prompted for your BPC login credentials ie “P” followed by your OIL Employee ID and password set by you.

(Please contact ERP BASIS for password)

%USER DEPARTMENT%

CONTROLLABLE COST ELEMENTS

%YEAR%

Page 6: End User Manual For - oilweb.oilindia.in User Manual.pdf · SAP Upgrade Project Technical & Functional Upgrade End User Manual For SAP BUSINESS OBJECTS PLANNING AND CONSOLIDATION

SAP BUSINESS PLANNING AND CONSOLIDATION 10.0 NW

END USER MANUAL

Wipro Ltd. Page 6 of 28

© Wipro Limited, 2011, All Rights Reserved.

This document is proprietary to Wipro Infotech, a division of Wipro Limited.

You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in

any form or by any means, nor may you modify or create derivative works based on the text of any file, or any part

thereof for public, private or commercial use, without prior written permission from Wipro Limited.

Excel will open >>>>>>>>>

Budget Estimate

%USER DEPARTMENT%

%USER_DEPARTMENT TEAM%

Click on

“Controllable Cost Elements”

%USER DEPARTMENT% Submit

%USER DEPARTMENT%

Click on “Controllable Cost Elements”

Click on “Budget Estimate”

Page 7: End User Manual For - oilweb.oilindia.in User Manual.pdf · SAP Upgrade Project Technical & Functional Upgrade End User Manual For SAP BUSINESS OBJECTS PLANNING AND CONSOLIDATION

SAP BUSINESS PLANNING AND CONSOLIDATION 10.0 NW

END USER MANUAL

Wipro Ltd. Page 7 of 28

© Wipro Limited, 2011, All Rights Reserved.

This document is proprietary to Wipro Infotech, a division of Wipro Limited.

You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in

any form or by any means, nor may you modify or create derivative works based on the text of any file, or any part

thereof for public, private or commercial use, without prior written permission from Wipro Limited.

Step 1

Step 2

Double Click

Cell Containing

Department

name

Page 8: End User Manual For - oilweb.oilindia.in User Manual.pdf · SAP Upgrade Project Technical & Functional Upgrade End User Manual For SAP BUSINESS OBJECTS PLANNING AND CONSOLIDATION

SAP BUSINESS PLANNING AND CONSOLIDATION 10.0 NW

END USER MANUAL

Wipro Ltd. Page 8 of 28

© Wipro Limited, 2011, All Rights Reserved.

This document is proprietary to Wipro Infotech, a division of Wipro Limited.

You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in

any form or by any means, nor may you modify or create derivative works based on the text of any file, or any part

thereof for public, private or commercial use, without prior written permission from Wipro Limited.

Step 3

Click to Expand

Click to Select Cost Centre

Click “OK”

Page 9: End User Manual For - oilweb.oilindia.in User Manual.pdf · SAP Upgrade Project Technical & Functional Upgrade End User Manual For SAP BUSINESS OBJECTS PLANNING AND CONSOLIDATION

SAP BUSINESS PLANNING AND CONSOLIDATION 10.0 NW

END USER MANUAL

Wipro Ltd. Page 9 of 28

© Wipro Limited, 2011, All Rights Reserved.

This document is proprietary to Wipro Infotech, a division of Wipro Limited.

You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in

any form or by any means, nor may you modify or create derivative works based on the text of any file, or any part

thereof for public, private or commercial use, without prior written permission from Wipro Limited.

Step 4

Click on “EPM” Tab

Click on “Refresh”

Double-Click cell

containing Cost

element ID to open Input Schedule

Page 10: End User Manual For - oilweb.oilindia.in User Manual.pdf · SAP Upgrade Project Technical & Functional Upgrade End User Manual For SAP BUSINESS OBJECTS PLANNING AND CONSOLIDATION

SAP BUSINESS PLANNING AND CONSOLIDATION 10.0 NW

END USER MANUAL

Wipro Ltd. Page 10 of 28

© Wipro Limited, 2011, All Rights Reserved.

This document is proprietary to Wipro Infotech, a division of Wipro Limited.

You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in

any form or by any means, nor may you modify or create derivative works based on the text of any file, or any part

thereof for public, private or commercial use, without prior written permission from Wipro Limited.

