Energy Community Secretariat Investment options in the Energy Community 115thAthens Forum, 25 26 November 2009
ELECTRICITY INFRASTRUCTUREELECTRICITY INFRASTRUCTURE
-- PROJECTS OF REGIONAL PRIORITYPROJECTS OF REGIONAL PRIORITY
1515THTHAthens ForumAthens Forum
2525 26 November 200926 November 2009
Energy Community SecretariatEnergy Community Secretariat
www.energy-community.org
INVESTMENT OPTIONS IN THE ENERGY COMMUNITY
8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority
2/29
Energy Community Secretariat Investment options in the Energy Community 215thAthens Forum, 25 26 November 2009
CONTENTCONTENT
INTRODUCTION
INVESTMENT OUTLOOK 2008 - 2009
THE TREATY AS A FRAMEWORK
PROGRESS UPDATE
THE CHALLENGE
CONCLUSIONS
8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority
3/29
Energy Community Secretariat Investment options in the Energy Community 315thAthens Forum, 25 26 November 2009
INTRODUCTIONINTRODUCTION
THE ENERGY POLICY IN EUROPE
Three common objectives:
sustainability
security of supply
competitiveness
One answer: A real Internal Energy Market
European Community has identified the requirements forachieving this:
Unbundling
Effective regulation
Transparency
Infrastructure
Network security
Adequacy of electricity generation and gas supply capacity
Energy as a public service
8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority
4/29Energy Community Secretariat Investment options in the Energy Community 415thAthens Forum, 25 26 November 2009
INTRODUCTIONINTRODUCTION
THE ENERGY POLICY IN SOUTH EAST EUROPE
The same objectives as in the EC, but more stringent
` One solution:
A common framework for regional energy market
8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority
5/29Energy Community Secretariat Investment options in the Energy Community 515thAthens Forum, 25 26 November 2009
INVESTMENTS OUTLOOK 2008INVESTMENTS OUTLOOK 2008--20092009
Effects of the financial and economic crisis
Energy investments in most regions and sectors are expected to drop sharply
in 2009, mostly in the OECD countries.
The financing environment is getting tougher, the final demand for energy is
weakening and the cash flows are falling.
Both supply and demand side investments are being affected.
The energy supply infrastructure is being affected in three ways by the
financial and economic crisis:
Tighter credits; energy companies find it more difficult to obtain credit for
both on-going operations and new projects; in some cases, the cost ofcapital has risen in absolute terms, making marginal investments
uneconomic;
Lower profitability of new power generation investments
Less need for capacity, with the falling demand for energy caused byeconomic downturn.
8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority
6/29Energy Community Secretariat Investment options in the Energy Community 615thAthens Forum, 25 26 November 2009
The GDP growth and energy demand forecast
Electricity consumption across the Energy Community has varied widely, in
some cases indicating sharp decline during the past year on the year to year
comparison
Change in electr icity consum ption in the Ener gy Com m unity [Feb. 2009 / Feb. 2008]
(source: Platts in SEE, 31 July 2009)
Former
YugoslavRepublic of
Macedonia Montenegro
Serbia
BiH - FBiH
BiH - RS
Albania
Croatia
-25.0
-20.0
-15.0
-10.0
-5.0
0.0
5.0
10.0
15.0
[%]
INVESTMENTS OUTLOOK 2008INVESTMENTS OUTLOOK 2008--20092009
8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority
7/29Energy Community Secretariat Investment options in the Energy Community 715thAthens Forum, 25 26 November 2009
The GDP growth and energy demand forecast
Projected electricity consumption growth is set to moderate values by each
of the Contracting Parties
Projected average consumption growht for the Region set for 2009 is 2.33%
INVESTMENTS OUTLOOK 2008INVESTMENTS OUTLOOK 2008--20092009
Pro jected annual electricity cons um ption grow th
(source: Security of Supply Statements, July 2009)
-5.0
-4.0
-3.0
-2.0
-1.0
0.0
1.0
2.0
3.0
4.0
5.0
Albania
[ - 2020]
BiH
[ - 2020]
Croatia
[ - 2012]
Former
YugoslavRepublic of
Macedonia
[ - 2020]
Montenegro Serbia
[ - 2015]
UNMIK
[ - 2018]
[%]
8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority
8/29Energy Community Secretariat Investment options in the Energy Community 815thAthens Forum, 25 26 November 2009
THETHE ENERGY COMMUNITYENERGY COMMUNITY A REGIONAL APPROACHA REGIONAL APPROACH
BENEFITS:
Economies of scale in energy investments and operations
Larger (regional) energy market for suppliers
Compatible rules and institutions with the European Union
Implementation of a harmonised legislative framework including:
Market rules
Third party access to networks
New infrastructure authorisation and licensing procedures
Mutual Recognition of licenses
Adoption of Generally Applicable Standards Application of common Safeguard Measures, etc.
