22
Confidential Emission Control Manufacturers Association P. Panda Executive Vice President Engineering Division ECT 2016 “ Emission Control Technology for Sustainable Growth"

Emission Control Manufacturers Associationecmaindia.in/Uploads/image/25imguf_Mr.P.Panda(MSIL).pdf · CAFE1 CAFE2 BSVI + RDE Monitor BSVI BSVI + RDE CF Application & Engine Development

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Emission Control Manufacturers Associationecmaindia.in/Uploads/image/25imguf_Mr.P.Panda(MSIL).pdf · CAFE1 CAFE2 BSVI + RDE Monitor BSVI BSVI + RDE CF Application & Engine Development

Confidential

Emission Control Manufacturers Association

P. PandaExecutive Vice President – Engineering Division

ECT 2016

“ Emission Control Technology for Sustainable Growth"

Page 2: Emission Control Manufacturers Associationecmaindia.in/Uploads/image/25imguf_Mr.P.Panda(MSIL).pdf · CAFE1 CAFE2 BSVI + RDE Monitor BSVI BSVI + RDE CF Application & Engine Development

Confidential

Emission Control Manufacturers Association

Changing Timelines

Considerations for the Future

Page 3: Emission Control Manufacturers Associationecmaindia.in/Uploads/image/25imguf_Mr.P.Panda(MSIL).pdf · CAFE1 CAFE2 BSVI + RDE Monitor BSVI BSVI + RDE CF Application & Engine Development

Confidential

Emission Control Manufacturers Association

Changing Timelines

Considerations for the Future

Page 4: Emission Control Manufacturers Associationecmaindia.in/Uploads/image/25imguf_Mr.P.Panda(MSIL).pdf · CAFE1 CAFE2 BSVI + RDE Monitor BSVI BSVI + RDE CF Application & Engine Development

Confidential

2016-17 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26

Original

Plan

Revised

Plan

CAFE2CAFE1

BSVI + RDE Monitor

BSVI

BSVI + RDE CF

Application & Engine

Development

Engine & ATS Development

Application Dev.

Fleet Validation

BSV RDE

Changing Timelines :

Emission Control Manufacturers Association

BS VI Development

CAFE1 CAFE2

Course

CorrectionFleet Validation

(4 + 5) Years

4 YearsReduction in Timelines

Increase in Complications

Considerations for the Future

Changing Timelines

Page 5: Emission Control Manufacturers Associationecmaindia.in/Uploads/image/25imguf_Mr.P.Panda(MSIL).pdf · CAFE1 CAFE2 BSVI + RDE Monitor BSVI BSVI + RDE CF Application & Engine Development

Confidential

2016-17 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26

Original

Plan

Revised

Plan

CAFE2CAFE1

BSVI + RDE Monitor

BSVI

BSVI + RDE CF

Application & Engine

Development

Fleet Validation Course

Correction

Engine & ATS Development

Application Dev.

Fleet Validation

BSV RDE

Changing Timelines :

Emission Control Manufacturers Association

BS VI Development

CAFE1 CAFE2

IMPACT OF NO BSV

Page 6: Emission Control Manufacturers Associationecmaindia.in/Uploads/image/25imguf_Mr.P.Panda(MSIL).pdf · CAFE1 CAFE2 BSVI + RDE Monitor BSVI BSVI + RDE CF Application & Engine Development

Confidential

2016-17 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26

Original

Plan

Revised

Plan

CAFE2CAFE1

BSVI + RDE Monitor

BSVI

BSVI + RDE CF

Application & Engine

Development

Fleet Validation Course

Correction

Engine & ATS Development

Application Dev.

