Encotec Energy (India) Pvt. Ltd. (Finding New Ways to Energy solutions from Shovel to Socket) (Finding New Ways to Energy solutions from Shovel to Socket) An Integrated Management Systems Company Presentation on Plasma Ignition System (PIS) at Power Management Institute, NTPC, Noida 9 June 2017

Encotec Energy (India) Pvt. Ltd. - netraconfer.ntpc.co.innetraconfer.ntpc.co.in/pdfs/RnD/2017/Day2/Session 7/3 Shri Rajeev... · Encotec Energy (India) Pvt. Ltd. ... Power plants;

Embed Size (px)

Citation preview

Page 1: Encotec Energy (India) Pvt. Ltd. - netraconfer.ntpc.co.innetraconfer.ntpc.co.in/pdfs/RnD/2017/Day2/Session 7/3 Shri Rajeev... · Encotec Energy (India) Pvt. Ltd. ... Power plants;

Encotec Energy (India) Pvt. Ltd.(Finding New Ways to Energy solutions from Shovel to Socket)(Finding New Ways to Energy solutions from Shovel to Socket)

An Integrated Management Systems Company

Presentation on Plasma Ignition System (PIS)

at

Power Management Institute, NTPC, Noida

9 June 2017

Page 2: Encotec Energy (India) Pvt. Ltd. - netraconfer.ntpc.co.innetraconfer.ntpc.co.in/pdfs/RnD/2017/Day2/Session 7/3 Shri Rajeev... · Encotec Energy (India) Pvt. Ltd. ... Power plants;

Shareholding Structure

50 : 50

Range of services

Engineering services, Erection & Commissioning services, Operation &Maintenance services, Supply of Chinese Spares & Overhauling of ThermalPower plants; Operation & Maintenance services for Substations; EPC ofSolar PV Projects, Renewable & Climate Change

Sales ₹ 605 Million* of ENCOTEC

Profile

Member of VPC Group, A Leading German Company in the Field of Engineering Consultancy & Other Related Services for Energy Sector

Sales ₹ 605 Million* of ENCOTEC₹ 3500 Million of VPC

Human Resources

825* of ENCOTEC1,000* of VPC

Certified to ISO 9001 : 2008 Quality Management SystemISO 14001 : 2015 Environment Management SystemOHSAS 18001 : 2007 Occupational Health & Safety Management SystemCRISIL MSE * 2 High Credit Worthiness

*as at March 31, 2017

| ENCOTEC | Corporate Presentation | 2016-08-302

Page 3: Encotec Energy (India) Pvt. Ltd. - netraconfer.ntpc.co.innetraconfer.ntpc.co.in/pdfs/RnD/2017/Day2/Session 7/3 Shri Rajeev... · Encotec Energy (India) Pvt. Ltd. ... Power plants;

Spectrum of Services

POWER GENERATION

TRANSMISSION & DISTRI-BUTION

Engineering Services

Renovation & Modernization

Operation & Maintenance

Training &

Capacity Building

Erection, Testing & Commissioning

| ENCOTEC | Corporate Presentation | 2016-08-303

ENCOTEC

RENEWABLE &

CLIMATE CHANGE

PROJECT

MANAGEMENTQuality Assurance

& Auditing Services

Plasma Ignition System and

Chinese Power Plant Spares

Capacity Building

EPC Services

Operational Management, Measurements, On Site Testing and Laboratory Services

Page 4: Encotec Energy (India) Pvt. Ltd. - netraconfer.ntpc.co.innetraconfer.ntpc.co.in/pdfs/RnD/2017/Day2/Session 7/3 Shri Rajeev... · Encotec Energy (India) Pvt. Ltd. ... Power plants;

Some of the Clients

| ENCOTEC | Corporate Presentation | 2016-08-304

…& many more.

