Elizabeth Quay Water Front Development – Island Vehicle Access Bridge

Small Bridges Conference - 23rd November 2015

Page 2: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

2

Presentation Outline

• Project Overview

• Key Challenges

• Description of Island Vehicle Access Bridge

• Design Vehicle

• Design Issues and Construction Staging• Diaphragm Walls

• Architectural Fascia Panels

• Deck Units

• Deck Slab

• Steel Edge Beams

• Earthworks

• Miscellaneous

• Acknowledgments

Elizabeth Quay – Island Vehicle Access Bridge

Page 3: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

3

Project Overview

• Elizabeth Quay is development being delivered by the Metropolitan Redevelopment Authority (MRA) on behalf of the State Government of Western Australia.

• Aim is to revitalise the city of Perth and return the city’s focus to the Swan River.

• Development covers nearly 10 hectares of riverfront land with a 2.7 hectare inlet surrounded by a split level promenade.

Elizabeth Quay – Island Vehicle Access Bridge

Page 4: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

4

Project Overview

• Managing Contractor: Leighton Broad

• Lead Architect: ARM Architecture

• Lead Structural Engineer: Arup

• Sub-Contractor: Civmec

• Sub-Contractor: GFWA

Elizabeth Quay – Island Vehicle Access Bridge

Page 5: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

5

Project Overview

Elizabeth Quay – Island Vehicle Access Bridge

Page 6: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

6

Project Overview

Elizabeth Quay – Island Vehicle Access Bridge

Page 7: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

7

Project Overview

Elizabeth Quay – Island Vehicle Access Bridge

Page 8: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

8

Project Overview

Elizabeth Quay – Island Vehicle Access Bridge

Page 9: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

9

Key Challenges

• Novated to Managing Contractor

• Architectural shape of bridge

• Garden bed on bridge

• Determination of the vehicle loading

• Services

• Construction in either the wet or dry

• B2 exposure classification for underside of deck

• Changing the substructure of the bridge (Perimeter edge inlet wall)

Elizabeth Quay – Island Vehicle Access Bridge

Page 10: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

10

Island Vehicle Access Bridge

• The curved profile of the bridge deck required careful consideration be given to the form of the bridge.

• In-situ concrete post tensioning and steel beams composite with a deck slab were considered.

• Prestressed deck units with an in-situ deck slab was adopted.

• Unknown if bridge would be constructed in the wet or the dry.

• Thus precast deck units were considered the most appropriate construction form as they offered a safer and more efficient construction option over water.

• Deck slab cantilever varied on each side of the bridge to a maximum of 2.58m.

Elizabeth Quay – Island Vehicle Access Bridge

Page 11: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

11

Island Vehicle Access Bridge

• Allow kayak access under the bridge – 1.2m clearance above HAT.

• Arup initially engaged by ARM Architecture to undertake the design of the vehicle bridge.

• The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution.

• The design of the substructure of the vehicle bridge was a continuation of this wall type.

• A corrosion allowance was used in the design along with cathodic protection.

• Architectural fascia reinforced concrete panels with in fill concrete between the sheet piles and fascia panels was proposed.

Elizabeth Quay – Island Vehicle Access Bridge

Page 12: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

12

Island Vehicle Access Bridge

• Upon Leighton Broad being award the Managing Contractor’s role, Arup were novated to Leighton Broad to complete the design of the vehicle bridge.

• As part of a value engineering exercise steel sheet piles and anchors were deemed too expensive and brought with it associated problems in relation to anchoring into the zone of potential future building piles and a complex anchor layout.

• Future maintenance of the anchors was also seem as problematic as too the cathodic protection system required for the sheet piles.

• Other options were explored, including contiguous flight auger (CFA) secant piled walls and diaphragm walls.

Elizabeth Quay – Island Vehicle Access Bridge

Page 13: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

13

Island Vehicle Access Bridge

Elizabeth Quay – Island Vehicle Access Bridge

Page 14: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

14

Island Vehicle Access Bridge

Elizabeth Quay – Island Vehicle Access Bridge

Page 15: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

15

Island Vehicle Access Bridge

Elizabeth Quay – Island Vehicle Access Bridge

Page 16: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

16

Island Vehicle Access Bridge

Elizabeth Quay – Island Vehicle Access Bridge

Page 17: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

17

Island Vehicle Access Bridge

Elizabeth Quay – Island Vehicle Access Bridge

Page 18: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

18

Island Vehicle Access Bridge

Elizabeth Quay – Island Vehicle Access Bridge

Page 19: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

19

Design Vehicle

• Rubbish truck, ambulance, fire trucks and utility vehicles were required to access the island

• M18 vehicle – AS5100-7

• 18 tonne vehicle - two axles

Elizabeth Quay – Island Vehicle Access Bridge

Page 20: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

20

Design Vehicle

Elizabeth Quay – Island Vehicle Access Bridge

Page 21: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

21

Diaphragm Walls

• GFWA were awarded the sub-contract for the design and construction for the inlet perimeter wall.