Fleet Validation

BSV RDE

Changing Timelines :

Emission Control Manufacturers Association

BS VI Development

CAFE1 CAFE2

BSIV

BSVI

1

3

22a

4a4

Impact of NO BSV

BSV

Original Approach (BSIV-BSV-BSVI)

Gas Exchange and CR

EGR and Cooling

Injection and Turbo System

Calibration

Base

Engin

e

Impro

vem

ents

Small DPF

Optimal Regenerations

Vehicle ImprovementsSmall De NOx

1 3 44 Yrs. 5 Yrs.

BSIV BSV BSVI

Page 7: Emission Control Manufacturers Associationecmaindia.in/Uploads/image/25imguf_Mr.P.Panda(MSIL).pdf · CAFE1 CAFE2 BSVI + RDE Monitor BSVI BSVI + RDE CF Application & Engine Development

Confidential

2016-17 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26

Original

Plan

Revised

Plan

CAFE2CAFE1

BSVI + RDE Monitor

BSVI

BSVI + RDE CF

Application & Engine

Development

Fleet Validation Course

Correction

Engine & ATS Development

Application Dev.

Fleet Validation

BSV RDE

Changing Timelines :

Emission Control Manufacturers Association

BS VI Development

CAFE1 CAFE2

BSIV

BSVI

1

3

22a

4a4

Impact of NO BSV

BSV

Original Approach (BSIV-BSV-BSVI)

Gas Exchange and CR

EGR and Cooling

Injection and Turbo System

Calibration

Base

Engin

e

Impro

vem

ents

Small DPF

Optimal Regenerations

Vehicle ImprovementsSmall De NOx

1 3 44 Yrs. 5 Yrs.

BSIV BSV BSVIMerits in Original Approach : (BSIV-BSV-BSVI)

Sufficient Time for Vehicle Level improvements ( BSV to BSVI ~ 5Yrs.)

Cost Effective/ Quality Effective approach due to availability of

Technologies from Europe.

New Approach >>

Page 8: Emission Control Manufacturers Associationecmaindia.in/Uploads/image/25imguf_Mr.P.Panda(MSIL).pdf · CAFE1 CAFE2 BSVI + RDE Monitor BSVI BSVI + RDE CF Application & Engine Development

Confidential

2016 2017 2018 2019 2020 2021 2022 2023 2024 2025

Original

Plan

Revised

Plan

FY

CAFE2CAFE1

BSVI + RDE Monitor

BSVI

BSVI + RDE CF

Application & Engine

Development

Fleet Validation Course

Correction

Engine & ATS Development

Application Dev.

Fleet Validation

BSV RDE

Emission Control Manufacturers Association

BS VI Development

CAFE1 CAFE2

IMPACT OF NO BSV

Considerations for the Future

BSIV

BSV

BSVI

1

3

2

4 a4

2a

1 4<4 Yrs.

BSIV BSVI Impact of NO BSV

New Approach (BSIV-BSVI)

Gas Exchange and CR

EGR and Cooling

Injection and Turbo System

Calibration

Base

Engin

e

Impro

vem

ents

Small DPF

Optimal Regenerations

Vehicle Improvements

De NOx

Page 9: Emission Control Manufacturers Associationecmaindia.in/Uploads/image/25imguf_Mr.P.Panda(MSIL).pdf · CAFE1 CAFE2 BSVI + RDE Monitor BSVI BSVI + RDE CF Application & Engine Development

Confidential

2016 2017 2018 2019 2020 2021 2022 2023 2024 2025

Original

Plan

Revised

Plan

FY

CAFE2CAFE1

BSVI + RDE Monitor

BSVI

BSVI + RDE CF

Application & Engine

Development

Fleet Validation Course

Correction

Engine & ATS Development

Application Dev.

Fleet Validation

BSV RDE

Emission Control Manufacturers Association

BS VI Development

CAFE1 CAFE2

IMPACT OF NO BSV

Considerations for the Future

BSIV

BSV

BSVI

1

3

2

4 a4

2a

1 4<4 Yrs.

