EMgt 9407

Construction Technology

Course Introduction and Objectives

Dr. Attaullah Shah

Page 2: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

Bio details of the Instructor

• Engr.Dr. Attaullah Shah – Director ( Planning and Projects AIOU)

» [email protected]. [email protected], www.drshahpak.weebly.com» +92-333-5729809, +92-51-9057212

• Qualification • PhD Civil Engineering ,M.Phil Eco ,MSc Structure Engg• MBA, MA Eco, MSc Envir Design,BSc Civil Engg (Gold Medal), Post Grad Dip Comp (Gold Medal)

• Professional and Field experience: – 25 Years

• Research Publications in refereed journals and conferences: – 26 Journals publications+40 Conference publications

• Areas of interests » Construction project Management » Structural Engineering» Sustainable built Environment

Page 3: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

Course Description

• The courses is aimed at emphasizing the technologies and processes involved in the heavy construction: – Excavation and earth-moving techniques, – Foundation systems,– High performance and other special concretes, – Concrete form design, concrete and steel construction,

concrete and steel enclosure systems, – Building frames and roofing structures. – Building Codes etc.

Page 4: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

Course outlines

• Week-1– Introduction to topics, – Construction Types, – Construction Operations and Management

Process. – The role of heavy construction projects in the

global socio-economic development– Group activity/Assignment:

• Role of Construction industry in the socio-Eco development

Page 5: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

Week 2: • Earth Moving and Excavation Techniques• Ground Compaction and Finishing Techniques, • Construction of Tunnels

Group Project-1– Each group will select the project given from the list

bottom. – Develop 2 page proposal for approval and – Submit a comprehensive project report on the topic,

followed by presentation.

Course outlines

Page 6: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

Week 3• Foundation systems • Special concretes • Quiz # 1

Week 4

High Performance Concrete Design, • Concrete Form Design, • Robotization for Concrete Forms• Assignment No.2• (Individual assignment)• What are different types of foundations and how the particular

type of foundation is selected?

Course outlines

Page 7: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

Week 5- Pre-stressed/Precast Concrete Construction

Week 6 - Mid Term Test (2-hours) - Construction of Bridges

Course outline

Page 8: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

Week 7

- High-rise buildings and skyscrapers

• Assignment#3 (Group activity)– Visit a high-rise building Constructed/under

const. in group and note down the salient construction features of the building.

– What are the special precautionary needs of high rise buildings

Page 9: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

Week 8

Wood and masonry construction

Week 9

• Quiz-2

• Steel Construction and Composite steel construction

Page 10: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

Week 10

- Construction of Dames and hydraulic structures – Assignment No.4: (Individual assignment)– Write a comprehensive note on ten major dames of the world,

their material, construction etc.

Week 11

Oil Terminals Construction in the Ocean (tentative)

Week 12 - Quiz #3- Safety in Construction

Page 11: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

• Group Assignment

• The class will be divided into two groups of 3 students each. The group assignment will be prepared and presented by the group. The group leader will present and other group members will assist. The duration of presentation will be 15 min followed by 5 min questions and answers.

Page 12: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

Project Instructions:

• You will write a report on a chosen heavy-construction technique or technology, e.g. Construction of Cable Stayed Bridges, Bridge Construction Techniques, Cofferdams, High rise buildings, Earth Reinforcement Methods, Micro Tunneling, Pipe Jacking

• Conduct an in-depth study using resources available in the library and on the Internet.

• The report shall be submitted in the following format: • Title Page• Acknowledgments (if any)• Table of Contents• Executive Summary (total 1000 words or less)• Brief introduction of the chosen topic

Page 13: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

• Advantages and disadvantages• Possible Applications

– Main Body of the Report (10-15 pages including tables and pictures)

• Introduction (1-2 pages) • History (if any)• Advantages and disadvantages of the technique (1-2

pages)• Possible applications in construction (1-2 pages)• Step-by-step Procedure (with pictures)• Comparison of chosen technique with other available

techniques (of the same nature) based on:

Page 14: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

• Performance, Time or speed of construction, Cost• Site constraints such as weather, site conditions etc.• Any other criteria, which you feel important

– Case Study: Provides details of a project where this technique has been used. You may include pictures of that project as well.

– Limitations of the chosen technique– Contractors or Companies which are currently using this

technique or providing such services (if any)• Conclusions (discuss your opinions about the merits and demerits• References: At least 10 for graduate students• All references must be properly cited in the report using numbers or last name

of the authors with year of publication. ( [1] or (Shah, 2005) ).

