    Energy Community Secretariat Investment options in the Energy Community 115thAthens Forum, 25 26 November 2009

    ELECTRICITY INFRASTRUCTUREELECTRICITY INFRASTRUCTURE

    -- PROJECTS OF REGIONAL PRIORITYPROJECTS OF REGIONAL PRIORITY

    1515THTHAthens ForumAthens Forum

    2525 26 November 200926 November 2009

    Energy Community SecretariatEnergy Community Secretariat

    www.energy-community.org

    INVESTMENT OPTIONS IN THE ENERGY COMMUNITY

  • 8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority

    2/29

    Energy Community Secretariat Investment options in the Energy Community 215thAthens Forum, 25 26 November 2009

    CONTENTCONTENT

    INTRODUCTION

    INVESTMENT OUTLOOK 2008 - 2009

    THE TREATY AS A FRAMEWORK

    PROGRESS UPDATE

    THE CHALLENGE

    CONCLUSIONS

  • 8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority

    3/29

    Energy Community Secretariat Investment options in the Energy Community 315thAthens Forum, 25 26 November 2009

    INTRODUCTIONINTRODUCTION

    THE ENERGY POLICY IN EUROPE

    Three common objectives:

    sustainability

    security of supply

    competitiveness

    One answer: A real Internal Energy Market

    European Community has identified the requirements forachieving this:

    Unbundling

    Effective regulation

    Transparency

    Infrastructure

    Network security

    Adequacy of electricity generation and gas supply capacity

    Energy as a public service

  • 8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority

    4/29Energy Community Secretariat Investment options in the Energy Community 415thAthens Forum, 25 26 November 2009

    INTRODUCTIONINTRODUCTION

    THE ENERGY POLICY IN SOUTH EAST EUROPE

    The same objectives as in the EC, but more stringent

    ` One solution:

    A common framework for regional energy market

  • 8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority

    5/29Energy Community Secretariat Investment options in the Energy Community 515thAthens Forum, 25 26 November 2009

    INVESTMENTS OUTLOOK 2008INVESTMENTS OUTLOOK 2008--20092009

    Effects of the financial and economic crisis

    Energy investments in most regions and sectors are expected to drop sharply

    in 2009, mostly in the OECD countries.

    The financing environment is getting tougher, the final demand for energy is

    weakening and the cash flows are falling.

    Both supply and demand side investments are being affected.

    The energy supply infrastructure is being affected in three ways by the

    financial and economic crisis:

    Tighter credits; energy companies find it more difficult to obtain credit for

    both on-going operations and new projects; in some cases, the cost ofcapital has risen in absolute terms, making marginal investments

    uneconomic;

    Lower profitability of new power generation investments

    Less need for capacity, with the falling demand for energy caused byeconomic downturn.

  • 8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority

    6/29Energy Community Secretariat Investment options in the Energy Community 615thAthens Forum, 25 26 November 2009

    The GDP growth and energy demand forecast

    Electricity consumption across the Energy Community has varied widely, in

    some cases indicating sharp decline during the past year on the year to year

    comparison

    Change in electr icity consum ption in the Ener gy Com m unity [Feb. 2009 / Feb. 2008]

    (source: Platts in SEE, 31 July 2009)

    Former

    YugoslavRepublic of

    Macedonia Montenegro

    Serbia

    BiH - FBiH

    BiH - RS

    Albania

    Croatia

    -25.0

    -20.0

    -15.0

    -10.0

    -5.0

    0.0

    5.0

    10.0

    15.0

    [%]

    INVESTMENTS OUTLOOK 2008INVESTMENTS OUTLOOK 2008--20092009

  • 8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority

    7/29Energy Community Secretariat Investment options in the Energy Community 715thAthens Forum, 25 26 November 2009

    The GDP growth and energy demand forecast

    Projected electricity consumption growth is set to moderate values by each

    of the Contracting Parties

    Projected average consumption growht for the Region set for 2009 is 2.33%

    INVESTMENTS OUTLOOK 2008INVESTMENTS OUTLOOK 2008--20092009

    Pro jected annual electricity cons um ption grow th

    (source: Security of Supply Statements, July 2009)