Step 5

Step 6

Click on “INSTRUCTIONS”

Tab to follow steps for template.

Page 11: End User Manual For - oilweb.oilindia.in User Manual.pdf · SAP Upgrade Project Technical & Functional Upgrade End User Manual For SAP BUSINESS OBJECTS PLANNING AND CONSOLIDATION

SAP BUSINESS PLANNING AND CONSOLIDATION 10.0 NW

END USER MANUAL

Wipro Ltd. Page 11 of 28

© Wipro Limited, 2011, All Rights Reserved.

This document is proprietary to Wipro Infotech, a division of Wipro Limited.

You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in

any form or by any means, nor may you modify or create derivative works based on the text of any file, or any part

thereof for public, private or commercial use, without prior written permission from Wipro Limited.

2. Budget Prepared will be

Populated

Automatically on Refresh

Click on “Offline Mode” in EPM Tab and save a

copy to your desktop

using normal Excel Save

As and close File

1. Click on Refresh

Page 12: End User Manual For - oilweb.oilindia.in User Manual.pdf · SAP Upgrade Project Technical & Functional Upgrade End User Manual For SAP BUSINESS OBJECTS PLANNING AND CONSOLIDATION

SAP BUSINESS PLANNING AND CONSOLIDATION 10.0 NW

END USER MANUAL

Wipro Ltd. Page 12 of 28

© Wipro Limited, 2011, All Rights Reserved.

This document is proprietary to Wipro Infotech, a division of Wipro Limited.

You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in

any form or by any means, nor may you modify or create derivative works based on the text of any file, or any part

thereof for public, private or commercial use, without prior written permission from Wipro Limited.

Step 7

Repeat Steps 4-6 for all relevant Cost elements for that Cost centre.

Step 8

Repeat Steps 1-7 for all relevant Cost Centers in the department.

Click on

“Return to Activity

Workspace”

Page 13: End User Manual For - oilweb.oilindia.in User Manual.pdf · SAP Upgrade Project Technical & Functional Upgrade End User Manual For SAP BUSINESS OBJECTS PLANNING AND CONSOLIDATION

SAP BUSINESS PLANNING AND CONSOLIDATION 10.0 NW

END USER MANUAL

Wipro Ltd. Page 13 of 28

© Wipro Limited, 2011, All Rights Reserved.

This document is proprietary to Wipro Infotech, a division of Wipro Limited.

You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in

any form or by any means, nor may you modify or create derivative works based on the text of any file, or any part

thereof for public, private or commercial use, without prior written permission from Wipro Limited.

Close Internet Explorer >>>>>>

Return to Excel >>>>

Budget Estimate

%USER DEPARTMENT%

%USER_DEPARTMENT TEAM%

Click on

“Controllable Cost Elements”

Click on “Budget Estimate”

%USER DEPARTMENT%

Submit

%USER DEPARTMENT% Click on “Submit”

Page 14: End User Manual For - oilweb.oilindia.in User Manual.pdf · SAP Upgrade Project Technical & Functional Upgrade End User Manual For SAP BUSINESS OBJECTS PLANNING AND CONSOLIDATION

SAP BUSINESS PLANNING AND CONSOLIDATION 10.0 NW

END USER MANUAL

Wipro Ltd. Page 14 of 28

© Wipro Limited, 2011, All Rights Reserved.

This document is proprietary to Wipro Infotech, a division of Wipro Limited.

You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in

any form or by any means, nor may you modify or create derivative works based on the text of any file, or any part

thereof for public, private or commercial use, without prior written permission from Wipro Limited.

Completion of Budget Estimate Process

2.2 BUDGET TRANSFER (Inter Cost Centre-Cost Element Budget Transfer)

User will receive a mail when activity is initiated by finance team.

Click on “Offline Mode” in

EPM Tab and save a copy

to your desktop using normal Excel Save As and close File

%USER DEPARTMENT% INPUT AND REVIEW

%YEAR%

BUDGET TRANSFER

Page 15: End User Manual For - oilweb.oilindia.in User Manual.pdf · SAP Upgrade Project Technical & Functional Upgrade End User Manual For SAP BUSINESS OBJECTS PLANNING AND CONSOLIDATION

SAP BUSINESS PLANNING AND CONSOLIDATION 10.0 NW

END USER MANUAL

Wipro Ltd. Page 15 of 28

© Wipro Limited, 2011, All Rights Reserved.