Page 5: Encotec Energy (India) Pvt. Ltd. - netraconfer.ntpc.co.innetraconfer.ntpc.co.in/pdfs/RnD/2017/Day2/Session 7/3 Shri Rajeev... · Encotec Energy (India) Pvt. Ltd. ... Power plants;

Energy Saving, Safe and High Efficiency, Low Nitrogen and Environment

Protection, Future Leading Science & Technology

Plasma Ignition System

5 | VPC | ENCOTEC | WOM | PIS | 2017-02-02

Page 6: Encotec Energy (India) Pvt. Ltd. - netraconfer.ntpc.co.innetraconfer.ntpc.co.in/pdfs/RnD/2017/Day2/Session 7/3 Shri Rajeev... · Encotec Energy (India) Pvt. Ltd. ... Power plants;

Anhui Xinneng Electric Technology Co., Ltd. is foundedin 2007, located in Hefei, which is China’s science andeducation city. The company is a science andtechnology company invested by Anhui ProvinceEnergy Group Co., Ltd., which relies on University ofScience of Technology of China and Plasma PhysicsResearch Institute of Chinese Academy of Sciences,and aims to combine production, study and research

About Our Partner

and aims to combine production, study and researchtogether.

Xinneng is part of WOM under Wenergy Group ofChina.

ENCOTEC is exclusive partner of WOM for PlasmaIgnition System design, supply, installation & after salesservice in India.

6 | VPC | ENCOTEC | WOM | PIS | 2017-02-02

Page 7: Encotec Energy (India) Pvt. Ltd. - netraconfer.ntpc.co.innetraconfer.ntpc.co.in/pdfs/RnD/2017/Day2/Session 7/3 Shri Rajeev... · Encotec Energy (India) Pvt. Ltd. ... Power plants;

Authorization as Exclusive Channel Partner

7 | VPC | ENCOTEC | WOM | PIS | 2017-02-02

Page 8: Encotec Energy (India) Pvt. Ltd. - netraconfer.ntpc.co.innetraconfer.ntpc.co.in/pdfs/RnD/2017/Day2/Session 7/3 Shri Rajeev... · Encotec Energy (India) Pvt. Ltd. ... Power plants;

In the early 1980s, with the industry recovering from the 1970s oil crisis and

the commissioning of new nuclear plants, technology was pursued to cycle

large fossil units down to low loads. The technical limitation of large coal units

being restricted to 30-40 percent load without additional fuel for flame stability

was one of the necessary topics to be addressed.

The objective was maintaining combustion stability while minimizing

secondary fuel costs.

Traditional igniter technology has been to use fuel oil as the primary fuel for

Background

8 | VPC | ENCOTEC | WOM | PIS | 2017-02-02

the igniter. The use of fuel oil for start up and stability is costly and causes

detrimental impacts to the plant air quality control equipment. The particulate

soot from igniter fuel oil combustion causes energization issues in

electrostatic precipitators, blinding and fire hazards in fabric filters, and

possible contamination and operational issues in wet FGD systems.

The Plasma Ignition Technology eliminates the fuel oil cost and environmental

issues, and as compared to natural gas, uses a readily available fuel source

at the coal-fired plant.

Page 9: Encotec Energy (India) Pvt. Ltd. - netraconfer.ntpc.co.innetraconfer.ntpc.co.in/pdfs/RnD/2017/Day2/Session 7/3 Shri Rajeev... · Encotec Energy (India) Pvt. Ltd. ... Power plants;

Results

Technology advances have been made in

ignition systems that would help coal plants

be more competitive when considering the

increasing challenge of part load operation.

Plasma Ignition Technology, a coal-fired

9 | VPC | ENCOTEC | WOM | PIS | 2017-02-02

Plasma Ignition Technology, a coal-fired

ignition system, has installed and operating

experience in helping coal plants reduce

costs and provide operating flexibility.

Page 10: Encotec Energy (India) Pvt. Ltd. - netraconfer.ntpc.co.innetraconfer.ntpc.co.in/pdfs/RnD/2017/Day2/Session 7/3 Shri Rajeev... · Encotec Energy (India) Pvt. Ltd. ... Power plants;

What is Plasma?

The plasma formation occurs by controlled generation

of an electrical discharge (arc) between two electrodes.

The passage of the air through and around the electric

arc causes it to become partially ionized and very hot.

