www.merredinsolarfarm.com.au ELECTRICITY GENERATION LICENCE APPLICATION Public Consultation October 2017 Merredin Solar Farm Merredin Solar Farm Nominee Pty Limited Disclaimer This document was compiled by Merredin Solar Farm Nominee Pty Ltd for use by the Economic Regulation Authority (ERA). The information contained therein is the property of Merredin Solar Farm Nominees Pty Ltd and may not be used by any other organisation or person without written consent. While due care has been exercised in compiling this document, the accuracy of information is provided in good faith without any expressed or implied warranty.

ELECTRICITY GENERATION LICENCE APPLICATION · As IASL is a 50% shareholder of MSFN we do not consider this a significant risk to the current financial position of the company. MSFN

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ELECTRICITY GENERATION LICENCE APPLICATION · As IASL is a 50% shareholder of MSFN we do not consider this a significant risk to the current financial position of the company. MSFN

www.merredinsolarfarm.com.au

ELECTRICITY GENERATION

LICENCE APPLICATION

Public Consultation October 2017

Merredin Solar Farm Merredin Solar Farm Nominee Pty Limited

Disclaimer

This document was compiled by Merredin Solar Farm Nominee Pty Ltd for use by the Economic Regulation

Authority (ERA). The information contained therein is the property of Merredin Solar Farm Nominees Pty Ltd

and may not be used by any other organisation or person without written consent. While due care has been

exercised in compiling this document, the accuracy of information is provided in good faith without any

expressed or implied warranty.

Page 2: ELECTRICITY GENERATION LICENCE APPLICATION · As IASL is a 50% shareholder of MSFN we do not consider this a significant risk to the current financial position of the company. MSFN

Merredin Solar Farm EGL Application-Public Consultation | Page 1 of 7

Page 1

CONTENTS

Glossary ............................................................................................................................................................. 2

1. Application Summary ................................................................................................................................. 3

1.1 Introduction ........................................................................................................................................ 3

1.2 Project Overview ................................................................................................................................ 3

2. Corporate Information ................................................................................................................................ 3

3. Financial Information .................................................................................................................................. 4

4. Technical Information ................................................................................................................................. 5

5. Other Regulatory Approvals ....................................................................................................................... 6

6. Public Interest Information .......................................................................................................................... 6

7. Licence Supply and Operating area ........................................................................................................... 6

Page 3: ELECTRICITY GENERATION LICENCE APPLICATION · As IASL is a 50% shareholder of MSFN we do not consider this a significant risk to the current financial position of the company. MSFN

Merredin Solar Farm EGL Application-Public Consultation | Page 2 of 7

Page 2

GLOSSARY

AC Alternating Current

CB Circuit Breaker

CAPEX Capital Expenditure (Project Cost)

CEFC Clean Energy Finance Council

CT/VT Current Transformer/Voltage Transformer

DA Developmental Approval

DC Direct Current

DSOC Declared sent out Capacity

EBITDA Earnings Before Interest Tax Depreciation and Amortisation

EPC Engineering, Procurement and Construction Contractor

ETAC Electricity Transfer Access Contract

IASL Ingenious Australian Solar Ltd

IEP Ingenious Estate Planning

IWC Interconnection Works Contract

kV kilo volts

kVA kilo volt ampere

LGC Large Generation Certificates

MSF Merredin Solar Farm

MSFN Merredin Solar Farm Nominee Pty Ltd

Muick Muick Pty Ltd

MW mega watt

Nord Nord LB

NRE Nomad Renewable Energy Ltd

PPA Power Purchase Agreement

PoC Point of Connection

PV Photovoltaic

RET Renewable Energy Target

Stellata Stellata ManagementCo Pty Ltd

SWIS South West Interconnected System

WEM Wholesale Electricity Market

WP Western Power

Page 4: ELECTRICITY GENERATION LICENCE APPLICATION · As IASL is a 50% shareholder of MSFN we do not consider this a significant risk to the current financial position of the company. MSFN