Page 15: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

Grade Distribution (Subject to change)

On Campus• Mid Term Exam 20 Percent• Final Exam 40 Percent• Class Assignments 10 Percent• Quizzes 10 Percent• Project Presentation 10 Percent• Group Project 10 Percent

-----------------------------------------------------• Total: 100%

Page 16: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

Introduction

Construction Industry in

21st Century

Dr. Attaullah Shah

Page 17: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

Introduction

Construction Industry in

21st Century

Dr. Attaullah Shah

Page 18: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

Volume of Global Construction Industry

Page 19: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

Role of Construction sector in Global Economy

• Annual global construction output U.S $ 4.5 trillion (2005)

• Output is heavily concentrated (77 per cent) in• the high income countries (Western Europe, North

America, Japan and Australasia).• The high-income countries produce 77 per cent of

global construction output with 26 per cent of total employment.

• The rest of the world (comprising low- and middle-income countries) produces only 23 per cent of output but has 74 per cent of employment – ……

• The Labor productivity in the developing countries is low…… What can be the major reasons in your mind?

Page 20: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

Construction market in 2011-12• Construction spending growth has stalled and 2011 was the

fourth consecutive year with little or no growth (since 2007) .

• Overall, world construction spending grew by just 0.5% to $4.6 trillion and is still below the levels achieved in 2007.

• However, on a positive note, 2011 saw the first increases in world construction spending since the start of the recession.

• Although, the outlook for 2012-13 is looking slightly more pessimistic as the developing economies responsible for much of the growth in the recent past are starting to slow as their developed country export markets continue to decline.

• Asia and Latin America were the fastest growing regions in 2011 by a wide margin.

• For the second year running China was the largest market in 2011, and is forecast to be the fastest growing market in 2012-13

Page 21: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

Global Construction spending 2011-12 and growth rate

Page 22: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

European Market• Sovereign debt crises and the uncertainty in

the Eurozone

• Only the Scandinavian counties are likely to

be largely immune from the impacts

• Austerity measures in many Western European countries have focused on the postponement/cancellation of many planned infrastructure projects.

• Construction spending growth will be significantly lower in Western Europe than trend growth for the rest of the world.

• It is likely that it will be 2020 before the market in Western Europe returns to output levels last seen in 2007.

• The fastest growing countries in Western Europe in 2012-13 are expected to be Germany (+1.8%) and the U.K. 1.6%

•  

Page 23: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

European Market-Cont’d

• The fastest growing countries in Eastern Europe in 2012 are expected to be Poland (+9.1%) followed by Russia (+6.5%) and Turkey (+5.5%), all with growth levels significantly above the average for the region as a whole.

• In Russia, construction spending on preparations for the 2014 Winter Olympics and the 2018 FIFA World Cup are boosting already booming energy and transport infrastructure spending.

Page 24: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

Middle East• In the Middle East, moderate construction spending growth

(+4.2%) is expected in 2012• Much of the growth will be led by increases in infrastructure

construction spending, in particular energy infrastructure.• Saudi Arabia, the largest market in the region, is also

expected to lead much of the growth in the region (+5% pa), through to 2015

• Followed by a return to growth in the U.A.E. (+4% pa), much of which will be led by Abu Dhabi, rather than Dubai which remains subdued and is largely expected to remain that way through the forecast period.

• Qatar continue to remain positive. Indeed, preparation for the FIFA World Cup 2022 and upgrading of associated infrastructure is expected to make construction spending.

Page 25: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

Africa

• Due to recent turmoil in much of North Africa • In particular, reconstruction in Libya and infrastructure

upgrades in Egypt are likely to act as a stimulus for the region through to 2015.

• In the rest of the region there is a mixed picture emerging, with some areas of strong growth, particularly Nigeria (+8%), with continuing declines in others particularly South Africa.

• Infrastructure construction is forecast to be the fastest growing sector of construction output through to 2015.

Page 26: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

The Americas

• The construction market in the U.S.A. is expected to remain stagnant in 2012, with little or no growth forecast, much like construction spending in Western Europe

• Some growth is expected in Canada and Mexico, although the problems in the U.S.A. are expected to constrain growth in both markets through to 2015.

• In contrast, much of South America is expected to see significant growth in construction spending through 2012

• In particular, the larger markets of Brazil, Argentina and Chile are forecast to see construction growth of over 5% in 2012.

