30
Eliminating and Eliminating and Controlling Controlling Dust & Noise Dust & Noise Hazards Hazards July 2002

Eliminating and Controlling Dust & Noise Hazards July 2002

Embed Size (px)

Citation preview

Page 1: Eliminating and Controlling Dust & Noise Hazards July 2002

Eliminating and Eliminating and ControllingControlling

Dust & Noise Dust & Noise HazardsHazards

July 2002

Page 2: Eliminating and Controlling Dust & Noise Hazards July 2002

2

EXPOSURE CONTROLS

Page 3: Eliminating and Controlling Dust & Noise Hazards July 2002

3

EFFECTIVE EXPOSURE CONTROL

Controls the hazard - reduces health threat

Promotes ability to work in comfort

Protects all potentially exposed workers

The control itself should not create a hazard.

Page 4: Eliminating and Controlling Dust & Noise Hazards July 2002

4

POINTS OF CONTROL

Miner

Path

Sourceof contaminant

Page 5: Eliminating and Controlling Dust & Noise Hazards July 2002

5

TYPES OF CONTROLS

ENGINEERING

ADMINISTRATIVE

Page 6: Eliminating and Controlling Dust & Noise Hazards July 2002

6

Preventing Hazard Generation

ENGINEERING

SUBSTITUTION

PROCESS CHANGE

PURCHASE EQUIPMENT

THAT WON’T PRODUCE

HAZARDS

Page 7: Eliminating and Controlling Dust & Noise Hazards July 2002

7

Engineering ControlsEngineering Controls

Design right to start with!Redesign as necessaryMaintain UtilizeSample to determine effectivenessTrain the workersUpdate with technology changes

Page 8: Eliminating and Controlling Dust & Noise Hazards July 2002

8

ENGINEERING REDESIGN EXAMPLES

AUTOMATE PARTS OF THE PROCESS

FOR EXAMPLE: COMPUTERIZED LOADING

Page 9: Eliminating and Controlling Dust & Noise Hazards July 2002

9

Engineering Controls

Operator redesigns crusher controls; puts operator in booth.

Reduce speed of moving parts.

Redesign spouts in bagging.

Use water, mist or fog sprays.

Replace metal parts with nonmetal parts.

Page 10: Eliminating and Controlling Dust & Noise Hazards July 2002

10

Engineering Controls (used after hazard is

generated)

Ventilation» General

» Dilution Ventilation

» Local Exhaust

Page 11: Eliminating and Controlling Dust & Noise Hazards July 2002

11

LOCAL EXHAUST VENTILATION

HOODSHOODS - Captures substance DUCT WORKDUCT WORK - Carries substance away FANSFANS - Move AIR through duct work AIR CLEANERAIR CLEANER - Removes substance and

removes it before air returns to environment MAKE-UP AIRMAKE-UP AIR - Replace air exhausted by

system

Page 12: Eliminating and Controlling Dust & Noise Hazards July 2002

12

Check seals

Regular Inspection and MaintenanceRegular Inspection and Maintenance

Is Absolutely Necessary!

Page 13: Eliminating and Controlling Dust & Noise Hazards July 2002

13

Something’s not right!Something’s not right!

Page 14: Eliminating and Controlling Dust & Noise Hazards July 2002

14

ENCLOSURE & ISOLATIONENCLOSURE & ISOLATIONEnvironmental Cab

Page 15: Eliminating and Controlling Dust & Noise Hazards July 2002

15

Engineer Out Path Noise with Barriers

INCREASE DISTANCE

AT THE SOURCESelect quiet equipmentReduce impact or impulsive forcesReduce speed in machines

