20

Email/Website - srpc.kar.nic.in · solar pavagada kspdcl 33kv avaada block 7 line 10 at kss-2(pavagada solar pp) - main lt-0801-a sp-85 7:32:53 8:32:41 0:59:48 june 29, 2020 no fast

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Email/Website - srpc.kar.nic.in · solar pavagada kspdcl 33kv avaada block 7 line 10 at kss-2(pavagada solar pp) - main lt-0801-a sp-85 7:32:53 8:32:41 0:59:48 june 29, 2020 no fast
Page 2: Email/Website - srpc.kar.nic.in · solar pavagada kspdcl 33kv avaada block 7 line 10 at kss-2(pavagada solar pp) - main lt-0801-a sp-85 7:32:53 8:32:41 0:59:48 june 29, 2020 no fast
Page 3: Email/Website - srpc.kar.nic.in · solar pavagada kspdcl 33kv avaada block 7 line 10 at kss-2(pavagada solar pp) - main lt-0801-a sp-85 7:32:53 8:32:41 0:59:48 june 29, 2020 no fast

Agenda for 5th meeting of Nodal Officers for SEM Data Coordination to be held on 22.07.2020 Page 1

Southern Regional Power Committee

Bengaluru

Agenda for the 5

th Meeting of Nodal Officers for SEM Data Coordination to be

held on 22.07.2020 (Through VC)

Introduction:

A meeting of Nodal Officers for SEM data coordination through Webex Video Conferencing

(VC) software is scheduled on 22.07.2020 to discuss the issues related to SEMs installed in

SR.

The following are the agenda items:

1. Faulty SEMs:

The following faulty SEMs needs to be replaced:

Utility Station SEM Sl.No/

Location ID Feeder Name

KPTCL Kadakola SA-0176-A/ CK-01 220 kV Kaniyampetta- Kadakola

TANTRAN

SCO

Kaythar NP-9629-A/ TK-51 400 kV Karaikudi- Kayatar line- 1

Kaythar NP-9634-A/ TK-50 400 kV Karaikudi- Kayatar line- 2

Tiruvalem NP-3325-A/ TT-86 400 kV Bus Section- 2 (PGCIL) at

Thiruvalam (TNEB)

Ulundurpet TN-7595-A/ TU-22 230 kV NLC TPS-II - Ulundurpet line

PGCIL

Thiruvalam NP-9584-A/ TT-74 400 kV Nellore - Thiruvalam line-1

Tuticorin PS NP-9609-A/ TT-97 400 kV Madurai - Tuticorin PS Line 1

Gazuwaka NP-9757-A/ AG-49 400 kV Simhadri Line 2 At Gazuwaka

Pugalur NP-9630-A/ TP-10 400 kV Karaikudi Line 2 At Pugalur

Thiruvalam NP-9607-A/ TT-79 765 kV Cuddapah-Thiruvalam Line- 2

BHAVINI

BHAVINI NP-7292-A/ BV-13 230 kV BHAVINI -Arni Line-1

BHAVINI NP-7645-A/ BV-21 230 kV BHAVINI -Kancheepuram Line-1

BHAVINI NP-7646-A/ BV-23 230 kV BHAVINI-Kancheepuram Line-2

2. Under Recording SEMs:

The following SEMs of PGCIL are under recording:

Station Name SEM Sl.No/Location ID Feeder Name

Pugalur HVDC SA-0333-A/TP-36 400 kV side of Converter Transformer- 2

at Pugalur HVDC

Vemagiri NP-9345-A/ AV-75 400 kV Simhadri Stage-II Line-1 at

Vemagiri (PG)

Kozhikode NP-8350-A/ KK-07 220 kV side of ICT-1 at Kozhikode

Page 4: Email/Website - srpc.kar.nic.in · solar pavagada kspdcl 33kv avaada block 7 line 10 at kss-2(pavagada solar pp) - main lt-0801-a sp-85 7:32:53 8:32:41 0:59:48 june 29, 2020 no fast

Agenda for 5th meeting of Nodal Officers for SEM Data Coordination to be held on 22.07.2020 Page 2

3. Time Drift:

a. The list of SEMs requiring time correction is at Annexure-I.

b. Time drift in SEMs shall be less than 40 seconds.

c. Time drift statement needed to be uploaded by 1200 hrs of first Monday of every

month to SRLDC website>Commercial>SEM Time drift.

4. SEM Reverse Polarity:

Reverse polarity, if any, needs to be corrected within a week from the receipt of

information. The details of SEM with reverse polarity are at Annexure-II.

5. Non furnishing of SEM Data: SEM data (location ID TN-11) at NCTPS on 400

kV Vallur line-1 is not being furnished by TANTRANSCO.

6. Pending recommendations of the 3rd

meeting of Nodal Officers for SEM

Data Coordination:

In the 3rd

meeting of Nodal Officers for SEM data coordination held on 5th

August 2016

installation of SEMs by TSTRANSCO on Bonakaalu- Chillakallu lines 1&2 had been

recommended.

In the 44th

meeting of Commercial Sub-Committee held on 29.05.2020, TSTRANSCO had

informed that Purchase Order for procurement of SEMs was placed on 22.04.2020 and the

installation of SEMs on Bonakaalu-Chillakallu lines 1&2 would be completed by

22.07.2020.

7. Database of SEMs and Calibration of SEMs:

7.1 In the previous Nodal officers meeting the following had been noted:

a) The utilities to maintain the data base of SEMs within their jurisdiction and should

have the factory test report and calibration date etc.

b) In case of any configuration change /SEM change the same has to be reported to

SRLDC and SRPC Secretariat to have the correct Accounting of Energy.

c) All Utilities may furnish action plan regarding calibration of the SEMs.

d) The factory test report and subsequent calibration reports shall be available with

respective site and softcopy of the test certificate and database regarding SEMs and

its calibration shall be furnished to SRLDC and SRPC secretariat.

7.2 PGCIL, SRTS-I vide email dated 10th

June 2020 intimated station-wise schedule of

calibration of SEMs in SR-1 jurisdiction from 17th

June 2020 to 15th

October 2020 with

two Teams (Annexure-III).

The gist of findings of SEM Calibration should be furnished by PGCIL to SRLDC.

8. Spare SEMs and DCDs:

All the utilities to maintain spare SEMs at least 10% of the total SEMs installed under

their jurisdiction and sufficient number of spare DCDs etc.

Page 5: Email/Website - srpc.kar.nic.in · solar pavagada kspdcl 33kv avaada block 7 line 10 at kss-2(pavagada solar pp) - main lt-0801-a sp-85 7:32:53 8:32:41 0:59:48 june 29, 2020 no fast

Agenda for 5th meeting of Nodal Officers for SEM Data Coordination to be held on 22.07.2020 Page 3

9. Certification of SEMs by PGCIL/CTU:

In the 39th

meeting of Commercial Sub-Committee, it was decided that the meters used for

apportioning the actual injection of ISTS power among regional entities may be certified

by PGCIL/CTU (on payment basis).

The following procedure to be followed in respect of certification of SEMs by

PGCIL/CTU:

i. User to approach PGCIL/CTU (SPDs/WPDs through SPPD/WPPD) for certification

of SEMs.

ii. User to approach Buyer (SPDs/WPDs through SPPD/WPPD) for witnessing the

certification of SEMs.

iii. Certification by PGCIL/CTU to be performed in the presence of User (SPD, SPPD,

WPPD) and Buyer

iv. User/SPD/SPPD/WPPD to submit the certification report (as per the format) to

SRLDC and SRPC Secretariat.

The format for certification of SEMs by PGCIL/CTU is at Annexure-IV.

10. SEM issues at Solar Parks:

a) Cross mapping of feeders at 220 kV Line-6 & 7:

In the Meeting held on Solar park issues on 02.07.2020, it was agreed that the

mapping of the SEMs on feeders at PGCIL 220 kV Line-6 & 7 (from KSPDCL SS-7

& SS-6) would be corrected by SRLDC on receipt of written communication from

KSPDCL along with the revised metering diagram/SLD of Pavagada solar park.

Status update by SRLDC

b) Non-recording during night hours by Main and Check meters at PGCIL end of

220 kV Line 1 and 2 of Galiveedu PS-4(Anantapuramau Solar Park):

In the Meeting held on Solar park issues on 02.07.2020, it was decided to adopt the

CT ratio of Main and check SEMs at PGCIL end of 220 kV Line 1 and 2 of Galiveedu

PS-4 to 800/1 instead of 1600/1 immediately.

Status update by PGCIL, SR-I

c) Non-recording of drawal by SEMs of ACME, NP Kunta during night hours:

In the Meeting held on Solar park issues on 02.07.2020, it was decided that M/s

ACME to resolve the issue by 12.07.2020, otherwise opening of ACME feeders

during night hours may be considered.

Status update by ACME/APSPCL

11. General requirements from Nodal officers:

i. Ensure the SEM data uploaded including raw data (DAT) and converted data (NPC)

are correct in all respects and take necessary steps for the same. The data should be

uploaded every week by 1700 hrs of Monday.

ii. Ensure that time drift statement is uploaded by 1200 hrs of first Monday of every

month.

iii. Ensure that SEMs under their jurisdiction have time drift less than 40 seconds.

iv. Ensure that reverse polarity, if any, is corrected within a week from the receipt of

information.

