35
Federal Lands Highway Polymer-Modified Emulsion Program NEPPP Meeting October 21, 2008 Chris Lubbers Sr. Technical Service Engineer BASF Corporation (704) 587-8145 [email protected] Helping Make Products Better TM

Emulsions 101 - Lubbers

Embed Size (px)

Citation preview

Page 1: Emulsions 101 - Lubbers

Federal Lands HighwayPolymer- Modified Emulsion

Program

NEPPP MeetingOctober 21, 2008

Chris LubbersSr. Technical Service Engineer

BASF Corporation(704) 587-8145

[email protected]

Helping MakeProducts Better TM

Page 2: Emulsions 101 - Lubbers

2

Summary

� Sponsored by FHWA (~2006)� Administered by NCPP� G. King – Program manager

� Extensive PME literature review completed� J. Johnston – NCPP – White paper

� Deliverable – Proposed spec for PME’s� Field projects – Central Bureau Fed Lands� Report-only data – BASF, PRI, Paragon

Page 3: Emulsions 101 - Lubbers

3

PME Specification Targets

� Low temperature recovery method� Preserves polymer morphology/structure� Requires Supplier Certification Program

� All residue testing completed on DSR

� Includes performance testing � Chip seal� Polymer-modified slurry� Micro surfacing

Page 4: Emulsions 101 - Lubbers

4

Strawman PME Specification Recovery Method + High T Testing

Testing Protocol f or 2008 Evaluations PROPERTY TEST METHOD SPEC RESULT

Asphalt Emulsion as Received Standard AASHTO or ASTM tests:

AASHTO M-140 Emulsified Asphalt or AASHTO M-208 Cationic Emulsified Asphalt

Field Viscosity Test WYDOT 538.0 Report

Residue Recovery (24 hours @ 25°C, 24 hours @ 60°C, For ced Draft Oven) Frequency Sweep (25 mm, 0.1 – 100 rad/sec, 10% Strain) AASHTO T 315

Frequency Sweep (G*, δ, etc…)

Multiple Stress Creep Recovery (100, 1000, 3200 & 10,000Pa)

HTG* TP 70-08 % Recovery & Jnr at each

stress level Frequency Sweep (25 mm, 0.1 – 100 rad/sec, 10% Strain) AASHTO T 315

Frequency Sweep (G*, δ, etc…)

Multiple Stress Creep Recovery (100, 1000, 3200 & 10,000Pa)

HTG - 6°C

TP 70-08 % Recovery & Jnr at each stress level

Frequency Sweep (25 mm, 0.1 – 100 rad/sec, 10% Strain) AASHTO T 315

Frequency Sweep (G*, δ, etc…)

Multiple Stress Creep Recovery (100, 1000, 3200 & 10,000Pa)

HTG -12°C

TP 70-08

Report

% Recovery & Jnr at each stress level

Test Strain Sweep, 1 – 50% strain, 10 rad/s 25ºC

• Resistance to Deformation: G*/sind @ 12% Strain

• Strain Tolerance: Strain Level at which G* < 90% G* initial

• Failure Properties: Strain Level at which G* <50% G* initial

Page 5: Emulsions 101 - Lubbers

5

Strawman PME Specification Intermediate and Low T Testing

Pressure Aging Residue (100°C, 300 psi, 20 hours) R 28 (PAV run on residue obtained by Forced Draft Oven Method run in PAV pan) Frequency Sweep (25 mm, 0.1 – 100 rad/sec,1% Strain) AASHTO T 315

Frequency Sweep (G*, δ, etc…)

Multiple Stress Creep Recovery (100, 1000, 3200 & 10,000Pa)

HTG* TP 70-08

% Recovery & Jnr at each stress level

Frequency Sweep (25 mm, 0.1 – 100 rad/sec,1% Strain) AASHTO T 315

Frequency Sweep (G*, δ, etc…)

Multiple Stress Creep Recovery (100, 1000, 3200 & 10,000Pa)

HTG - 6°C

TP 70-08 % Recovery & Jnr at each stress level

Frequency Sweep (25 mm, 0.1 – 100 rad/sec,1% Strain) AASHTO T 315

Frequency Sweep (G*, δ, etc…)

Multiple Stress Creep Recovery (100, 1000, 3200 & 10,000Pa)

HTG -12°C

TP 70-08 % Recovery & Jnr at each

stress level Frequency Sweep (8 mm, 0.1-100 rad/sec, % Strain (TBD)) 0°C

Frequency Sweep (G*, δ, etc…)

Frequency Sweep (8 mm, 0.1-100 rad/sec, % Strain (TBD))

10°C Frequency Sweep

(G*, δ, etc…) Frequency Sweep (8 mm, 0.1-100 rad/sec, % Strain (TBD))

20°C

AASHTO T 315

Report

Frequency Sweep (G*, δ, etc…)

