    Eliminate Water Supply

    Impact

    of New Residential

    Development

    withZero FootprintLeague of California Cities

    ConferenceSept. 26, 2008

    John Olaf Nelson Water Resources Mgt

    [email protected]

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    3/28

    What is Zero Footprint?

    A. Onsite Reduction of Potable Demand:

    Conservation Measures

    Recycled Water Use

    B. Off-site Offsets of Potable Demand:

    Utility Conservation Programs

    Utility Recycled Water Projects

    A + B = Zero Net Potable Demand

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    4/28

    How Paid For?

    Onsite Reductions are cost to

    Developer at time of construction.

    Off-site Offsets are payments made to

    Utility (lump sum or an added

    connection fee.

    Both reduce profit margin to Developer.

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    5/28

    How are Savings Assured?Onsite

    Use of approved devices

    Inspection by Utility

    Conditions, Covenants & Restrictions

    (CC&Rs)

    Off-site Factor of Safety in estimating savings

    Utility sets/approves Offset Fee

    Utility administers off-site cons. programs

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    6/28

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    7/28

    EPAct Standards

    ULFTs 1.6 gpf

    Shower heads 2.5 gpm

    Faucets/aerators 2.2 gpm

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    8/28

    New Standards - Inside

    HE Toilets 1.28 gpf*

    HE Shower heads 2.0 gpm

    HE Faucets/aerators 1.5gpm**

    HE Clothes washers 5.5

    gcd HE Dishwashers 0.6 gcd

    Submeter MF 21.8 gpd

    Structured Plumb./HWD 8.5 gpd

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    9/28

    HE Toilets and Appliances

    Dual Flush

    Clothes Washer & Dryer

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    10/28

    Structured Plumbing

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    11/28

    in Plan View

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    12/28

    HWD RetrofitHot Cold

    Receiver

    < Recycle Pump and

    Temperature Sensor

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    13/28

    New Standards - Outside

    Limit Turf for SF to < 800 sf

    No narrow strips of turf (< 8 ft)

    Xeriscape plant materials

    Smart (ET) Controller

    Meet States MAWA requirement *

    * 70% ET Adjustment Factor

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    14/28

    XeriscapeTraditional

    Xeriscape

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    15/28

    ET Controller

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    16/28

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    17/28

    B/C of Some Onsite Measures

    HE Clothes Washer

    4.4

    Submetering MF 2.3 HE Dishwasher 1.3

    Structured Plumbing 1.2

    ET Controllers for SF 0.7

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    18/28

    Added Unit Cost

    HE Clothes Washer $238

    Submetering MF $273

    HE Dishwasher $111 Structured Plumbing $573

    ET Controllers for SF $312

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    19/28

    Select Off-site Programs & B/C

    Utility Cust.

    ET Contr. - Irr. (100%) 2.6 5.1

    Submetering MF (100%) 1.9 2.3

    ET Contr. - UQ SF (75%) 1.2

    1.5

    HWD Retrofit (40%) 1.0 1.8

    ET Contr. - Typ. SF (50%) 0.6 0.5

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    20/28

    Estd Program Unit Cost to Utility

    ET Contr. - Irr. (100%) $1,180

    Submetering MF (100%) $473

    ET Contr. - UQ SF (75%)

    $590

    HWD Retrofit (40%) $270

    ET Contr. - Typ. SF (50%) $324

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    21/28

    Case Example

    Location:

    Inland Coastal Valley of North CA

    33 inches of annual rainfall (nil in summer)

    Description:

    300 acres (29% open space)

    1,736 DUs (SF = 68%) 250,000 sf of commercial

    Total Project Demand = 580 afa (0.518 mgd)

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    22/28

    EDU Relationships

    EDU Ratio

    SF Detached 1.00

    SF Attached 0.70 MF 0.53

    Second Units 0.24

    Note: 1,736 DUs = 1,330 EDUs

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    23/28

    Onsite Reductions and

    Remaining Offset NeedOnsite Reductions:

    Conservation 23%

    Recycled Water Use 24%

    Total 47%

    Remainder to offset viaOff-site Programs: 53%

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    24/28

    Measures and Distribution

    of Onsite Reductions

    `

    Recycle 51% EPAct 25%

    HE Clothes Washers 9%

    Submetering 4%

    Commercial and HE Dishwasher 1% eachStructured Plumbing w. HWD 4%

    ET Controllers 5%

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    25/28

    Expand Existing 28%

    ET - Upper Quart. SF 16%

    Increase Clothes

    Washer Rebates 6%

    HWD Retrofit 8%

    Submetering MF

    15%

    ET - Irr. Only 18%

    ET - Typical SF 9%

    Note: ET Controller Programs total 43%

    Off-site Program Savings and

    Distribution

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    26/28

    Case Example Recap

    M$ $/DU $/EDU

    Onsite Conservation 1.2 684 892

    Onsite Recycled 3.2 1,857 2,424Off-site Conservation 2.9* 1,650 2,154**

    Total $7.3 $4,191 $5,470

    * Includes 22% Safety Factor for est. errors.

    ** Offset Fee to pay for Off-site Programs

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    27/28

    Build-it-Green Points

    Points

    Build-It-Green points for SF: 294

    Portion in Water category*: 66

    Application of New Standards

    can capture: 46

    * Excluding consideration of Recycled Water Use