10
CONST CONC CONN COMM INCAND IN WC HORIZ FLUOR EQUIP EXIST CONTR CONT COMBINATION FIRE/SMOKE DAMPER 1 CAT-3 CABLE SWITCH MOTOR DUPLEX RECEPTACLE MOUNTED 8" ABOVE COUNTERTOP U.N.O. ISOLATED GROUND DUPLEX RECEPTACLE OVERLOAD AND PILOT LIGHT QUADRAPLEX RECEPTACLE (TWO DUPLEX UNDER COMMON WALL MOUNTED OCCUPANCY WITH INTEGRAL MANUAL OVERRIDE (SUBSCRIPT "3, 4, D OR P" DENOTES 3-WAY, 4-WAY, MANUAL MOTOR STARTER SWITCH WITH THERMAL COMBINATION MOTOR CONTROLLER/DISCONNECT DIMMER OR PA SYSTEM CALL-IN, RESPECTIVELY) DUPLEX RECEPTACLE JUNCTION BOX FIRE ALARM PULL STATION WALL MOUNTED TV OUTLET FIRE ALARM AUDIBLE/VISUAL DEVICE WALL MOUNTED JUNCTION BOX 8" ABOVE COUNTERTOP U.N.O.) CAT-3 AND CAT-5E CABLES CEILING MOUNTED OCCUPANCY SENSOR AND TELEPHONE PROVISIONS/CONNECTIONS DATA OUTLET (* INDICATES MOUNTED 8" ABOVE COMBINATION TELEPHONE/DATA OUTLET (* INDICATES MOUNTED FLOOR MOUNTED POKE-THRU DEVICE WITH POWER, DATA, DUPLEX RECEPTACLE, GROUND FAULT INTERRUPTER TYPE CONDUIT HOMERUN TO PANEL (2#12, 1#12G, 3/4"C UNO) SPECIAL PURPOSE RECEPTACLE (COORDINATE EXACT TYPE WITH COUNTERTOP U.N.O.) CAT - 5E CABLES EQUIPMENT SUPPLIER) TELEPHONE OUTLET (SUBSCRIPT "W" DENOTES WALL MOUNTED AT 48" A.F.F., * INDICATES MOUNTED 8" ABOVE COUNTERTOP U.N.O.) BELL / BUZZER PAGING SYSTEM SPEAKER FIRE ALARM VISUAL DEVICE SECONDARY CLOCK, DOUBLE FACE SECURITY SYSTEM KEYPAD OUTLET SECURITY SYSTEM MOTION SENSOR OUTLET, WALL MTD. SECURITY SYSTEM MOTION SENSOR OUTLET, CLG. MTD. FIRE ALARM SMOKE DETECTOR (SUBSCRIPT "S" DENOTES SUPPLY DUCT DETECTOR, SUBSCRIPT "R" DENOTES RETURN DUCT DETECTOR) ATOMIC WALL CLOCK SMOKE DOOR HOLDER SWITCH SWITCH COVER) M M NOTES: TEMPERATURE SENSOR EMER IN KW KA KVA HVAC HWS IG HWC HWR HTG HP HD FL GPH H GPM GFCI GFI GCR GEN GAL GA GALV F/B F/A G FS FT FN FPVV FPM EXP FD FIXT FF FDR FD FCU FA FA ) EXH EWT ESP EQ EL ELEV ELEC DIFF EA EER EDH EC EAT DS DWG DTL DN D DFU DIA DC DB CWS CWR CW CVO COP CR CU EXHAUST DUCT UP CT CT M MVD 48" A.F.F. AS REQD. SP - 48" AFF 48" AFF 18" AFF -- 18" AFF 18" AFF SUPPLY DUCT UP STATIC PRESSURE SENSOR RETURN DUCT UP RETURN DUCT DOWN EXHAUST DUCT DOWN SUPPLY DUCT DOWN MOTORIZED DAMPER MANUAL VOLUME DAMPER M SD M -- 18" AFF AS REQ'D 18" AFF AS REQ'D AS REQ'D 