Better conditions for stability and mutual assistance
Dispute settlement procedure
8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority
9/29Energy Community Secretariat Investment options in the Energy Community 915thAthens Forum, 25 26 November 2009
PROGRESS UPDATE transmission lines
IT
SK
HU
SI
HR
BA
GR
TR
BG
RO
MD
UKR
AL
ME
RS
ATHeviz
Pecs
Ernestinovo
Sombor
Novi SadTimisoara
Zerjavinec
Cirkovce
Konjsko
Durres
Tirana
Elbasan
Bitola
MaritsaEast I
N. Santa
Podgorica
Stip
ChervenaMogila
Babaeski
Skopje
Nadab
Bekesaba
Okroglo
Udine
Nis
Recently completed orUnder const ruction
Candidate pro jects
Florina
Constanta
to Pasakoy(TR)
to Italy
to Italy
to Italy
to Italy
S.Mitrovica
Ugljevik
New investments in transmission infrastructure(source: SECI TSP Review, May 2008)
MK
Kosovo B
8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority
10/29Energy Community Secretariat Investment options in the Energy Community 1015thAthens Forum, 25 26 November 2009
PROGRESS UPDATE transmission lines
IT
SK
HU
SI
HR
BA
GR
TR
BG
RO
MD
UKR
AL
ME
RS
ATHeviz
Pecs
Ernestinovo
Sombor
Novi SadTimisoara
Zerjavinec
Cirkovce
Konjsko
Durres
Tirana
Elbasan
Bitola
MaritsaEast I
N. Santa
Podgorica
Stip
ChervenaMogila
Babaeski
Skopje
Nadab
Bekesaba
Okroglo
Udine
Nis
Recently completed orUnder const ruction
Candidate pro jects
Florina
Constanta
to Pasakoy(TR)
to Italy
to Italy
to Italy
to Italy
S.Mitrovica
Ugljevik
New OHL 400 kV interconnection Tirana (AL) Podgorica (CG)
Construction progressing on both sides
- expected to be commissioned by mid 2010
MK
Kosovo B
8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority
11/29Energy Community Secretariat Investment options in the Energy Community 1115thAthens Forum, 25 26 November 2009
PROGRESS UPDATE transmission lines
IT
SK
HU
SI
HR
BA
GR
TR
BG
RO
MD
UKR
AL
ME
RS
ATHeviz
Pecs
Ernestinovo
Sombor
Novi SadTimisoara
Zerjavinec
Cirkovce
Konjsko
Durres
Tirana
Elbasan
Bitola
MaritsaEast I
N. Santa
Podgorica
Stip
ChervenaMogila
Babaeski
Skopje
Nadab
Bekesaba
Okroglo
Udine
Nis
Recently completed orUnder const ruction
Candidate pro jects
Florina
Constanta
to Pasakoy(TR)
to Italy
to Italy
to Italy
to Italy
S.Mitrovica
Ugljevik
New 400kV transmission line Tirana Elbasan (AL)
- Construction progressing
- expected to be commissioned byApril 2010
MK
Kosovo B
8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority
12/29
8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority
13/29Energy Community Secretariat Investment options in the Energy Community 1315thAthens Forum, 25 26 November 2009
PROGRESS UPDATE transmission lines
IT
SK
HU
SI
HR
BA
GR
TR
BG
RO
MD
UKR
AL
ME
RS
ATHeviz
Pecs
Ernestinovo
Sombor
Novi SadTimisoara
Zerjavinec
Cirkovce
Konjsko
Durres
Tirana
Elbasan
Bitola
MaritsaEast I
N. Santa
Podgorica
Stip