This document is proprietary to Wipro Infotech, a division of Wipro Limited.

You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in

any form or by any means, nor may you modify or create derivative works based on the text of any file, or any part

thereof for public, private or commercial use, without prior written permission from Wipro Limited.

Either Click on Link “Open Activity” (Circled in Green above) or paste link (Circled in

Red above) in address bar of internet explorer.

You will be prompted for your BPC login credentials ie “P” followed by your OIL Employee ID and password set by you.

(Please contact ERP BASIS for password)

BUDGET TRANSFER

%USER

DEPARTMENT%

%USER_DEPARTMENT TEAM%

Click on “INPUT

AND REVIEW”

Click on “BUDGET

TRANSFER”

INPUT AND REVIEW

Page 16: End User Manual For - oilweb.oilindia.in User Manual.pdf · SAP Upgrade Project Technical & Functional Upgrade End User Manual For SAP BUSINESS OBJECTS PLANNING AND CONSOLIDATION

SAP BUSINESS PLANNING AND CONSOLIDATION 10.0 NW

END USER MANUAL

Wipro Ltd. Page 16 of 28

© Wipro Limited, 2011, All Rights Reserved.

This document is proprietary to Wipro Infotech, a division of Wipro Limited.

You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in

any form or by any means, nor may you modify or create derivative works based on the text of any file, or any part

thereof for public, private or commercial use, without prior written permission from Wipro Limited.

Excel will open >>>>>>>>>

%USER DEPARTMENT%

Submit

%USER DEPARTMENT%

Click on

“BUDGET

TRANSFER”

BUDGET TRANSFER

INPUT AND REVIEW

Page 17: End User Manual For - oilweb.oilindia.in User Manual.pdf · SAP Upgrade Project Technical & Functional Upgrade End User Manual For SAP BUSINESS OBJECTS PLANNING AND CONSOLIDATION

SAP BUSINESS PLANNING AND CONSOLIDATION 10.0 NW

END USER MANUAL

Wipro Ltd. Page 17 of 28

© Wipro Limited, 2011, All Rights Reserved.

This document is proprietary to Wipro Infotech, a division of Wipro Limited.

You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in

any form or by any means, nor may you modify or create derivative works based on the text of any file, or any part

thereof for public, private or commercial use, without prior written permission from Wipro Limited.

Close Excel >> Web Login >> “INPUT AND REVIEW” Tab >> “Submit” >> Close

“INPUT AND REVIEW” Tab

Completion of Process

2.3 SPECIAL SANCTION (Supplementary Budget Request)

User will receive a mail when activity is initiated by finance team.

Click on

“Instructions” Sheet

and Follow steps mentioned

Page 18: End User Manual For - oilweb.oilindia.in User Manual.pdf · SAP Upgrade Project Technical & Functional Upgrade End User Manual For SAP BUSINESS OBJECTS PLANNING AND CONSOLIDATION

SAP BUSINESS PLANNING AND CONSOLIDATION 10.0 NW

END USER MANUAL

Wipro Ltd. Page 18 of 28

© Wipro Limited, 2011, All Rights Reserved.

This document is proprietary to Wipro Infotech, a division of Wipro Limited.

You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in

any form or by any means, nor may you modify or create derivative works based on the text of any file, or any part

thereof for public, private or commercial use, without prior written permission from Wipro Limited.

Either Click on Link “Open Activity” (Circled in Green above) or paste link (Circled in Red above) in address bar of internet explorer.

You will be prompted for your BPC login credentials ie “P” followed by your OIL

Employee ID and password set by you.

(Please contact ERP BASIS for password)

%USER DEPARTMENT%

INPUT AND REVIEW

%YEAR%

SPECIAL SANCTION

Page 19: End User Manual For - oilweb.oilindia.in User Manual.pdf · SAP Upgrade Project Technical & Functional Upgrade End User Manual For SAP BUSINESS OBJECTS PLANNING AND CONSOLIDATION

SAP BUSINESS PLANNING AND CONSOLIDATION 10.0 NW

END USER MANUAL

Wipro Ltd. Page 19 of 28

© Wipro Limited, 2011, All Rights Reserved.