Test Strain Sweep, 1 – 50% strain, 10 rad/s 25ºC

• Resistance to Deformation: G*/sind @ 12% Strain

• Strain Tolerance: Strain Level at which G* < 90% G* initial

• Failure Properties: Strain Level at which G* <50% G* initial

Bending Beam Rheometer -12°C + -18°C

AASHTO T 313 Stiffness + m-value

Page 6: Emulsions 101 - Lubbers

6

Strawman PME Specification Performance Testing

Performance tests for Chip Seals Sweep Test Modified ASTM D-7000 Report

Performance tests for Polymer Modified Slurry Seals and Micro-Surfacing Recommended Performance Guidelines for Emulsified Asphalt Slurry Seal Surfaces ISSA A105 ISSA

Recommended Performance Guidelines for Polymer Modified Micro-Surfacing ISSA A143 ISSA

Tests recommended by Caltrans Slurry/Micro-Surface Mix Design Procedure Project /Contract 65A0151 TBD

* High Temperature Performance Grade as selected for local climate (LTPPBind version 3.1)

Page 7: Emulsions 101 - Lubbers

7

Central Bureau Fed Lands Projects Strawman – Report-Only Data

� Testing Labs (Third Party + Industry):� PRI Asphalt Technologies, Inc (Tampa, FL)

� Paragon Technical Services, Inc. (Richland, MS)� BASF Corporation (Charlotte, NC)

Project Date System(s)Utah Parks September, 2008 Chip Seal - CRS-2P (SBR)

Micro Surfacing (NRL, Ralumac)

Dinosaur Natl. Monument September, 2008 Chip Seal - PASS - CRS-2P (Latex)

Death Valley November, 2008 Chip Seal (SBR, SBS?)

Crater Lake Spring 2009 Chip Seal (TBD)

Page 8: Emulsions 101 - Lubbers

Emulsions 101Polymer-Modified Emulsions

for Surface Treatments

NEPPP MeetingOctober 21, 2008

Chris LubbersSr. Technical Service Engineer

BASF Corporation(704) 587-8145

[email protected]

Helping MakeProducts Better TM

Page 9: Emulsions 101 - Lubbers

9

Outline

� Asphalt emulsion primer

� What are polymers?

� Why polymers for asphalt emulsions?

� Modification of asphalt emulsions

� Polymer networks in asphalt emulsions

� Impact on performance + properties

Page 10: Emulsions 101 - Lubbers

10

Asphalt Emulsions - Formulation

� Components

�Asphalt

�Surfactant (surface active agents, emulsifiers)

�Water

�Mechanical energy (colloid mill)

� Other Ingredients

�Additives (calcium chloride, cutback agents,…)

�Modifiers – Polymers

Page 11: Emulsions 101 - Lubbers

11

� Dispersion of asphalt in water�Water – continuous phase�Asphalt – non-continuous or dispersed phase

–Stabilized by surfactant

� Surfactant emulsion class .

�Cationic

�Anionic

�Nonionic

Asphalt Emulsions – Component Distribution

Page 12: Emulsions 101 - Lubbers

12

Asphalt DropletsAsphalt Droplets

0

2

4

6

8

0.1 1 10 100

Particle Size, µµµµm

Vol

ume

%

Page 13: Emulsions 101 - Lubbers

13

What are Poly mers?

� Comprised of many small molecules�Poly = many

�Monomers = small molecules or repeat units

� Monomers chemically react larger molecules�Water-based polymers – latex form (SBR)

�Solvent-based polymers – pellets, bale (SB-,SBS)

� Properties are determined by:�Types and sequence of monomers

�Molecular weight

Page 14: Emulsions 101 - Lubbers

14

Polymer Types for Asphalt Mod.

� SBR Latex – Chip Seals, Slurry and Micro Surfacing

� SB/SBS – Chip Seals

� Natural Rubber Latex – Ralumac (Micro Surfacing)

� Other – Neoprene, EVA, GTR (REAS), Fibers

Page 15: Emulsions 101 - Lubbers

15

Typical Monomers

C C

C C

H

H

H

H

H

H

Styrene

Butadiene

C C

H H

H

H

HH

H

H

C C

C C

H

H

CH3

H

H

H

Isoprene (NR)

Page 16: Emulsions 101 - Lubbers

16

Viscoelastic Behavior Cured Latex Modified Asphalt Emulsion

� G* = f(T) = deform. resist.

� Asphalt� High G* at low T – brittle� Low G* at high T – viscous � ∆∆∆∆G*(80oC – 20oC) = 1000x

�SBR Polymer� Lower G* at low T – flexible� Higher G* at high T – elastic� ∆∆∆∆G*(80oC – 20oC) = 10x

1.E+03

1.E+04

1.E+05

1.E+06

1.E+07

1.E+08

1.E+09

-60 -40 -20 0 20 40 60 80

Temperature, °C

Com

plex

Mod

ulus

[G*]

, Pa

AAA-1 Asphalt

SBR Polymer

Low T g

High Molecular Weight

Page 17: Emulsions 101 - Lubbers

17

Polymer Modification of Asphalt Emulsions

� Emulsify polymer modified asphalt

� “Pre-modified” emulsion

� Polymers – SBS, SB-

� Higher mod. asphalt viscosity

� higher asphalt + mill temp.