Page 6: Email/Website - srpc.kar.nic.in · solar pavagada kspdcl 33kv avaada block 7 line 10 at kss-2(pavagada solar pp) - main lt-0801-a sp-85 7:32:53 8:32:41 0:59:48 june 29, 2020 no fast

Agenda for 5th meeting of Nodal Officers for SEM Data Coordination to be held on 22.07.2020 Page 4

v. Coordination with the OEMs so as to ensure that field stations under jurisdiction have

up-to-date access with the meter conversion software.

vi. Coordination with CTU to ensure faulty SEM is replaced, and/or any other issues in

the purview of CTU.

vii. In case of any configuration change /SEM change the same needed to be reported to

SRLDC and SRPC Secretariat for proper accounting of energy.

viii. Sole responsible for coordinating with SRLDC metering Group in case of any change

in injection/drawal formula.

ix. All Elster make Main SEMs should be replaced by other make SEMs as Elster SEMs

have reactive energy recording issues.

x. Maintain sufficient spare SEMs and ancillary equipments such as DCDs etc.

******

Page 7: Email/Website - srpc.kar.nic.in · solar pavagada kspdcl 33kv avaada block 7 line 10 at kss-2(pavagada solar pp) - main lt-0801-a sp-85 7:32:53 8:32:41 0:59:48 june 29, 2020 no fast

Utility Name Station Name Description Location Meter No GPS Meter Drift Time Drift

Date of

Checking

Whether time

Correction done ?

Meter

Status(Fast/Slow)KSEB PARASALA 110KV KUZHITHURAI LINE AT PARASALA NP-5639-A KK-05 10:12:30 8:49:23 1:23:07 June 29, 2020 NO SLOW

SOLAR PAVAGADA

KSPDCL

33KV AVAADA BLOCK 7 LINE 10 AT KSS-2(PAVAGADA SOLAR PP) - MAIN LT-0801-A SP-85 7:32:53 8:32:41 0:59:48 June 29, 2020 NO FAST

ANDHRA

PRADESH

SATTENAPALLI 400KV SRISAILAM LB LINE 1 AT SATTENAPALLI NP-3027-A AS-14 15:14:05 14:14:22 0:59:43 June 22, 2020 NO SLOW

SOLAR PAVAGADA

KSPDCL

33KV KSS-1(PAVAGADA SOLAR PP) LINE 6 AT ADYAH BLOCK 1 - STANDBY LT-0589-A SP-42 7:04:53 7:34:42 0:29:49 June 29, 2020 YES FAST

NPC BHAVINI 230kV side of GT 1 AT BHAVNI NP-7299-A BV-01 11:07:33 11:35:36 0:28:03 June 1, 2020 NO FAST

NPC BHAVINI 230KV KANCHEEPURAM LINE 2 AT BHAVNI NP-7295-A BV-23 11:09:14 11:37:16 0:28:02 June 1, 2020 NO FAST

NPC BHAVINI 230KV SIRUSERI LINE 1 AT BHAVNI NP-7303-A BV-17 11:10:42 11:38:39 0:27:57 June 1, 2020 NO FAST

NPC BHAVINI 230KV SIRUSERI LINE 1 AT BHAVNI NP-7304-A BV-17 11:10:56 11:38:37 0:27:41 June 1, 2020 NO FAST

NPC BHAVINI 230kV side of GST AT BHAVNI NP-7311-A BV-03 11:11:35 11:37:26 0:25:51 June 1, 2020 NO FAST

NPC BHAVINI 230KV SIDE OF ST 1 AT BHAVNI NP-7298-A BV-02 11:07:54 11:33:45 0:25:51 June 1, 2020 NO FAST

GOA XELDEM 220KV AMBEVADI LINE AT XELDEM NP-5511-A GP-02 14:02:00 14:26:56 0:24:56 June 22, 2020 NO FAST

KPTCL AMBEWADI 220kV XELDEM LINE AT AMBEWADI NP-5600-A CA-03 12:00:00 12:24:17 0:24:17 June 1, 2020 NO FAST

NPC BHAVINI 230KV KANCHEEPURAM LINE 1 AT BHAVNI NP-7297-A BV-21 11:09:32 11:32:47 0:23:15 June 1, 2020 NO FAST

GOA PONDA 220KV AMBEVADI LINE AT PONDA NP-5506-A GP-01 9:08:00 9:30:12 0:22:12 June 8, 2020 NO FAST

NPC BHAVINI 230KV ARNI LINE 2 AT BHAVNI NP-7290-A BV-15 11:08:36 11:30:40 0:22:04 June 1, 2020 NO FAST

NPC BHAVINI 230KV SIRUSERI LINE 2 AT BHAVNI NP-7302-A BV-19 11:10:19 11:29:35 0:19:16 June 1, 2020 NO FAST

KPTCL GUTTUR 220KV SIDE OF ICT 2 AT GUTTUR NP-5688-A CG-04 11:08:40 11:26:13 0:17:33 June 2, 2020 NO FAST

KPTCL AMBEWADI 220KV PONDA LINE AT AMBEWADI(PRESENTLY CONNECTED TO XELDEM) NP-5598-A CA-02 12:00:00 12:17:16 0:17:16 June 1, 2020 NO FAST

NPC BHAVINI 230KV ARNI LINE 1 AT BHAVNI NP-7293-A BV-13 11:08:56 11:25:34 0:16:38 June 1, 2020 NO FAST

SOLAR PAVAGADA

KSPDCL

66KV SOFT BANK BLOCK 24 LINE 5 AT KSS-5(PAVAGADA SOLAR PP) - CHECK LT-0878-A SQ-71 15:13:13 15:28:59 0:15:46 June 15, 2020 YES FAST

KPTCL GUTTUR 220kV side of ICT 1 AT GUTTUR NP-4062-A CG-02 11:07:46 11:20:48 0:13:02 June 2, 2020 NO FAST

TANTRANSCO ACHARAPAKKAM 230KV MAPS LINE AT ACHARAPAKAM NP-6175-A TA-54 16:20:12 16:32:12 0:12:00 June 3, 2020 NO FAST

SOLAR ANANTHAPURAM 33KV (ANANTHAPURAM SOLAR PP) GALIVEEDU PS-1 LINE 1 AT NP KUNTA (PGCIL)

ACMEKRNL

AT-0507-A SA-37 18:18:34 18:06:40 0:11:54 June 11, 2020 YES SLOW

KPTCL GUTTUR 400KV SIDE OF ICT 2 AT GUTTUR NP-4114-A CG-03 10:59:14 10:47:40 0:11:34 June 2, 2020 NO SLOW

SOLAR ANANTHAPURAM 33KV (ANANTHAPURAM SOLAR PP) GALIVEEDU PS-1 LINE 1 AT NP KUNTA (PGCIL)

ACMEKRNL

AT-0508-A SA-38 18:16:46 18:05:14 0:11:32 June 11, 2020 YES SLOW

TANTRANSCO ALAMATHY 400KV THIRUVALEM (TN) LINE 2 AT ALAMATHY NP-7818-A TA-14 12:48:07 12:59:28 0:11:21 June 8, 2020 NO FAST

NPC BHAVINI 230kV MAPS TIE LINE AT BHAVNI NP-7312-A BV-11 11:11:00 11:00:00 0:11:00 June 1, 2020 NO SLOW

NPC BHAVINI 230kV MAPS TIE LINE AT BHAVNI NP-7313-A BV-11 11:11:00 11:00:00 0:11:00 June 1, 2020 NO SLOW

SOLAR PAVAGADA

KSPDCL

33KV ADYAH BLOCK 13 LINE 4 AT KSS-3(PAVAGADA SOLAR PP) - CHECK LT-0613-A SQ-02 6:19:50 6:09:11 0:10:39 June 22, 2020 YES SLOW

TANTRANSCO ALAMATHY 400KV THIRUVALEM (TN) LINE 1 AT ALAMATHY NP-7262-A TA-13 12:48:15 12:58:50 0:10:35 June 8, 2020 NO FAST

NTPC NTECL VALLUR 400kV side of GT 1 AT VALLUR NP-7824-A VL-01 10:00:00 9:50:00 0:10:00 June 1, 2020 NO SLOW

SOLAR PAVAGADA

KSPDCL

33KV KSS-1(PAVAGADA SOLAR PP) LINE 4 AT ADYAH BLOCK 3 - STANDBY LT-0581-A SP-36 13:17:20 13:07:20 0:10:00 June 11, 2020 YES SLOW

SOLAR PAVAGADA

KSPDCL

33KV KSS-2(PAVAGADA SOLAR PP) LINE 4 AT ADYAH BLOCK 6 - STANDBY LT-0623-A SP-69 13:10:10 13:00:22 0:09:48 June 11, 2020 YES SLOW

KPTCL GUTTUR 400KV JSW LINE AT GUTTUR NP-4061-A CG-18 11:05:33 10:55:46 0:09:47 June 2, 2020 NO SLOW

SOLAR ANANTHAPURAM 33KV (ANANTHAPURAM SOLAR PP) GALIVEEDU PS-1 LINE 5 AT NP KUNTA (PGCIL)

ACMEHIS

AT-0495-A SA-49 18:14:36 18:05:10 0:09:26 June 11, 2020 YES SLOW

SOLAR ANANTHAPURAM 33KV (ANANTHAPURAM SOLAR PP) GALIVEEDU PS-2 LINE 1 AT NP KUNTA (PGCIL)

