Emergency Response Team Role & Responsibility
By Shailesh Mistry
HOD - EHS Dept.,
7/31/2019 Emergency Response Team R %26 R
2/12
What do you mean by Emergency? Emergency can be a situation / a condition that is threaten to the
persons working, property or environment to have potential effects bythe hazards in-built.
Disaster means the occurrence of a sudden calamity or a chain ofevents which affect normal working within the factory area and / or maycause serious injuries, loss of life, extensive damage to the properties,
environment, etc. It may also result from severe storm, f lood, crashed aircraft, earth quake or deliberate act like terrorism & sabotage.
Emergency may be of two types:
1. On-Site Emergency
It is a situation created in an installation in which workers, property &environment in the plant premises are affected.2. Off-Site EmergencyIt is a situation created in an installation in which effects are spread out side theboundary limit of the plant.
2
7/31/2019 Emergency Response Team R %26 R
3/12
What may be the emergencies at our plant
premises ? Ruptures or leakage of methanol tank.
This could lead to problems of fire hazards. In case of methanol, this situation is dangerous as methanol vapors will
travel extensively and flash fire is likely as the quantity of material is likely to be high.
Rupture / failure of other solvent tanks.
The results will be similar to the first scenario except volume of outflow being small; situation will be manageable
more easily.
Fire or Explosion. (Eg. Runaway Reaction) Release of H2S if the absorption system fails coupled with runaway reaction.
Sudden release of large quantity of flammable solvents to the atmosphere by bursting of storage tank / pipe line
Explosion in the boiler
Spillage of fuel oil / diesel from the storage tank.
Rupture / leakage of acid, alkali tanks
Scrap yard fire
Hydrogen Truck overturning.
Explosion in distillation column.
Explosion of Hydrogenation vessel.
Dimethyl Sulphate tank leakage.
Forklift overturning3
CS2 leakage
Natural Calamity like Flood, Earth Quake, Storm, etc.
Manmade Disaster like Terrorism
7/31/2019 Emergency Response Team R %26 R
4/12
Why do an emergency occur ?
Major Reasons:
Process Abnormalities
Wrong Handling of Process Parameters
Instability of a chemical
Compromise on Quality of the Material being used
Control System Fails
Safety Interlock Fails
Over confidence
Supervision Failure
Behaviour of an Employee
4
7/31/2019 Emergency Response Team R %26 R
5/12
- -Why?
The primary objective of the emergency procedure is to
safeguard the life of the personnel working in the plant and
plant itself & the environment. In emergency, a well planned
and practiced action plan can help in reducing the
consequences and potential loss of life and property &
Environment.
5
7/31/2019 Emergency Response Team R %26 R
6/12
-Teams?
As per our On-Site Emergency Plan we have total Eight Emergency Teams:
1. Emergency Task Force
2. Plant Protection Team
3. Medical Team
4. Communication Team
5. Security Team
6. Roll Call Team
7. Search & Rescue Team8. Recovery Team
6
Besides this, we have Emergency Response Team Members
7/31/2019 Emergency Response Team R %26 R
7/12
Emergency Team MemberWhat should he
know?
He is also a part of an On-Site Emergency Team as an additional Helpful Member.
He should have a commitment towards the safety of a person, property & environment.
He should be familiar with the On-Site Emergency Plan Procedure.
He should be aware about
1. Emergency Control Center & Alternative Emergency Control Center
2. Fire Alarm system and MCP Points
3. Assembly Points & Wind Indicator
4. Fire Hydrant System and First-Aid Fire Extinguisher
5. Public Announcement System & Intercom System6. Emergency Evacuation Procedure
7. Availability of Fire & Safety Equipments
8. Who are First-Aiders and where is the First-Aid Box nearby his working area?
9. Emergency Numbers7
7/31/2019 Emergency Response Team R %26 R
8/12
mergency eam em er
o e
ResponsibilityIn case of Emergency Siren: -
First step is to check his own job whether he can stop and leave the place.
Understand the announcement of Emergency Situation.
Know the wind direction and start the emergency evacuation for other subordinates
including Contract Workmen by directing the Safe Assembly Point nearby.
He should be alert in his section. He should inform his presence to Control Room / Shift In-
charge / Security Main Gate.
If he can leave the place after stopping the section, check around his area for any other
person working.
After evacuation , he should directly reach to the Emergency Location & report to Safety
personnel / Incident Controller.