    -5.0

    -4.0

    -3.0

    -2.0

    -1.0

    0.0

    1.0

    2.0

    3.0

    4.0

    5.0

    Albania

    [ - 2020]

    BiH

    [ - 2020]

    Croatia

    [ - 2012]

    Former

    YugoslavRepublic of

    Macedonia

    [ - 2020]

    Montenegro Serbia

    [ - 2015]

    UNMIK

    [ - 2018]

    [%]

  • 8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority

    8/29Energy Community Secretariat Investment options in the Energy Community 815thAthens Forum, 25 26 November 2009

    THETHE ENERGY COMMUNITYENERGY COMMUNITY A REGIONAL APPROACHA REGIONAL APPROACH

    BENEFITS:

    Economies of scale in energy investments and operations

    Larger (regional) energy market for suppliers

    Compatible rules and institutions with the European Union

    Implementation of a harmonised legislative framework including:

    Market rules

    Third party access to networks

    New infrastructure authorisation and licensing procedures

    Mutual Recognition of licenses

    Adoption of Generally Applicable Standards Application of common Safeguard Measures, etc.

    Better conditions for stability and mutual assistance

    Dispute settlement procedure

  • 8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority

    9/29Energy Community Secretariat Investment options in the Energy Community 915thAthens Forum, 25 26 November 2009

    PROGRESS UPDATE transmission lines

    IT

    SK

    HU

    SI

    HR

    BA

    GR

    TR

    BG

    RO

    MD

    UKR

    AL

    ME

    RS

    ATHeviz

    Pecs

    Ernestinovo

    Sombor

    Novi SadTimisoara

    Zerjavinec

    Cirkovce

    Konjsko

    Durres

    Tirana

    Elbasan

    Bitola

    MaritsaEast I

    N. Santa

    Podgorica

    Stip

    ChervenaMogila

    Babaeski

    Skopje

    Nadab

    Bekesaba

    Okroglo

    Udine

    Nis

    Recently completed orUnder const ruction

    Candidate pro jects

    Florina

    Constanta

    to Pasakoy(TR)

    to Italy

    to Italy

    to Italy

    to Italy

    S.Mitrovica

    Ugljevik

    New investments in transmission infrastructure(source: SECI TSP Review, May 2008)

    MK

    Kosovo B

  • 8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority

    10/29Energy Community Secretariat Investment options in the Energy Community 1015thAthens Forum, 25 26 November 2009

    PROGRESS UPDATE transmission lines

    IT

    SK

    HU

    SI

    HR

    BA

    GR

    TR

    BG

    RO

    MD

    UKR

    AL

    ME

    RS

    ATHeviz

    Pecs

    Ernestinovo

    Sombor

    Novi SadTimisoara

    Zerjavinec

    Cirkovce

    Konjsko

    Durres

    Tirana

    Elbasan

    Bitola

    MaritsaEast I

    N. Santa

    Podgorica

    Stip

    ChervenaMogila

    Babaeski

    Skopje

    Nadab

    Bekesaba

    Okroglo

    Udine

    Nis

    Recently completed orUnder const ruction

    Candidate pro jects

    Florina

    Constanta

    to Pasakoy(TR)

    to Italy

    to Italy

    to Italy

    to Italy

    S.Mitrovica

    Ugljevik

    New OHL 400 kV interconnection Tirana (AL) Podgorica (CG)

    Construction progressing on both sides

    - expected to be commissioned by mid 2010

    MK

    Kosovo B

  • 8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority

    11/29Energy Community Secretariat Investment options in the Energy Community 1115thAthens Forum, 25 26 November 2009