BSIV BSVI Impact of NO BSV

New Approach (BSIV-BSVI)

Gas Exchange and CR

EGR and Cooling

Injection and Turbo System

Calibration

Base

Engin

e

Impro

vem

ents

Small DPF

Optimal Regenerations

Vehicle Improvements

De NOx

Considerations in New Approach : (BSIV-BSVI < 4Yrs)

Very Short Time for Vehicle Level improvements and Base Engine Design Changes.

Merits in Original Approach : (BSIV-BSV-BSVI)

Sufficient Time for Vehicle Level improvements ( BSV to BSVI ~ 5Yrs.)

Cost Effective/ Quality Effective approach due to availability of

Technologies from Europe.

Execution Of Task :OEM >>

Page 10: Emission Control Manufacturers Associationecmaindia.in/Uploads/image/25imguf_Mr.P.Panda(MSIL).pdf · CAFE1 CAFE2 BSVI + RDE Monitor BSVI BSVI + RDE CF Application & Engine Development

Confidential

2016-17 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26

Original

Plan

Revised

Plan

CAFE2CAFE1

BSVI + RDE Monitor

BSVI

BSVI + RDE CF

Application & Engine

Development

Engine & ATS Development

Application Dev.

Fleet Validation

BSV RDE

Changing Timelines :

Emission Control Manufacturers Association

BS VI Development

CAFE1 CAFE2

Fleet Validation Course

Correction

Page 11: Emission Control Manufacturers Associationecmaindia.in/Uploads/image/25imguf_Mr.P.Panda(MSIL).pdf · CAFE1 CAFE2 BSVI + RDE Monitor BSVI BSVI + RDE CF Application & Engine Development

Confidential

2016-17 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26

Revised

Plan

BSVI + RDE Monitor BSVI + RDE CF

Considerations for the Future

Emission Control Manufacturers Association

CAFE1 CAFE2

35

Variants

Total Variants ~ 350

Total Manufacturers : 10

Variants / Manufacturer : 35

Huge Quantum : 2 Yrs. = 35 models

~2 Vehicle/ Month

Timespan < 4 Yrs.

Skilled Manpower in huge

numbers

Skilled Manpower in Huge Nos. Required

?

Actual Fuel

Availability

Phasing In

Ideal Fuel

Availability

Phasing In gives adequate time to plan and implement

Execution Of Task :OEM >>

Page 12: Emission Control Manufacturers Associationecmaindia.in/Uploads/image/25imguf_Mr.P.Panda(MSIL).pdf · CAFE1 CAFE2 BSVI + RDE Monitor BSVI BSVI + RDE CF Application & Engine Development

Confidential

2016-17 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26

Revised

Plan

BSVI + RDE Monitor BSVI + RDE CF

Considerations for the Future

Emission Control Manufacturers Association

CAFE1 CAFE2

35

Variants

Total Variants ~ 350

Total Manufacturers : 10

Variants / Manufacturer : 35

Huge Quantum : 2 Yrs. = 35 models

~2 Vehicle/ Month

Timespan < 4 Yrs.

Skilled Manpower in huge

numbers

Skilled Manpower in Huge Nos. Required

?

Actual Fuel

Availability

Phasing In

Ideal Fuel

Availability

Phasing In gives adequate time to plan and implement

Execution Of Task :OEM >>

Considerations in New Approach : (BSIV-BSVI < 4Yrs)

Very Short Time for Vehicle Level improvements and Base Engine Design Changes.

Merits in Original Approach : (BSIV-BSV-BSVI)

Sufficient Time for Vehicle Level improvements ( BSV to BSVI ~ 5Yrs.)

Cost Effective approach due to availability of Technologies from Europe.

Skilled Manpower in huge nos. and Phasing In to meet the target.