Merredin Solar Farm EGL Application-Public Consultation | Page 3 of 7

Page 3

1. APPLICATION SUMMARY

1.1 Introduction

Merredin Solar Farm – Phase 1 (‘MSF’) is a proposed development for a 100MWac solar PV farm, connected into WA’s South West Interconnected System (SWIS), located south of Merredin, approximately 260kms East of Perth, Western Australia. The site is situated in the wheatbelt on a farm with a General Farming zone with the proposed land use approved for the needs of a solar farm. Rights to develop the site for a solar farm have been secured with Options to Lease over Lot 194 and Lot 19444 having been secured in favour of the proponent.

Merredin Solar Farm Nominee Pty Limited (‘MSFN’) is applying for a generator licence for the Merredin Solar Farm and will be the owner and operator of the solar farm. MSFN intends to develop, finance, own and operate the proposed solar farm.

MSFN is applying for a generation licence for the 100MWac solar farm and intends to only operate as a generator.

1.2 Project Overview

The MSF site has been selected due to its proximity to the network Point of Connection (POC) at Merredin Terminal Substation and does not require 3rd party wayleaves/easements to connect to the SWIS. The existing Western Power substation is located North-West of the site, allowing for a direct and dedicated connection onto the transmission network at a connection voltage of 220kV. The site is relatively flat, rural land and receives strong consistent solar irradiance, making it an ideal location. The project has a minimum life of 25 years; however, an Option/Lease Agreement has been entered into for 30 years.

The MSF will consist of approximately 406,000 solar PV modules (325Wp polysilicon) covering an area of 360 hectares, with an expected output of approximately 278GWh of electricity per annum.

The overall capital expenditure includes both the work to build and commission the solar farm governed by the EPC contract, and the grid connection works governed under the ETAC/IWC contract with Western Power. The total expected capital expenditure is circa $160m.

Planning permission for the project was granted in June 2017 with the ETAC/IWC anticipated to be signed during the course of Q4 2017. MSFN will appoint an EPC Contractor to carry out the construction works. Currently an ECI contract is in place with RCR O’Donnell Griffin to support the design of the solar farm and the connection to the SWIS. Construction is forecast to commence on site in June 2018 and is anticipated to take 9 months. MSF is intended to be operational by the end of March 2019.

MSF will be a renewable electricity generator in the Wholesale Electricity Market (WEM) supplying electricity under a combination of commercial Power Purchase Agreements (PPA) with Western Australian electricity suppliers and if required dispatch power into the WEM balancing market.

2. CORPORATE INFORMATION

The licence applicant for MSF is Merredin Solar Farm Nominee Pty Limited (MSFN) (ACN 618 527 432, ABN 69 618 527 432) incorporated in 2017. MSFN is owned 50% by Ingenious Australian Solar Ltd (IASL), 25% by Muick Pty Ltd atf Santen Family Trust (Muick) and 25% by Nomad Renewable Energy Ltd (NRE).

• Ingenious Australian Solar Ltd (IASL) (UK company number 10712137) is a UK limited company wholly owned by Ingenious Capital Management Holdings Ltd (‘Ingenious’) which is a UK limited company based in London. The infrastructure division of Ingenious invests capital into renewable projects and has invested over £500m since 2011 (solar PV, onshore wind and anaerobic digestion) globally.

• Muick Pty Ltd (ACN: 137 460 916) atf Santen Family Trust is an Australian company of which Troy Santen is the sole Director.

• Nomad Renewable Energy Ltd (UK company number 9842866) is a UK limited company of which Guy Beesley is the sole Director.

Page 5: ELECTRICITY GENERATION LICENCE APPLICATION · As IASL is a 50% shareholder of MSFN we do not consider this a significant risk to the current financial position of the company. MSFN

Merredin Solar Farm EGL Application-Public Consultation | Page 4 of 7

Page 4

• Stellata Management Co Pty Ltd (Stellata) are a Western Australian based company who specialise in developing utility scale renewable energy projects. Stellata’s shareholding is identical to that of MSFN. Our team have successfully developed over 530MW of solar parks and commercial roofs across Europe and have managed the construction and energisation of over 600MW of solar PV worldwide.

