ELECTRONICS MANUFACTURING CLUSTER (EMC) AT ADITYAPUR, JHARKHAND
Opportunity to Invest
April 2015
BACKGROUND
Jharkhand Infrastructure Development Corporation Ltd (JINFRA)
Government of Jharkhand has incorporated a Joint Venture Company
named Jharkhand Infrastructure Development Corporation Ltd with IL&FS
JINFRA has been mandated to provide advisory services for development
of infrastructure projects in Jharkhand to be developed on suitable Format.
Electronic Manufacturing Cluster at Adityapur Industrial Area Phase VII is
one of the flagship project
Structure of Presentation
1. Electronics Sector in India
2. Jharkhand Scenario
3. Adityapur
4. Existing Industries at Adityapur
5. EMC at Adityapur
6. Project Master Plan
7. Incentives to Electronics Industries
ELECTRONICS SECTOR IN INDIA
Electronics Market in India – trend & forecast
65% of demand for electronics products is met by imports
Indian Electronic Products
Segment Products Covered
Consumer Electronics TVs (CRT and FPD), DVD players, set-top boxes, home theatre systems, MP3 players, audio equipment, digital cameras and other household appliances
Automotive Electronics Electric vehicles, power windows, anti-brake locking systems, remote keyless entry, two-wheeler (2W) ignition units, flashers, regulators, instrument clusters (2W,4W), engine management system 4W and car radios
Industrial Electronics Power electronics, LED lighting, CFL, energy meters, UPS, inverters, weighing scales and power supplies
IT Systems and Hardware Desktops, notebooks, tablets, monitors, servers, storage flash memory cards, USB drives and printers/MFDs
Telecom products and
equipments
Fixed-line and mobile telecommunication equipment, modems,
routers, switches, IP PBX, BTS (GSM, CDMA), WiMax (BTS,CPE), PON/GPON ONT/OLT and DWDM
Mobile Devices Mobile Handsets
Other Electronics Aerospace, Strategic electronics including defense, medical
electronics and smart cards
Segment wise share
Indian Electronics Market: Top 20 Priority Products (2013)
Source- www.deity.gov.in
ELECTRONICS SCENARIO IN
JHARKHAND
Projected Demand for Electronics Companies – total Built Up
Area
Projected number of Electronics Companies
ADITYAPUR
Location of Adityapur
Adityapur/Jamshedpur
Jharkhand
Project location at Adityapur-Regional Assessment
Site strategically located at boundary of Jharkhand, West Bengal and Orissa.
EMC Adityapur- Regional Advantages
Tata Motors & Auto Cluster, Tata Steel,
XLRI Jamshedpur (0-10 km)
Bokaro Steel Plant, Ranchi
(CAPITAL), IIM Ranchi, Birla
Institute of Technology, Ranchi,
Indian School of Mines,
Dhanbad, IIT Kharagpur (200-
300 km)
Rourkela Steel Plant, Jindal Steel ,
Haldia Port (200-300 km) Paradip Port, Kolkata (300-400 km)
Within 50 Km
Within 100 Km
Within 200 Km
Within 300 Km
Kolkata
Kharagpur
Jamshedpur Urban Agglomeration-Growth potential
Adityapur Industrial Area - Brief • Adityapur – Part of Jamshedpur Urban Agglomeration - JUA consisting of
Industrial and Residential precincts spanning over 49 sq.km (of 149 sq.km of
JUA)
• Adityapur Industrial Area (AIA) of around 3000 acres is broadly divided into
seven phases with each phase having direct approach from the state highway
• The Industrial area houses around 800 active Medium and small scale
industries
• AIA caters to large industries like Usha Martin, Tata Motors and Tata Steel etc.
• AIADA- An autonomous body under the aegis of the department of industries,
GoJ with a command area of nearly 33,970 acres is the owner and regulator of
this land
• AIADA has undertaken development of an Electronic Manufacturing
Cluster(EMC) within AIA in order to:
– Develop an ecosystem of suppliers and consumers to bridge the demand
supply gap of domestic electronics consumption
– Develop the state’s e o o y y attra ti g i vest e t i the E“DM “e tor and provide employment opportunities.