ACMEBHI

AT-0501-A SA-67 19:34:00 19:24:34 0:09:26 June 11, 2020 YES SLOW

TANTRANSCO ALAMATHY 400KV VALLUR LINE 1 AT ALAMATHY NP-7819-A TA-11 12:47:27 12:56:37 0:09:10 June 8, 2020 NO FAST

NPC BHAVINI 230KV ARNI LINE 1 AT BHAVNI NP-7292-A BV-13 11:08:56 11:00:00 0:08:56 June 1, 2020 NO SLOW

KPTCL GUTTUR 400kV MUNIRABAD LINE AT GUTTUR NP-5690-A CG-15 11:07:18 11:15:57 0:08:39 June 2, 2020 NO FAST

SOLAR ANANTHAPURAM 33KV (ANANTHAPURAM SOLAR PP) GALIVEEDU PS-2 LINE 2 AT NP KUNTA (PGCIL)

ACMEBHI

AT-0505-A SA-70 19:37:46 19:29:10 0:08:36 June 11, 2020 YES SLOW

KPTCL KODASALLI 220KV KAIGA LINE AT KODASALLI SA-0173-A CK-42 11:00:00 11:08:30 0:08:30 June 1, 2020 NO FAST

TANTRANSCO KADLANGUDI 230KV NLC TS 2 LINE AT KADALANGUDI LT-0572-A TK-41 11:48:19 11:40:00 0:08:19 June 8, 2020 Yes SLOW

SOLAR PAVAGADA

KSPDCL

33KV ADYAH BLOCK 6 LINE 3 AT KSS-2(PAVAGADA SOLAR PP) - CHECK LT-0610-A SP-65 5:53:15 5:45:00 0:08:15 June 22, 2020 YES SLOW

TANTRANSCO ARNI 230KV BHAVNI LINE 1 AT ARNI NP-7307-A TA-52 6:31:15 6:23:03 0:08:12 June 22, 2020 NO SLOW

TANTRANSCO ARNI 230KV BHAVNI LINE 2 AT ARNI NP-7308-A TA-53 6:31:15 6:23:03 0:08:12 June 22, 2020 NO SLOW

SOLAR PAVAGADA

KSPDCL

33KV ADYAH BLOCK 13 LINE 3 AT KSS-3(PAVAGADA SOLAR PP) - MAIN LT-0568-A SP-97 6:15:04 6:06:58 0:08:06 June 22, 2020 YES SLOW

SOLAR ANANTHAPURAM 33KV (ANANTHAPURAM SOLAR PP) NP KUNTA (PGCIL) LINE 1 AT GALIVEEDU PS-1

ACMEKRNL

AT-0509-A SA-39 18:27:00 18:19:07 0:07:53 June 11, 2020 YES SLOW

SOLAR PAVAGADA

KSPDCL

33KV KSS-1(PAVAGADA SOLAR PP) LINE 5 AT ADYAH BLOCK 1 - STANDBY LT-0556-A SP-39 8:27:43 8:19:51 0:07:52 June 22, 2020 YES SLOW

SOLAR PAVAGADA

KSPDCL

33KV ADYAH BLOCK 10 LINE 5 AT KSS-2(PAVAGADA SOLAR PP) - CHECK LT-0555-A SP-71 5:59:06 5:51:19 0:07:47 June 22, 2020 YES SLOW

TANTRANSCO NCTPS 400KV VALLUR LINE 2 AT NCTPS NP-8360-A TN-12 12:15:35 12:23:14 0:07:39 June 1, 2020 NO FAST

SOLAR ANANTHAPURAM 220 KV NP KUNTA LINE 6 AT ANANTHAPURAM (NP KUNTA PS4) - STANDBY AT-0530-A SA-30 16:34:15 16:26:56 0:07:19 June 11, 2020 NO SLOW

SOLAR PAVAGADA

KSPDCL

33KV ADYAH BLOCK 10 LINE 6 AT KSS-2(PAVAGADA SOLAR PP) - CHECK LT-0569-A SP-74 6:02:09 5:54:55 0:07:14 June 22, 2020 YES SLOW

KPTCL NELAMANGALA 400KV MYSORE LINE 1 AT NELAMANGALA NP-2482-A CN-17 13:39:15 13:46:25 0:07:10 June 29, 2020 NO FAST

SOLAR ANANTHAPURAM 33KV (ANANTHAPURAM SOLAR PP) GALIVEEDU PS-1 LINE 5 AT NP KUNTA (PGCIL)

ACMEHIS

AT-0496-A SA-49 18:12:44 18:05:37 0:07:07 June 11, 2020 YES SLOW

SOLAR PAVAGADA

KSPDCL

33KV ADYAH BLOCK 6 LINE 3 AT KSS-2(PAVAGADA SOLAR PP)-MAIN LT-0640-A SP-64 5:53:48 5:46:48 0:07:00 June 22, 2020 YES SLOW

TANTRANSCO ALAMATHY 400KV VALLUR LINE 2 AT ALAMATHY NP-7817-A TA-12 11:13:34 11:20:33 0:06:59 June 5, 2020 NO FAST

SOLAR ANANTHAPURAM 33KV (ANANTHAPURAM SOLAR PP) GALIVEEDU PS-1 LINE 2 AT NP KUNTA (PGCIL)

ACMEKRNL

AT-0511-A SA-40 18:07:00 18:00:08 0:06:52 June 11, 2020 YES SLOW

KPTCL NELAMANGALA 400KV YELAHANKA LINE 2 AT NELAMANGALA NP-4053-A CN-19 13:36:10 13:29:24 0:06:46 June 29, 2020 NO SLOW

SOLAR PAVAGADA

KSPDCL

33KV TATA BLOCK 17 LINE 7 AT KSS-4(PAVAGADA SOLAR PP) - MAIN LT-0699-A SQ-43 7:33:45 7:27:02 0:06:43 June 22, 2020 yes SLOW

SOLAR PAVAGADA

KSPDCL

33KV KSS-2(PAVAGADA SOLAR PP) LINE 5 AT ADYAH BLOCK 10 - STANDBY LT-0558-A SP-72 12:56:33 12:49:57 0:06:36 June 11, 2020 YES SLOW

SOLAR PAVAGADA

KSPDCL

33KV ADYAH BLOCK 1 LINE 6 AT KSS-1(PAVAGADA SOLAR PP) - MAIN LT-0625-A SP-40 5:25:08 5:18:38 0:06:30 June 22, 2020 YES SLOW

KPTCL NELAMANGALA 400KV HIRIYUR LINE 2 AT NELAMANGALA NP-4052-A CN-15 9:26:10 9:19:45 0:06:25 June 30, 2020 NO SLOW

SOLAR ANANTHAPURAM 220 KV NP KUNTA LINE 4 AT ANANTHAPURAM (GALIVEEDU PS-2) - STANDBY AT-0527-A SA-28 16:40:10 16:33:45 0:06:25 June 11, 2020 NO SLOW

SOLAR PAVAGADA

KSPDCL

33KV TATA BLOCK 21 LINE 4 AT KSS-4(PAVAGADA SOLAR PP) - CHECK LT-0726-A SQ-35 7:40:16 7:34:00 0:06:16 June 22, 2020 yes SLOW

SOLAR ANANTHAPURAM 33KV (ANANTHAPURAM SOLAR PP) GALIVEEDU PS-1 LINE 2 AT NP KUNTA (PGCIL)

ACMEKRNL

AT-0510-A SA-40 18:09:30 18:03:15 0:06:15 June 11, 2020 YES SLOW

TELENGANA MALKARAM 400kV RAMAGUNDAM LINE AT MALKARAM NP-7820-A AM-22 12:51:00 12:57:13 0:06:13 June 1, 2020 YES FAST

TANTRANSCO ECHUR 230KV MAPS LINE AT ECHUR NP-6174-A TE-01 13:15:54 13:22:05 0:06:11 June 3, 2020 NO FAST

SOLAR ANANTHAPURAM 33KV (ANANTHAPURAM SOLAR PP) NP KUNTA (PGCIL) LINE 2 AT GALIVEEDU PS-2

ACMEBHI

AT-0506-A SA-72 19:23:03 19:16:55 0:06:08 June 11, 2020 YES SLOW

SOLAR PAVAGADA

KSPDCL

33KV TATA BLOCK 15 LINE 9 AT KSS-4(PAVAGADA SOLAR PP) - CHECK LT-0730-A SQ-50 7:25:11 7:19:03 0:06:08 June 22, 2020 yes SLOW

SOLAR PAVAGADA

KSPDCL

33KV TATA BLOCK 18 LINE 6 AT KSS-4(PAVAGADA SOLAR PP) - MAIN LT-0695-A SQ-40 7:32:45 7:26:38 0:06:07 June 22, 2020 yes SLOW

SOLAR PAVAGADA

KSPDCL

33KV ADYAH BLOCK 13 LINE 4 AT KSS-3(PAVAGADA SOLAR PP) - MAIN LT-0557-A SQ-01 6:17:12 6:11:08 0:06:04 June 22, 2020 YES SLOW

SOLAR ANANTHAPURAM 33KV (ANANTHAPURAM SOLAR PP) NP KUNTA (PGCIL) LINE 2 AT GALIVEEDU PS-1

ACMEKRNL

AT-0512-A SA-42 18:29:17 18:23:15 0:06:02 June 11, 2020 YES SLOW

TANTRANSCO HOSUR230 230KV YERANDAHALLI LINE AT HOSUR (TN) LT-0323-A TH-30 12:07:00 12:01:00 0:06:00 June 1, 2020 YES SLOW