Stellata is providing development services to MSFN. Stellata’s Board consists of two directors from IASL and one each from Muick and NRE.

MSFN’s core activity is to develop, finance, own and operate the proposed solar farm. MSFN is applying for a generation licence for the 100MWac solar farm and intends that the electricity output shall be sold under a combination of commercial Power Purchase Agreements (PPAs) with Western Australian electricity suppliers and dispatch power in the WEM balancing market.

The MSFN board is made up of four directors, two from IASL, and one each from Muick and NRE none of whom have been or would have been disqualified from managing corporations under the Corporations Act 2001.

The board consists of Sebastian Speight and Baiju Devani (IASL Directors), Guy Beesley (Nomad Renewable Energy Director) and Troy Santen (Muick Director).

Figure 1: Merredin Solar Farm Corporate Structure

3. FINANCIAL INFORMATION

MSFN is classified as a small proprietary company under the Corporations Act 2001 (Cwlth), there is no statutory obligation to prepare and lodge financial reports with ASIC.

MSFN intends to finance its activity through a combination of debt and equity. The total expected capital expenditure of the project is $160m.

It is anticipated that 75% of the project CAPEX will be provided by way of debt (project finance). The company has been in discussions with a range of European and Australian Banks. Nord LB has already financed a number of renewable projects in Australia including Lakeland (15MW solar + storage) in QLD, Wirsol/Edify’s 198MW solar portfolio, 113MW Bodangora Wind Farm NSW, and the 13MW Mugga Lane solar farm ACT.

Page 6: ELECTRICITY GENERATION LICENCE APPLICATION · As IASL is a 50% shareholder of MSFN we do not consider this a significant risk to the current financial position of the company. MSFN

Merredin Solar Farm EGL Application-Public Consultation | Page 5 of 7

Page 5

The equity for the construction will be provided by IASL and Ingenious Estate Planning (IEP) by way of a revolving credit facility.

MSFN is a recently incorporated company established for the purpose of constructing the project and as such has limited financial obligations at this time. To date MSFN has been solely funded through loans from its shareholders. MSFN has provided security to one of its shareholders, IASL, in respect of monies lent under a loan agreement.

IASL has also lent monies to Stellata, a sister company of MSFN. MSFN has provided IASL with a guarantee in respect of the monies borrowed by Stellata.

As IASL is a 50% shareholder of MSFN we do not consider this a significant risk to the current financial position of the company.

MSFN is a special purpose vehicle and its core business activity relates to the generation and sale of electricity, LGCs and capacity credits. The Company will enter into a number of contracts prior to financial close in June 2018 in order to achieve this.

a) Power Purchase Agreements

The Company aims to sell electricity, LGCs and capacity credits to a number of energy retailers active in the WEM. The Company is currently in term sheet discussions with these retailers in order to finalise the off-take agreements.

b) O&M Agreement

The Company will enter into an Operations and Maintenance Contract (O&M contract) with a contractor that can carry out the required operation and maintenance of MSF. For the first 2 years (as a minimum), the O&M services will be provided by the same company that provides the EPC services.

4. TECHNICAL INFORMATION

MSF will have an operational capacity of 100MWac at its POC (metering point) consisting of approximately 406,000 solar PV modules (325Wp polysilicon) covering an area of 360 hectares, with an expected output of 278GWh of electricity per annum.

The solar farm will comprise of solar PV modules installed on aluminium frames, utilising a single-axis tracker system aligned North-South. The tracker system will be supported by driven steel piles and will follow the sun from East to West during a day and will return to a stowage condition after dusk and during high wind conditions.