ChervenaMogila
Babaeski
Skopje
Nadab
Bekesaba
Okroglo
Udine
Nis
Recently completed orUnder const ruction
Candidate pro jects
Florina
Constanta
to Pasakoy(TR)
to Italy
to Italy
to Italy
to Italy
S.Mitrovica
Ugljevik
New OHL 400 kV interconnection Tirana 2 (AL) - TPP Kosovo B
- MoU between TSOs signed in 2008, financial agreement with KfW signed
- construction expected to start in 2010 and finish 2012
MK
Kosovo B
8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority
14/29
Energy Community Secretariat Investment options in the Energy Community 1415thAthens Forum, 25 26 November 2009
PROGRESS UPDATE transmission lines
IT
SK
HU
SI
HR
BA
GR
TR
BG
RO
MD
UKR
AL
ME
RS
ATHeviz
Pecs
Ernestinovo
Sombor
Novi SadTimisoara
Zerjavinec
Cirkovce
Konjsko
Durres
Tirana
Elbasan
Bitola
MaritsaEast I
N. Santa
Podgorica
Stip
ChervenaMogila
Babaeski
Skopje
Nadab
Bekesaba
Okroglo
Udine
Nis
Recently completed orUnder const ruction
Candidate pro jects
Florina
Constanta
to Pasakoy(TR)
to Italy
to Italy
to Italy
to Italy
S.Mitrovica
Ugljevik
New OHL 400 kV interconnection
former Yugoslav Republic of Macedonia - Serbia
- Serbia completed construction of part I and II (Nish Leskovac),
- Former Yugoslav Republic of Macedonia - the EIA study is under way and
financing agreement with the WB is closed
MK
Kosovo B
8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority
15/29
Energy Community Secretariat Investment options in the Energy Community 1515thAthens Forum, 25 26 November 2009
PROGRESS UPDATE transmission lines
IT
SK
HU
SI
HR
BA
GR
TR
BG
RO
MD
UKR
AL
ME
RS
ATHeviz
Pecs
Ernestinovo
Sombor
Novi SadTimisoara
Zerjavinec
Cirkovce
Konjsko
Durres
Tirana
Elbasan
Bitola
MaritsaEast I
N. Santa
Podgorica
Stip
ChervenaMogila
Babaeski
Skopje
Nadab
Bekesaba
Okroglo
Udine
Nis
Recently completed orUnder const ruction
Candidate pro jects
Florina
Constanta
to Pasakoy(TR)
to Italy
to Italy
to Italy
to Italy
S.Mitrovica
Ugljevik
New HVDC submarine interconnection Croatia Italy
- Common feasibility study is under preparation by HEP-OPS and TERNA
MK
Kosovo B
8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority
16/29
Energy Community Secretariat Investment options in the Energy Community 1615thAthens Forum, 25 26 November 2009
PROGRESS UPDATE transmission lines
IT
SK
HU
SI
HR
BA
GR
TR
BG
RO
MD
UKR
AL
ME
RS
ATHeviz
Pecs
Ernestinovo
Sombor
Novi SadTimisoara
Zerjavinec
Cirkovce
Konjsko
Durres
Tirana
Elbasan
Bitola
MaritsaEast I
N. Santa
Podgorica
Stip
ChervenaMogila
Babaeski
Skopje
Nadab
Bekesaba
Okroglo
Udine
Nis
Recently completed orUnder const ruction
Candidate pro jects
Florina
Constanta
to Pasakoy(TR)
to Italy
to Italy
to Italy
to Italy
S.Mitrovica
Ugljevik
New HVDC submarine interconnection Montenegro Italy
- Feasibility study is completed in 2008 and project was accepted.