18" AFF 18" AFF 18" AFF 96" AFF 80" AFF 48" AFF THERMOSTAT CHECK VALVE BALL VALVE SOLENOID VAVLE GATE VALVE DUCT MOUNTED SMOKE DETECTOR STRAINER WITH BALL VALVE BLOW DOWN THERMOMETER WITH BRASS WELL CHILLED WATER SUPPLY MOTORIZED 3-WAY VALVE BUTTERFLY VALVE MOTORIZED BUTTERFLY VALVE POWER AND SYSTEMS FIRE ALARM DEVICES CEILING 80" AFF 96" AFF 96" AFF 48" AFF 96" AFF FIRE LINE CONDENSER WATER SUPPLY CHILLED WATER RETURN CONDENSATE DRAIN HEATING HOT WATER RETURN HEATING HOT WATER SUPPLY CONDENSER WATER RETURN AIR LINE GAS LINE EMERGENCY LIGHT SAFETY CIRCUIT DOWN LIGHT FIXTURES ON EMERGENCY CIRCUIT CEILING OR WALL MOUNTED. EXIT LIGHT CEILING OR WALL MTD., SHADING FLUORESCENT FIXTURE DOWN LIGHT FIXTURES CLG. OR WALL MTD. WALL WASHER LIGHT FIXTURE CEILING MTD. FLUORESCENT FIXTURE ON EMERGENCY LIFE NEMA SIZE 3-POLE, 30A. FUSE MOTOR STARTER FVNR UNO; NUMBER INDICATES CIRCUIT BREAKER DISCONNECT SWITCH - THERMAL MAGNETIC CB IN NEMA 1 ENCLOSURE; AMPS/POLES DISCONNECT SWITCH - 30/-/3 INDICATES 30A., 3-POLE, NONFUSED: 30/30/3 INDICATES 30A., AS INDICATED AS INDICATED INDICATING SINGLE OR DOUBLE FACE, DIRECTION SYMBOL CFH CKT COL CLG CO CI CHS CHR CFM ABV AT BTUH CB CD CAT C BLDG BTU AUX AV AFF AHU AMB AIC AFG AC AF ADJ A/C ABC ABS A DESCRIPTION SYMBOL PIPE TURN DOWN DOMESTIC HOT WATER (HW) DOMESTIC COLD WATER (CW) 5281' (/%2: '2:1 SANITARY SEWER DOMESTIC HOT WATER RECIRCULATION CLEANOUT PIPE TURN UP GREASE WASTE FCO FD FLOOR CLEANOUT BALL VALVE FLOOR DRAIN WALL CLEANOUT DESCRIPTION SYMBOL UNO MTG. HEIGHT SIZE TRANSITION RECTANGULAR TO ROUND AND SIZE TRANSITION RECTANGULAR ELBOW WITH TURNING VANES 5$',86 (/%2: 5281' 25 5(&7$1*8/$5 (/%2: 5281' 25 5(&7$1*8/$5 FLEXIBLE DUCT CONNECTION 5281' (/%2: '2:1 5281' (/%2: 83 DESCRIPTION LIGHTING FIXTURES C CFM E CFM AS REQD. AS REQD. AS REQD. FIRE DAMPER SMOKE DAMPER DISCONNECTS AND MOTORS 9" BFC A CFM SUPPLY AIR DIFFUSER WITH FLEXIBLE DUCT CONNECTION. 