Electricity generated by the PV modules will be fed via string cabling to combiner boxes and then through to central inverters located within medium voltage (MV) substations. Each MV substation will contain 5MVa of inverters (2 x 2.5MVa SMA sunny central units) which convert direct current (DC) into alternating current (AC). AC electricity is then passed through a transformer which steps up the voltage to 33kV.

Once at 33kV, power is transmitted back to the Customer Substation / Switchroom before stepping up to 220kV and connecting to the SWIS at Western Power’s Merredin Terminal.

The solar farm will be comprised of 22 x 5MWac arrays, a customer substation, on site switchyard and associated Western Power connection assets.

It is anticipated that the metering will be done at 220kV at the common point of coupling with Western Power’s transmission network. Western Power will install a metering breaker along with associated CT/VTs for the purpose of metering the output of the solar farm.

The forecast annual generation for the project is 278GWh in year 1, 276GWh in year 2, 275GWh in year 3, 274GWh in year 4 and 273GWh in year 5.

Western Power (WP) will be the meter operator for the connection.

Page 7: ELECTRICITY GENERATION LICENCE APPLICATION · As IASL is a 50% shareholder of MSFN we do not consider this a significant risk to the current financial position of the company. MSFN

Merredin Solar Farm EGL Application-Public Consultation | Page 6 of 7

Page 6

5. OTHER REGULATORY APPROVALS

The project has received full Developmental Approval (DA) from the Wheatbelt Development Assessment Panel (DAP) on 15 June 2017, subject to a number of conditions.

The Western Power ETAC and IWC are being prepared and are expected to be executed during Q4 2017. The application process involves a number of steps. The early phases are complete and the network studies and scoping phase contract with Western Power was signed on 26 July 2017. The contract target duration is noted as 8 weeks and these works are currently ongoing.

MSFN is in the process of registering with the following organisations:

• Australian Energy Market Operator (AEMO): Registration is sought as a Market Participant with intermittent non-scheduled generators.

• Clean Energy Regulator: Registration will be sought as an accredited power station able to create Renewable Energy Certificates (RECs). The RECs shall be classified as Large-scale Generation Certificates (LGCs).

6. PUBLIC INTEREST INFORMATION

MSFN is committed to engaging with the community and other stakeholders on all of its projects, from inception through to operation. The MSF project has been warmly welcomed by the local landowners, and the Merredin Shire Council were very supportive throughout the Development Application process where no public complaints or objections were raised.

As part of the planning approvals process, a feasibility study was completed to assess the environmental impacts on the surrounding area. The outcomes of the environmental impact assessment determining that there are no significant environmental impacts as a result of the proposed development. Planning Approval for the project was obtained from the DAP on 15 June 2017.

MSFN has engaged with the Merredin Volunteer Fire and Rescue Service and will be discussing the farm layout to ensure that local members concerns are addressed in addition to the regulatory requirements for a Solar Farm in a rural setting.

During construction and O&M, the MSF project will provide local employment opportunities and stimulus to local businesses. We expect a peak of approximately 200 people to be working on site during the construction period, with 2 or 3 permanent staff plus further temporary staff during ongoing operations and maintenance.

MSFN supports initiatives that strengthen the local community and intend to contribute to focus areas that maximise benefits for the Merredin region and surrounding areas.

MSF will add competition to the WEM and increase renewable energy generation within Western Australia as well as contributing to meeting the federal Renewable Energy Target.

7. LICENCE SUPPLY AND OPERATING AREA

MSF is located south of Merredin, on Lot 194 and Lot 19444, approximately 260kms East of Perth, Western Australia. The leased area covers the entirety of lot 194 and covers approximately 168ha of the 238ha of lot 19444. The license area map is attached .