After reaching the emergency location, he should follow the instruction given by Safety
Personnel / Incident Controller.
8
7/31/2019 Emergency Response Team R %26 R
9/12
Emergency Team Member
Role &
ResponsibilitySafety Personnel / Incident Controller may instruct for Emergency Mitigation in time:
To help in First-Aid Treatment
To help in victim transfer to OHC To
To help in Process Control
To help in Plant Protection
To help in Utility Operation
To help in Fire Fighting Operation
To help in Contain the spillage
To help in Rescue operation To help in wearing Safety Equipments like SCBA Set, PVC Suit, Canister Mask, etc.
To help is Gas Monitoring of the area
To help in counting employees available at Emergency Site
Emergency in Control9
7/31/2019 Emergency Response Team R %26 R
10/12
7/31/2019 Emergency Response Team R %26 R
11/12
Emergency PreparednessEmergency Exercise Flow Chart
EMRGENCY ALARM
PANEL ENGINEER
PUBLIC ANNOUNCEMENT SYSTEM
DECLARATION OF INCIDENCE & LOCATION
REPEATER PANELECC PANEL
INCIDENCE
AREA
INCIDENT CONTROLLER TEAM LEADERS
SEARCH&
RESCUE
ROLL CALL RECOVERYSECURITYMEDICALCOMMUNIC
ATION
PLANT
PROTECTION
EMEERGENCYTASK FORCE
Safetypersonnel
Fireman4Tech (Elect)
UtilityOperator
Sec. Guard-4
Panel Engr-2Area sup.
InstrumentPersonnel
HR personnelSecurity Guard
Male nurse-1Amb. Driver-1
Sup - QA-2First-aider2
Head Guard-2Sec. Guard-4
Sec. Guard-1HR / ADMNCanteen sup.
Mechsupervisor - 1
Mech fitterElectricain
NOMINATEDAREA
SUPERVISOR
HR /SECURITY
PEROSNNEL
HOD-MAINT
/ SIC-MAINT
SECURITY
PEROSNNELSIC - QASITE
COORDINAT
OR
SICPROD.IC
TEAM
TEAM
LEADER
MEMBERS
UTILITY
OPERATOR
FIRE WATER
PUMP HOUSE
NONEMERGENCY
TEAMTECHNICAL
PERSONS
EMERGENCYASSEMBLY
POINT
NON TECHNICAL/CONTRACT/VISITORS
ASSEMBLY
POINTS 1/2/3/4
1.Ensures availability
of operator at WP
house
2.Cordens off area with
the help of security
team.
3.Containment of
emergency at the place
of occurrence.
4. co- ordinates with
the repair team for
attending any repair to
1.Mobilises the
technical manpower to
protect the plant in allrespects.
2.Decides shutdown of
the plant & safeevacuation of
personnel.
1.Prepares a list of
persons to be
communicatedinternally & externally.
2.Establishes internal
communication withfollowing priority:
HOD (Prod)
HOD (F &S)DGM (Opern)
3.Ensures all telephonelines are free.
4.Refrain external
communicationwithout ermission of
1.Team leader/
Member will
accompany the injuredto Medical Health
Centre.
2.If required, injuredperson would be
transferred to
Contractual Hospital.
3. Mobilizes additional
transport, if required.4. List out names of
injured persons.
1.Closes main gatesand restricts the
movements.
2 Provides security
coverage at main gate,
near time office and
area of emergency.
3.Cordons off the
emergency area and
evacuate the
unauthorized.4.Permits Fire-tender,
Ambulance.5.Provides details of
1.Team will receive
instructions from CEC
& immediately attendrepair work.
2. Help of contract
employees to assist therepair team may be
arranged, if required.
1. Reports to CEC &take instructions.
2. Mobilizes team,
establishes contact
with the Roll Call
Team from time to
time.
3. Informs CEC, if any
person is missing, then
starts searching of
missing person.4.Uses necessary
PPEs while searching
missing person.
1Eensures list ofcompany employees
from T.O.& Contract -
Workers and Visitors
from security.
2. Takes head count of
the persons reportingnear T.O.(Asse.Point)
3. Establishes
communication with
CEC to pass oninformation about
missing personnel.
4. Arranges food &
ROLE/
FUNCTIONS
7/31/2019 Emergency Response Team R %26 R
12/12
Thank you