4-WAY THROW UNLESS NOTED OTHERWISE. TYPE AND CFM INDICATED ON PLANS. CEILING RETURN AIR GRILLE. TYPE AND CFM INDICATED ON PLANS. CEILING EXHAUST AIR GRILLE. TYPE AND CFM INDICATED ON PLANS. CONTINUOUS OC ON CENTER RQMT EMERGENCY REQUIREMENT HEIGHT VERT XFMR INCHES INCHES WATER COLUMN KILOWATT KILOVOLT AMPERES KILOAMPERES INCANDESCENT HOT WATER RECIRCULATION (DOMESTIC) HOT WATER SUPPLY ISOLATED GROUND HOT WATER RETURN HORSEPOWER HORIZONTAL HEATING HEAD HEATING, VENTILATION, & AIR CONDITIONING WP Y WT WPO VV WB WH W W VTR VT VPO VARIABLE VOLUME TERMINAL UNIT WEATHERPROOF WASTE PLUGGED OPENING TRANSFORMER WYE WEIGHT VENT THRU THE ROOF VENT PLUGGED OPENING WATER HEATER WET BULB WATTS WIDTH VENT VERTICAL SENS SEER SPECS SHT MTL SQFT SS, SAN SPKR SWGR SWBD SURF T-STAT VENTIL EXPANSION FIRE DAMPER FINISH FLOOR FLOOR DRAIN FIXTURE FEEDER DEGREES FAHRENHEIT FAN COIL UNIT FREE AREA FIRE ALARM ENTERING WATER TEMPERATURE EXTERNAL STATIC PRESSURE EQUIPMENT EXHAUST EXISTING EQUAL GROUND FAULT CIRCUIT INTERRUPTER GROUND FAULT INTERRUPTER GALLONS PER MINUTE GALLONS PER HOUR GENERAL CONTRACTOR GENERATOR GALVANIZED GALLONS GAUGE FROM BELOW FROM ABOVE FUSED SWITCH GROUND FEET FEET PER MINUTE FULL NEUTRAL FLUORESCENT FLOW LINE FAN POWERED VARIABLE VOLUME TERMINAL UNIT STD VA VAV VA V UNO V UF TTB TYP TELE TC TOT SYM SW SFU SSC SQ SP SHT RTU SD SA RT STANDARD TELEPHONE TERMINAL BOARD UNLESS NOTED OTHERWISE TOTAL (BTU) VARIABLE AIR VOLUME VENTILATION VOLT-AMPS UNDERFLOOR VOLT VALVE VACUUM TYPICAL TELEPHONE TIMECLOCK SYMMETRICAL THERMOSTAT SWITCHGEAR SWITCHBOARD SURFACE SWITCH SEASONAL ENERGY EFFICIENCY RATIO SUPPLY FIXTURE UNITS SHORT CIRCUIT CURRENT SANITARY SEWER SQUARE FEET SPECIFICATIONS STATIC PRESSURE SHEET METAL SPEAKER SQUARE SHEET ROOF TOP UNIT SUPPLY AIR SENSIBLE (BTU) STORM DRAIN RAINTIGHT PERF PLBG REQ'D REFR RM ELEVATION ELEVATOR ELECTRICAL RPM RMS COEFFICIENT OF PERFORMANCE CURRENT TRANSFORMER COOLING TOWER CARD READER CONTRACTOR DIFFUSER ENTERING AIR TEMPERATURE ENERGY EFFICIENCY RATIO ELECTRICAL CONTRACTOR EACH ELECTRIC DUCT HEATER DOWNSPOUT DRAWING DETAIL DOWN DRAINAGE FIXTURE UNITS COLD WATER VALVED OPENING CONDENSER WATER SUPPLY CONDENSER WATER RETURN DEPTH DIRECT CURRENT DRY BULB DIAMETER COLD WATER CONDENSING UNIT PWR REC RLA REF QTY R/A RCP RCP PNL PVC PSIG PSIA PSI PH PF ODS OZ PD PE P OD ROOM ROOT MEAN SQUARED RPM PRESSURE DROP POUNDS PER SQUARE INCH-GAUGE POUNDS PER SQUARE INCH-ABSOLUTE REFORCED CONCRETE PIPE POUNDS PER SQUARE INCH POWER RUNNING LOAD AMPS