Execution Of Task :Supplier >>

Page 13: Emission Control Manufacturers Associationecmaindia.in/Uploads/image/25imguf_Mr.P.Panda(MSIL).pdf · CAFE1 CAFE2 BSVI + RDE Monitor BSVI BSVI + RDE CF Application & Engine Development

Confidential

2016-17 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26

Revised

Plan

BSVI + RDE Monitor BSVI + RDE CF

Considerations for the Future

Emission Control Manufacturers Association

CAFE1 CAFE2

Investment Period

Supplier / Part : 4

Skilled Manpower in huge nos. required

4 Million

Market Size

1Mn / Yr.

Parts :(BSIV-BSVI)Sensors : DPF :

Urea :SCR/NSC :

Fuel injector system :

EGR system

Prod.

New Industry come In

Cost (For Consumer) and Technology to be developed hand in hand indigenously.

Execution Of Task :Supplier >>

Ramp

up

Page 14: Emission Control Manufacturers Associationecmaindia.in/Uploads/image/25imguf_Mr.P.Panda(MSIL).pdf · CAFE1 CAFE2 BSVI + RDE Monitor BSVI BSVI + RDE CF Application & Engine Development

Confidential

2016-17 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26

Revised

Plan

BSVI + RDE Monitor BSVI + RDE CF

Considerations for the Future

Emission Control Manufacturers Association

CAFE1 CAFE2

Investment Period

Supplier / Part : 4

Skilled Manpower in huge nos. required

4 Million

Market Size

1Mn / Yr.

Parts :(BSIV-BSVI)Sensors : DPF :

Urea :SCR/NSC :

Fuel injector system :

EGR system

Prod.

New Industry come In

Cost (For Consumer) and Technology to be developed hand in hand indigenously.

Execution Of Task :Supplier >>

Ramp

up

Considerations in New Approach : (BSIV-BSVI < 4Yrs)

Very Short Time for Vehicle Level improvements and Base Engine Design Changes.

Merits in Original Approach : (BSIV-BSV-BSVI)

Sufficient Time for Vehicle Level improvements ( BSV to BSVI ~ 5Yrs.)

Cost Effective approach due to availability of Technologies from Europe.

Suppliers Skill Upgradation In huge nos. required in a very short timeframe.

Skilled Manpower in huge nos. and Phasing In to meet targets.

Engine/ Platform Design Constraints

Cost (For Consumer) and Technology to be developed hand in hand indigenously.

Page 15: Emission Control Manufacturers Associationecmaindia.in/Uploads/image/25imguf_Mr.P.Panda(MSIL).pdf · CAFE1 CAFE2 BSVI + RDE Monitor BSVI BSVI + RDE CF Application & Engine Development

Confidential

2016-17 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26 2027-28 2030-31 2032-33

BSVI + RDE Monitor BSVI + RDE CF

Considerations for the Future

Emission Control Manufacturers Association

CAFE1 CAFE2

Engine/Platform Design Constraints

Approach 1 (Engine/Platform Life Cycle >10 Yrs.)

Approach 2 (Engine/Platform Life Cycle > 10 Yrs.)

CAFE3

Big challenge to channelize available resources for meeting

RDE,CAFÉ and Safety, concurrently.Base E/G

Design

Rework at short notice???

Plan and Develop Base

Engine < 4 Yrs

Skill and Timelines

BNCAP-2

No Time to Modify

Offset/SideSafety Compliance

Pedestrian

BNCAP-1

Page 16: Emission Control Manufacturers Associationecmaindia.in/Uploads/image/25imguf_Mr.P.Panda(MSIL).pdf · CAFE1 CAFE2 BSVI + RDE Monitor BSVI BSVI + RDE CF Application & Engine Development

Confidential

2016-17 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28

BSVI + RDE Monitor BSVI + RDE CF

Considerations for the Future

Emission Control Manufacturers Association

CAFE1 CAFE2

Big Challenge to upgrade skill and apply new technology

Engaged Skilled Manpower (Europe , Japan etc.,)

CAFE3

EURO VI

Technology Challenge to do application technology indigenously.

India

Europe

RDE-I

WLTPCAFE1 CAFE3CAFE2

WLTP?