• Indeed, Brazil and Panama are likely to have construction spending growth of over 10% pa through to 2015

• In Brazil, preparations for the 2014 FIFA World Cup and the 2016 Rio Olympics are well advanced and increases in construction spending are largely being led by infrastructures.

Page 27: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

Australasia

• Construction spending in Australia is expected to grow by close to 5% in 2012,

• Similarly, construction spending in New Zealand is forecast to rise as earthquake reconstruction moves forward through to 2015.

Page 28: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

Global Construction Industry forecast.Share of spending by region: 2015-20

• In the short term there is expected to be a degree of stagnation in global construction spending in 2012, with more sustained growth not expected until 2015 onwards

• Developing countries are expected to lead growth in 2012. The strongest construction spending growth will again be in China, followed by India and Indonesia

Page 29: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

THE CONSTRUCTION INDUSTRY

• The construction industry is one of the largest industries in the United States as well as world, historically accounting for about 10% of the nation’s gross national product and employing some 10 million workers.

• It is widely recognized that construction as a discipline is a combination of art and science.

Page 30: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

Construction industry segments• Two very broad categories: - General building construction

- Engineered construction.• General Building Construction• Include residential, commercial, institutional and industrial

buildings. • Residential construction produces buildings for human habitation,

including single-family dwellings, condominiums, multifamily townhouses, flats and apartments and high-rise apartment buildings.

• Commercial construction includes retail and wholesale stores, markets and shops, shopping centers, office buildings, warehouses and small manufacturing facilities.

• Institutional construction are medical clinics and hospitals, schools and universities, recreational centers and athletic stadiums, governmental buildings and houses of worship and other religious buildings.

Page 31: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

• Industrial construction is a special segment of the industry that develops large-scale projects with a high degree of technical complexity.

• Such endeavours result in facilities that manufacture and process products; examples include steel mills, electric power-generating plants, petroleum refineries, petrochemical

processing plants

Construction industry segments

Page 32: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

• Engineered construction• This broad category of construction, sometimes called

engineering construction, is characterized by designs prepared by engineers rather than architects, the provision of facilities usually related to the public infrastructure and thus owned by public-sector entities and funded through bonds, rates or taxes and a high degree of mechanization and the use of much heavy equipment and plant in the construction process.

• Examples: PSDP mega projects in Pakistan • Two common subcategories of engineered construction are:

-Highway construction and

- Heavy construction.

Page 33: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

Impact of Construction on National Economies

Page 34: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

THE CONSTRUCTION INDUSTRY

• Construction Contractors– Companies and individuals engaged in the

business of construction are commonly referred to as construction contractors because they operate under a contract arrangement with the owner.

Page 35: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

THE CONSTRUCTION INDUSTRY

FIGURE 1-1. Construction of St. Louis Gateway Arch. (Copyright © American Institute of Steel Construction, Inc. Reprinted with permission. All rights reserved.)

Page 36: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

THE CONSTRUCTION INDUSTRY

• Construction Industry Divisions– The major divisions

of the construction industry consist of building construction (also called “vertical construction”) and heavy construction (also called “horizontal construction”). FIGURE 1-2. Distribution of U.S. new

construction volume. (Source: Bureau of the Census)

Page 37: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

THE CONSTRUCTION INDUSTRY

FIGURE 1-3. Modern building construction project.

Page 38: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

THE CONSTRUCTION INDUSTRY

FIGURE 1-4. Heavy construction project—Kennedy Space Center launch complex. (U.S. Air Force photograph)

Page 39: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

THE CONSTRUCTION PROCESS

• Project Development and Contract Procedures– The major steps in the construction

contracting process include bid solicitation, bid preparation, bid submission, contract award, and contract administration.

Page 40: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

Construction Project Lifecycle.

Page 41: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

• Pre-Project Phase: • An idea or perceived need or desire to improve• Project delivery system to be used• Type of contract to be used with the contractor.• The owner may engage a professional engineer, an

architect or a project manager during this pre-project phase to advise on these important decisions.

• Planning and design phase• It is convenient to divide this phase into three stages.

– Stage-I: The goal of the first stage is to define the project’s objectives, consider alternative ways to attain those objectives

– Stage-II: Develop schematic diagrams showing the relationships among the various project components,

– Stage-III: Detailed design of the structural, electrical and other systems

Construction Project Lifecycle.