    PROGRESS UPDATE transmission lines

    IT

    SK

    HU

    SI

    HR

    BA

    GR

    TR

    BG

    RO

    MD

    UKR

    AL

    ME

    RS

    ATHeviz

    Pecs

    Ernestinovo

    Sombor

    Novi SadTimisoara

    Zerjavinec

    Cirkovce

    Konjsko

    Durres

    Tirana

    Elbasan

    Bitola

    MaritsaEast I

    N. Santa

    Podgorica

    Stip

    ChervenaMogila

    Babaeski

    Skopje

    Nadab

    Bekesaba

    Okroglo

    Udine

    Nis

    Recently completed orUnder const ruction

    Candidate pro jects

    Florina

    Constanta

    to Pasakoy(TR)

    to Italy

    to Italy

    to Italy

    to Italy

    S.Mitrovica

    Ugljevik

    New 400kV transmission line Tirana Elbasan (AL)

    - Construction progressing

    - expected to be commissioned byApril 2010

    MK

    Kosovo B

  • 8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority

    12/29

  • 8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority

    13/29Energy Community Secretariat Investment options in the Energy Community 1315thAthens Forum, 25 26 November 2009

    PROGRESS UPDATE transmission lines

    IT

    SK

    HU

    SI

    HR

    BA

    GR

    TR

    BG

    RO

    MD

    UKR

    AL

    ME

    RS

    ATHeviz

    Pecs

    Ernestinovo

    Sombor

    Novi SadTimisoara

    Zerjavinec

    Cirkovce

    Konjsko

    Durres

    Tirana

    Elbasan

    Bitola

    MaritsaEast I

    N. Santa

    Podgorica

    Stip

    ChervenaMogila

    Babaeski

    Skopje

    Nadab

    Bekesaba

    Okroglo

    Udine

    Nis

    Recently completed orUnder const ruction

    Candidate pro jects

    Florina

    Constanta

    to Pasakoy(TR)

    to Italy

    to Italy

    to Italy

    to Italy

    S.Mitrovica

    Ugljevik

    New OHL 400 kV interconnection Tirana 2 (AL) - TPP Kosovo B

    - MoU between TSOs signed in 2008, financial agreement with KfW signed

    - construction expected to start in 2010 and finish 2012

    MK

    Kosovo B

  • 8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority

    14/29

    Energy Community Secretariat Investment options in the Energy Community 1415thAthens Forum, 25 26 November 2009

    PROGRESS UPDATE transmission lines

    IT

    SK

    HU

    SI

    HR

    BA

    GR

    TR

    BG

    RO

    MD

    UKR

    AL

    ME

    RS

    ATHeviz

    Pecs

    Ernestinovo

    Sombor

    Novi SadTimisoara

    Zerjavinec

    Cirkovce

    Konjsko

    Durres

    Tirana

    Elbasan

    Bitola

    MaritsaEast I

    N. Santa

    Podgorica

    Stip

    ChervenaMogila

    Babaeski

    Skopje

    Nadab

    Bekesaba

    Okroglo

    Udine

    Nis

    Recently completed orUnder const ruction

    Candidate pro jects

    Florina

    Constanta

    to Pasakoy(TR)

    to Italy

    to Italy

    to Italy

    to Italy

    S.Mitrovica

    Ugljevik

    New OHL 400 kV interconnection

    former Yugoslav Republic of Macedonia - Serbia

    - Serbia completed construction of part I and II (Nish Leskovac),

    - Former Yugoslav Republic of Macedonia - the EIA study is under way and

    financing agreement with the WB is closed

    MK

    Kosovo B

  • 8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority

    15/29

    Energy Community Secretariat Investment options in the Energy Community 1515thAthens Forum, 25 26 November 2009

    PROGRESS UPDATE transmission lines

    IT

    SK

    HU

    SI

    HR

    BA

    GR

    TR

    BG

    RO

    MD

    UKR

    AL

    ME

    RS

    ATHeviz

    Pecs

    Ernestinovo

    Sombor

    Novi SadTimisoara

    Zerjavinec

    Cirkovce

    Konjsko

    Durres

    Tirana

    Elbasan

    Bitola

    MaritsaEast I

    N. Santa

    Podgorica

    Stip

    ChervenaMogila

    Babaeski

    Skopje

    Nadab

    Bekesaba

    Okroglo

    Udine

    Nis

    Recently completed orUnder const ruction

    Candidate pro jects

    Florina

    Constanta

    to Pasakoy(TR)

    to Italy

    to Italy

    to Italy

    to Italy

    S.Mitrovica

    Ugljevik

    New HVDC submarine interconnection Croatia Italy

    - Common feasibility study is under preparation by HEP-OPS and TERNA

    MK

    Kosovo B

  • 8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority

    16/29

    Energy Community Secretariat Investment options in the Energy Community 1615thAthens Forum, 25 26 November 2009

