Southern Company Transmission
Georgia Control Center
8/2/2019 EMS Picture
2/25
Eastern Interconnect
~700,000 MWs interconnected and
operated synchronously. Operations and transactions must
be closely coordinated.
Ability to lean on others aids thereliability of all participants.
However, distant events can havewidespread impacts.
North American Electric Reliability
Corporation (NERC)
8/2/2019 EMS Picture
3/25
Georgia Power Company Transmission
Transmission Lines
o 46 kV & 69 kV 3,520 miles
o 115 kV 5,553 miles
o 230 kV 2,158 mileso 500 kV 1,100 miles
Substations
o 227 Trans. and Gen.
o 1955 Distribution
Load Data
o So. Control Area: 48,000 MW
o GPC: 29,800 MW
8/2/2019 EMS Picture
4/25
Tie Lines and Control Centers
Tie Lines are thetransmission linesconnecting electricutilities
There are 53 TieLines that connectSouthern Company toneighboring utilities inthe Southeast
8/2/2019 EMS Picture
5/25
Power Coordination Centero System Balancing Authority
o Reliability Coordinator
o Monitor Interface Flows
o Facilitate Transmission Transactions
Local Transmission Control Centerso Monitor and Control the Transmission System
o Facilitate Work Requests
o Local Security
o Restoration
Distribution Control Centerso Monitor and Control Distribution Breakers and Feeders
o Communicate with distribution customers
Southern Company Operations
8/2/2019 EMS Picture
6/25
How Does the GCC Function?
Floor Operators
SystemOperators (SO) AreaOperators
ensure reliabilityand security of thetransmission grid
in GA
monitor andcontrol the
transmission gridin GA in real-time
Pre-Arrange
process requests,write safe
switching orders,communicate with
personnel
Security
study transmissionwork requests to
ensure the work isdone in a way tokeep grid reliable Support
Engineersprovide technical
guidance asneeded
8/2/2019 EMS Picture
7/25
8/2/2019 EMS Picture
8/25
System Operator Desk
o Perform contingency analysis and security studies
o Develop operating solutions for identified
contingencies
o Monitor system voltage schedule
o Analyze outages and assist Area desk withrestoration plans
o Communicate with PCC and external entities
Desk Responsibilities Continued
8/2/2019 EMS Picture
9/25
Other Functions
Pre-Arrange
o Coordinate all work requests for facility outages
1More than 12,000 in 2010
o Verify feasibility of work requests through SystemSecurity
o Write accurate and safe switching orders
o Notify all impacted parties of work requests
o Compile and distribute the daily work summary
8/2/2019 EMS Picture
10/25
Other Functions Continued
System Security
o Conduct security studies/perform contingencyanalysis for outage requests
o Develop necessary operating solutions to facilitatemajor construction projects
o Coordinate with Transmission Planning group to helpplan to build reliable system
o
Conduct annual Summer Operating Study and reportresults
8/2/2019 EMS Picture
11/25
Other Functions Continued
Support Engineers
o Provide technical support to other GCC groups
o Collect and distribute data from the field
o Verify equipment data with field personnel and otheroperating companies
o Produce and maintain operating procedures (e.g.Blackstart)
o Fault Data Analysis
8/2/2019 EMS Picture
12/25
Operator Tools
Energy Management System (EMS)o PNA (Power Network Analysis) view real-time data
from EMS and also perform and build case studies
o OPNA (Offline PNA) perform studies and N-1
contingency analysiso EMo (Electronic Monitor) view real-time status to
get the big picture quickly
o Dynamic Line Rating
o Fault Location
8/2/2019 EMS Picture
13/25
Operator Tools
Other Simulation and Viewing Toolso PowerWorld view real-time flows, also big picture
o PSS/E perform studies and in-depth contingencyanalysis using modified planning model
o TransMapo GenVarr
o Situational Awareness
8/2/2019 EMS Picture
14/25
EMS Real-time Screenshot Example
Operator Tools
8/2/2019 EMS Picture
15/25
PowerWorld Real-time Screenshot Example
Software Tools
8/2/2019 EMS Picture
16/25
8/2/2019 EMS Picture
17/25
Reliability Tools
Weather Forecasts
Lightning Tracker
Fault Data Analysis Geographic Information System
Summer Operating Study
Sub-Transmission Automation
8/2/2019 EMS Picture
18/25
Weather Reports
8/2/2019 EMS Picture
19/25
8/2/2019 EMS Picture
20/25
Determine Location of Lightning Event
FALLSFault
AnalysisandLightning
Location
System
8/2/2019 EMS Picture
21/25
8/2/2019 EMS Picture
22/25
EMS Real-time Screenshot Example
Operator Tools
8/2/2019 EMS Picture
23/25
Summer Operating Database - Overload
8/2/2019 EMS Picture
24/25
Current Issues
Reliability Standards
Cyber Security
Employee Skills and Training Staffing