– Attract and retain entrepreneurial talent.
Industrial Ecosystem in Jharkhand
EXISTING INDUSTRIES IN ADITYAPUR
Precision Instruments
Engineering Industries
AIADA – Existing Industries and Products
Foundry Component
Fabrication
AIADA – Industries and Products
• More than 900 active industries engaged in
Engineering, Chemical, Food and Beverages
sectors
• 25 of these units are Export Oriented Units
KYOCERA CTC PRECISION TOOLS PVT LTD
• Kyocera CTC Precision Tools Private Limited - a manufacturing company jointly established by Kyocera Asia Pacific Private Limited and CTC (India) Private Limited at Adityapur.
• Products - Industrial cutting tool manufacturer focusing on the manufacture of micro drills for printed circuit boards and hole-making tools called Micro Industrial Tools
• Start of construction - November 2012
• Start of trial operation - December 2013
• Manufacturing plant size
• Lot area: approx. 8,000m2 Floor space: approx. 7,000m2 (2-story building)
• Production targets: Begin producing 100,000 inserts per month
EMC AT ADITYAPUR
EMC at Adityapur – Location
ADITYAPUR
PROJECT SITE
GAMHARIA
ADITYAPUR
INDUSTRIAL AREA
TATA STEEL PLANT
AREA
JAMSHEDPUR
TISCO ADITYAPUR
HOUSING COMPLEX
TO KANDRA
Airport
EMC at Adityapur – Location
PROPOSED MASTER PLAN
FOR INTEGRATED
DEVELOPMENT ~235
ACRES
EMC BOUNDARY -
82.49 ACRES
ADITYAPUR TOLL
BRIDGE
Salient features of EMC at Adityapur Land of 82.49 acres offered for the project is owned by AIADA
EMC is a part of integrated township of 234 acres which houses IT/ITes Park, STPI along
with other supporting facilities and infrastructure.
The estimated infrastructure development cost of EMC is around Rs. 1400 million
Developed land/built space to be offered at competitive rates compared to rest of India
State of art Support infrastructure (both physical & social)
Assurance of uninterrupted power being supplied by JUSCO ( A Tata Group company)
Central & state incentives can be availed by industrial units in ESDM sector
Anchor tenants to be offered equity stake in the project subject to maximum of 25% in
SPV for smooth operations of the project.
Stable Political environment with government having full majority in legislative assembly
and favorable policies/initiatives to facilitate decision making by units
Availability of quality & skilled manpower in Adityapur/ Jamshedpur/ catchment area
Captive demand for automotive electronics product due to presence of Tata motors and
other ancillary units
EMC at Adityapur - Site Connectivity
To/From Ranchi
– NH 33
To/FromKolkata
– NH33
Jamshedpur Railway
Station – 7 km
Adityapur Railway Station
– 4 km
To/From Kolkata
To/From
Mumbai
To/From Ranchi
Airport –
3 km
Ranchi Airport - 130 km
With four laning process
of NH 33 to be complete
by 2016, it will be a 1.5
hours drive
Site 15 km
from NH 33
Tata Steel Plant
Tata Motors Factory
EMC at Adityapur- Status
• AIADA submitted Final Application along with DPR for
obtaining DeitY approval
• AIADA obtained In-principle project approval from
DeitY for getting central grant of Rs 50 crores
• Final Application with Final DPR submitted to DeitY in
February 2015. Final Approval expected by April 2015
Location Advantage
Connectivity : The project site is well connected with rest
of the country via all modes of transportation:
Port: The site is well connected to Haldia (approx
250 Km) or Paradip Port (approx 380 Km) to
facilitate imports and exports.
Road: The site is well connected via SH-5 and NH 33
which connects it with major IT cities –
Bhubaneshwar & Kolkata. Upcoming ring road
(eastern and western corridor) of 60 km shall
provide rapid connectivity to Jamshedpur &
Adityapur.
Rail: Adityapur railway station (5 km) and
Jamshedpur railway station (8 km) connects the site
with rest of the country.
Air: located in close proximity to Jamshedpur airport
(3 km) and Ranchi airport (130 km)
Skilled Manpower
Jharkhand is well known education hub, providing
skilled manpower, one of the most critical resources
for any industry to thrive.