Page 8: ELECTRICITY GENERATION LICENCE APPLICATION · As IASL is a 50% shareholder of MSFN we do not consider this a significant risk to the current financial position of the company. MSFN

PRELIMINARY - Not For Construction

AutoCAD SHX Text
SUB CONTRACTORS
AutoCAD SHX Text
MERREDIN SITE OFFICE
AutoCAD SHX Text
CRIB ROOM
AutoCAD SHX Text
CHANGE ROOM
AutoCAD SHX Text
TOILETS FEMALE
AutoCAD SHX Text
FIRST AID
AutoCAD SHX Text
TOILETS-MALE
AutoCAD SHX Text
RCR SITE OFFICE
AutoCAD SHX Text
SUB CONTRACTORS
AutoCAD SHX Text
SUB CONTRACTORS
AutoCAD SHX Text
ASSEMBLY QUAD
AutoCAD SHX Text
10,000LT TANK
AutoCAD SHX Text
WORKSHOPS
AutoCAD SHX Text
Railway
AutoCAD SHX Text
5
AutoCAD SHX Text
4
AutoCAD SHX Text
15490
AutoCAD SHX Text
5490
AutoCAD SHX Text
Reserve 19476
AutoCAD SHX Text
19363
AutoCAD SHX Text
9363
AutoCAD SHX Text
19444
AutoCAD SHX Text
9444
AutoCAD SHX Text
193
AutoCAD SHX Text
194
AutoCAD SHX Text
SUB CONTRACTORS
AutoCAD SHX Text
MERREDIN SITE OFFICE
AutoCAD SHX Text
CRIB ROOM
AutoCAD SHX Text
CHANGE ROOM
AutoCAD SHX Text
TOILETS FEMALE
AutoCAD SHX Text
FIRST AID
AutoCAD SHX Text
TOILETS-MALE
AutoCAD SHX Text
RCR SITE OFFICE
AutoCAD SHX Text
SUB CONTRACTORS
AutoCAD SHX Text
SUB CONTRACTORS
AutoCAD SHX Text
ASSEMBLY QUAD
AutoCAD SHX Text
10,000LT TANK
AutoCAD SHX Text
WORKSHOPS
AutoCAD SHX Text
193
AutoCAD SHX Text
H
AutoCAD SHX Text
G
AutoCAD SHX Text
F
AutoCAD SHX Text
E
AutoCAD SHX Text
D
AutoCAD SHX Text
C
AutoCAD SHX Text
B
AutoCAD SHX Text
A
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
9
AutoCAD SHX Text
10
AutoCAD SHX Text
11
AutoCAD SHX Text
12
AutoCAD SHX Text
A1
AutoCAD SHX Text
H
AutoCAD SHX Text
G
AutoCAD SHX Text
F
AutoCAD SHX Text
E
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
9
AutoCAD SHX Text
10
AutoCAD SHX Text
D
AutoCAD SHX Text
C
AutoCAD SHX Text
B
AutoCAD SHX Text
11
AutoCAD SHX Text
12
AutoCAD SHX Text
A
AutoCAD SHX Text
DRAWING No.
AutoCAD SHX Text
SHEET No.
AutoCAD SHX Text
DRAWING STATUS
AutoCAD SHX Text
PROJ No.
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
REFERENCE DRAWING No.
AutoCAD SHX Text
REV
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DRN
AutoCAD SHX Text
DETAILS OF REVISION
AutoCAD SHX Text
CHK
AutoCAD SHX Text
APP
AutoCAD SHX Text
CLIENT
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
DESIGN ENG
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
SIGNATURE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
(WHEN PRINTED A1 SIZE)
AutoCAD SHX Text
REFERENCE DRAWING TITLE