Page 42: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

• Contractor selection phase– Client: Procurement and tendering methods to be

– Contractor: • Study of various methods and techniques/equipment by the

to workout the schedule of the project and all activities and

• Second, a priced proposal will be prepared, including the direct costs of labour, materials, plant and subcontractors, various overhead charges and a sufficient added amount for profit.

– The last step in this phase is the submittal, opening and evaluation of tenders, the selection of the successful contractor and the finalization of the construction contract.

Page 43: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

• Project mobilization phase– Various bonds, licenses and insurances must be secured ( Can

you name some)

– A detailed programme for the construction activities must be prepared.

– The cost estimate must be converted to a project budget and the system for tracking actual project costs must be established.

– The worksite must be organized, with provisions for temporary buildings and services, access and delivery, storage areas and site security.

– The process of obtaining materials and equipment to be incorporated into the project must be initiated and arrangements for labor, the other essential resource, must be organized.

– With the completion of this phase, it is finally time to begin the actual field construction.

Page 44: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

– Project operations phase– Three majors areas are looked into by the contractors

• Monitoring and control ( Five aspects ) – Time Management

– Cost management

– Quality Management

– Work safety and

– Environmental issues

• Resource Management • Documentation and Communication

– Project closeout and termination phase:• Finally, as the project nears completion, a number of special activities

must take place before the contractor’s responsibilities can be considered complete.

• Tastings, final verification and acceptance etc

• closing the construction office and terminating the staff’s employment.

Page 45: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

THE CONSTRUCTION PROCESS

• For major projects, steps in the project development process include the following:– Recognizing the need for the project.– Determining the technical and financial

feasibility of the project.– Preparing detailed plans, specifications,

and cost estimates for the project.– Obtaining approval from regulatory

agencies.

Page 46: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

THE CONSTRUCTION PROCESS

• How Construction Is Accomplished– Construction employing an owner

construction force.– Owner management of construction.– Construction by a general contractor.– Construction using a design/build (turnkey)

contract.– Construction utilizing a construction

management contract.

Page 47: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

THE CONSTRUCTION PROCESS

FIGURE 1-5. Construction employing owner construction forces.

FIGURE 1-6. Owner-managed construction. [Either (a) or (b) or both may be employed.]

Many large industrial organizations, as well as a number of governmental agencies, possess their own construction forces. Although these forces are utilized primarily for repair, maintenance, and alteration work, they are often capable of undertaking new construction projectsMore frequently, owners utilize their construction staffs to manage their new construction.

Page 48: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

THE CONSTRUCTION PROCESS

FIGURE 1-7. Construction by a general contractor.

- Construction by a general contractor operating under a prime contract is probably the most common method of having a facility constructed

Page 49: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

THE CONSTRUCTION PROCESS

FIGURE 1-8. Construction employing a design/build firm.

Design and Build: Under the design/build or turnkey construction concept (Figure 1-8), an owner contracts with a firm to both design and build a facility meeting certain specified (usually, performance oriented) requirements. Such contracts are frequently utilized by construction firms that specialize in a particular type of construction and possess standard designs which they modify to suit the owner's needs. Since the same organization is both designing and building the facility, coordination problems are minimized and construction can begin before completion of final design. In this case, the construction contract is normally on a cost-reimbursement basis. This type of construction is referred to as fast-track. The major disadvantages of the design/build concept are difficulty in obtaining competition

Page 50: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

THE CONSTRUCTION PROCESS

FIGURE 1-9. Construction utilizing a construction management contract.

Construction Management contracts: A professional construction manager (CM) acts as the owner's agent to direct both the design and construction of a facility.

-Three separate contracts are awarded by the owner for design, construction, and construction management of the project.

Page 51: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

Methods of Construction Procurement

Methods of construction project procurement (Mastermann,1996).

Page 52: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

Design Bid Build vs Design & Build

Advantages of Design and Build:-Single point of Responsibility-Price certainty-Speed and high progress-Effective Cost control -Build ability/Constructability.-Less claims

Disadvantages:-Poor quality of design-Additional fee for design revision and improvements.-Lack of flexibility in the contract

Page 53: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

Classification Design & Build projects in China

Page 54: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

CODES AND REGULATIONS• Projects constructed in most areas of the world must comply

with a number of governmental regulations. • Building Codes

– These include building codes, zoning regulations, environmental regulations, and contractor licensing laws, among others.