Leading institutes like Xavier Labour Relations
Institute (XLRI)-James, IIM-Ranchi, Birla Institute of
Technology-Ranchi, Indian School of Mines-
Dhanbad etc, provide technical and/or managerial
education and training per excellence.
Ready Market for Auto Electronic Components
Manufacturing
Home to one of the largest commercial
manufacturing unit in India (Tata Motors at
Jamshedpur).
More than 600 auto ancillary industries including
auto component units are functioning in Adityapur (
One of the largest Auto Cluster of the country),
providing direct employment to more than 25,000
people.
Upcoming Industrial Park – Mega Projects
Government of Jharkhand is planning to setup up IT
Park and STPI at Adityapur.
An Automotive Vendor Park will be established
under PPP mode at Adityapur.
Target Sectors for EMC at Adityapur
Sectors Type of Industries Products
Electronic
Components
Industrial Electronics Circuit board, Inverters , Energy Meters, Solar panels
LED Lights/Fixtures CFL Lights, LED Lights
Consumer Electronics Tv's(LCD & LED), Home Appliances, Set -top Boxes, Digital
Camera, Flat Panel Display etc
Automotive Electronics
Electronic brake distribution, Traction control, 2W ignition, 4
W ignition, Digital Instrument (Speedometers), Car Stereo,
Anti-lock braking system
Power Electronics Diodes, Thyristors, Transistors
Telecom Products
Optical Fibre Cable Single mode, Multimode and Plastic optical fiber (POF)
Switches Switch board/ panel
WiFi, WiMax and WiMAX advance
Telecom Equipment
Smart cards, biometric, swap machine (credit/debit
card),Mobile Phone, Mobile Accessories, Modem/Routers
Carrier Ethernet/ Network Integration Cables
Health& Medical
Electronics Medical Equipment products Medical Electronic Devices
IT Products IT Hardware Computer Accessories, Pri ter, Desktop’s, Laptop's, CD's, DVD's, Scanner , Pen drives, Tablets
PROJECT MASTER PLAN
MASTER PLAN
EMC-Area Statement LANDUSE DETAILS
Area details as per DPR
Saleable Area Non Saleable Area Total Area Proccesing Area
Description No Of Plots
Industrial Plots
2 acre plot 9 18 18
1 acre plot 22 22 22
0.5 acre plot 21 10.5 10.5
Flatted Factory 1 5 5
Total Industrial Land Area 55.5 55.5
Green Area 5.95 5.95
Ware House/ Truck Parking 2 2
Road Area 12.14 12.14
Total Proccesing Area 57.50 18.09 75.59
Non Proccesing Area
School / Creche 0.31 0.31
Hospital /Health Care Centre 0.25 0.25
Incubation Centre 0.64 0.64 Testing and Certification Centre
Admin and Support Offices 0.32 0.32
Employee Hostel & Mess 0.59 0.59
Trade Pavilions 0.78 0.78
Local Shopping and Restaurant 0.56 0.56
Total Support & Services Area 3.13 0.32 3.45
Green Area 2.96 2.96
Road Area 0.49 0.49
Total Non Proccesing Area 3.13 3.77 6.90
Total EMC Area 60.63 21.86 82.49
% of toal area 73.50 26.50 82.49
Proposed Master Plan
Facilities being offered in EMC
Supporting project components for EMC at Adityapur
Basic Services Essential Services Welfare Services
Entrance plaza
Internal roads
Storm water drainage
Street Lighting
Water supply network with WTP
Sewerage collection system with STP
Truck terminal & warehousing
Electric distribution with power backup
Waste disposal & management
Government support offices
Employee hostel & mess
Health centre
Creche/nursery
Local shopping centre
Restaurant
Park and Recreational Facility
Support Services Manufacturing Services Government regulatory support/services
Incubation centre
Trade pavilion
Training Facility
Auditorium
Video Conferencing
IT Infrastructure
Tool Room
CAD/CAM
Flatted factory
Testing & certification centre
Development commissioner/designated
officer for custom clearance
Tax Support
Labour Compliance
Pollution Control
AIADA Administration Office
Details of Common Facilities