AutoCAD SHX Text
REFERENCE DRAWINGS
AutoCAD SHX Text
3rd ANGLE PROJECTION (uno)
AutoCAD SHX Text
TITLE
AutoCAD SHX Text
ALT DRAWING No.
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
THE DESIGN REPRESENTED IN, & THE COPYRIGHT IN, THIS DOCUMENT ARE THE PROPERTY OF RCR TOMLINSON & MAY NOT BE USED, DISCLOSED OR REPRODUCED EXCEPT WITH THE EXPRESS PERMISSION OF RCR TOMLINSON
AutoCAD SHX Text
STELLATA
AutoCAD SHX Text
MERREDIN SOLAR FARM
AutoCAD SHX Text
PROPOSED TRACKER ARRANGEMENT
AutoCAD SHX Text
SITE LAYOUT
AutoCAD SHX Text
A006577-001
AutoCAD SHX Text
SHEET 1 OF 1
AutoCAD SHX Text
8
AutoCAD SHX Text
A006577
AutoCAD SHX Text
PRELIMINARY
AutoCAD SHX Text
NTS
AutoCAD SHX Text
AG
AutoCAD SHX Text
24.07.17
AutoCAD SHX Text
JB
AutoCAD SHX Text
24.07.17
AutoCAD SHX Text
EH
AutoCAD SHX Text
24.07.17
AutoCAD SHX Text
AG
AutoCAD SHX Text
24.07.17
AutoCAD SHX Text
A..........
AutoCAD SHX Text
GENERAL
AutoCAD SHX Text
1
AutoCAD SHX Text
MW
AutoCAD SHX Text
24.07.17
AutoCAD SHX Text
PRELIMINARY DESIGN
AutoCAD SHX Text
JB
AutoCAD SHX Text
EH
AutoCAD SHX Text
THIS DRAWING IS SENT TO YOU IN CONFIDENCE & MUST NOT BE COPIED OR DISCUSSED WITH THIRD PARTIES WITHOUT WRITTEN PERMISSION. WARNING - RCR TOMLINSON RESERVE THE RIGHT TO CHANGE THE INFORMATION IN THIS DRAWING AT IT'S DISCRETION. THE CURRENT LAYOUT IS BASED ON PRELIMINARY INFORMATION, ALL DIMENSIONS NEED TO BE VERIFIED PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION.
AutoCAD SHX Text
FOR TENDER PURPOSES ONLY
AutoCAD SHX Text
PRELIMINARY
AutoCAD SHX Text
SYSTEM SPECIFICATIONS
AutoCAD SHX Text
EFFECTIVE AC CAPACITY @ 25°C
AutoCAD SHX Text
100
AutoCAD SHX Text
MW
AutoCAD SHX Text
DC CAPACITY @ STC
AutoCAD SHX Text
131.87
AutoCAD SHX Text
MW
AutoCAD SHX Text
MODULE CAPACITY
AutoCAD SHX Text
325
AutoCAD SHX Text
W
AutoCAD SHX Text
EFFECTIVE INVERTER CAPACITY
AutoCAD SHX Text
2.27
AutoCAD SHX Text
MW
AutoCAD SHX Text
PCS EFFECTIVE CAPACITY
AutoCAD SHX Text
4.55
AutoCAD SHX Text
MW
AutoCAD SHX Text
DC/AC RATIO
AutoCAD SHX Text
1.32
AutoCAD SHX Text
ROW SPACING
AutoCAD SHX Text
6.5
AutoCAD SHX Text
m
AutoCAD SHX Text
TILT ANGLE
AutoCAD SHX Text
±60°
AutoCAD SHX Text
TOTAL MODULES
AutoCAD SHX Text
405,768
AutoCAD SHX Text
MODULES PER STRING
AutoCAD SHX Text
29
AutoCAD SHX Text
NUMBER OF STRINGS
AutoCAD SHX Text
13,992
AutoCAD SHX Text
NUMBER OF INVERTERS
AutoCAD SHX Text
44
AutoCAD SHX Text
TOTAL OF PCS
AutoCAD SHX Text
22
AutoCAD SHX Text
NUMBER OF MODULES PER TRACKER
AutoCAD SHX Text
87