REFLECTED CEILING PLAN RECEPTACLE REFRIGERATOR REFERENCE RETURN AIR REQUIRED QUANTITY POLYVINYL CHLORIDE PERFORATED POWER FACTOR PANEL PLUMBING PHASE OVERFLOW DOWNSPOUT PHOTO-ELECTRIC OUTSIDE DIAMETER POLES OUNCE LIN FT MBTUH MECH MISC MTRZD NEMA NFPA CUBIC FEET PER HOUR CONSTRUCTION CONCRETE CONNECT CUBIC FEET PER MINUTE COMMUNICATION CLEAN OUT CIRCUIT COLUMN CEILING CHILLED WATER SUPPLY CHILLED WATER RETURN CAST IRON NO OBD OA NEC NO NIC NC NA N MVD ABOVE COUNTER AMPS, AMPERE ABS AMP TRIP BRITISH THERMAL UNIT PER HOUR CIRCUIT BREAKER CONDENSATE DRAIN CATALOGUE CONDUIT BRITISH THERMAL UNIT AUDIO VISUAL AUXILIARY, AUXILIARIES BUILDING AMPERES INTERRUPTING CAPACITY ABOVE FINISH FLOOR AIR HANDLING UNIT ABOVE FINISH GRADE AMBIENT AMP FRAME ALTERNATING CURRENT AIR CONDITIONER ADJACENT ABOVE LAT MCF MTL MTR MTG MTD MIN MIC MCM MA MCC MCB MAX LWT LTG LB LAT KWH L MOTORIZED NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION NATIONAL FIRE PROTECTION ASSOCIATION OPPOSED BLADE DAMPER NATIONAL ELECTRICAL CODE MANUAL VOLUME DAMPER NORMALLY OPEN OUTSIDE AIR NUMBER NOT IN CONTRACT NORMALLY CLOSED NOT APPLICABLE NEUTRAL LATENT (BTU) LEAVING WATER TEMPERATURE THOUSAND CUBIC FEET THOUSAND CIRCULAR MILS MISCELLANEOUS MICROPHONE MECHANICAL MOUNTING MOUNTED METAL MOTOR MINIMUM MOTOR CONTROL CENTER MAIN CIRCUIT BREAKER MILI AMPS LINEAR FOOT POUNDS (WEIGHT) MAXIMUM LIGHTING LEAVING AIR TEMPERATURE KILOWATT - HOUR LENGTH 9" BFC ELECTRICAL SYMBOLS HVAC LEGEND PLUMBING LEGEND ABBREVIATIONS 1. PROVIDE 3/4"C FROM SECURITY, TELEPHONE AND DATA OUTLETS TO ABOVE NEAREST ACCESSIBLE LAY-IN CEILING. REFER TO SPECIFICATIONS FOR WIRING REQUIREMENTS. 2. MOUNT FIRE ALARM AUDIBLE/VISUAL AND VISUAL ONLY DEVICES AT 80"AFF UNLESS OTHERWISE REQUIRED BY AMERICANS WITH DISABILITIES ACT REQUIREMENTS. CO WCO S K C S F F F MS J GFI IG A GW SS TS S CHS CHR CWS CWS HWS HWR D F G PROJECT NUMBER DATE SHEET TITLE REV. # DESCRIPTION DATE 1 2 3 4 5 SHEET NUMBER 402 Parker Street McKinney, Texas t 972.302.9747 conduitad.com 4144 N. Central Expressway, Suite 380 Dallas, Texas 75204 Ph: 214.428.7744 Fax: 214.428.7770 www.mezaengineeringinc.com Project: MEZA ENGINEERING, INC. Texas Registered Engineering Firm F-345 15006.000