    PROGRESS UPDATE transmission lines

    IT

    SK

    HU

    SI

    HR

    BA

    GR

    TR

    BG

    RO

    MD

    UKR

    AL

    ME

    RS

    ATHeviz

    Pecs

    Ernestinovo

    Sombor

    Novi SadTimisoara

    Zerjavinec

    Cirkovce

    Konjsko

    Durres

    Tirana

    Elbasan

    Bitola

    MaritsaEast I

    N. Santa

    Podgorica

    Stip

    ChervenaMogila

    Babaeski

    Skopje

    Nadab

    Bekesaba

    Okroglo

    Udine

    Nis

    Recently completed orUnder const ruction

    Candidate pro jects

    Florina

    Constanta

    to Pasakoy(TR)

    to Italy

    to Italy

    to Italy

    to Italy

    S.Mitrovica

    Ugljevik

    New HVDC submarine interconnection Montenegro Italy

    - Feasibility study is completed in 2008 and project was accepted.

    - Draft agreement for construction between TERNA S.p.A and Prenos AD

    has been initialed

    MK

    Kosovo B

  • 8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority

    17/29

    Energy Community Secretariat Investment options in the Energy Community 1715thAthens Forum, 25 26 November 2009

    Novi Sad

    PROGRESS UPDATE transmission lines

    IT

    SK

    HU

    SI

    HR

    BA

    GR

    TR

    BG

    RO

    MD

    UKR

    AL

    ME

    RS

    ATHeviz

    Pecs

    Ernestinovo

    Sombor

    Timisoara

    Zerjavinec

    Cirkovce

    Konjsko

    Durres

    Tirana

    Elbasan

    Bitola

    MaritsaEast I

    N. Santa

    Podgorica

    Stip

    ChervenaMogila

    Babaeski

    Skopje

    Nadab

    Bekesaba

    Okroglo

    Udine

    Nis

    Recently completed orUnder const ruction

    Candidate pro jects

    Florina

    Constanta

    to Pasakoy(TR)

    to Italy

    to Italy

    to Italy

    to Italy

    S.Mitrovica

    Ugljevik

    New OHL 400 kV interconnection Serbia - Romania

    - Feasibility study is finalized, other studies are under way

    MK

    Kosovo B

  • 8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority

    18/29

    Energy Community Secretariat Investment options in the Energy Community 1815thAthens Forum, 25 26 November 2009

    Novi Sad

    PROGRESS UPDATE transmission lines

    IT

    SK

    HU

    SI

    HR

    BA

    GR

    TR

    BG

    RO

    MD

    UKR

    AL

    ME

    RS

    ATHeviz

    Pecs

    Ernestinovo

    Sombor

    Timisoara

    Zerjavinec

    Cirkovce

    Konjsko

    Durres

    Tirana

    Elbasan

    Bitola

    MaritsaEast I

    N. Santa

    Podgorica

    Stip

    ChervenaMogila

    Babaeski

    Skopje

    Nadab

    Bekesaba

    Okroglo

    Udine

    Nis

    Recently completed orUnder const ruction

    Candidate pro jects

    Florina

    Constanta

    to Pasakoy(TR)

    to Italy

    to Italy

    to Italy

    to Italy

    S.Mitrovica

    Ugljevik

    OHL 400 kV interconnection Sombor (RS) Pecs (H)

    - In 2008 listed for technical assistanceunder IPF however with insufficient

    political support

    MK

    Kosovo B

  • 8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority

    19/29

    Energy Community Secretariat Investment options in the Energy Community 1915thAthens Forum, 25 26 November 2009