• Diaphragm walls are commonly used for sea walls.

• Have the benefit of a high control of verticality due to the bucket and guide wall system.

• Walls were typically 600mm thick with a maximum panel length of approx. 6m.

• Shear keys with a water stop between adjacent wall panels.

• Glass fibre reinforced plastic (GFRP) reinforcement was used on the inlet face of the walls without architectural fascia panels for durability purposes (fascia panels at vehicle access bridge).

Elizabeth Quay – Island Vehicle Access Bridge

Page 22: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

22

Diaphragm Walls

• Lateral deflection a significant design consideration.

• Two conditions were outlined in the performance specification for the inlet wall.

• First condition permitted a deflection of δ/H of 0.75%.

• Wall deflecting upon completing the backfill behind the wall and excavation in front of the wall.

• Second condition permitted a deflection of δ/H of 0.25%.

• Wall deflection which occurs in response to applying the settlement sensitive pavement structure and the design surcharge loading behind the wall.

Elizabeth Quay – Island Vehicle Access Bridge

Page 23: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

23

Diaphragm Walls

Elizabeth Quay – Island Vehicle Access Bridge

Page 24: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

24

Architectural Fascia Panels

• Architectural fascia panels were located facing the majority of the diaphragm walls.

• Typically 150mm thick with patterned protrusions.

• Moulds were fabricated of the patterned protrusions.

• Panels were constructed at Civmec’s fabrication yard in Henderson, WA.

• High quality finish achieved.

• Visual inspections undertaken and repair work undertaken to the protrusions where required.

Elizabeth Quay – Island Vehicle Access Bridge

Page 25: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

25

Architectural Fascia Panels

• Two methods used to install the fascia panels.

• Strong back beams.

• Cantilever rigging frame used where access to the front of the inlet wall was constrained.

• Ferrules cast into the back face of the wall.

• L-shape starter bars to be threaded in to provide a connection between the fascia panel and the in-situ concrete cast in the void between the back of the fascia panel and the front of the diaphragm wall.

• Extended to 0.5m below LAT and generally installed in the dry.

Elizabeth Quay – Island Vehicle Access Bridge

Page 26: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

26

Architectural Fascia Panels

Elizabeth Quay – Island Vehicle Access Bridge

Page 27: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

27

Architectural Fascia Panels

Elizabeth Quay – Island Vehicle Access Bridge

Page 28: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

28

Architectural Fascia Panels

Elizabeth Quay – Island Vehicle Access Bridge

Page 29: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

29

Architectural Fascia Panels

Elizabeth Quay – Island Vehicle Access Bridge

Page 30: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

30

Architectural Fascia Panels

Elizabeth Quay – Island Vehicle Access Bridge

Page 31: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

31

Architectural Fascia Panels

Elizabeth Quay – Island Vehicle Access Bridge

Page 32: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

32

Architectural Fascia Panels

Elizabeth Quay – Island Vehicle Access Bridge

Page 33: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

33

Deck Units

• Prestressed precast concrete constructed at Delta Corporation’s fabrication yard in Herne Hill, WA.

• Cross section of the bridge consisted of 9 x 500mm deep deck units.

• 7 x 596mm deck units.

• 2 x 1192mm deck units – at each end with the large deck slab cantilevers.

• Connected to the headstock cast on the diaphragm wall via a dowel, which was then grouted up.

• Serviceability was the governing limit state – B2 exposure classification AS5100-5.

Elizabeth Quay – Island Vehicle Access Bridge

Page 34: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

34

Deck Units

• This required the underside of the deck units to be in compression under a serviceability limit state load combination that comprised permanent effects plus 50% of the serviceability live load.

• During the detailed design the stressing bed which had previously been advised as being available and now unavailable.

• Thus a stressing bed with a reduced capacity was required to be used – which didn’t have sufficient prestress to satisfy the B2 exposure classification of AS5100-5.

• It was advised that the bridge deck would be constructed in the dry – thus there was an opportunity to prop the deck units during the construction of the deck slab.

Elizabeth Quay – Island Vehicle Access Bridge

Page 35: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

35

Deck Units

• Once the deck slab has reached sufficient strength and the deck units had become composite with the deck slab the props could be removed.

• This solution meant that the deck units did not have to support the self weight of the wet deck slab concrete and thus meant the amount of prestress could be reduced to within the stressing capacity of the available stressing bed.

