What connected operationscould look like.
2Microsoft Services
08:05 AMThe Maintenance Manager shows the engineer their automated predictive maintenance capability that plots sensor information geographically on a large map.
Suharto YuwonoMaintenance Manager
Indra CahyadiNew Maintenance Engineer
Probability of Failure
Probability of Failure
Rig Manager: Diamond OffshoreRog Owner: Diamond OffshoreRig Type: DrllingGeneration: 3Rid Design: Earl & Wight, Sedco SeriesRated water depth: 1800 ftDrilling depth: 25,000 ft
Operating StatusStatus: WorkingOperator: Shell
Region: Muara BadakCountry: Indonesia
Current water depth: 315 ft
Equipment detailsDreco 185' x 50' x 40'; Capacity: 1,333,000 lbsOilwell E-3000 3,000 HP3 x Oilwell A-1700-PT triplex 12in, 1600 HPVarco TDS-4S driven by a GE 752Oilwell 49.5 in. diameter Model A-495Earl & Wright/Sedco 711 Series
ConstructionGustoMSC CJ46
Kim Seah Shipyard 2016
Ocean Vanguard
Suharto YuwonoMaintenance Manager
Indra CahyadiNew Maintenance Engineer
08:10 AMThe map predicts time to failure for hundreds of thousands of parts across the oil rigs, pipelines and refineries. It then summarizes this and displays a color coded map for easy visual identification of locations with pending maintenance requirements.
Probability of Failure
Probability of Failure
Rig Manager: Diamond OffshoreRog Owner: Diamond OffshoreRig Type: DrllingGeneration: 3Rid Design: Earl & Wight, Sedco SeriesRated water depth: 1800 ftDrilling depth: 25,000 ft
Operating StatusStatus: WorkingOperator: Shell
Region: Muara BadakCountry: Indonesia
Current water depth: 315 ft
Equipment detailsDreco 185' x 50' x 40'; Capacity: 1,333,000 lbsOilwell E-3000 3,000 HP3 x Oilwell A-1700-PT triplex 12in, 1600 HPVarco TDS-4S driven by a GE 752Oilwell 49.5 in. diameter Model A-495Earl & Wright/Sedco 711 Series
ConstructionGustoMSC CJ46
Kim Seah Shipyard 2016
Ocean Vanguard
08:10 AMThe map predicts time to failure for hundreds of thousands of parts across the oil rigs, pipelines and refineries. It then summarizes this and displays a color coded map for easy visual identification of locations with pending maintenance requirements.
Suharto YuwonoMaintenance Manager
Indra CahyadiNew Maintenance Engineer
08:15 AM
Teguh LieCC Engineer
Indra CahyadiNew Maintenance Engineer
Suharto introduces Indra to CC EngineerTeguh Lie. Teguh shows Indra how real-time Condition Based Maintenance not only drives the weekly scheduling process for maintenance, but also provides daily scenario updates which allow CC operators to make last minute optimizations to the schedule.
8:20 AM10/23/2014
27 28
Temperature Sensor
Motor source
Standpipe
Drill Line
Pipe Rack
Kelly Drive
Suction line
Goose-neck
Vibrating Hose
FILE ACTIONS ADMINISTRATION RESOURCES SYSTEM UTILITIES
Schedule Transfers Assets Resources Timelines Projects Resources Orders Inventory Updates Help
Task
Frequency
Priority
Annually From
Annually To
Starting From
Last Scheduled
Standard Time
Weekly
2
October
November
25 Oct 14
16 Oct 14
1.00
Type
Class
Shop
Rig Officer
Safety
Lockout
Inspection
Preventative
B
General Maintenance
Nedine Shenkar
Yes
Yes
Yes
Crew Details
CREW NAMES
C1 Day 12 Hour
C2 Day 12 Hour
C3 Night 8 Hour
C4 Day 8 Hour
Head Count
12
12
10
10
Task
Work List 908
Work List 367
Work List 673
Work List 277
Last reading on
23 Sep 14
23 Sep 14
22 Sep 14
21 Sep 14
Weekly reading
1700
1250
1789
1239
Run hour per m
60
75
55
75
Duration
23
62
55
48
08:20 AMIndra sees that the new method is much more effective than the old way of shutting down entire facilities to do maintenance on all parts, even when not completely necessary at that time.