    Bitola

    Novi Sad

    PROGRESS UPDATE transmission lines

    IT

    SK

    HU

    SI

    HR

    BA

    GR

    TR

    BG

    RO

    MD

    UKR

    AL

    ME

    RS

    ATHeviz

    Pecs

    Ernestinovo

    Sombor

    Timisoara

    Zerjavinec

    Cirkovce

    Konjsko

    Durres

    Tirana

    Elbasan

    MaritsaEast I

    N. Santa

    Podgorica

    Stip

    ChervenaMogila

    Babaeski

    Skopje

    Nadab

    Bekesaba

    Okroglo

    Udine

    Nis

    Recently completed orUnder const ruction

    Candidate pro jects

    Florina

    Constanta

    to Pasakoy(TR)

    to Italy

    to Italy

    to Italy

    to Italy

    S.Mitrovica

    Ugljevik

    Interconnection

    former Yugoslav Republic of Macedonia Albania - Italy

    - 2 part line [OHL 400 kV Bitola Elbasan]

    [HVDC submarine line Albania Italy]

    -the feasibility study is under revision (MEPSO) due to the decision for

    development of the interconnection Montenegro - Italy

    MK

    Kosovo B

  • 8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority

    20/29

    Energy Community Secretariat Investment options in the Energy Community 2015thAthens Forum, 25 26 November 2009

    Bitola

    Novi Sad

    PROGRESS UPDATE transmission lines

    IT

    SK

    HU

    SI

    HR

    BA

    GR

    TR

    BG

    RO

    MD

    UKR

    AL

    ME

    RS

    ATHeviz

    Pecs

    Ernestinovo

    Sombor

    Timisoara

    Zerjavinec

    Cirkovce

    Konjsko

    Durres

    Tirana

    Elbasan

    MaritsaEast I

    N. Santa

    Podgorica

    Stip

    ChervenaMogila

    Babaeski

    Skopje

    Nadab

    Bekesaba

    Okroglo

    Udine

    Nis

    Recently completed orUnder const ruction

    Candidate pro jects

    Florina

    Constanta

    to Pasakoy(TR)

    to Italy

    to Italy

    to Italy

    to Italy

    S.Mitrovica

    Ugljevik

    OHL 400 kV interconnection Skopje Kosovo B

    - old (decommissioned) 220 kV line to be refurbished to 400 kV interconnection

    - under consideration by the TSOs

    MK

    Kosovo B

    PROGRESS UPDATE t i i l i

  • 8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority

    21/29

    Energy Community Secretariat Investment options in the Energy Community 2115thAthens Forum, 25 26 November 2009

    Bitola

    Novi Sad

    PROGRESS UPDATE transmission lines

    IT

    SK

    HU

    SI

    HR

    BA

    GR

    TR

    BG

    RO

    MD

    UKR

    AL

    ME

    RS

    ATHeviz

    Pecs

    Ernestinovo

    Sombor

    Timisoara

    Zerjavinec

    Cirkovce

    Konjsko

    Durres

    Tirana

    Elbasan

    MaritsaEast I

    N. Santa

    Podgorica

    Stip

    ChervenaMogila

    Babaeski

    Skopje

    Nadab

    Bekesaba

    Okroglo

    Udine

    Nis

    Under const ruction

    Candidate pro jects

    Florina

    Constanta

    to Pasakoy(TR)

    to Italy

    to Italy

    to Italy

    to Italy

    S.Mitrovica

    Ugljevik

    MK

    Transmission infrastructure development

    - status as of November 2009

    Completed preparation

    Advanced preparation

    To be reconsidered

    In operation

    Kosovo B

    PROGRESS UPDATE ti

  • 8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority

    22/29

    Energy Community Secretariat Investment options in the Energy Community 2215thAthens Forum, 25 26 November 2009