Sl No Building Name
Proposed
Covered Area
(SFT)
Site Area
(Sqm)
Ground
Coverage
(Sqm)
Ground
Coverage
(%)
No of
Parking
No of
Storey
1 Entrance Plaza 1,580 136 100.90 74.19 NIL G
2 Flatted Factory 2,00,264 20251 3721 18.37 Truck-30,
Car-318 G+IV
3 Truck Terminal &
Warehouse 21,663 8112.75 2012.5 24.81
Truck-18,
Car-10 G
4 Trade Pavillion 32,377 3136.3 1398 44.57 Car-36 G+I
5 Incubation Centre 45,705 2605 849.22 32.60 Car-32 G+IV
6 Testing & Certification
7 Admin Building 9,053 1276.25 420.5 32.95 Car-13 G+2
8 Employees Hostel 50,541 2395 1131.35 47.24 Car-20 G+IV
9 Health Care Centre 9,176 1000 426.25 42.63 Car-3 G+II
10 School & Crèche 8,372 1260 777.75 61.73 Car-3 G+II
11 Local Shopping
Centre 16,937 2277 786.75 34.55 Car-19 G+I
Total 3,95,667
Flatted Factory / Standard Factories
Multi-storied Built up space (10,000 sq.ft on each floor) for Electronics factories
Trade Pavilion
Incubation Centre & Testing Lab
Administration Building
E ployee’s Hostel Specially designed for Expatriate Executives planning to stay for long periods
Primary Health Centre
Local Shopping Centre
Availability of Industrial Plots/Built Space
Available – Plots + Ready to move in Standard Factories
• Plots sizes available for allotment in the EMC:
• 5 acre plot is reserved for Flatted factories (FF) / Standard
Factories
• Initially 200,000 sq.ft built up area (BUA) for FF planned which
may go up to 800,000 sq.ft depending on demand
Sl.No Size of Plot (in acres) No. of Plots
1 0.5 23
2 1.0 19
3 2.0 9
4 5.0 1
Developed plots are offered @ Rs 1630 per sqm (indicative)
INCENTIVES TO ELECTRONICS INDUSTRIES
Incentives under M-SIPS
GoI incentives are available for entire value chain of
identified electronics products for 10 years
Reimbursement of 25% of Capital expenditure
Reimbursement of CVD/Excise for capital
equipment in non SEZ units
Reimbursement of central taxes and duties for 10
years i sele t high te h u its like FAB’s a d ATMP’s Preferential Market Access (PMA)
Preference to domestically manufactured electronic
products in government procurement
Extent of government procurement from domestic
manufacturing will not be less than 30% of the total
procurement
Export Incentives
Focus product scheme- 2% duty credit scrip
Special products scheme - 5% duty credit scrip
Electronics Development Fund (EDF) being created
by GoI as part of Digital I dia to support R&D a d
innovation in the ESDM sector
GoI offerings for ESDM units
Comprehensive Project Investment Subsidy (CPIS)
7% of total Capital investment with ceiling of
Rs.5 crore.
5% additional incentive for providing
employment to local persons.
5% additional benefit to SC/ST/Women/
Handicapped Entrepreneurs.
Reimbursement of 75% of Net VAT paid per
annum- upto max 75% of total fixed capital investment for 5 years.
Financial Assistance for patent: max of 50% of expenditure with ceiling of Rs 2 lakh per patent.
Lease rentals (including premises on rent): Reimbursement of upto 50% of actual cost incurred with a ceiling of Rs 5 lakh per annum upto 3 years for the plug-and-play built up office space of minimum 2500 sq. ft.
Quality Certification- @ 50% of the expenditure incurred upto max Rs 2 lakh.
Electricity duty exemption for Mega projects (capex of Rs 100 cr & above): 50% for 5 years
Govt of Jharkhand Incentives
FAQs
• Developed plots are offered at competitive rate as compared to
similar facility at other EMC in India
• Industrial power tariff: Around Rs 6 per unit
• Core & shell structure are also available on outright sale (long
term lease) and rental models
• Assured State Government support in getting clearances
THANK YOU
If you have queries regarding EMC, please
feel free to write to:
Phone: +91-651-2241306