An average temperature of 3,000°C would be typical.

The hot air forms high velocity luminous jet from the

anode, which is termed as plasma. It has a similar

appearance to a gas flame.

10 | VPC | ENCOTEC | WOM | PIS | 2017-02-02

The plasma is not a product of combustion but the

energized ionized air.

The position of both the anode and cathode are

controlled to optimum position for plasma quality and

extending electrode life.

Page 11: Encotec Energy (India) Pvt. Ltd. - netraconfer.ntpc.co.innetraconfer.ntpc.co.in/pdfs/RnD/2017/Day2/Session 7/3 Shri Rajeev... · Encotec Energy (India) Pvt. Ltd. ... Power plants;

Plasma Ignition Unit System

11 | VPC | ENCOTEC | WOM | PIS | 2017-02-02

Page 12: Encotec Energy (India) Pvt. Ltd. - netraconfer.ntpc.co.innetraconfer.ntpc.co.in/pdfs/RnD/2017/Day2/Session 7/3 Shri Rajeev... · Encotec Energy (India) Pvt. Ltd. ... Power plants;

The Plasma Torch Ignition of Pulverized Coal to Enlarge

Plasma jet

Three times wind

Secondary wind

Enriched Coal

Enriched Coal

FurnacePlasma jet

Secondary wind

Three times wind

The first

stage flame

The second

stage flame

The third

stage flame

12 | VPC | ENCOTEC | WOM | PIS | 2017-02-02

Page 13: Encotec Energy (India) Pvt. Ltd. - netraconfer.ntpc.co.innetraconfer.ntpc.co.in/pdfs/RnD/2017/Day2/Session 7/3 Shri Rajeev... · Encotec Energy (India) Pvt. Ltd. ... Power plants;

The Component of Plasma Igniter

Ignition unit

Cathode inlet

Working

Anode outlet

Anode

Plasma igniter is mainly composed of anode, cathode,

ignition devices and other components. The rear of the

igniter is equipped with working medium gas, cooling water,

water-cooled cables and control circuit interface.

Working medium

gas

Anode and

cathode inlet

13 | VPC | ENCOTEC | WOM | PIS | 2017-02-02

Page 14: Encotec Energy (India) Pvt. Ltd. - netraconfer.ntpc.co.innetraconfer.ntpc.co.in/pdfs/RnD/2017/Day2/Session 7/3 Shri Rajeev... · Encotec Energy (India) Pvt. Ltd. ... Power plants;

NO. Name Unit Result Remarks

1Primary duct wind speed

m/s 18.0~26.0Plasma burner ignition winds

2primary air temperature ℃

Room temperature

~75

The Main Design Parameters of the Plasma Burner

3 pulverized coal t/h 4.0~10.0

4pulverized coal concentration

kg/kg 0.18~0.625 primary air duct

5vents wind

speedm/s 40~50

nozzle temperature by

1000℃

6burner

resistancePa <1000

ignition combustion

14 | VPC | ENCOTEC | WOM | PIS | 2017-02-02

Page 15: Encotec Energy (India) Pvt. Ltd. - netraconfer.ntpc.co.innetraconfer.ntpc.co.in/pdfs/RnD/2017/Day2/Session 7/3 Shri Rajeev... · Encotec Energy (India) Pvt. Ltd. ... Power plants;

Product Type

Product Type PICS-I2-100 PICS-I2-150 PICS-300

Unit 100~1200MW 300~1200MW 300~1200MW

Received basis volatiles More than 18% 15%~18% More than 12%

Type of BurnerOnce-

Though/SwirlingOnce-

Though/SwirlingOnce-

Though/Swirling

Rate powerRate power 100kW 150kW 300kW

Voltage 380±10%V 380±10%V 380±10%V

Capacity 180kVA 250kVA 400kVA

Cooling water 4m³/h 5m³/h 7m³/h

Working gas 80Nm³/h 100Nm³/h 120Nm³/h

15 | VPC | ENCOTEC | WOM | PIS | 2017-02-02

Page 16: Encotec Energy (India) Pvt. Ltd. - netraconfer.ntpc.co.innetraconfer.ntpc.co.in/pdfs/RnD/2017/Day2/Session 7/3 Shri Rajeev... · Encotec Energy (India) Pvt. Ltd. ... Power plants;