This document is proprietary to Wipro Infotech, a division of Wipro Limited.

You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in

any form or by any means, nor may you modify or create derivative works based on the text of any file, or any part

thereof for public, private or commercial use, without prior written permission from Wipro Limited.

Excel will open >>>>>>>>>

SPECIAL SANCTION

%USER DEPARTMENT%

%USER_DEPARTMENT TEAM%

Click on “INPUT AND REVIEW”

%USER DEPARTMENT% Submit

%USER DEPARTMENT%

Click on “SPECIAL

SANCTION”

Click on “SPECIAL

SANCTION”

INPUT AND REVIEW

SPECIAL SANCTION

INPUT AND REVIEW

Page 20: End User Manual For - oilweb.oilindia.in User Manual.pdf · SAP Upgrade Project Technical & Functional Upgrade End User Manual For SAP BUSINESS OBJECTS PLANNING AND CONSOLIDATION

SAP BUSINESS PLANNING AND CONSOLIDATION 10.0 NW

END USER MANUAL

Wipro Ltd. Page 20 of 28

© Wipro Limited, 2011, All Rights Reserved.

This document is proprietary to Wipro Infotech, a division of Wipro Limited.

You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in

any form or by any means, nor may you modify or create derivative works based on the text of any file, or any part

thereof for public, private or commercial use, without prior written permission from Wipro Limited.

Click on

“Instructions” Sheet

and Follow steps

mentioned

Page 21: End User Manual For - oilweb.oilindia.in User Manual.pdf · SAP Upgrade Project Technical & Functional Upgrade End User Manual For SAP BUSINESS OBJECTS PLANNING AND CONSOLIDATION

SAP BUSINESS PLANNING AND CONSOLIDATION 10.0 NW

END USER MANUAL

Wipro Ltd. Page 21 of 28

© Wipro Limited, 2011, All Rights Reserved.

This document is proprietary to Wipro Infotech, a division of Wipro Limited.

You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in

any form or by any means, nor may you modify or create derivative works based on the text of any file, or any part

thereof for public, private or commercial use, without prior written permission from Wipro Limited.

Close Excel >> Web Login >> “INPUT AND REVIEW” Tab >> “Submit” >> Close

“INPUT AND REVIEW” Tab Completion of Process

3 REPORT ANANLYSIS

Open internet explorer and enter URL: http://cibp1.oilindia.in:8000/sap/bpc/web

Enter Login

User ID and Password

Page 22: End User Manual For - oilweb.oilindia.in User Manual.pdf · SAP Upgrade Project Technical & Functional Upgrade End User Manual For SAP BUSINESS OBJECTS PLANNING AND CONSOLIDATION

SAP BUSINESS PLANNING AND CONSOLIDATION 10.0 NW

END USER MANUAL

Wipro Ltd. Page 22 of 28

© Wipro Limited, 2011, All Rights Reserved.

This document is proprietary to Wipro Infotech, a division of Wipro Limited.

You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in

any form or by any means, nor may you modify or create derivative works based on the text of any file, or any part

thereof for public, private or commercial use, without prior written permission from Wipro Limited.

Start Page of

BPC

Click on EPM

Office Add-in

Excel

Page 23: End User Manual For - oilweb.oilindia.in User Manual.pdf · SAP Upgrade Project Technical & Functional Upgrade End User Manual For SAP BUSINESS OBJECTS PLANNING AND CONSOLIDATION

SAP BUSINESS PLANNING AND CONSOLIDATION 10.0 NW

END USER MANUAL

Wipro Ltd. Page 23 of 28

© Wipro Limited, 2011, All Rights Reserved.

This document is proprietary to Wipro Infotech, a division of Wipro Limited.

You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in

any form or by any means, nor may you modify or create derivative works based on the text of any file, or any part

thereof for public, private or commercial use, without prior written permission from Wipro Limited.

3.1 MONTHLY VARIANCE REPORTING

Select Year From

Drop Down List

Page 24: End User Manual For - oilweb.oilindia.in User Manual.pdf · SAP Upgrade Project Technical & Functional Upgrade End User Manual For SAP BUSINESS OBJECTS PLANNING AND CONSOLIDATION

SAP BUSINESS PLANNING AND CONSOLIDATION 10.0 NW

END USER MANUAL

Wipro Ltd. Page 24 of 28

© Wipro Limited, 2011, All Rights Reserved.

