11
Embassy of Switzerland Swiss Contribution Office Hungary Swiss – Hungarian Cooperation Programme Rules and Procedures Information Days, May 2008 Miskolc - Debrecen

Embassy of Switzerland Swiss Contribution Office Hungary Swiss – Hungarian Cooperation Programme Rules and Procedures Information Days, May 2008 Miskolc

Embed Size (px)

Citation preview

Page 1: Embassy of Switzerland Swiss Contribution Office Hungary Swiss – Hungarian Cooperation Programme Rules and Procedures Information Days, May 2008 Miskolc

Embassy of SwitzerlandSwiss Contribution Office Hungary

Swiss – Hungarian Cooperation ProgrammeRules and Procedures

Information Days, May 2008

Miskolc - Debrecen

Information Days, May 2008

Miskolc - Debrecen

Page 2: Embassy of Switzerland Swiss Contribution Office Hungary Swiss – Hungarian Cooperation Programme Rules and Procedures Information Days, May 2008 Miskolc

Embassy of SwitzerlandSwiss Contribution Office Hungary

• 2-Loop approach

• Selection procedures

• Reporting and audit

• 2-Loop approach

• Selection procedures

• Reporting and audit

The Presentation will cover the…The Presentation will cover the…

Page 3: Embassy of Switzerland Swiss Contribution Office Hungary Swiss – Hungarian Cooperation Programme Rules and Procedures Information Days, May 2008 Miskolc

Embassy of SwitzerlandSwiss Contribution Office Hungary

• 1st loop: Project Outline (approx. 5 pages)

• 2nd loop: Final Project Proposal (up to 20 pages + annexes)

• 1st loop: Project Outline (approx. 5 pages)

• 2nd loop: Final Project Proposal (up to 20 pages + annexes)

I. 2-Loop ApproachI. 2-Loop Approach

Page 4: Embassy of Switzerland Swiss Contribution Office Hungary Swiss – Hungarian Cooperation Programme Rules and Procedures Information Days, May 2008 Miskolc

Embassy of SwitzerlandSwiss Contribution Office Hungary

The Project OutlineThe Project Outline

1. General Information

5. Project organization

2. Applicant 6. Budget

3. Relevance 7. Horizontal issues

4. Project content

8. Maturity of project

Page 5: Embassy of Switzerland Swiss Contribution Office Hungary Swiss – Hungarian Cooperation Programme Rules and Procedures Information Days, May 2008 Miskolc

Embassy of SwitzerlandSwiss Contribution Office Hungary

Under NFÜ’s overall responsibility:

• Calls open for consultation

• Call for proposal with eligibility criteria

• Formal check

• Content check: Project appraisal

• Decision: Projects to be send to Switzerland (Committee(s))

Under NFÜ’s overall responsibility:

• Calls open for consultation

• Call for proposal with eligibility criteria

• Formal check

• Content check: Project appraisal

• Decision: Projects to be send to Switzerland (Committee(s))

II. Selection ProceduresII. Selection Procedures

Page 6: Embassy of Switzerland Swiss Contribution Office Hungary Swiss – Hungarian Cooperation Programme Rules and Procedures Information Days, May 2008 Miskolc

Embassy of SwitzerlandSwiss Contribution Office Hungary

• Call open for consultation: 1-2 weeks

• Call open for applicants: 1-2 months

• Decision by NFÜ: 1-3 months

• Decision by Swiss side: 1-3 months

• Elaboration of Final Project Proposal: approx. 3 months

• Second loop starts…

• Call open for consultation: 1-2 weeks

• Call open for applicants: 1-2 months

• Decision by NFÜ: 1-3 months

• Decision by Swiss side: 1-3 months

• Elaboration of Final Project Proposal: approx. 3 months

• Second loop starts…

Time FrameTime Frame

Page 7: Embassy of Switzerland Swiss Contribution Office Hungary Swiss – Hungarian Cooperation Programme Rules and Procedures Information Days, May 2008 Miskolc

Embassy of SwitzerlandSwiss Contribution Office Hungary

MoU

Bilateral Framework Agreement

Project Agreements

Supply and services contracts

EU Swiss Federal Council

Hungary Swiss Federal Council

Switzerland(SDC or SECO)

Executing Agency Suppliers

Legal Framework

Hungary (NFÜ)

Implementation AgreementNFÜExecuting Agency

Page 8: Embassy of Switzerland Swiss Contribution Office Hungary Swiss – Hungarian Cooperation Programme Rules and Procedures Information Days, May 2008 Miskolc

Embassy of SwitzerlandSwiss Contribution Office Hungary

III. Reporting and Audit

The Executing Agency has to deliver:

• Interim reports

• Annual project reports

• Project completion reports

The Executing Agency has to deliver:

• Interim reports

• Annual project reports

• Project completion reports

Page 9: Embassy of Switzerland Swiss Contribution Office Hungary Swiss – Hungarian Cooperation Programme Rules and Procedures Information Days, May 2008 Miskolc

Embassy of SwitzerlandSwiss Contribution Office Hungary

Audit

• At the completion of each project a financial audit is required

• In addition, for projects lasting longer than 2 years an interim audit is required

• At the completion of each project a financial audit is required

• In addition, for projects lasting longer than 2 years an interim audit is required

Page 10: Embassy of Switzerland Swiss Contribution Office Hungary Swiss – Hungarian Cooperation Programme Rules and Procedures Information Days, May 2008 Miskolc

Embassy of SwitzerlandSwiss Contribution Office Hungary

Further Information

• www.nfu.hu/svajci_hozzajarulas (the englisch version of this presentation will be available) www.swiss-contribution.ch (general website)www.swiss-contribution.ch/hungary(coming soon)

• Newsletter: Will be coming later this year - we have your contacts!

Page 11: Embassy of Switzerland Swiss Contribution Office Hungary Swiss – Hungarian Cooperation Programme Rules and Procedures Information Days, May 2008 Miskolc

Embassy of SwitzerlandSwiss Contribution Office Hungary

Contact

Liliana de Sá KirchknopfLiliana de Sá Kirchknopf

Head of the Swiss Contribution Office in Head of the Swiss Contribution Office in BudapestBudapest

Swiss EmbassySwiss Embassy

Email: [email protected]: [email protected]

Liliana de Sá KirchknopfLiliana de Sá Kirchknopf

Head of the Swiss Contribution Office in Head of the Swiss Contribution Office in BudapestBudapest

Swiss EmbassySwiss Embassy

Email: [email protected]: [email protected]