RDE-II

EURO VII?

Page 17: Emission Control Manufacturers Associationecmaindia.in/Uploads/image/25imguf_Mr.P.Panda(MSIL).pdf · CAFE1 CAFE2 BSVI + RDE Monitor BSVI BSVI + RDE CF Application & Engine Development

Confidential

2016-17 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28

BSVI + RDE Monitor BSVI + RDE CF

Considerations for the Future

Emission Control Manufacturers Association

CAFE1 CAFE2

Big Challenge to upgrade skill and develop new technology

Engaged Skilled Manpower (Europe , Japan etc.,)

CAFE3

EURO VI

Technology Challenge to develop technology indigenously.

India

Europe

RDE-I

WLTPCAFE1 CAFE3CAFE2

WLTP?

RDE-II

EURO VII?

Considerations in New Approach : (BSIV-BSVI < 4Yrs)

Very Short Time for Vehicle Level improvements and Base Engine Design Changes.

Merits in Original Approach : (BSIV-BSV-BSVI)

Sufficient Time for Vehicle Level improvements ( BSV to BSVI ~ 5Yrs.)

Cost Effective/ Quality Effective approach due to availability of

Technologies from Europe.

Base Engine Design (Life Cycle >10 Yrs.) : RDE (2023) + CAFE 2 (2022) + Safety

Skilled Manpower in huge nos. and Phasing In to meet targets.

Big challenge to upgrade skills and develop new technology, indigenously.

Trends and Investments

Suppliers Skill Upgradation In huge nos. required in a very short timeframe.

Page 18: Emission Control Manufacturers Associationecmaindia.in/Uploads/image/25imguf_Mr.P.Panda(MSIL).pdf · CAFE1 CAFE2 BSVI + RDE Monitor BSVI BSVI + RDE CF Application & Engine Development

Confidential

Considerations for the Future

Emission Control Manufacturers Association

Trends and Investments

Gasoline

Diesel

Others

Gasoline

Diesel

Others

2015 : Market Size 13 Million 2020 : Market Size 15 Million

By 2020, despite the decreasing market, Diesel still hold a big share in Europe.

Trend in Europe

Others : CNG/ Ethanol/ Electric

Market trend in India ? Planned Investments by Suppliers

Page 19: Emission Control Manufacturers Associationecmaindia.in/Uploads/image/25imguf_Mr.P.Panda(MSIL).pdf · CAFE1 CAFE2 BSVI + RDE Monitor BSVI BSVI + RDE CF Application & Engine Development

Skill Upgradation Required

Confidential

2016 2017 2018 2019 2020 2021 2022 2023 2024 2025

Revised

Plan

FY

BSVI + RDE Monitor BSVI + RDE CF

Considerations for the Future

Emission Control Manufacturers Association

CAFE1 CAFE2

Investment Period

Supplier / Part : 44 Million

Market Size

Parts :(BSIV-BSVI)Sensors : DPF :

Urea :SCR/NSC :

Fuel injector system :

EGR system

Ramp

up

1Mn / Yr.

Considerations in New Approach : (BSIV-BSVI < 4Yrs)

Merits in Original Approach : (BSIV-BSV-BSVI)

Sufficient Time for Vehicle Level improvements ( BSV to BSVI ~ 5Yrs.)

Cost Effective approach due to availability of Technologies from Europe.

Very Short Time for Vehicle Level improvements and Base Engine Design Changes.

Suppliers Skill Upgradation in huge nos. Required in a very short timeframe.

Base Engine Design (Life Cycle >10 Yrs.) : RDE (2023) + CAFE 2 (2022) + Safety

Skilled Manpower in huge nos. and Phasing In to meet targets.

Big challenge to upgrade skills and develop new technology, indigenously.

Planned Investments by Supplier to meet the emission norms for Diesel market.

