15
End to End (e2e) Solutions: DAS, Small Cells, & Wi-Fi Proprietary & Confidential

End to End (e2e) Solutionsfastdas.com/uploads/3/4/6/3/3463216/fast_das_inbuilding_mobility... · Analyzer Signal Generator iBwave PCTel Scanner Atoll Planet Google Earth 6 Proprietary

  • Upload
    others

  • View
    15

  • Download
    0

Embed Size (px)

Citation preview

End to End (e2e) Solutions:

DAS, Small Cells, & Wi-Fi

Proprietary & Confidential

About us

Core Values

Integrity

Excellence

Innovation Service

Quality

2 Proprietary & Confidential

Customer Focus = Results

4

Focus

Integrate & scale tasks

Utilize the latest cost

cutting tools

Stay on top of

technology trends

Utilize cutting

edge tools Result

Improve & Normalize

Quality

Accelerate time to market

Educate & Innovate

Reduce Costs

Proprietary & Confidential

Capabilities

Technologies:

LTE (TDD/FDD)

CDMA—EvDO/EvDV 1xRTT

GPRS/GSM

UMTS/WCDMA

HSxPA

Wi-Fi—802.11a,b,g,n

Bluetooth—802.16x

Services:

Engineering Support, Network Planning, Spectrum Strategy

Test, Survey, Design, Deploy, Provision, Commission Optimize

Construction: Material & Logistics

Site Acquisition, Zoning, Permitting

Integration-Sweep & OTDR Testing-Commissioning

Project Management, Quality & Closeout

Programming, Statistical Modeling, KPI Analysis

Business Consulting & Regulatory

e2e:

Small Cell & Wi-Fi Installation

iDAS & oDAS Construction

Optical Fiber Transport

Macro Sites & Tower Construction

Microwave Point to Multipoint

5 Proprietary & Confidential

The Right Tools

Test & Design

TEMS

JDSU

Vector Network Analyzer

Signal Generator

iBwave PCTel

Scanner

Atoll

Planet

Google Earth

6 Proprietary & Confidential

e2e Accountability

e2e accountability is the only way to guarantee:

•Performance results, scope/cost control, & timeliness

System life cycle reliability requires e2e ownership of:

•Test, survey, design, install, provision, & optimization activities by project

Pave a smooth path to project close out by:

•Stepping out of the cubical to provide QA/QC oversight of install

Testing, analysis, & design support of install:

•Authorizes field design adaptations in real time, refines overall system quality, & speeds install

7 Proprietary & Confidential

Our e2e Engineering Services

Client Requirement Questionnaire

•Test Design Install Provision Commission Optimize Close-out

Survey & Test

•Benchmark, Continuous Wave, OTDR, KPI Statistics, etc.

Design & Predictive Model

•Budgetary, iBwave, Atoll, Planet, Google Earth

Deploy

•Project Manage, Install, Provision, Commission

Optimize

•KPI Assess, Troubleshoot, Analyze, Change Manage, Close-Out

8 Proprietary & Confidential

e2e Workflows Client Requirements (Questionnaire method)

Budgetary Design:

•Define scope, schedule, cost

•Analyze network data

•Design prototyping

•Stakeholder buy-in

System Engineering & Design

Site Survey

•Pictures, Notes, etc.

•Testing (BM & CW)

•Data collection, post processing, & analysis

Design Package

•3D Model,

•Predictions, &

•Reports

Install, System Integration

Construction Management

•QA/QC install

•Architect administration

•Provision

•Testing

•Data collection, post processing, & analysis

•Commission

Optimization & Maintenance

Testing

•Data collection, post processing, & analysis

System Modifications

•Change management

Maintenance

•Service & warranty options

Close-Out

9 Proprietary & Confidential

e2e Approach

Client Requirements (Questionnaire)

System Engineering & Design

Install, System Integrate

Optimization & Maintenance

10

Client Requirements)

System Engineering &

Design

Install, System Integrate

Optimization & Maintenance

Proprietary & Confidential

Data Gathering:

•Venue Drawings,

•Post processing,

•Statistical analysis

•SNMP switch data

Budgetary Design:

•Create a rough-order of magnitude(ROM) budgetary design model utilizing:

•Client questionnaire,

•Drawings,

•Network performance data,

•Google Earth Pro, &

• iBwave

Define:

•Scope, budget, & schedule plans with client, get buy-in & establish:

•Project plan,

•Kick off, &

•Escalation procedures

Client Requirements (Questionnaire)

11 Proprietary & Confidential

System Engineer & Design

Site Survey:

•Pictures & notes of:

•Candidate MDF & IDF closets,

•Antenna locations,

•Installation hazards, &

•Other design-impacting detail

Testing:

•Data Collection:

•Benchmarking (BM) Data Collection, Programming, Post Processing, & Analysis

•Continuous-Wave (CW) testing,

• PC TEL,

•JDSU,

•TEMs Pocket, &/or

•Other

•Recommend design modifications

Finalize Design:

•Incorporate finalized:

•BM & CW test results, & Link Budgets

•Tune iBwave Model, run predictions, & reports

Hand Off to Construction:

•Architecture,

•Predictions,

•Original Equipment Manufacturer (OEM) specification sheets,

•Bill of Materials(BOM), Installers’ notes, &

•Other required reports

•Defined:

•Methods of Procedure(MOP),

•Installation oversight, &

•Contingency plans

12 Proprietary & Confidential

Install & System Integrate

Construction Administration:

•TPM Management of:

•Scope,

•Logistics,

•Coordination,

•Install Speed,

•Budgets, &

•Day to day QA/QC of installation

System Integration Oversight:

•System Architect Supervision of:

•Field design adaptations,

•Provisioning, &

•Testing:

•Sweep,

•RAN,

•E911, &

•e2e network performance

•Authenticate KPI delivery & system commissioning

13 Proprietary & Confidential

Optimize & Maintain

Requirements:

•Configuration documentation audit

•Programming

•KPI statistical assessment

•Troubleshooting

•Optimization strategy

Testing:

•Data Collection,

•Post Processing, &

•Data Analysis

•System/Network Configuration Audit, &

•L1, L2 & E2E Throughput, RSSI, S/N, RSRP testing

•Big data Assessments & Visual Basic Macro development

•Slice & Dice Data into any format (charts, tables, etc.)

Performance Modifications:

•Troubleshooting & correction

•Change management

•Configuration log

•Performance management & upgrade planning

•Available 24/7 (365) remote monitoring and maintenance support

•Network availability and up-time guarantees

14 Proprietary & Confidential

@ the speed of AWESOME!

Proprietary & Confidential

15

Contact information:

Farzin Stephen Yazdani

•571-212-0936

[email protected]

•8380 Greensboro Drive, Ste.503, McLean VA, 22102

Customer Experience Metrics

ISO 9001 & 14000 Six Sigma

Staff Certifications and Credentials

iBwave, JDSU, Actix, TEMS, Corning-Mobile Access, Commscope, SOLiD, Zinwave, TE

Recent Successes:

DC Metro, Reagan & Dulles Airports, 16 stadiums, multiple office buildings and a theme park

Proprietary & Confidential