ELECTRICAL SYMBOLS HVAC LEGEND …storage.cloversites.com/bluestonepartnersllc/documents/CD MEP Set...data outlet (* indicates mounted 8" above ... flow line fan powered variable

  • Upload
    vutram

  • View
    301

  • Download
    15

Embed Size (px)

Citation preview

Page 1: ELECTRICAL SYMBOLS HVAC LEGEND …storage.cloversites.com/bluestonepartnersllc/documents/CD MEP Set...data outlet (* indicates mounted 8" above ... flow line fan powered variable

CONST

CONC

CONN

COMM

INCAND

IN WC

HORIZ

FLUOR

EQUIP

EXIST

CONTR

CONT

COMBINATION FIRE/SMOKE DAMPER

1 CAT-3 CABLE

SWITCH

MOTOR

DUPLEX RECEPTACLE MOUNTED 8" ABOVE COUNTERTOP U.N.O.

ISOLATED GROUND DUPLEX RECEPTACLE

OVERLOAD AND PILOT LIGHT

QUADRAPLEX RECEPTACLE (TWO DUPLEX UNDER COMMON

WALL MOUNTED OCCUPANCY WITH INTEGRAL MANUAL OVERRIDE

(SUBSCRIPT "3, 4, D OR P" DENOTES 3-WAY, 4-WAY,

MANUAL MOTOR STARTER SWITCH WITH THERMAL

COMBINATION MOTOR CONTROLLER/DISCONNECT

DIMMER OR PA SYSTEM CALL-IN, RESPECTIVELY)

DUPLEX RECEPTACLE

JUNCTION BOX

FIRE ALARM PULL STATION

WALL MOUNTED TV OUTLET

FIRE ALARM AUDIBLE/VISUAL DEVICE

WALL MOUNTED JUNCTION BOX

8" ABOVE COUNTERTOP U.N.O.) CAT-3 AND CAT-5E CABLES

CEILING MOUNTED OCCUPANCY SENSOR

AND TELEPHONE PROVISIONS/CONNECTIONS

DATA OUTLET (* INDICATES MOUNTED 8" ABOVE

COMBINATION TELEPHONE/DATA OUTLET (* INDICATES MOUNTED

FLOOR MOUNTED POKE-THRU DEVICE WITH POWER, DATA,

DUPLEX RECEPTACLE, GROUND FAULT INTERRUPTER TYPE

CONDUIT HOMERUN TO PANEL (2#12, 1#12G, 3/4"C UNO)

SPECIAL PURPOSE RECEPTACLE (COORDINATE EXACT TYPE WITH

COUNTERTOP U.N.O.) CAT - 5E CABLES

EQUIPMENT SUPPLIER)

TELEPHONE OUTLET (SUBSCRIPT "W" DENOTES WALL MOUNTED AT

48" A.F.F., * INDICATES MOUNTED 8" ABOVE COUNTERTOP U.N.O.)

BELL / BUZZER

PAGING SYSTEM SPEAKER

FIRE ALARM VISUAL DEVICE

SECONDARY CLOCK, DOUBLE FACE

SECURITY SYSTEM KEYPAD OUTLET

SECURITY SYSTEM MOTION SENSOR OUTLET, WALL MTD.

SECURITY SYSTEM MOTION SENSOR OUTLET, CLG. MTD.

FIRE ALARM SMOKE DETECTOR (SUBSCRIPT "S" DENOTES SUPPLY

DUCT DETECTOR, SUBSCRIPT "R" DENOTES RETURN DUCT DETECTOR)

ATOMIC WALL CLOCK

SMOKE DOOR HOLDER

SWITCH

SWITCH

COVER)

M

M

NOTES:

TEMPERATURE SENSOR

EMER

IN

KW

KA

KVA

HVAC

HWS

IG

HWC

HWR

HTG

HP

HD

FL

GPH

H

GPM

GFCI

GFI

GCR

GEN

GAL

GA

GALV

F/B

F/A

G

FS

FT

FN

FPVV

FPM

EXP

FD

FIXT

FF

FDR

FD

FCU

FA

FA

°F

EXH

EWT

ESP

EQ

EL

ELEV

ELEC

DIFF

EA

EER

EDH

EC

EAT

DS

DWG

DTL

DN

D

DFU

DIA

DC

DB

CWS

CWR

CW

CVO

COP

CR

CU

EXHAUST DUCT UP

CT

CT

M

MVD

48" A.F.F.

AS REQD.