Experience

No Power Plant Capacity UnitBoiler

manufacturerCombustion

modeType of coal Location

1 Hefei power plant 600MW #5 DECOpposed

Firing Bituminous coal Anhui

2 Tongling power plant 1000MW #5 SECTangential

FiringBituminous

coalAnhui

3 Maanshan power plant 660MW #1 SECTangential

FiringBituminous

coalAnhui

4Gansu jinchang

cogeneration power plant330MW #1、#2

Wuhan boiler manufacturer

Tangential Firing

Bituminous coal Gansu

5 Hefei power plant 600MW #6 DECOpposed Firing

Bituminous coal Anhui

6Xinjiang jiarun power

plant350MW #3、#4 SEC

Tangential Firing

Brown coal Xinjiang

7 Pingwei power plant 1000MW #5、#6 Beijing baweiOpposed

Bituminous coal Anhui7 Pingwei power plant 1000MW #5、#6 Beijing baweiOpposed

Firing Bituminous coal Anhui

8 Luan power plant 600MW #3、#4 SECTangential

FiringBituminous coal Anhui

9 Dapu power plant 660MW #1、#2 SECTangential

FiringBituminous coal Guangdong

10 Xuancheng power plant 660MW #2 HECTangential

FiringBituminous coal Anhui

11 Fuzhou power plant 1000MW #1、#2 DECOpposed

Firing Bituminous coal Jiangxi

12 Xinjiang qitai power plant 660MW #1、#2 HECOpposed

Firing Zhundong coal Xinjiang

13 Banji power plant 1000MW #1、#2 SECTangential

FiringBituminous coal Anhui

16 | VPC | ENCOTEC | WOM | PIS | 2017-02-02

Page 17: Encotec Energy (India) Pvt. Ltd. - netraconfer.ntpc.co.innetraconfer.ntpc.co.in/pdfs/RnD/2017/Day2/Session 7/3 Shri Rajeev... · Encotec Energy (India) Pvt. Ltd. ... Power plants;

On-Site Visits to China

ENCOTEC in coordination with WOM will arrange visits to Powerplants of WOM in Anhui province of China where similar PlasmaIgnition Systems (PIS) have been installed & operatingsatisfactorily for last many years.

17 | VPC | ENCOTEC | WOM | PIS | 2017-02-02

Page 18: Encotec Energy (India) Pvt. Ltd. - netraconfer.ntpc.co.innetraconfer.ntpc.co.in/pdfs/RnD/2017/Day2/Session 7/3 Shri Rajeev... · Encotec Energy (India) Pvt. Ltd. ... Power plants;

ENCOTEC - WOM Scope of Work

• Complete coordination with Owner;

• Design, Engineering & supply of PIS on CIF basis at any Indian port;

• Storage of PIS at site;

• Installation of PIS;

• Commissioning of PIS;

• Operation support to Owner;• Operation support to Owner;

• After Sale Services for next five (5) years including spares, which may

be further extended as per mutual agreement;

18 | VPC | ENCOTEC | WOM | PIS | 2017-02-02

Page 19: Encotec Energy (India) Pvt. Ltd. - netraconfer.ntpc.co.innetraconfer.ntpc.co.in/pdfs/RnD/2017/Day2/Session 7/3 Shri Rajeev... · Encotec Energy (India) Pvt. Ltd. ... Power plants;

Our Plasma ignition products are in safe operation and economic benefits, energy conservation, environmental protection and investment cost has been achieved by the major power generation companies, electric power design institute and boiler manufacturers.

Page 20: Encotec Energy (India) Pvt. Ltd. - netraconfer.ntpc.co.innetraconfer.ntpc.co.in/pdfs/RnD/2017/Day2/Session 7/3 Shri Rajeev... · Encotec Energy (India) Pvt. Ltd. ... Power plants;

… FOR BETTER RESULTS.