IN THE TRANSMISSION PATHSeparate noise and receiverUse sound absorbing materials

Page 16: Eliminating and Controlling Dust & Noise Hazards July 2002

Barrier ConceptBarrier Concept

Shadow

Zone

DiffractedDiffracted

PropagatedPropagatedReflectedReflected

Noise SourceNoise Source

BarrierBarrier

Page 17: Eliminating and Controlling Dust & Noise Hazards July 2002

17

Work PracticesWork Practices

Vacuums with HEPA filters

NO dry sweeping

Use wet methods X

Page 18: Eliminating and Controlling Dust & Noise Hazards July 2002

18

ADMINISTRATIVE ADMINISTRATIVE CONTROLSCONTROLS

ROTATE WORKERS / WORK SCHEDULES

ESTABLISH REGULATED AREAS

WARNING SIGNS & BARRICADES

EDUCATION & TRAINING

ELIMINATE THE JOB

Page 19: Eliminating and Controlling Dust & Noise Hazards July 2002

19

HAZARD TRAINING INCLUDES:

HAZARDS OF MATERIAL OR PHYSICAL AGENT

HAZARD RECOGNITION

EFFECTIVE CONTROL MEASURES

PPE PROGRAMS

•INVOLVES:

-SUPERVISORS

-MINERS

Page 20: Eliminating and Controlling Dust & Noise Hazards July 2002

20

ACCOMPLISHED BY:ACCOMPLISHED BY:

FORMAL TRAINING

HEALTH AND SAFETY MEETINGS

BOOKLETS

SIGNS AND LABELS

Page 21: Eliminating and Controlling Dust & Noise Hazards July 2002

21

NOISE HAZARDOUS AREA

HEARING PROTECTION

REQUIRED

WARNING SIGNS

Page 22: Eliminating and Controlling Dust & Noise Hazards July 2002

22

SUPERVISOR SUPERVISOR EDUCATIONEDUCATION

WHEN / WHERE TO GET HELP

LEGAL / CORPORATE RESPONSIBILITIES

COST / BENEFIT INFORMATION

Page 23: Eliminating and Controlling Dust & Noise Hazards July 2002

23

MINER EDUCATIONMINER EDUCATION

SAFETY AND HEALTH HAZARD EDUCATION

OPERATING PROCEDURES - EFFECTIVE USE OF CONTROLS

UNDERSTANDING MAINTENANCE NEEDS

Page 24: Eliminating and Controlling Dust & Noise Hazards July 2002

24

MINE OPERATOR MUST BE COMMITTED!

FURNISH SAFE / HEALTHY FACILITIES

TRAIN MINERS

CONTROL HAZARDS

MONITOR THE WORKPLACE

Page 25: Eliminating and Controlling Dust & Noise Hazards July 2002

25

MINERS:

OBSERVE RULES - work practices, cleanup, hygiene

NOTIFY SUPERVISORS OF HAZARDOUS CONDITIONS AND PROBLEMS WITH CONTROL MEASURES

MAINTENANCE USE REQUIRED PPE

Page 26: Eliminating and Controlling Dust & Noise Hazards July 2002

26

CONTROL EXPOSURES AT POINT OF WORKER

JOB ROTATION

ENCLOSURES/Booths/Cabs

TRAINING & EDUCATION

PERSONAL MONITORING

MAINTENANCE PROGRAMS

Page 27: Eliminating and Controlling Dust & Noise Hazards July 2002

27

PERSONAL PROTECTIVE EQUIPMENT

HEALTH HAZARD CONTROL

RESPIRATORS

HEARING PROTECTION

COVERALLS, GLOVES, BOOTS, GLASSES, HARD HATS

Page 28: Eliminating and Controlling Dust & Noise Hazards July 2002

28

Use PPE Use PPE

WHEN……. Other controls are being

developed and installed Additional protection is

needed The hazards can’t be

controlled any other way

Page 29: Eliminating and Controlling Dust & Noise Hazards July 2002

29

AIRBORNE CONTAMINANTS: 56/57.5005

NOISE: Part 62

DRILL DUST CONTROL: 58.620

MSHA REGULATIONS30 CFR

Page 30: Eliminating and Controlling Dust & Noise Hazards July 2002