SP

-

48" AFF

48" AFF

18" AFF

--

18" AFF

18" AFF

SUPPLY DUCT UP

STATIC PRESSURE SENSOR

RETURN DUCT UP

RETURN DUCT DOWN

EXHAUST DUCT DOWN

SUPPLY DUCT DOWN

MOTORIZED DAMPER

MANUAL VOLUME DAMPER

M

SD

M

--

18" AFF

AS REQ'D

18" AFF

AS REQ'D

AS REQ'D

18" AFF

18" AFF

18" AFF

96" AFF

80" AFF

48" AFF

THERMOSTAT

CHECK VALVE

BALL VALVE

SOLENOID VAVLE

GATE VALVE

DUCT MOUNTED SMOKE DETECTOR

STRAINER WITH BALL VALVE BLOW DOWN

THERMOMETER WITH BRASS WELL

CHILLED WATER SUPPLY

MOTORIZED 3-WAY VALVE

BUTTERFLY VALVE

MOTORIZED BUTTERFLY VALVE

POWER AND SYSTEMS

FIRE ALARM DEVICES

CEILING

80" AFF

96" AFF

96" AFF

48" AFF

96" AFF

FIRE LINE

CONDENSER WATER SUPPLY

CHILLED WATER RETURN

CONDENSATE DRAIN

HEATING HOT WATER RETURN

HEATING HOT WATER SUPPLY

CONDENSER WATER RETURN

AIR LINE

GAS LINE

EMERGENCY LIGHT

SAFETY CIRCUIT

DOWN LIGHT FIXTURES ON EMERGENCY CIRCUIT

CEILING OR WALL MOUNTED.

EXIT LIGHT CEILING OR WALL MTD., SHADING

FLUORESCENT FIXTURE

DOWN LIGHT FIXTURES CLG. OR WALL MTD.

WALL WASHER LIGHT FIXTURE CEILING MTD.

FLUORESCENT FIXTURE ON EMERGENCY LIFE

NEMA SIZE

3-POLE, 30A. FUSE

MOTOR STARTER FVNR UNO; NUMBER INDICATES

CIRCUIT BREAKER DISCONNECT SWITCH - THERMAL

MAGNETIC CB IN NEMA 1 ENCLOSURE; AMPS/POLES

DISCONNECT SWITCH - 30/-/3 INDICATES 30A.,

3-POLE, NONFUSED: 30/30/3 INDICATES 30A.,

AS INDICATED

AS INDICATED

INDICATING SINGLE OR DOUBLE FACE, DIRECTION

SYMBOL

CFH

CKT

COL

CLG

CO

CI

CHS

CHR

CFM

ABV

AT

BTUH

CB

CD

CAT

C

BLDG

BTU

AUX

AV

AFF

AHU

AMB

AIC

AFG

AC

AF

ADJ

A/C

ABC

ABS

A

DESCRIPTIONSYMBOL

PIPE TURN DOWN

DOMESTIC HOT WATER (HW)

DOMESTIC COLD WATER (CW)

ROUND 90° ELBOW DOWN

SANITARY SEWER

DOMESTIC HOT WATER RECIRCULATION

CLEANOUT

PIPE TURN UP

GREASE WASTE

FCO

FD

FLOOR CLEANOUT

BALL VALVE

FLOOR DRAIN

WALL CLEANOUT

DESCRIPTIONSYMBOL

UNO

MTG. HEIGHT

SIZE TRANSITION

RECTANGULAR TO ROUND AND SIZE TRANSITION

RECTANGULAR ELBOW WITH TURNING VANES

90° RADIUS ELBOW, ROUND OR RECTANGULAR

45° ELBOW, ROUND OR RECTANGULAR

FLEXIBLE DUCT CONNECTION

ROUND 90° ELBOW DOWN

ROUND 90° ELBOW UP

DESCRIPTION

LIGHTING FIXTURES

C CFM

E CFM

AS REQD.

AS REQD.

AS REQD.