AutoCAD SHX Text
NUMBER OF STRINGS PER TRACKER
AutoCAD SHX Text
3
AutoCAD SHX Text
NUMBER OF TRACKERS
AutoCAD SHX Text
4,664
AutoCAD SHX Text
EXISTING MERREDIN ENERGY POWER STATION
AutoCAD SHX Text
STELLATA SUBSTATION
AutoCAD SHX Text
SITE ACCESS FROM ACCESS FROM ACCESS FROM FROM FROM ROBARTSON ROAD
AutoCAD SHX Text
CONSTRUCTION COMPOUND
AutoCAD SHX Text
FUTURE PROVISION FOR BATTERY STORAGE, SEE EXPLANATORY NOTE 1
AutoCAD SHX Text
VEGETATION TO BE REMOVED
AutoCAD SHX Text
HV POWER LINES AND EASEMENT
AutoCAD SHX Text
405,768 NO. 325W PV MODULES
AutoCAD SHX Text
HV POWER LINES AND EASEMENT
AutoCAD SHX Text
INDICATIVE BUSHFIRE EXCLUSION ZONE
AutoCAD SHX Text
VEGETATION TO BE RETAINED
AutoCAD SHX Text
BRUCE ROCK - MERREDIN ROAD
AutoCAD SHX Text
5MVA INVERTER STATION
AutoCAD SHX Text
NOTE 1 PROVISION FOR FUTURE BATTERY STORAGE: LAYOUT INCLUDES A PROVISION FOR BATTERY STORAGE THAT MAY BE INSTALLED AT A LATER STAGE. THE BATTERY STORAGE WILL CONSIST OF UP TO 50 NO. 40FOOT SHIPPING CONTAINERS. IT IS ANTICIPATED THAT THE LAYOUT COULD ACCOMMODATE UP TO 50MWH SUBJECT TO PROJECT FUNDING AND APPROVAL
AutoCAD SHX Text
MV POWER LINES AND EASEMENT
AutoCAD SHX Text
PERIMETER FENCE
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PLAN VIEW SITE SCALE 1:7500
AutoCAD SHX Text
2
AutoCAD SHX Text
MW
AutoCAD SHX Text
25.07.17
AutoCAD SHX Text
INVERTERS ADDED
AutoCAD SHX Text
JB
AutoCAD SHX Text
EH
AutoCAD SHX Text
3
AutoCAD SHX Text
MW
AutoCAD SHX Text
02.08.17
AutoCAD SHX Text
MODULES MOVED
AutoCAD SHX Text
JB
AutoCAD SHX Text
EH
AutoCAD SHX Text
EXISTING MERREDIN 220/132kV SUBSTATION (MRT)
AutoCAD SHX Text
4
AutoCAD SHX Text
AG
AutoCAD SHX Text
18.08.17
AutoCAD SHX Text
SUBSTATION MOVED
AutoCAD SHX Text
JB
AutoCAD SHX Text
EH
AutoCAD SHX Text
EXTRA 5.14 MW DC (15 Ha)
AutoCAD SHX Text
5
AutoCAD SHX Text
AG
AutoCAD SHX Text
28.08.17
AutoCAD SHX Text
DC/AC RATIO & ROW SPACING UPDATED
AutoCAD SHX Text
JB
AutoCAD SHX Text
EH
AutoCAD SHX Text
6
AutoCAD SHX Text
AG
AutoCAD SHX Text
30.08.17
AutoCAD SHX Text
PANELS MOVED
AutoCAD SHX Text
JB
AutoCAD SHX Text
EH
AutoCAD SHX Text
7
AutoCAD SHX Text
AG
AutoCAD SHX Text
05.09.17
AutoCAD SHX Text
DESIGN UPDATED
AutoCAD SHX Text
JB
AutoCAD SHX Text
EH
AutoCAD SHX Text
WESTERN POWER SUBSTATION
AutoCAD SHX Text
8
AutoCAD SHX Text
AG
AutoCAD SHX Text
12.09.17
AutoCAD SHX Text
DESIGN UPDATED
AutoCAD SHX Text
JB
AutoCAD SHX Text
EH
AutoCAD SHX Text
POWER CONVERTER STATION SCALE 1:600
AutoCAD SHX Text
CONSTRUCTION COMPOUND SCALE 1:2000