- Draft agreement for construction between TERNA S.p.A and Prenos AD
has been initialed
MK
Kosovo B
8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority
17/29
Energy Community Secretariat Investment options in the Energy Community 1715thAthens Forum, 25 26 November 2009
Novi Sad
PROGRESS UPDATE transmission lines
IT
SK
HU
SI
HR
BA
GR
TR
BG
RO
MD
UKR
AL
ME
RS
ATHeviz
Pecs
Ernestinovo
Sombor
Timisoara
Zerjavinec
Cirkovce
Konjsko
Durres
Tirana
Elbasan
Bitola
MaritsaEast I
N. Santa
Podgorica
Stip
ChervenaMogila
Babaeski
Skopje
Nadab
Bekesaba
Okroglo
Udine
Nis
Recently completed orUnder const ruction
Candidate pro jects
Florina
Constanta
to Pasakoy(TR)
to Italy
to Italy
to Italy
to Italy
S.Mitrovica
Ugljevik
New OHL 400 kV interconnection Serbia - Romania
- Feasibility study is finalized, other studies are under way
MK
Kosovo B
8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority
18/29
Energy Community Secretariat Investment options in the Energy Community 1815thAthens Forum, 25 26 November 2009
Novi Sad
PROGRESS UPDATE transmission lines
IT
SK
HU
SI
HR
BA
GR
TR
BG
RO
MD
UKR
AL
ME
RS
ATHeviz
Pecs
Ernestinovo
Sombor
Timisoara
Zerjavinec
Cirkovce
Konjsko
Durres
Tirana
Elbasan
Bitola
MaritsaEast I
N. Santa
Podgorica
Stip
ChervenaMogila
Babaeski
Skopje
Nadab
Bekesaba
Okroglo
Udine
Nis
Recently completed orUnder const ruction
Candidate pro jects
Florina
Constanta
to Pasakoy(TR)
to Italy
to Italy
to Italy
to Italy
S.Mitrovica
Ugljevik
OHL 400 kV interconnection Sombor (RS) Pecs (H)
- In 2008 listed for technical assistanceunder IPF however with insufficient
political support
MK
Kosovo B
8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority
19/29
Energy Community Secretariat Investment options in the Energy Community 1915thAthens Forum, 25 26 November 2009
Bitola
Novi Sad
PROGRESS UPDATE transmission lines
IT
SK
HU
SI
HR
BA
GR
TR
BG
RO
MD
UKR
AL
ME
RS
ATHeviz
Pecs
Ernestinovo
Sombor
Timisoara
Zerjavinec
Cirkovce
Konjsko
Durres
Tirana
Elbasan
MaritsaEast I
N. Santa
Podgorica
Stip
ChervenaMogila
Babaeski
Skopje
Nadab
Bekesaba
Okroglo
Udine
Nis
Recently completed orUnder const ruction
Candidate pro jects
Florina
Constanta
to Pasakoy(TR)
to Italy
to Italy
to Italy
to Italy
S.Mitrovica
Ugljevik
Interconnection
former Yugoslav Republic of Macedonia Albania - Italy
- 2 part line [OHL 400 kV Bitola Elbasan]
[HVDC submarine line Albania Italy]
-the feasibility study is under revision (MEPSO) due to the decision for
development of the interconnection Montenegro - Italy
MK
Kosovo B
8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority
20/29
Energy Community Secretariat Investment options in the Energy Community 2015thAthens Forum, 25 26 November 2009
Bitola
Novi Sad
PROGRESS UPDATE transmission lines
IT
SK
HU
SI
HR
BA
GR
TR
BG
RO
MD
UKR
AL
ME
RS
ATHeviz
Pecs
Ernestinovo
Sombor
Timisoara
Zerjavinec
Cirkovce
Konjsko
Durres
Tirana
Elbasan
MaritsaEast I
N. Santa
Podgorica
Stip
ChervenaMogila
Babaeski
Skopje
Nadab
Bekesaba
Okroglo
Udine
Nis
Recently completed orUnder const ruction
Candidate pro jects
Florina
Constanta
to Pasakoy(TR)
to Italy
to Italy
to Italy
to Italy
S.Mitrovica
Ugljevik
OHL 400 kV interconnection Skopje Kosovo B
- old (decommissioned) 220 kV line to be refurbished to 400 kV interconnection
- under consideration by the TSOs
MK
Kosovo B
PROGRESS UPDATE t i i l i
8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority
21/29
Energy Community Secretariat Investment options in the Energy Community 2115thAthens Forum, 25 26 November 2009
Bitola
Novi Sad
PROGRESS UPDATE transmission lines
IT
SK
HU
SI
HR
BA
GR
TR
BG
RO
MD
UKR
AL
ME
RS
ATHeviz
Pecs
Ernestinovo
Sombor
Timisoara
Zerjavinec
Cirkovce
Konjsko
Durres
Tirana
Elbasan
MaritsaEast I
N. Santa
Podgorica
Stip
ChervenaMogila
Babaeski
Skopje
Nadab
Bekesaba
Okroglo
Udine
Nis
Under const ruction
Candidate pro jects
Florina
Constanta
to Pasakoy(TR)
to Italy
to Italy
to Italy
to Italy
S.Mitrovica
Ugljevik
MK
Transmission infrastructure development
- status as of November 2009
Completed preparation
Advanced preparation
To be reconsidered
In operation
Kosovo B
PROGRESS UPDATE ti
8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority
22/29
Energy Community Secretariat Investment options in the Energy Community 2215thAthens Forum, 25 26 November 2009
PROGRESS UPDATE power generation