    PROGRESS UPDATE power generation

    Investment planning in power generation scenario

    source: SECI - GIS Update - EIHP / EKC (USAID), November 2007

    PROGRESS UPDATE ti

  • 8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority

    23/29

    Energy Community Secretariat Investment options in the Energy Community 2315thAthens Forum, 25 26 November 2009

    PROGRESS UPDATE power generation

    Investment planning in power generation - scenario

    source: SECI GIS Update - EIHP / EKC (USAID), November 2007

    PROGRESS UPDATE power generation

  • 8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority

    24/29

    Energy Community Secretariat Investment options in the Energy Community 2415thAthens Forum, 25 26 November 2009

    Petrol / gas fired CC TPP [97 MW] Vlore (Albania)

    - commissioned in 2009 and operated at partial capacity (2530 MW)

    expected to be fully operational by 2010

    HPP on Drin River watershed, [50-80 MW]Ashta (Albania)

    - BOT concession attributed to Consortium of Austria (Verbund and EVN) in

    September 2008, mechanical equipment contracted in September 2009 -

    expected to be operational in 2012

    HPP storage cascade [up to 340 MW] on Devoli river(Albania)

    - BOT tender awarded to Joint Venture EVN / Statkraft in January 2008 -

    construction expected to start late 2010.

    PROGRESS UPDATE power generation

    Investment projects currently advancing in implementation

    status as of November 2009

    PROGRESS UPDATE power generation

  • 8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority

    25/29

    Energy Community Secretariat Investment options in the Energy Community 2515thAthens Forum, 25 26 November 2009

    Lignite fired TPP [2000 MW] Kosovo C staged-out as

    TPP [2 x 500 MW] New Kosovo (UNMIK)- In October 2009 the Ministry of Energy and Mining announced decision to

    build 2x500 MW TPP with a first stage of 500 MW EIA prepared,

    negotiations with the investor are expected to be closed in 2010

    HPP [450 MW] Buk Bijela on Drina river redefined to a reduced

    capacity [150 MW] HPP Gornja Drina (BiH)

    - In October the utilities EP RS (Bosnia and Herzegovina) and EPS (Serbia)decided to reduce the capacity of the HPP project Buk Bijela [450 MW] on the

    river Drina and define a new HPP project Gornja Drina [150 MW] feasibility

    study is under way

    PROGRESS UPDATE power generation

    Investment projects currently under reconsideration

    status as of November 2009

  • 8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority

    26/29

    CONCLUSIONS (1)CONCLUSIONS (1)

  • 8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority

    27/29

    Energy Community Secretariat Investment options in the Energy Community 2715thAthens Forum, 25 26 November 2009

    The progress with investments has been slowed down by the financial

    and economic crisis

    Many investment priorities announced by companies andgovernments, but limited capacity (both financial and administrative)

    constrain the achievements in a timely manner

    Long delays in announcing tenders and selecting the investors; inmany instances, decisions are reversed and projects re-tendered,

    Projects costs were significantly shifted upwards after the feasibility

    studies were updated

    Turn key contracts are currently difficult to secure given the many

    uncertainties

    CONCLUSIONS (1)CONCLUSIONS (1)

    CONCLUSIONS (2)CONCLUSIONS (2)

  • 8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority

    28/29

    Energy Community Secretariat Investment options in the Energy Community 2815thAthens Forum, 25 26 November 2009

    Equipment contracting becomes more problematic; prior to the crisis,

    prices went significantly up and so did lead time for manufacturing energy

    technologies

    Tender documentation is in many cases not sufficiently well prepared,

    There are concerns about the natural resources availabili ty in case of

    hydro power plants, where water is also use for irrigation purposes

    Concession or association terms are often unclear this concern may

    be the case for often very low number of expressions of interest from the

    leading investors in the region

    The markets remain small and fragmented and the investment decisions

    are still influenced by the energy nationalism;

    CONCLUSIONS (2)CONCLUSIONS (2)

  • 8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority

    29/29

    Energy Community Secretariat Investment options in the Energy Community 2915thAthens Forum, 25 26 November 2009

    THANK YOU

    Simon Uzunov

    www.energy-community.org