Elizabeth Quay – Island Vehicle Access Bridge

Page 36: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

36

Deck Units

Elizabeth Quay – Island Vehicle Access Bridge

Page 37: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

37

Deck Units

Elizabeth Quay – Island Vehicle Access Bridge

Page 38: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

38

Deck Units

Elizabeth Quay – Island Vehicle Access Bridge

Page 39: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

39

Deck Units

Elizabeth Quay – Island Vehicle Access Bridge

Page 40: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

40

Deck Units

Elizabeth Quay – Island Vehicle Access Bridge

Page 41: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

41

Deck Slab - Services

• 1 x 200 OD conduit for fire

• 1 x 150 OD for irrigation

• 1 x 125 OD for gas

• 1 x 110 OD for sewer

• 1 x 110 OD for water

• 1 x 50 OD for irrigation

• 3 x 110 OD for power

• 1 x 110 OD spare for power

• 1 x 110 OD for NBN

• 1 x 110 OD spare for comms

• 1 x 110 OD spare for A/V

• 1 x 50 OD for CCTV

• 1 x 50 OD for comms

Elizabeth Quay – Island Vehicle Access Bridge

Page 42: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

42

Deck Slab - Services

• Divided into two service corridors 1100mm wide each.

• Deck slab was thickened at the service corridors and the deck units removed at these locations.

• The thickened deck slab spanned between adjacent deck units.

• Punching shear was checked as the service corridors ran along the path of the M18 design vehicle.

Elizabeth Quay – Island Vehicle Access Bridge

Page 43: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

43

Deck Slab

Elizabeth Quay – Island Vehicle Access Bridge

Page 44: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

44

Deck Slab

Elizabeth Quay – Island Vehicle Access Bridge

Page 45: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

45

Deck Slab

Elizabeth Quay – Island Vehicle Access Bridge

Page 46: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

46

• Steel edge beams fabricated at Alltype Engineering at Naval Base, WA.

• Installation on site used a small crane to hold the steel edge beams in place over the chemically anchored permanent hold down bolts.

• Small crane was also used to confirm the positioning of the steel edge beams.

• Temporary hold down bolts were used to ensure the locality of the steel edge beam before the permanent chemically anchored hold down bolts were constructed.

Elizabeth Quay – Island Vehicle Access Bridge

Steel Edge Beam

Page 47: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

47

Steel Edge Beam

• The detail on the inside face incorporated a steel mesh which acts to prevent debris from falling into the inlet below whilst allowing water to drain into the inlet.

• No hand railing was proposed for the bridge which was consistent with the remainder of the promenade, however the connection was designed such that one could be installed on top in the future if required.

Elizabeth Quay – Island Vehicle Access Bridge

Page 48: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

48

Steel Edge Beam

Elizabeth Quay – Island Vehicle Access Bridge

Page 49: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

49

Steel Edge Beam

Elizabeth Quay – Island Vehicle Access Bridge

Page 50: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

50

Steel Edge Beam

Elizabeth Quay – Island Vehicle Access Bridge

Page 51: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

51

Steel Edge Beam

Elizabeth Quay – Island Vehicle Access Bridge

Page 52: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

52

Steel Edge Beam

Elizabeth Quay – Island Vehicle Access Bridge

Page 53: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

53

Steel Edge Beam

Elizabeth Quay – Island Vehicle Access Bridge

Page 54: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

54

Steel Edge Beam

Elizabeth Quay – Island Vehicle Access Bridge

Page 55: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

55

Steel Edge Beam

Elizabeth Quay – Island Vehicle Access Bridge

Page 56: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

56

Earthworks

• Significant earthworks required for Elizabeth Quay.

• A sea bund was constructed to facilitate the construction of the man made island.

• The inlet was flooded before the island construction had been completed to enable construction of the maritime infrastructure such as the floating walkway and mooring and berthing facilities.

Elizabeth Quay – Island Vehicle Access Bridge

Page 57: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

57

Earthworks

Elizabeth Quay – Island Vehicle Access Bridge

Page 58: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

58

Earthworks

Elizabeth Quay – Island Vehicle Access Bridge

Page 59: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

59

Miscellaneous

• Garden bed located on the bridge by ARM Architects.

• A drainage cell was detailed along with the cross fall and longitudinal fall of the bridge served to transport water from the garden bed off the bridge and protect the deck waterproofing.

• Waterproofing under the garden bed – Bituthene 3000.

• Concrete upstands.

• Removable bollards.

• Bike racks.

• Paving.

Elizabeth Quay – Island Vehicle Access Bridge

Page 60: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

60

Miscellaneous

Elizabeth Quay – Island Vehicle Access Bridge

Page 61: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

61

Miscellaneous

Elizabeth Quay – Island Vehicle Access Bridge

Page 62: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

62

Acknowledgements

• Acknowledgements:- Arup

- Leighton Broad

- ARM Architecture

- GFWA

- Civmec

- Delta Corporation

- Alltype Engineering

- MRA

- WGE

Elizabeth Quay – Island Vehicle Access Bridge

Page 63: Elizabeth Quay Water Front Development Island Vehicle ... · Presentation Outline ... •The original design of the inlet perimeter wall, by others, was a sheet pile and anchor solution

63

Island Vehicle Access Bridge

• Questions?

Elizabeth Quay – Island Vehicle Access Bridge