� Exit temp. > 100oC

� Heat exchanger, back press.

� Polymer inside asphalt droplet

Page 18: Emulsions 101 - Lubbers

18

Polymer Modification of Asphalt Emulsions

� Add latex external to asphalt � Methods

– soap batching

– co-milling – asphalt line

– co-milling – soap line

� Polymers – SBR, NR latex

� Lower asphalt process T

� No special mill, handling

� Polymer in water phase

� Continuous polymer film formation on curing

Page 19: Emulsions 101 - Lubbers

19

Bitumen

Latex

Latex Modified Emulsion Cured Bitumen Emulsion

• Optimum for Fine Polymer Network Formation

Latex Polymer-Modified Asphalt Emulsion

Page 20: Emulsions 101 - Lubbers

20

Chip Seal – Field Application

Page 21: Emulsions 101 - Lubbers

21

Chip Seal Surface Treatment

Near Taos, NM

Page 22: Emulsions 101 - Lubbers

22

CRS-2 vs.CRS-2P(LM) – Physical Props.

3 wt.% SBR latex polymer (on asphalt)

� Residue�ASTM D 6934 - Oven evaporation at 163oC

� Polymer�Raises SP, drastically increases ductility and ER

Test Method CRS-2 CRS-2PR&B Softening Point ( oF) ASTM D 36 115 128Ductility (4 oC, cm) ASTM D 113 21 150+Elastic Recovery (10 oC, %) AASHTO T 301 5 60

Page 23: Emulsions 101 - Lubbers

23

Sweep Testing – CRS-2P vs CRS-2ASTM D7000 - 04

Page 24: Emulsions 101 - Lubbers

24

� Latex polymers accumulate at optimum location

� Act to glue aggregate together!!!

Chip Seal with Latex Modified CRS

Aggregate particles Emulsion Residue

Page 25: Emulsions 101 - Lubbers

25

Curing of CRS-2LM Emulsion

� Water in asphalt emulsion wicks the aggregate surfa ce.� Order of migration = Water, latex particles, asphalt droplets

Page 26: Emulsions 101 - Lubbers

26

Latex Polymer Distribution –Unstable CRS-2L Emulsion

� Latex particles migrate together with water???� Polymer rich regions around aggregate = NO

Waterwicking

CRS-2LM with Surfactant A

Page 27: Emulsions 101 - Lubbers

27

Latex Polymer Distribution –Stable CRS-2L Emulsion

� Latex particles migrate together with water!� Polymer rich regions around aggregate = YES

Waterwicking

CRS-2LM with Surfactant D

Page 28: Emulsions 101 - Lubbers

28

Micro Surfacing Operation

Cohesion Development<1 hrCohesion Development<1 hr1min<Mix Time<3 min1min<Mix Time<3 min

Page 29: Emulsions 101 - Lubbers

29

Micro Surfacing – High ADT + ESAL’s

AUTOBAHN

Paved in Oct. 2001Photo from Sept. 2003

Page 30: Emulsions 101 - Lubbers

30

Micro Surfacing Mix Formulation

• Blade Coating Operation• 2 m wide + <1 cm thick• 4-5 km/hour• Traffic within 1 hour

• Latex Polymer Binds • Asphalt • Fines to Aggregates

Aggregate

Emulsion

Water

Cement

Latex Polymer =

3% of Asphalt

Page 31: Emulsions 101 - Lubbers

31

Micro Surfacing – Polymer Morphology Field Application

5µµµµm

Texas State Highway 84

• Near Waco,TX

• Paved in 1998

• Samples taken in 2001

Page 32: Emulsions 101 - Lubbers

32

Cured Latex Polymer Network

Micro Surfacing Latex Foam

Page 33: Emulsions 101 - Lubbers

33

Wet Track Abrasion Loss – ISSA TB-100

SBR latex polymer� 50% reduction in loss

� one hour soak � 67% reduction in loss

� six day soak

� Surface of mix� tougher �more abrasion res.

� Adhesion + water resistance� improved

05

1015202530354045

Loss

(g/

ft2 )

Unmod. SBR

1 Hour 6 Day

3 wt% SBR (on asphalt)

Page 34: Emulsions 101 - Lubbers

34

Micro Surfacing Residue – SHRP Grade

64

70

76

82

0 10 20 30 40 50

Curing Time, day

Tem

p. a

t G*/

sin(

δδ δδ)=

1kP

a, °

C

Emulsion Only

Emulsion+Cement

Emulsion+Cement+SBR Latex

30 days Cured

60

65

70

75

80

85

90

Emulsiononly

+ Cement +3% Latex

Pha

se A

ngle

at G

*sin

(δδ δδ

)=1k

Pa,

deg

ree

Rut

ting

resi

stan

ce te

mpe

ratu

re,

°C

Page 35: Emulsions 101 - Lubbers

35

Summary – Polymer Modified Emulsions

� Chip seals•Early and long term chip retention

•High temperature strength

• Low temperature flexibility

� Slurry seal and micro surfacing• Improved mix cohesion

•Reduction in abrasion loss of aggregate

•Resistance to deformation