SOLAR PAVAGADA

KSPDCL

33KV KREDL LINE 11 AT KSS-3(PAVAGADA SOLAR PP) - MAIN LT-0859-A SQ-22 7:53:20 7:47:23 0:05:57 June 29, 2020 NO SLOW

TANTRANSCO NLC(TN) 400KV NLCTSII LINE 2 AT NLC(TN) NP-3302-A TN-32 9:29:31 9:23:35 0:05:56 June 1, 2020 NO SLOW

POWERGRID NAGAPATTINAM 400KV TRICHY LINE 2 AT NAGAPATTINAM NP-8322-A TN-06 9:58:57 10:04:45 0:05:48 June 1, 2020 NO FAST

SOLAR ANANTHAPURAM 33KV (ANANTHAPURAM SOLAR PP) GALIVEEDU PS-2 LINE 2 AT NP KUNTA (PGCIL)

ACMEBHI

AT-0504-A SA-70 19:36:00 19:30:12 0:05:48 June 11, 2020 YES SLOW

SOLAR PAVAGADA

KSPDCL

33KV KSS-1(PAVAGADA SOLAR PP) LINE 3 AT ADYAH BLOCK 3 - STANDBY LT-0635-A SP-33 13:04:41 12:58:56 0:05:45 June 11, 2020 YES SLOW

ANDHRA

PRADESH

KALAPAAKA 400KV KHAMMAM LINE 2 AT KALPAKA NP-7231-A AK-24 11:15:00 11:09:16 0:05:44 June 1, 2020 NO SLOW

SOLAR PAVAGADA

KSPDCL

66KV ACME REWA BLOCK 38 LINE 8 AT KSS-8(PAVAGADA SOLAR PP) - MAIN NP-9892-A SR-70 16:25:57 16:20:17 0:05:40 June 29, 2020 NO SLOW

SOLAR PAVAGADA

KSPDCL

33KV KSS-1(PAVAGADA SOLAR PP) LINE 11 AT KREDL - STANDBY LT-0853-A SP-57 9:16:50 9:11:11 0:05:39 June 29, 2020 NO SLOW

SOLAR PAVAGADA

KSPDCL

33KV ADYAH BLOCK 3 LINE 3 AT KSS-1(PAVAGADA SOLAR PP) - CHECK LT-0591-A SP-32 5:33:36 5:27:59 0:05:37 June 22, 2020 YES SLOW

SOLAR PAVAGADA

KSPDCL

33KV KSS-2(PAVAGADA SOLAR PP) LINE 6 AT ADYAH BLOCK 10 - STANDBY LT-0614-A SP-75 7:49:21 7:43:49 0:05:32 June 22, 2020 YES SLOW

SOLAR PAVAGADA

KSPDCL

33KV ADYAH BLOCK 1 LINE 5 AT KSS-1(PAVAGADA SOLAR PP) - MAIN LT-0617-A SP-37 5:19:12 5:13:47 0:05:25 June 22, 2020 YES SLOW

POWERGRID KURNOOL 765kV 400KV KURNOOL(AP) LINE 1 AT KURNOOL NP-3067-A AK-51 16:04:40 16:10:01 0:05:21 June 2, 2020 YES FAST

SOLAR PAVAGADA

KSPDCL

33KV ADYAH BLOCK 2 LINE 2 AT KSS-1(PAVAGADA SOLAR PP) - CHECK LT-0570-A SP-29 5:30:47 5:25:27 0:05:20 June 22, 2020 YES SLOW

SOLAR PAVAGADA

KSPDCL

33KV ADYAH BLOCK 13 LINE 3 AT KSS-3(PAVAGADA SOLAR PP) - CHECK LT-0607-A SP-98 6:14:37 6:09:19 0:05:18 June 22, 2020 YES SLOW

SOLAR PAVAGADA

KSPDCL

33KV ADYAH BLOCK 6 LINE 4 AT KSS-2(PAVAGADA SOLAR PP) - CHECK LT-0603-A SP-68 5:56:14 5:50:57 0:05:17 June 22, 2020 YES SLOW

SOLAR PAVAGADA

KSPDCL

33KV ADYAH BLOCK 10 LINE 6 AT KSS-2(PAVAGADA SOLAR PP)-MAIN LT-0626-A SP-73 6:02:39 5:57:23 0:05:16 June 22, 2020 YES SLOW

SOLAR PAVAGADA

KSPDCL

33KV KSS-3(PAVAGADA SOLAR PP) LINE 3 AT ADYAH BLOCK 13 - STANDBY LT-0586-A SP-99 7:36:50 7:31:34 0:05:16 June 22, 2020 YES SLOW

SOLAR ANANTHAPURAM 33KV (ANANTHAPURAM SOLAR PP) NP KUNTA (PGCIL) LINE 1 AT GALIVEEDU PS-2

ACMEBHI

AT-0503-A SA-69 19:21:00 19:15:49 0:05:11 June 11, 2020 YES SLOW

POWERGRID KURNOOL 765kV 765KV SIDE OF ICT 2 AT KURNOOL NP-3073-A AK-43 15:38:40 15:43:50 0:05:10 June 2, 2020 YES FAST

SOLAR PAVAGADA

KSPDCL

66KV RENEW BLOCK 33 LINE 7 AT KSS-7(PAVAGADA SOLAR PP) - MAIN LT-0834-A SR-37 14:07:29 14:02:25 0:05:04 June 11, 2020 YES SLOW

SOLAR PAVAGADA

KSPDCL

66KV KSS-7(PAVAGADA SOLAR PP) LINE 7 AT RENEW BLOCK 33 - STANDBY LT-0813-A SR-39 13:41:55 13:36:52 0:05:03 June 11, 2020 YES SLOW

ANNEXURE I (1/1)

Time Drift Issues

Page 8: Email/Website - srpc.kar.nic.in · solar pavagada kspdcl 33kv avaada block 7 line 10 at kss-2(pavagada solar pp) - main lt-0801-a sp-85 7:32:53 8:32:41 0:59:48 june 29, 2020 no fast

Utility Name Station Name Location Description Meter No

Wind - (Tuticorin GIS ) ORANGE SIRONJ WT-06 230KV TUTICORIN GIS LINE-1 AT ORANGE SIRONJ SA-0015-A

Wind - (Tuticorin GIS ) MYTRAH WT-08 230KV MYTRAH LINE-2 AT TUTICORIN GIS CHECK SA-0014-A

Wind - (Tuticorin GIS ) BETAM WT-12 230KV TUTICORIN GIS LINE-1 AT BETAM LT-0565-A

SOLAR ANANTHAPURAM SA-28 220 KV NP KUNTA LINE 4 AT ANANTHAPURAM (GALIVEEDU PS-2) - STANDBY NP-9746-A

SOLAR ANANTHAPURAM SA-39 33KV (ANANTHAPURAM SOLAR PP) NP KUNTA (PGCIL) LINE 1 AT GALIVEEDU PS-1 ACMEKRNL AT-0509-A

SOLAR ANANTHAPURAM SA-42 33KV (ANANTHAPURAM SOLAR PP) NP KUNTA (PGCIL) LINE 2 AT GALIVEEDU PS-1 ACMEKRNL AT-0512-A

SOLAR ANANTHAPURAM SA-51 33KV (ANANTHAPURAM SOLAR PP) NP KUNTA (PGCIL) LINE 5 AT GALIVEEDU PS-1 ACMEHIS AT-0497-A

SOLAR ANANTHAPURAM SA-54 33KV (ANANTHAPURAM SOLAR PP) NP KUNTA (PGCIL) LINE 6 AT GALIVEEDU PS-1 ACMEHIS AT-0499-A

SOLAR ANANTHAPURAM SA-69 33KV (ANANTHAPURAM SOLAR PP) NP KUNTA (PGCIL) LINE 1 AT GALIVEEDU PS-2 ACMEBHI AT-0503-A

SOLAR ANANTHAPURAM SA-72 33KV (ANANTHAPURAM SOLAR PP) NP KUNTA (PGCIL) LINE 2 AT GALIVEEDU PS-2 ACMEBHI AT-0506-A

ALL NTPC METERS AT ANANTHAPURAM

METERS AT PAVAGADA SENT SEPARATELY

THE CORRECT POLARITY OF ALIPURA-RAGULUPADU TO BE CHECKED JOINTLY BY TS AND AP,AND CONCLUSION TO BE GIVEN TO SRLDC

ANNEXURE II (1/1)

Reverse Polarity Issues

Page 9: Email/Website - srpc.kar.nic.in · solar pavagada kspdcl 33kv avaada block 7 line 10 at kss-2(pavagada solar pp) - main lt-0801-a sp-85 7:32:53 8:32:41 0:59:48 june 29, 2020 no fast