Page 20: Emission Control Manufacturers Associationecmaindia.in/Uploads/image/25imguf_Mr.P.Panda(MSIL).pdf · CAFE1 CAFE2 BSVI + RDE Monitor BSVI BSVI + RDE CF Application & Engine Development

Skill Upgradation Required

Confidential

2016 2017 2018 2019 2020 2021 2022 2023 2024 2025

Revised

Plan

FY

BSVI + RDE Monitor BSVI + RDE CF

Considerations for the Future

Emission Control Manufacturers Association

CAFE1 CAFE2

Investment Period

Supplier / Part : 44 Million

Market Size

Parts :(BSIV-BSVI)Sensors : DPF :

Urea :SCR/NSC :

Fuel injector system :

EGR system

Ramp

up

1Mn / Yr.

Considerations in New Approach : (BSIV-BSVI < 4Yrs)

Merits in Original Approach : (BSIV-BSV-BSVI)

Sufficient Time for Vehicle Level improvements ( BSV to BSVI ~ 5Yrs.)

Cost Effective approach due to availability of Technologies from Europe.

Very Short Time for Vehicle Level improvements and Base Engine Design Changes.

Suppliers Skill Upgradation in huge nos. Required in a very short timeframe.

Base Engine Design (Life Cycle >10 Yrs.) : RDE (2023) + CAFE 2 (2022) + Safety

Skilled Manpower in huge nos. and Phasing In to meet targets.

Big challenge to upgrade skills and develop new technology, indigenously.

Planned Investments by Supplier to meet the emission norms for Diesel market.

Page 21: Emission Control Manufacturers Associationecmaindia.in/Uploads/image/25imguf_Mr.P.Panda(MSIL).pdf · CAFE1 CAFE2 BSVI + RDE Monitor BSVI BSVI + RDE CF Application & Engine Development

Skill Upgradation Required

Confidential

2016 2017 2018 2019 2020 2021 2022 2023 2024 2025

Revised

Plan

FY

BSVI + RDE Monitor BSVI + RDE CF

Aspects for the Future

Emission Control Manufacturers Association

CAFE1 CAFE2

Investment Period

Supplier / Part : 44 Million

Market Size

Parts :(BSIV-BSVI)Sensors : DPF :

Urea :SCR/NSC :

Fuel injector system :

EGR system

Ramp

up

1Mn / Yr.

Considerations in New Approach : (BSIV-BSVI < 4Yrs)

Very Short Time for Vehicle Level improvements and Base Engine Design Changes.

Suppliers Skill Upgradation in huge nos. Required in a very short timeframe.

Base Engine Design (Life Cycle >10 Yrs.) : RDE (2023) + CAFE 2 (2022) + Safety

Skilled Manpower in huge nos. and Phasing In to meet targets.

Big challenge to upgrade skills and develop new technology, indigenously.

Planned Investments by Supplier to meet the emission norms for Diesel market.

Challenges

Plan BSIV to BSVI implementation in <4Yrs

Upgrade Skill Level of Manpower to make in India

Make the Design cost effective to sell in India

Plan In India

Skill In India

Sell In India

Opportunities

Page 22: Emission Control Manufacturers Associationecmaindia.in/Uploads/image/25imguf_Mr.P.Panda(MSIL).pdf · CAFE1 CAFE2 BSVI + RDE Monitor BSVI BSVI + RDE CF Application & Engine Development

Confidential

2016 2017 2018 2019 2020 2021 2022 2023 2024 2025

Proposed

Plan

FY

BSVI + RDE Monitor BSVI + RDE CF

Challenge for the Future

Emission Control Manufacturers Association

CAFE1 CAFE2

Investment Period

Supplier / Part : 4

Skill Upgradation Required

4 Million

Market Size

Parts :(BSIV-BSVI)Sensors : DPF :

Urea :SCR/NSC :

Fuel injector system :

EGR system

Ramp

up

1Mn / Yr.

Thank you