This document is proprietary to Wipro Infotech, a division of Wipro Limited.

You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in

any form or by any means, nor may you modify or create derivative works based on the text of any file, or any part

thereof for public, private or commercial use, without prior written permission from Wipro Limited.

Double Click to Select Cost centre or Department

Double Click to

Select month,

quarter or Year

Page 25: End User Manual For - oilweb.oilindia.in User Manual.pdf · SAP Upgrade Project Technical & Functional Upgrade End User Manual For SAP BUSINESS OBJECTS PLANNING AND CONSOLIDATION

SAP BUSINESS PLANNING AND CONSOLIDATION 10.0 NW

END USER MANUAL

Wipro Ltd. Page 25 of 28

© Wipro Limited, 2011, All Rights Reserved.

This document is proprietary to Wipro Infotech, a division of Wipro Limited.

You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in

any form or by any means, nor may you modify or create derivative works based on the text of any file, or any part

thereof for public, private or commercial use, without prior written permission from Wipro Limited.

Click “Refresh”

Report will be Populated with data

Page 26: End User Manual For - oilweb.oilindia.in User Manual.pdf · SAP Upgrade Project Technical & Functional Upgrade End User Manual For SAP BUSINESS OBJECTS PLANNING AND CONSOLIDATION

SAP BUSINESS PLANNING AND CONSOLIDATION 10.0 NW

END USER MANUAL

Wipro Ltd. Page 26 of 28

© Wipro Limited, 2011, All Rights Reserved.

This document is proprietary to Wipro Infotech, a division of Wipro Limited.

You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in

any form or by any means, nor may you modify or create derivative works based on the text of any file, or any part

thereof for public, private or commercial use, without prior written permission from Wipro Limited.

3.2 BUDGET ADJUSTMENT REPORT (TRACKING INTIAL BUDGET, TRANSFERS and SUPPLEMENTARY SANCTIONS)

1. Click on “COST

CENTRE WISE”

Sheet

2. Click on “Refresh” to see

cost centre wise break up of department

Double Click on “5.

BUDGET ADJUSTMENT

REPORT.XLSX

Page 27: End User Manual For - oilweb.oilindia.in User Manual.pdf · SAP Upgrade Project Technical & Functional Upgrade End User Manual For SAP BUSINESS OBJECTS PLANNING AND CONSOLIDATION

SAP BUSINESS PLANNING AND CONSOLIDATION 10.0 NW

END USER MANUAL

Wipro Ltd. Page 27 of 28

© Wipro Limited, 2011, All Rights Reserved.

This document is proprietary to Wipro Infotech, a division of Wipro Limited.

You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in

any form or by any means, nor may you modify or create derivative works based on the text of any file, or any part

thereof for public, private or commercial use, without prior written permission from Wipro Limited.

1. Double Click to

Select Department or

Cost Centre

2. Double Click to Select Year

3. Click on “Refresh”

2. Click on “COST CENTRE WISE”

Sheet

2. Click on “Refresh” to see

cost centre wise break up of department

Page 28: End User Manual For - oilweb.oilindia.in User Manual.pdf · SAP Upgrade Project Technical & Functional Upgrade End User Manual For SAP BUSINESS OBJECTS PLANNING AND CONSOLIDATION

SAP BUSINESS PLANNING AND CONSOLIDATION 10.0 NW

END USER MANUAL

Wipro Ltd. Page 28 of 28

© Wipro Limited, 2011, All Rights Reserved.

This document is proprietary to Wipro Infotech, a division of Wipro Limited.

You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in

any form or by any means, nor may you modify or create derivative works based on the text of any file, or any part

thereof for public, private or commercial use, without prior written permission from Wipro Limited.

3.3 STATEMENT OF SAVINGS

Double Click on “6.

STATEMENT OF

SAVINGS.XLSX

1. Double Click to select Department or Cost centre

5. Click on

“Refresh”

2. Select Year from

Drop-Down List

3. Double Click to Select month

within that year

4. Double Click to Select “Periodic”,

“QTD” or YTD”

6. Data wiil be

populated