Investment planning in power generation scenario
source: SECI - GIS Update - EIHP / EKC (USAID), November 2007
PROGRESS UPDATE ti
8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority
23/29
Energy Community Secretariat Investment options in the Energy Community 2315thAthens Forum, 25 26 November 2009
PROGRESS UPDATE power generation
Investment planning in power generation - scenario
source: SECI GIS Update - EIHP / EKC (USAID), November 2007
PROGRESS UPDATE power generation
8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority
24/29
Energy Community Secretariat Investment options in the Energy Community 2415thAthens Forum, 25 26 November 2009
Petrol / gas fired CC TPP [97 MW] Vlore (Albania)
- commissioned in 2009 and operated at partial capacity (2530 MW)
expected to be fully operational by 2010
HPP on Drin River watershed, [50-80 MW]Ashta (Albania)
- BOT concession attributed to Consortium of Austria (Verbund and EVN) in
September 2008, mechanical equipment contracted in September 2009 -
expected to be operational in 2012
HPP storage cascade [up to 340 MW] on Devoli river(Albania)
- BOT tender awarded to Joint Venture EVN / Statkraft in January 2008 -
construction expected to start late 2010.
PROGRESS UPDATE power generation
Investment projects currently advancing in implementation
status as of November 2009
PROGRESS UPDATE power generation
8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority
25/29
Energy Community Secretariat Investment options in the Energy Community 2515thAthens Forum, 25 26 November 2009
Lignite fired TPP [2000 MW] Kosovo C staged-out as
TPP [2 x 500 MW] New Kosovo (UNMIK)- In October 2009 the Ministry of Energy and Mining announced decision to
build 2x500 MW TPP with a first stage of 500 MW EIA prepared,
negotiations with the investor are expected to be closed in 2010
HPP [450 MW] Buk Bijela on Drina river redefined to a reduced
capacity [150 MW] HPP Gornja Drina (BiH)
- In October the utilities EP RS (Bosnia and Herzegovina) and EPS (Serbia)decided to reduce the capacity of the HPP project Buk Bijela [450 MW] on the
river Drina and define a new HPP project Gornja Drina [150 MW] feasibility
study is under way
PROGRESS UPDATE power generation
Investment projects currently under reconsideration
status as of November 2009
8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority
26/29
CONCLUSIONS (1)CONCLUSIONS (1)
8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority
27/29
Energy Community Secretariat Investment options in the Energy Community 2715thAthens Forum, 25 26 November 2009
The progress with investments has been slowed down by the financial
and economic crisis
Many investment priorities announced by companies andgovernments, but limited capacity (both financial and administrative)
constrain the achievements in a timely manner
Long delays in announcing tenders and selecting the investors; inmany instances, decisions are reversed and projects re-tendered,
Projects costs were significantly shifted upwards after the feasibility
studies were updated
Turn key contracts are currently difficult to secure given the many
uncertainties
CONCLUSIONS (1)CONCLUSIONS (1)
CONCLUSIONS (2)CONCLUSIONS (2)
8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority
28/29
Energy Community Secretariat Investment options in the Energy Community 2815thAthens Forum, 25 26 November 2009
Equipment contracting becomes more problematic; prior to the crisis,
prices went significantly up and so did lead time for manufacturing energy
technologies
Tender documentation is in many cases not sufficiently well prepared,
There are concerns about the natural resources availabili ty in case of
hydro power plants, where water is also use for irrigation purposes
Concession or association terms are often unclear this concern may
be the case for often very low number of expressions of interest from the
leading investors in the region
The markets remain small and fragmented and the investment decisions
are still influenced by the energy nationalism;
CONCLUSIONS (2)CONCLUSIONS (2)
8/10/2019 Electricity Inftrastructure - Projects of the Regional Priority
29/29
Energy Community Secretariat Investment options in the Energy Community 2915thAthens Forum, 25 26 November 2009
THANK YOU
Simon Uzunov
www.energy-community.org