Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
Sporting and wellness
just at your doorstep
Embrace a
Lifestyle Centeredon Leisure,
Nature and Wellness
at Lavida
Life upon tranquil and quieter
moments with family
The picturesque Putrajaya Lake
is within walking distance
Thoroughfares Connection• North-South Expressway Central Link (PLUS)• Lebuhraya Damansara-Puchong (LDP)• Maju Expressway (MEX)• Expressway Lingkaran Tengah (ELITE)• South Klang Valley Expressway (SKVE)
Public Transportation Connection• Express Rail-Link (ERL)• Bus / Taxi / Airport Limousine
• Park & Ride Service• Mobike Bike-Sharing
Top Klang Valley Connection• 26km to KLIA (via ELITE)• 36km to KLCC (via MEX)• 37km to Petaling Jaya (via LDP)
Well Connected and
Served Township
A Future Locationbeing in the center of an
innovative ICT township
A Self-ContainedTownship with
Comprehensive Public
Amenities and Facilities• Sports & Fitness Facilities - Cyberjaya Lake Gardens Community Club - Cyberjaya Sports Arena - Cyberjaya Paintball Park - Cyberjaya Go-Kart Circuit
• Shopping Hotspots - DPulze Shopping Centre - Gem in Mall - Centrus Shopping Mall - Tamarind Square - Skypark Mall (Opening Soon)
• Financial Institutions
• Educational Institutions
• Multinational Companies
• F&B Outlets
• Corporate Offices
Master Layout Plan
BLOCK A (PHASE 2A)
BLO
CK B
BLO
CK C
BLO
CK C
LAVIDAExecutive
LAVIDADeluxe
OPUS Residence(Completed 2018)
A. Multipurpose Court
B. Playground
C. Walkway
LEGEND
EXECUTIVE
FAMILYAREA
AC
MASTERBEDROOM
282.66 sq. ft.
MASTERBATH
BATH 2
BEDROOM 2157.69 sq. ft.
BEDROOM 3157.70 sq. ft.
AC
40’
88’
PORCH
ENTRANCE
CLOSETSTORELIVING
AREA
PATIO DINING
GUESTBATH
GUEST ROOM127.55 sq. ft. MAID’S
ROOM46.18 sq. ft.
YARDBATH 3
DRYKITCHEN
WETKITCHEN
Ground Floor First Floor
LAVIDAExecutive
FLOOR PLAN & BUILDING SPECIFICATIONSANITARY FITTINGSWater Closet : 4 nosBasin : 3 nosShower Rose : 4 nosKitchen Sink with Tap : 1 nos
FENCING Brickwall / Mild steel
OTHERS Refuse Chamber
ELECTRICAL INSTALLATION & PROVISIONLighting Point : 27 nosPower Point : 25 nosWater Heater Point : 03 nosAir Cond. Point : 06 nosDoor Bell Point : 01 nosCeiling Fan Point : 06 nosSMATV Outlet : 03 nosTelephone Point : 02 nosIncoming Three Phase : 01
Structure : Reinforced concreteWall : Bricks wall with plaster & paintRoofing Covering : Metal / Reinforced concrete roof Ceiling : Skim coat / Plaster ceiling with paint finishWindows : Aluminium frame with glass panelDoors : Flush door / Aluminium sliding door Ironmongery : Selected locksets
FLOOR FINISHES Car porch : Concrete imprintLiving / Dining / Kitchen : TilesBathrooms : TilesBedrooms : Selected timber strips Staircase & Family Area : Selected timber strips Store : Cement renderUtility Room : Tiles
WALL FINISHESGeneral : Plaster & paintKitchen : Tiles (5’ height)Bathrooms : Tiles (ceiling height)
DISCLAIMER :
• Tile: Tile surface flatness and tonality cannot be perfect in every batch. Thus, it is not possible to achieve total consistency of colour and flatness
at the joints in its selection and installation.
• Materials, Fittings, Equipment, Finishes, and Installations & Appliances: The brand, colour and model of all materials, fittings, equipment, finishes,
installations and appliances supplied shall be provided subject to architect and/or interior designer’s selection, market availability and the sole
discretion of the developer.
• Specification and/or interior designer’s final design: All the above specification shall subject to variation and modification by architect.
• Layout / Location: Layout / location of all joinery, fittings, equipment, appliances, electrical points, door swing positions and types of door
(swing, sliding & folding) are subject to architect’s and/or designer’s sole discretion.
ShaftburySquare
Cyberview LodgeResort & Spa
from KL
from LDP
from KLIA
from North SouthExpressway Central-Link
Cyberjaya CommunitySports Complex
LimKokWingUniversity
The Place
SubwayPetronas Putrajaya
Sentral(KLIA
Transit)
PerdanaLakeview
East
Cyberjaya LakeGarden
UniversityMultimediaMalaysia
CyberjayaSmartSchool
StreetMall
CyberjayaTransportTerminal
HewlettPackard
Neo Cyber1 & 2
LHDM
d’Melor
CBD Perdana
D’Pulze
CUCMSCenturySquare
Shell
MCMC
IBM
BMW
HSBC
MDEC
ELCInternationalSchool
DELL
Sekolah Seri Puteri
Proposed MRT Line
Putrajaya Ring Road
Putrajaya Ring Road
CYBERJAYA
PUTRAJAYA
Maju
Expr
essw
ay
SKVE Highway
SKVE
High
way
Pers
iaran
APE
C
Putrajaya Lake
Lingkaran Cyber Point Timur
Maybank/CIMB
Persiaran Multimedia
Persiaran Tasik
GPS CoordinatesN: 02º55’15.341”E: 101º40’10.847”
C Y B E R J A Y AR E S I D E N S I
Another prestigious project by,
(889064-W)
A member of,
03-6201 8680 (Sales Gallery)
016-269 5336 (IBM)
019-321 5636 (Raymee)
016-622 6584 (Jafferi)
CrystalVille Group
Crystalville Group
www.crystalvillegroup.com
Please contact
Developer License No.: 13983 - 2/11 - 2021/01085 (L) | Validity Period: 16/11/2019 to 15/11/2021 | Sales & Advertising Permit No.: 13983 - 2/11-2021/01085 (P) | Validity Period: 16/11/2019 to 15/11/2021 | Approving Authority: Majlis Perbandaran Sepang | Building Plan Approval Reference No.: MP.SPG 600-34/2/144(11) | Tenure of Land: Freehold | Restriction-in-interest: The Land cannot be transferred, charged, without prior consent from the State Authority | Expected Date of Completion: November 2021 (Phase 2A) | Phase 2A, Total No. Unit: 8 Units | Selling Price: Type 2A (Min. RM1,385,000 – Max. RM1,385,000) | Bumiputra Discount 7% | Land Encumbrances: Public Bank Bhd | Disclaimer: All Information contained herein including the measurements and illustrations are subject to amendments without notifications as may be required by the authorities or the developer’s consultants and are not intended to form and cannot form part of an offer or contract. All measurements are approximate. All illustrations are artist’s impression only.
HQSuite 10.08, Block B, 10th Floor,Plaza Mont' Kiara, No. 2, Jalan Kiara,50480 Kuala Lumpur.Tel: 03-6201 8680 Fax: 03-6201 8681
Sales GalleryNo. 2, Jalan Opus 4,Perdana Lakeview East, Cyber 7,63000 Cyberjaya, Selangor.Email: [email protected]