Teguh LieCC Engineer
Indra CahyadiNew Maintenance Engineer
8:20 AM10/23/2014
Oct 23
Oct 23 24 25 26 27
FILE ACTIONS ADMINISTRATION RESOURCES SYSTEM UTILITIES
Predictive Maintenance Scenarios for Week 25, Oct – 31, Oct 2014
CREW NAMES
C1 Day 12 Hour
C2 Day 12 Hour
C3 Night 8 Hour
C4 Day 8 Hour
Head Count
12
12
10
10
Task
Work List 908
Work List 367
Work List 673
Work List 277
CREW NAMES
C1 Day 12 Hour
C2 Day 12 Hour
C3 Night 8 Hour
C4 Day 8 Hour
Head Count
12
12
10
10
Task
Work List 908
Work List 367
Work List 673
Work List 277
CREW NAMES
C1 Day 12 Hour
C2 Day 12 Hour
C3 Night 8 Hour
C4 Day 8 Hour
Head Count
12
12
10
10
Task
Work List 908
Work List 367
Work List 673
Work List 277
Scenario 2
Scenario 3
M T W T F S S
M T W T F S S
Scenario 1
M T W T F S S
October 2014
321 4
10987 1165
17161514 181312
24232221 252019
31302928 12726
302928
23
23 Oct 2014
26
28
27 28 29 30
08:25 AM
Teguh LieCC Engineer
Indra CahyadiNew Maintenance Engineer
Teguh shows Indra the weekly maintenance scenarios which are generated based on predictive models that take into account all constraints and options – including predicted time to failure, relative importance of that part to overall functioning, availability of staff and parts, production schedules, weather patterns, etc. CC operators evaluate the options based upon their experience and formalize the weekly maintenance schedule. The cycle is repeated on a daily basis to fine tune schedules based upon last minute changes and/or sensor readings.
08:30 AMWeekly schedules as well as daily schedule updates are then transmitted directly to the ruggedized tablets of each maintenance engineer.
Johan SusmanMaintenance Engineer
10
Probability of Failure
Probability of Failure
Rig Manager: Diamond OffshoreRog Owner: Diamond OffshoreRig Type: DrllingGeneration: 3Rid Design: Earl & Wight, Sedco SeriesRated water depth: 1800 ftDrilling depth: 25,000 ft
Operating StatusStatus: WorkingOperator: Shell
LocationRegion: Muara Badak
Country: IndonesiaCurrent water depth: 315 ftEquipment details
Dreco 185' x 50' x 40'; Capacity: 1,333,000 lbsOilwell E-3000 3,000 HP3 x Oilwell A-1700-PT triplex 12in, 1600 HPVarco TDS-4S driven by a GE 752Oilwell 49.5 in. diameter Model A-495Earl & Wright/Sedco 711 Series
ConstructionGustoMSC CJ46
Kim Seah Shipyard 2016
Ocean Vanguard
Motor pump J7-11 -57392vibrating beyond the tolerance limits
60% chance of failure within 7 days
Operating Status : RED ALERT
09:00 AMAn exception is flagged up on the large screens of the Command Center. One of the pumps on an offshore oil rig appears to have begun vibrating beyond the tolerance limits.
Teguh LieCC Engineer
Indra CahyadiNew Maintenance Engineer
Do you want to know what happens next?
He is in charge of piloting the drone to check on site what
happened and evaluate visually the
damages to recommend intervention
Will Thomson
Drone Operator
He is responsible forhaving the parts
available and ship them to the right location so the
operation can be quickly executed
Benny Darmadi
Warehouse Manager
He is a millennium and just joined the company and he is
looking at leveraging tools that are simple to use as the ones he uses in his daily life.
IndraCahyadiNew Maintenance
Engineer
He is in charge of managing the maintenance
operations and leverages analytics and
Internet of Things to have comprehensive view so he can plan
preventive and reactive activities.
Suharto Yuwono
Maintenance Manager
He is always on the move and looks at
having solutions that connected in real
time with the command center so he has always up to date information.
Johan SusmanField Maintenance
Engineer
He is monitoring what is happening and manages all the
planning activities to allocate the proper
resources for preventive and
reactive maintenance operations.
TeguhLie
Command Center Engineer
13