S.No Name of Station From To No. Of Meters Team Details

1 Nellore, Nellore PS, Nellore Transco 17 June 2020 07 July 2020 35 Team-1

2 Chilakalurpet 09 July 2020 14 July 2020 9 Team-1

3 Vijayawada 16 July 2020 27 July 2020 20 Team-1

4 Khammam 29 July 2020 10 August 2020 17 Team-1

5 Nagarjuna Sagar 12 August 2020 21 August 2020 16 Team-1

6 Vemagiri PG, Vemagiri Transco 24 August 2020 03 September 2020 18 Team-1

7 Gajuwaka, Simhadri 05 September 2020 17 September 2020 21 Team-1

8 Srikakulam, Garividi 19 September 2020 27 September 2020 13 Team-1

9 Cuddapah, Cuddapah 765kV 29 September 2020 13 October 2020 24 Team-1

10 Chittor Transco 15 October 2020 15 October 2020 2 Team-1

Total SEMs 175 Team-1

S.No Name of Station From To No. Of Meters Team Details

1 Hyderabad 17 June 2020 25 June 2020 15 Team-2

2 Maheswaram 26 June 2020 02 July 2020 12 Team-2

3 Munirabad 03 July 2020 06 July 2020 6 Team-2

4 Nizambad 08 July 2020 15 July 2020 14 Team-2

5 Dichpalli 16 July 2020 16 July 2020 2 Team-2

6 Ramagundam NTPC 18 July 2020 21 July 2020 6 Team-2

7 Warangal 23 July 2020 29 July 2020 11 Team-2

8 NP KUNTA 01 August 2020 27 August 2020 38 Team-2

POWERGRID CORPORATION OF INDIA LIMITED

REGIONAL ASSET MANAGEMENT

SOUTHERN REGION TRANSMISSION SYSTEM-I

Plan for Onsite Calibration of Special Energy Meters Installed at POWERGRID Substations & POWERGRID meters

installed at other utilites

ANNEXURE III (1/2)

Page 10: Email/Website - srpc.kar.nic.in · solar pavagada kspdcl 33kv avaada block 7 line 10 at kss-2(pavagada solar pp) - main lt-0801-a sp-85 7:32:53 8:32:41 0:59:48 june 29, 2020 no fast

9 Gooty 31 August 2020 09 September 2020 18 Team-2

10 Hindupur 11 September 2020 11 September 2020 2 Team-2

11 Kurnool, Kurnool APTransco 14 September 2020 25 September 2020 22 Team-2

12 Mahaboob Nager 28 September 2020 28 September 2020 2 Team-2

13 Raichur 30 September 2020 08 October 2020 14 Team-2

14 RTPS 10 October 2020 12 October 2020 4 Team-2

Total SEMs 166 Team-2

ANNEXURE III (2/2)

Page 11: Email/Website - srpc.kar.nic.in · solar pavagada kspdcl 33kv avaada block 7 line 10 at kss-2(pavagada solar pp) - main lt-0801-a sp-85 7:32:53 8:32:41 0:59:48 june 29, 2020 no fast

Joint verification report of Special Energy Meter (SEM)

Sl NO Description

1 Name of the station

2 Name of the transmission element

3 Meter Serial Number

4 Make & model number of the meter

5 Owner of the meter

6 Main / Check / Standby

7 PT Ratio

8 CT Ratio

9 Accuracy Class of meter

10 Accuracy Class of CT/PT

11 Meter test reports verified & enclosed

(Yes/No)

12 Display of all parameters have been

verified (Yes/No)

13 Meter polarity verified

(Energy going out of bus shall read

positive and vice versa)

(Yes/No)

14 Fuses and connections have been

verified and found to be intact

(Yes/No)

15 Data downloading from meter & NPC

file conversion as per prescribed

format is verified

(Yes/No)

16 AMR facility available (Yes/No)

17 Time drift (hh:mm:ss)

18 Whether time drift correction

software available at site

19 Whether Night time reading is OK

(Yes/No)

Remarks (If any):

Witnessed by: Signature along with date

CTU Generator/Seller Solar Park Developer STU/ Buyer

Details

ANNEXURE IV (1/1)

Page 12: Email/Website - srpc.kar.nic.in · solar pavagada kspdcl 33kv avaada block 7 line 10 at kss-2(pavagada solar pp) - main lt-0801-a sp-85 7:32:53 8:32:41 0:59:48 june 29, 2020 no fast

Email/Website

No. SRPC/SE-I/2020/ दिन ांक/ Dated: 7th July, 2020

सेवा में / To

सांलग्न सूचीके अनुस र

As per attached List

Sub: Agenda for 5th Meeting of Nodal Officers for SEM data coordination (Webex) to be

held on 22.07.2020- Reg

महोिय/महोिय / Sir/ Madam,

It is informed that the 5th Meeting of Nodal Officers for SEM data coordination is to be held on

22.07.2020 (Wednesday) through Webex at 10:30 hrs.

SRLDC vide email dated 2nd July, 2020 has furnished the agenda notes for the meeting and is

herewith attached as Annexure. The same is available to download from SRPC website

(www.srpc.kar.nic.in).

The Webex meeting link will be communicated through mail in due course. All the concerned

nodal officers/nominees are requested kindly to attend the meeting through Webex.

भविीय/Yours faithfully,

सांलग्नक:यथोपरर /Encl: as above

(मेका रामकृष्ण/MEKA RAMAKRISHNA)

अधीक्षक अभभयांत (C) / Superintending Engineer(C)

भ रत सरक र

केन्द्रीय ववद्युत प्र धधकरण

िक्षक्षण क्षेत्रीय ववद्युत सभमतत

29, रेस कोसस क्र स रोड

बेंगलूरु :-560 009

Government of India

Central Electricity Authority

Southern Regional Power Committee

29, Race Course Cross Road BENGALURU- 560 009

Phone : 080 -2228 2516 ; e-mail: [email protected]; web site: www.srpc.kar.nic.in

th

Page 13: Email/Website - srpc.kar.nic.in · solar pavagada kspdcl 33kv avaada block 7 line 10 at kss-2(pavagada solar pp) - main lt-0801-a sp-85 7:32:53 8:32:41 0:59:48 june 29, 2020 no fast
Page 14: Email/Website - srpc.kar.nic.in · solar pavagada kspdcl 33kv avaada block 7 line 10 at kss-2(pavagada solar pp) - main lt-0801-a sp-85 7:32:53 8:32:41 0:59:48 june 29, 2020 no fast

7/7/2020 Gmail - SEM NODAL OFFICERS MEET AGENDA

https://mail.google.com/mail/u/1?ik=00a3b8867b&view=pt&search=all&permmsgid=msg-f%3A1671119716805602804&simpl=msg-f%3A1671119716805602804&… 1/1

COMMERCIALDATA SRPC <[email protected]>

SEM NODAL OFFICERS MEET AGENDA

SRLDC Market Operation <[email protected]> Thu, Jul 2, 2020 at 9:02 PMTo: "srpc.commercialdata" <[email protected]>Cc: "K S Deva Prasad (के एस द�वा �साद)" <[email protected]>, tsrinivas <[email protected]>, "Shamreena Varghese(शमरीना वर�घसी)" <[email protected]>

Madam/Sir

1. Kindly make SEM OEMs as special invitees2. SRLDC would shortly give a list of nodal officers whose contacts are known .The same may be given for

verification if any.

-- Thank You and Regards,

SRLDC, Market Operation

2 attachments

METER ISSUES.xlsx27K

SEM Nodal officers agenda.docx16K

ANNEXURE (1/7)

Page 15: Email/Website - srpc.kar.nic.in · solar pavagada kspdcl 33kv avaada block 7 line 10 at kss-2(pavagada solar pp) - main lt-0801-a sp-85 7:32:53 8:32:41 0:59:48 june 29, 2020 no fast

General SRLDC Agenda for SEM Nodal officers meet:

1. General requirements from Nodal officers who shall

I. Ensure that data is uploaded by 1700 hrs of Monday every week

II. Ensure that time drift statement is uploaded by 1200 hrs of first Monday of the

month

III. Should ensure that meters under their jurisdiction have time drift less than 40

seconds, and ensure that reverse polarity ,if any, is corrected within a week from

the receipt of information

IV. Should have independent coordination with the OEMs so as to ensure that field

stations under their jurisdiction have up-to-date access with the meter conversion

software

V. Must coordinate with CTU to ensure any faulty meter is replaced, and/or any

other issues requiring coordination with CTU

VI. Should be one-point contact with SRLDC metering Group in case of any change

in injection/drawal formulas

VII. Ensure the SEM data uploaded including raw Data and Converted Data are

correct in all respects, and take necessary steps for the same

VIII. Have all elster main meters (used in accounting) replaced by other meters as they

have reactive energy recording issues

IX. Have a spare of 10% of the total meters installed, and 5% of the ancillary

equipment’s such as DCDs etc

2. Requirement from SR2

I. The gist of findings of SEM Calibration done should be sent to SRLDC

3. Specific meters to be checked-as given in the attached files.

ANNEXURE (2/7)

Page 16: Email/Website - srpc.kar.nic.in · solar pavagada kspdcl 33kv avaada block 7 line 10 at kss-2(pavagada solar pp) - main lt-0801-a sp-85 7:32:53 8:32:41 0:59:48 june 29, 2020 no fast

Utility Name Station Name Description Location Meter No GPS Meter Drift Time DriftDate of Checking

Whether time Correction done ? Meter Status(Fast/Slow)

KSEB PARASALA 110KV KUZHITHURAI LINE AT PARASALA NP-5639-A KK-05 10:12:30 8:49:23 1:23:07 June 29, 2020 NO SLOWSOLAR PAVAGADA KSPDCL 33KV AVAADA BLOCK 7 LINE 10 AT KSS-2(PAVAGADA SOLAR PP) - MAIN LT-0801-A SP-85 7:32:53 8:32:41 0:59:48 June 29, 2020 NO FAST