– International Building Code– Pakistan Building Code ( Seismic provisions 2007)– Pakistan Energy Code

• Zoning, Environmental, and Other Regulations• CDA Zoning Code • Environmental regulations (EIA) • Safety and health Regulations (OSHA)

Page 55: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

STATE OF THE INDUSTRY• Construction Productivity: • Much of the blame for industry low productivity problems should

be shared by owners, contractors, labor, and government, many of the problems could be overcome by improved management of the construction effort by owners and contractors with the cooperation of the other parties.

• Reducing Construction Costs– Good work planning.– Carefully selecting and training workers and managers.– Efficiently scheduling labor, materials, and equipment.– Properly organizing work.– Using laborsaving techniques, such as prefabrication and

preassembly.– Minimizing rework through timely quality control.– Preventing accidents through good safety procedures.

Page 56: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

Construction Management • It refers to the act of managing the construction process• The construction manager, who may be a contractor project

manager, superintendent, or one of their representatives, manages the basic resources of construction.

• These resources include workers and subcontractors, equipment and construction plant, material, money (income, expenditure, and cash flow), and time.– Poor construction management practices can lead to: – Project delays that increase labor and equipment cost and the

cost of borrowed funds.– High material costs caused by poor purchasing procedures, inefficient handling,

and/or loss– Increased subcontractor cost and poor contractor-subcontractor

relations.– High insurance costs resulting from material and equipment loss

or damage or a poor safety record. – Low profit margin or a loss on construction volume and many

more

Page 57: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

CONSTRUCTION MANAGEMENT• The scope of construction management is broad and

includes such topics as construction contracts, construction methods and materials, production and cost estimating, progress and cost control, quality control, and safety.

• Elements of Construction Management

– Quality Management• includes such activities as specification development,

process control, product acceptance, laboratory and technician certification, training, and communication.

• Quality control (QC),which is a part of the quality management process, is primarily concerned with the process control function. Since the contractor has the greatest control over the construction processi t has been found that quality control is most effective when performed by the contractor.

Page 58: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

• Safety and Health– Historically, the construction industry has had one of the

highest accident rates among all industries – The following construction operations have been found to

account for the majority of serious construction injuries:

- Concrete construction, especially construction of formwork, placing concrete into form work, and failure of form work during construction.

- The erection of prefabricated trusses, precast concrete elements, and structural steel.

- The construction and operation of temporary facilities including scaffolding, construction plants, lifts, and

storage facilities-

- Working from elevated positions resulting in falls.

- Construction equipment operations.

Page 59: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

– Organization for Construction

FIGURE 1-10. Representative construction company organization chart.

Page 60: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

CONSTRUCTION MANAGEMENTReasons for Construction Company Failure;

Dun & Bradstreet and others have investigated the reasons for the high rate of bankruptcy in the construction industry. Some of the major factors they have identified include: -lack of capital, -poor cost estimating, -inadequate cost accounting, and- lack of general management ability.

All of these factors can be categorized as elements of poor management. Such studies indicate that at least90% of all construction company failures can be attributed to inadequate management.

Use of Computers: limited but new networks

Page 61: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

CONSTRUCTION TRENDS AND PROSPECTS

• Construction Trends• Some of the major trends noted in the construction industry in recent

years include; – Increasing international competition,– Rapid changes in technology, the wide availability of in formation via

the Internet, – increasing speed and ease of communication, and increasing– Governmental regulation of the industry, particularly in the areas of

safety and environmental protection. As a result of these developments, the larger well-managed construction firms are capturing an increasing share of the total construction market.

- - These trends, along with the increasing use of computers for design and management, have created a growing demand for technically competent and innovative construction managers,

- - With increasing automation of construction equipment has come an increasing demand for highly skilled equipment operators and technicians

Page 62: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

• Problems and Prospects– In summary, the future of construction

appears as dynamic as does its past. An abundance of problems, challenges, opportunities, and rewards wait for those who choose to enter the construction industry.

Page 63: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

Further study • Please read the research paper:

• Role of Construction industry in the economic development-An empirical evidence from Pakistan

• www.civil.neduet.edu.pk/ICCIDC- I/Conference%20Proceedings/.../030.pdf

• Presented at ICCIDC-I in NED University Karachi. • Please critically review the paper

Page 64: EMgt 9407 Construction Technology Course Introduction and Objectives Dr. Attaullah Shah

Group Assignment • Write a detailed note on “Role of

Construction industry in the socio-Eco development with special reference to developing country.

• Read the journal and conference papers