ANDHRA PRADESH

SATTENAPALLI 400KV SRISAILAM LB LINE 1 AT SATTENAPALLI NP-3027-A AS-14 15:14:05 14:14:22 0:59:43 June 22, 2020 NO SLOW

SOLAR PAVAGADA KSPDCL 33KV KSS-1(PAVAGADA SOLAR PP) LINE 6 AT ADYAH BLOCK 1 - STANDBY LT-0589-A SP-42 7:04:53 7:34:42 0:29:49 June 29, 2020 YES FASTNPC BHAVINI 230kV side of GT 1 AT BHAVNI NP-7299-A BV-01 11:07:33 11:35:36 0:28:03 June 1, 2020 NO FASTNPC BHAVINI 230KV KANCHEEPURAM LINE 2 AT BHAVNI NP-7295-A BV-23 11:09:14 11:37:16 0:28:02 June 1, 2020 NO FASTNPC BHAVINI 230KV SIRUSERI LINE 1 AT BHAVNI NP-7303-A BV-17 11:10:42 11:38:39 0:27:57 June 1, 2020 NO FASTNPC BHAVINI 230KV SIRUSERI LINE 1 AT BHAVNI NP-7304-A BV-17 11:10:56 11:38:37 0:27:41 June 1, 2020 NO FASTNPC BHAVINI 230kV side of GST AT BHAVNI NP-7311-A BV-03 11:11:35 11:37:26 0:25:51 June 1, 2020 NO FASTNPC BHAVINI 230KV SIDE OF ST 1 AT BHAVNI NP-7298-A BV-02 11:07:54 11:33:45 0:25:51 June 1, 2020 NO FASTGOA XELDEM 220KV AMBEVADI LINE AT XELDEM NP-5511-A GP-02 14:02:00 14:26:56 0:24:56 June 22, 2020 NO FAST

KPTCL AMBEWADI 220kV XELDEM LINE AT AMBEWADI NP-5600-A CA-03 12:00:00 12:24:17 0:24:17 June 1, 2020 NO FASTNPC BHAVINI 230KV KANCHEEPURAM LINE 1 AT BHAVNI NP-7297-A BV-21 11:09:32 11:32:47 0:23:15 June 1, 2020 NO FASTGOA PONDA 220KV AMBEVADI LINE AT PONDA NP-5506-A GP-01 9:08:00 9:30:12 0:22:12 June 8, 2020 NO FASTNPC BHAVINI 230KV ARNI LINE 2 AT BHAVNI NP-7290-A BV-15 11:08:36 11:30:40 0:22:04 June 1, 2020 NO FASTNPC BHAVINI 230KV SIRUSERI LINE 2 AT BHAVNI NP-7302-A BV-19 11:10:19 11:29:35 0:19:16 June 1, 2020 NO FAST

KPTCL GUTTUR 220KV SIDE OF ICT 2 AT GUTTUR NP-5688-A CG-04 11:08:40 11:26:13 0:17:33 June 2, 2020 NO FASTKPTCL AMBEWADI 220KV PONDA LINE AT AMBEWADI(PRESENTLY CONNECTED TO XELDEM) NP-5598-A CA-02 12:00:00 12:17:16 0:17:16 June 1, 2020 NO FASTNPC BHAVINI 230KV ARNI LINE 1 AT BHAVNI NP-7293-A BV-13 11:08:56 11:25:34 0:16:38 June 1, 2020 NO FAST

SOLAR PAVAGADA KSPDCL 66KV SOFT BANK BLOCK 24 LINE 5 AT KSS-5(PAVAGADA SOLAR PP) - CHECK LT-0878-A SQ-71 15:13:13 15:28:59 0:15:46 June 15, 2020 YES FASTKPTCL GUTTUR 220kV side of ICT 1 AT GUTTUR NP-4062-A CG-02 11:07:46 11:20:48 0:13:02 June 2, 2020 NO FAST

TANTRANSCO ACHARAPAKKAM 230KV MAPS LINE AT ACHARAPAKAM NP-6175-A TA-54 16:20:12 16:32:12 0:12:00 June 3, 2020 NO FASTSOLAR ANANTHAPURAM 33KV (ANANTHAPURAM SOLAR PP) GALIVEEDU PS-1 LINE 1 AT NP KUNTA (PGCIL)

ACMEKRNLAT-0507-A SA-37 18:18:34 18:06:40 0:11:54 June 11, 2020 YES SLOW

KPTCL GUTTUR 400KV SIDE OF ICT 2 AT GUTTUR NP-4114-A CG-03 10:59:14 10:47:40 0:11:34 June 2, 2020 NO SLOWSOLAR ANANTHAPURAM 33KV (ANANTHAPURAM SOLAR PP) GALIVEEDU PS-1 LINE 1 AT NP KUNTA (PGCIL)

ACMEKRNLAT-0508-A SA-38 18:16:46 18:05:14 0:11:32 June 11, 2020 YES SLOW

TANTRANSCO ALAMATHY 400KV THIRUVALEM (TN) LINE 2 AT ALAMATHY NP-7818-A TA-14 12:48:07 12:59:28 0:11:21 June 8, 2020 NO FASTNPC BHAVINI 230kV MAPS TIE LINE AT BHAVNI NP-7312-A BV-11 11:11:00 11:00:00 0:11:00 June 1, 2020 NO SLOWNPC BHAVINI 230kV MAPS TIE LINE AT BHAVNI NP-7313-A BV-11 11:11:00 11:00:00 0:11:00 June 1, 2020 NO SLOW

SOLAR PAVAGADA KSPDCL 33KV ADYAH BLOCK 13 LINE 4 AT KSS-3(PAVAGADA SOLAR PP) - CHECK LT-0613-A SQ-02 6:19:50 6:09:11 0:10:39 June 22, 2020 YES SLOWTANTRANSCO ALAMATHY 400KV THIRUVALEM (TN) LINE 1 AT ALAMATHY NP-7262-A TA-13 12:48:15 12:58:50 0:10:35 June 8, 2020 NO FAST

NTPC NTECL VALLUR 400kV side of GT 1 AT VALLUR NP-7824-A VL-01 10:00:00 9:50:00 0:10:00 June 1, 2020 NO SLOWSOLAR PAVAGADA KSPDCL 33KV KSS-1(PAVAGADA SOLAR PP) LINE 4 AT ADYAH BLOCK 3 - STANDBY LT-0581-A SP-36 13:17:20 13:07:20 0:10:00 June 11, 2020 YES SLOWSOLAR PAVAGADA KSPDCL 33KV KSS-2(PAVAGADA SOLAR PP) LINE 4 AT ADYAH BLOCK 6 - STANDBY LT-0623-A SP-69 13:10:10 13:00:22 0:09:48 June 11, 2020 YES SLOWKPTCL GUTTUR 400KV JSW LINE AT GUTTUR NP-4061-A CG-18 11:05:33 10:55:46 0:09:47 June 2, 2020 NO SLOWSOLAR ANANTHAPURAM 33KV (ANANTHAPURAM SOLAR PP) GALIVEEDU PS-1 LINE 5 AT NP KUNTA (PGCIL) ACMEHIS AT-0495-A SA-49 18:14:36 18:05:10 0:09:26 June 11, 2020 YES SLOW

SOLAR ANANTHAPURAM 33KV (ANANTHAPURAM SOLAR PP) GALIVEEDU PS-2 LINE 1 AT NP KUNTA (PGCIL) ACMEBHI AT-0501-A SA-67 19:34:00 19:24:34 0:09:26 June 11, 2020 YES SLOW

TANTRANSCO ALAMATHY 400KV VALLUR LINE 1 AT ALAMATHY NP-7819-A TA-11 12:47:27 12:56:37 0:09:10 June 8, 2020 NO FASTNPC BHAVINI 230KV ARNI LINE 1 AT BHAVNI NP-7292-A BV-13 11:08:56 11:00:00 0:08:56 June 1, 2020 NO SLOW

KPTCL GUTTUR 400kV MUNIRABAD LINE AT GUTTUR NP-5690-A CG-15 11:07:18 11:15:57 0:08:39 June 2, 2020 NO FASTSOLAR ANANTHAPURAM 33KV (ANANTHAPURAM SOLAR PP) GALIVEEDU PS-2 LINE 2 AT NP KUNTA (PGCIL) ACMEBHI AT-0505-A SA-70 19:37:46 19:29:10 0:08:36 June 11, 2020 YES SLOW

KPTCL KODASALLI 220KV KAIGA LINE AT KODASALLI SA-0173-A CK-42 11:00:00 11:08:30 0:08:30 June 1, 2020 NO FASTTANTRANSCO KADLANGUDI 230KV NLC TS 2 LINE AT KADALANGUDI LT-0572-A TK-41 11:48:19 11:40:00 0:08:19 June 8, 2020 Yes SLOW

SOLAR PAVAGADA KSPDCL 33KV ADYAH BLOCK 6 LINE 3 AT KSS-2(PAVAGADA SOLAR PP) - CHECK LT-0610-A SP-65 5:53:15 5:45:00 0:08:15 June 22, 2020 YES SLOWTANTRANSCO ARNI 230KV BHAVNI LINE 1 AT ARNI NP-7307-A TA-52 6:31:15 6:23:03 0:08:12 June 22, 2020 NO SLOWTANTRANSCO ARNI 230KV BHAVNI LINE 2 AT ARNI NP-7308-A TA-53 6:31:15 6:23:03 0:08:12 June 22, 2020 NO SLOW

SOLAR PAVAGADA KSPDCL 33KV ADYAH BLOCK 13 LINE 3 AT KSS-3(PAVAGADA SOLAR PP) - MAIN LT-0568-A SP-97 6:15:04 6:06:58 0:08:06 June 22, 2020 YES SLOWSOLAR ANANTHAPURAM 33KV (ANANTHAPURAM SOLAR PP) NP KUNTA (PGCIL) LINE 1 AT GALIVEEDU PS-1

ACMEKRNLAT-0509-A SA-39 18:27:00 18:19:07 0:07:53 June 11, 2020 YES SLOW

SOLAR PAVAGADA KSPDCL 33KV KSS-1(PAVAGADA SOLAR PP) LINE 5 AT ADYAH BLOCK 1 - STANDBY LT-0556-A SP-39 8:27:43 8:19:51 0:07:52 June 22, 2020 YES SLOWSOLAR PAVAGADA KSPDCL 33KV ADYAH BLOCK 10 LINE 5 AT KSS-2(PAVAGADA SOLAR PP) - CHECK LT-0555-A SP-71 5:59:06 5:51:19 0:07:47 June 22, 2020 YES SLOW

TANTRANSCO NCTPS 400KV VALLUR LINE 2 AT NCTPS NP-8360-A TN-12 12:15:35 12:23:14 0:07:39 June 1, 2020 NO FASTSOLAR ANANTHAPURAM 220 KV NP KUNTA LINE 6 AT ANANTHAPURAM (NP KUNTA PS4) - STANDBY AT-0530-A SA-30 16:34:15 16:26:56 0:07:19 June 11, 2020 NO SLOWSOLAR PAVAGADA KSPDCL 33KV ADYAH BLOCK 10 LINE 6 AT KSS-2(PAVAGADA SOLAR PP) - CHECK LT-0569-A SP-74 6:02:09 5:54:55 0:07:14 June 22, 2020 YES SLOWKPTCL NELAMANGALA 400KV MYSORE LINE 1 AT NELAMANGALA NP-2482-A CN-17 13:39:15 13:46:25 0:07:10 June 29, 2020 NO FASTSOLAR ANANTHAPURAM 33KV (ANANTHAPURAM SOLAR PP) GALIVEEDU PS-1 LINE 5 AT NP KUNTA (PGCIL) ACMEHIS AT-0496-A SA-49 18:12:44 18:05:37 0:07:07 June 11, 2020 YES SLOW

SOLAR PAVAGADA KSPDCL 33KV ADYAH BLOCK 6 LINE 3 AT KSS-2(PAVAGADA SOLAR PP)-MAIN LT-0640-A SP-64 5:53:48 5:46:48 0:07:00 June 22, 2020 YES SLOWTANTRANSCO ALAMATHY 400KV VALLUR LINE 2 AT ALAMATHY NP-7817-A TA-12 11:13:34 11:20:33 0:06:59 June 5, 2020 NO FAST

SOLAR ANANTHAPURAM 33KV (ANANTHAPURAM SOLAR PP) GALIVEEDU PS-1 LINE 2 AT NP KUNTA (PGCIL) ACMEKRNL

AT-0511-A SA-40 18:07:00 18:00:08 0:06:52 June 11, 2020 YES SLOW

KPTCL NELAMANGALA 400KV YELAHANKA LINE 2 AT NELAMANGALA NP-4053-A CN-19 13:36:10 13:29:24 0:06:46 June 29, 2020 NO SLOWSOLAR PAVAGADA KSPDCL 33KV TATA BLOCK 17 LINE 7 AT KSS-4(PAVAGADA SOLAR PP) - MAIN LT-0699-A SQ-43 7:33:45 7:27:02 0:06:43 June 22, 2020 yes SLOWSOLAR PAVAGADA KSPDCL 33KV KSS-2(PAVAGADA SOLAR PP) LINE 5 AT ADYAH BLOCK 10 - STANDBY LT-0558-A SP-72 12:56:33 12:49:57 0:06:36 June 11, 2020 YES SLOWSOLAR PAVAGADA KSPDCL 33KV ADYAH BLOCK 1 LINE 6 AT KSS-1(PAVAGADA SOLAR PP) - MAIN LT-0625-A SP-40 5:25:08 5:18:38 0:06:30 June 22, 2020 YES SLOWKPTCL NELAMANGALA 400KV HIRIYUR LINE 2 AT NELAMANGALA NP-4052-A CN-15 9:26:10 9:19:45 0:06:25 June 30, 2020 NO SLOWSOLAR ANANTHAPURAM 220 KV NP KUNTA LINE 4 AT ANANTHAPURAM (GALIVEEDU PS-2) - STANDBY AT-0527-A SA-28 16:40:10 16:33:45 0:06:25 June 11, 2020 NO SLOWSOLAR PAVAGADA KSPDCL 33KV TATA BLOCK 21 LINE 4 AT KSS-4(PAVAGADA SOLAR PP) - CHECK LT-0726-A SQ-35 7:40:16 7:34:00 0:06:16 June 22, 2020 yes SLOWSOLAR ANANTHAPURAM 33KV (ANANTHAPURAM SOLAR PP) GALIVEEDU PS-1 LINE 2 AT NP KUNTA (PGCIL)

ACMEKRNLAT-0510-A SA-40 18:09:30 18:03:15 0:06:15 June 11, 2020 YES SLOW

TELENGANA MALKARAM 400kV RAMAGUNDAM LINE AT MALKARAM NP-7820-A AM-22 12:51:00 12:57:13 0:06:13 June 1, 2020 YES FASTTANTRANSCO ECHUR 230KV MAPS LINE AT ECHUR NP-6174-A TE-01 13:15:54 13:22:05 0:06:11 June 3, 2020 NO FAST

SOLAR ANANTHAPURAM 33KV (ANANTHAPURAM SOLAR PP) NP KUNTA (PGCIL) LINE 2 AT GALIVEEDU PS-2 ACMEBHI AT-0506-A SA-72 19:23:03 19:16:55 0:06:08 June 11, 2020 YES SLOW

SOLAR PAVAGADA KSPDCL 33KV TATA BLOCK 15 LINE 9 AT KSS-4(PAVAGADA SOLAR PP) - CHECK LT-0730-A SQ-50 7:25:11 7:19:03 0:06:08 June 22, 2020 yes SLOWSOLAR PAVAGADA KSPDCL 33KV TATA BLOCK 18 LINE 6 AT KSS-4(PAVAGADA SOLAR PP) - MAIN LT-0695-A SQ-40 7:32:45 7:26:38 0:06:07 June 22, 2020 yes SLOWSOLAR PAVAGADA KSPDCL 33KV ADYAH BLOCK 13 LINE 4 AT KSS-3(PAVAGADA SOLAR PP) - MAIN LT-0557-A SQ-01 6:17:12 6:11:08 0:06:04 June 22, 2020 YES SLOWSOLAR ANANTHAPURAM 33KV (ANANTHAPURAM SOLAR PP) NP KUNTA (PGCIL) LINE 2 AT GALIVEEDU PS-1

ACMEKRNLAT-0512-A SA-42 18:29:17 18:23:15 0:06:02 June 11, 2020 YES SLOW

TANTRANSCO HOSUR230 230KV YERANDAHALLI LINE AT HOSUR (TN) LT-0323-A TH-30 12:07:00 12:01:00 0:06:00 June 1, 2020 YES SLOWSOLAR PAVAGADA KSPDCL 33KV KREDL LINE 11 AT KSS-3(PAVAGADA SOLAR PP) - MAIN LT-0859-A SQ-22 7:53:20 7:47:23 0:05:57 June 29, 2020 NO SLOW

TANTRANSCO NLC(TN) 400KV NLCTSII LINE 2 AT NLC(TN) NP-3302-A TN-32 9:29:31 9:23:35 0:05:56 June 1, 2020 NO SLOWPOWERGRID NAGAPATTINAM 400KV TRICHY LINE 2 AT NAGAPATTINAM NP-8322-A TN-06 9:58:57 10:04:45 0:05:48 June 1, 2020 NO FAST

SOLAR ANANTHAPURAM 33KV (ANANTHAPURAM SOLAR PP) GALIVEEDU PS-2 LINE 2 AT NP KUNTA (PGCIL) ACMEBHI AT-0504-A SA-70 19:36:00 19:30:12 0:05:48 June 11, 2020 YES SLOW

SOLAR PAVAGADA KSPDCL 33KV KSS-1(PAVAGADA SOLAR PP) LINE 3 AT ADYAH BLOCK 3 - STANDBY LT-0635-A SP-33 13:04:41 12:58:56 0:05:45 June 11, 2020 YES SLOWANDHRA PRADESH

KALAPAAKA 400KV KHAMMAM LINE 2 AT KALPAKA NP-7231-A AK-24 11:15:00 11:09:16 0:05:44 June 1, 2020 NO SLOW

SOLAR PAVAGADA KSPDCL 66KV ACME REWA BLOCK 38 LINE 8 AT KSS-8(PAVAGADA SOLAR PP) - MAIN NP-9892-A SR-70 16:25:57 16:20:17 0:05:40 June 29, 2020 NO SLOWSOLAR PAVAGADA KSPDCL 33KV KSS-1(PAVAGADA SOLAR PP) LINE 11 AT KREDL - STANDBY LT-0853-A SP-57 9:16:50 9:11:11 0:05:39 June 29, 2020 NO SLOWSOLAR PAVAGADA KSPDCL 33KV ADYAH BLOCK 3 LINE 3 AT KSS-1(PAVAGADA SOLAR PP) - CHECK LT-0591-A SP-32 5:33:36 5:27:59 0:05:37 June 22, 2020 YES SLOWSOLAR PAVAGADA KSPDCL 33KV KSS-2(PAVAGADA SOLAR PP) LINE 6 AT ADYAH BLOCK 10 - STANDBY LT-0614-A SP-75 7:49:21 7:43:49 0:05:32 June 22, 2020 YES SLOWSOLAR PAVAGADA KSPDCL 33KV ADYAH BLOCK 1 LINE 5 AT KSS-1(PAVAGADA SOLAR PP) - MAIN LT-0617-A SP-37 5:19:12 5:13:47 0:05:25 June 22, 2020 YES SLOW

POWERGRID KURNOOL 765kV 400KV KURNOOL(AP) LINE 1 AT KURNOOL NP-3067-A AK-51 16:04:40 16:10:01 0:05:21 June 2, 2020 YES FASTSOLAR PAVAGADA KSPDCL 33KV ADYAH BLOCK 2 LINE 2 AT KSS-1(PAVAGADA SOLAR PP) - CHECK LT-0570-A SP-29 5:30:47 5:25:27 0:05:20 June 22, 2020 YES SLOWSOLAR PAVAGADA KSPDCL 33KV ADYAH BLOCK 13 LINE 3 AT KSS-3(PAVAGADA SOLAR PP) - CHECK LT-0607-A SP-98 6:14:37 6:09:19 0:05:18 June 22, 2020 YES SLOWSOLAR PAVAGADA KSPDCL 33KV ADYAH BLOCK 6 LINE 4 AT KSS-2(PAVAGADA SOLAR PP) - CHECK LT-0603-A SP-68 5:56:14 5:50:57 0:05:17 June 22, 2020 YES SLOWSOLAR PAVAGADA KSPDCL 33KV ADYAH BLOCK 10 LINE 6 AT KSS-2(PAVAGADA SOLAR PP)-MAIN LT-0626-A SP-73 6:02:39 5:57:23 0:05:16 June 22, 2020 YES SLOWSOLAR PAVAGADA KSPDCL 33KV KSS-3(PAVAGADA SOLAR PP) LINE 3 AT ADYAH BLOCK 13 - STANDBY LT-0586-A SP-99 7:36:50 7:31:34 0:05:16 June 22, 2020 YES SLOWSOLAR ANANTHAPURAM 33KV (ANANTHAPURAM SOLAR PP) NP KUNTA (PGCIL) LINE 1 AT GALIVEEDU PS-2 ACMEBHI AT-0503-A SA-69 19:21:00 19:15:49 0:05:11 June 11, 2020 YES SLOW

POWERGRID KURNOOL 765kV 765KV SIDE OF ICT 2 AT KURNOOL NP-3073-A AK-43 15:38:40 15:43:50 0:05:10 June 2, 2020 YES FASTSOLAR PAVAGADA KSPDCL 66KV RENEW BLOCK 33 LINE 7 AT KSS-7(PAVAGADA SOLAR PP) - MAIN LT-0834-A SR-37 14:07:29 14:02:25 0:05:04 June 11, 2020 YES SLOWSOLAR PAVAGADA KSPDCL 66KV KSS-7(PAVAGADA SOLAR PP) LINE 7 AT RENEW BLOCK 33 - STANDBY LT-0813-A SR-39 13:41:55 13:36:52 0:05:03 June 11, 2020 YES SLOW

TIME DRIFT ISSUES

ANNEXURE (3/7)

Page 17: Email/Website - srpc.kar.nic.in · solar pavagada kspdcl 33kv avaada block 7 line 10 at kss-2(pavagada solar pp) - main lt-0801-a sp-85 7:32:53 8:32:41 0:59:48 june 29, 2020 no fast

Utility Name Station Name SEM Sl.No/Location ID Feeder NameSA-0176-A

CK-01NP-9584-A

TT-74NP-9609-A

TT-97NP-7292-A

BV-13NP-7645-A

BV-21NP-7646-A

BV-23NP-9757-A

AG-49TN-7595-A

TU-22NP-9630-A

TP-10NP-9629-A

TK-51NP-9634-A

TK-50NP-3325-A

TT-86NP-9607-A

TT-79

METER FAILURE ISSUES

NPC BHAVINI 230KV ARNI LINE 1 AT BHAVNI

KPTCL KADAKOLA 220KV KANIYAMPETTA LINE AT KADAKOLA

NPC BHAVINI 230KV KANCHEEPURAM LINE 1 AT BHAVNI

NPC BHAVINI 230KV KANCHEEPURAM LINE 2 AT BHAVNI

TANTRANSCO Kaythar 400KV KARAIKUDI LINE 2 AT KAYTHAR

POWERGRID GAZUWAKA 400KV SIMHADRI LINE 2 AT GAZUWAKA

TANTRANSCO TIRUVALEM 400KV BUS SECTION 2 (PGCIL) AT THIRUVALAM (TNEB)

POWERGRID THIRUVALAM 765 KV CUDDAPAH LINE 2 AT THIRUVALEM

TANTRANSCO Kaythar 400KV KARAIKUDI LINE 1 AT KAYATAR

TANTRANSCO ULUNDURPET 230KV NLC TS 2 LINE AT ULUNDURPET

POWERGRID PUGALUR 400KV KARAIKUDI LINE 2 AT PUGALUR

POWERGRID THIRUVALAM 400KV NELLORE LINE 1 AT THIRUVALEM

POWERGRID TUTICORIN PS 400KV MADURAI LINE 1 AT TUPS

ANNEXURE (4/7)

Page 18: Email/Website - srpc.kar.nic.in · solar pavagada kspdcl 33kv avaada block 7 line 10 at kss-2(pavagada solar pp) - main lt-0801-a sp-85 7:32:53 8:32:41 0:59:48 june 29, 2020 no fast

Utility Name Station Name SEM Sl.No/Location ID Feeder NameSA-0333-A

TP-36

NP-9345-AAV-75

NP-8350-AKK-07

UNDER RECORDING ISSUES

POWERGRID KOZHIKODE 220KV SIDE OF ICT 1 AT KOZHIKODE

POWERGRID PUGALUR HVDC400KV SIDE OF CONVERTER

TRANSFORMER 2 AT PUGALUR HVDC

POWERGRID VEMAGIRI(PG) 400 KV SIMHADRI STAGE 2 LINE 1 AT VEMAGIRI (PG)

ANNEXURE (5/7)

Page 19: Email/Website - srpc.kar.nic.in · solar pavagada kspdcl 33kv avaada block 7 line 10 at kss-2(pavagada solar pp) - main lt-0801-a sp-85 7:32:53 8:32:41 0:59:48 june 29, 2020 no fast

Utility Name Station Name SEM Sl.No/Location ID Feeder NameNP-7809-A

TN-11TANTRANSCO NCTPS 400KV VALLUR LINE 1 AT NCTPS

NON RECIPT OF SEM DATA

ANNEXURE (6/7)

Page 20: Email/Website - srpc.kar.nic.in · solar pavagada kspdcl 33kv avaada block 7 line 10 at kss-2(pavagada solar pp) - main lt-0801-a sp-85 7:32:53 8:32:41 0:59:48 june 29, 2020 no fast

Utility Name Station Name Location DescriptionWind - (Tuticorin GIS ) ORANGE SIRONJ WT-06 230KV TUTICORIN GIS LINE-1 AT ORANGE SIRONJWind - (Tuticorin GIS ) MYTRAH WT-08 230KV MYTRAH LINE-2 AT TUTICORIN GIS CHECKWind - (Tuticorin GIS ) BETAM WT-12 230KV TUTICORIN GIS LINE-1 AT BETAMSOLAR ANANTHAPURAM SA-28 220 KV NP KUNTA LINE 4 AT ANANTHAPURAM (GALIVEEDU PS-2) - STANDBYSOLAR ANANTHAPURAM SA-39 33KV (ANANTHAPURAM SOLAR PP) NP KUNTA (PGCIL) LINE 1 AT GALIVEEDU PS-1 ACMEKRNLSOLAR ANANTHAPURAM SA-42 33KV (ANANTHAPURAM SOLAR PP) NP KUNTA (PGCIL) LINE 2 AT GALIVEEDU PS-1 ACMEKRNLSOLAR ANANTHAPURAM SA-51 33KV (ANANTHAPURAM SOLAR PP) NP KUNTA (PGCIL) LINE 5 AT GALIVEEDU PS-1 ACMEHISSOLAR ANANTHAPURAM SA-54 33KV (ANANTHAPURAM SOLAR PP) NP KUNTA (PGCIL) LINE 6 AT GALIVEEDU PS-1 ACMEHISSOLAR ANANTHAPURAM SA-69 33KV (ANANTHAPURAM SOLAR PP) NP KUNTA (PGCIL) LINE 1 AT GALIVEEDU PS-2 ACMEBHISOLAR ANANTHAPURAM SA-72 33KV (ANANTHAPURAM SOLAR PP) NP KUNTA (PGCIL) LINE 2 AT GALIVEEDU PS-2 ACMEBHI

ALL NTPC METERS AT ANANTHAPURAM

METERS AT PAVAGADA SENT SEPARATELY

THE CORRECT POLARITY OF ALIPURA-RAGULUPADU TO BE CHECKED JOINTLY BY TS AND AP,AND CONCLUSION TO BE GIVEN TO SRLDC

REVERSE POLARITY ISSUES

ANNEXURE (7/7)