FIRE DAMPER

SMOKE DAMPER

DISCONNECTS AND MOTORS

9" BFC

ACFM

SUPPLY AIR DIFFUSER WITH FLEXIBLE DUCT CONNECTION. 4-WAY THROW

UNLESS NOTED OTHERWISE. TYPE AND CFM INDICATED ON PLANS.

CEILING RETURN AIR GRILLE. TYPE AND CFM INDICATED ON PLANS.

CEILING EXHAUST AIR GRILLE. TYPE AND CFM INDICATED ON PLANS.

CONTINUOUSOC ON CENTER

RQMTEMERGENCY

REQUIREMENT

HEIGHT

VERT

XFMR

INCHES

INCHES WATER COLUMN

KILOWATT

KILOVOLT AMPERES

KILOAMPERES

INCANDESCENT

HOT WATER RECIRCULATION (DOMESTIC)

HOT WATER SUPPLY

ISOLATED GROUND

HOT WATER RETURN

HORSEPOWER

HORIZONTAL

HEATING

HEAD

HEATING, VENTILATION, & AIR CONDITIONING

WP

Y

WT

WPO

VV

WB

WH

W

W

VTR

VT

VPO

VARIABLE VOLUME TERMINAL UNIT

WEATHERPROOF

WASTE PLUGGED OPENING

TRANSFORMER

WYE

WEIGHT

VENT THRU THE ROOF

VENT PLUGGED OPENING

WATER HEATER

WET BULB

WATTS

WIDTH

VENT

VERTICAL

SENS

SEER

SPECS

SHT MTL

SQFT

SS, SAN

SPKR

SWGR

SWBD

SURF

T-STAT

VENTIL

EXPANSION

FIRE DAMPER

FINISH FLOOR

FLOOR DRAIN

FIXTURE

FEEDER

DEGREES FAHRENHEIT

FAN COIL UNIT

FREE AREA

FIRE ALARM

ENTERING WATER TEMPERATURE

EXTERNAL STATIC PRESSURE

EQUIPMENT

EXHAUST

EXISTING

EQUAL

GROUND FAULT CIRCUIT INTERRUPTER

GROUND FAULT INTERRUPTER

GALLONS PER MINUTE

GALLONS PER HOUR

GENERAL CONTRACTOR

GENERATOR

GALVANIZED

GALLONS

GAUGE

FROM BELOW

FROM ABOVE

FUSED SWITCH

GROUND

FEET

FEET PER MINUTE

FULL NEUTRAL

FLUORESCENT

FLOW LINE

FAN POWERED VARIABLE VOLUME TERMINAL UNIT

STD

VA

VAV

VA

V

UNO

V

UF

TTB

TYP

TELE

TC

TOT

SYM

SW

SFU

SSC

SQ

SP

SHT

RTU

SD

SA

RT

STANDARD

TELEPHONE TERMINAL BOARD

UNLESS NOTED OTHERWISE

TOTAL (BTU)

VARIABLE AIR VOLUME

VENTILATION

VOLT-AMPS

UNDERFLOOR

VOLT

VALVE

VACUUM

TYPICAL

TELEPHONE

TIMECLOCK

SYMMETRICAL

THERMOSTAT

SWITCHGEAR

SWITCHBOARD

SURFACE

SWITCH

SEASONAL ENERGY EFFICIENCY RATIO

SUPPLY FIXTURE UNITS

SHORT CIRCUIT CURRENT

SANITARY SEWER

SQUARE FEET

SPECIFICATIONS

STATIC PRESSURE

SHEET METAL

SPEAKER

SQUARE

SHEET

ROOF TOP UNIT

SUPPLY AIR

SENSIBLE (BTU)

STORM DRAIN

RAINTIGHT

PERF

PLBG

REQ'D

REFR

RM ELEVATION

ELEVATOR

ELECTRICAL

RPM

RMS

COEFFICIENT OF PERFORMANCE

CURRENT TRANSFORMER

COOLING TOWER

CARD READER

CONTRACTOR

DIFFUSER

ENTERING AIR TEMPERATURE

ENERGY EFFICIENCY RATIO

ELECTRICAL CONTRACTOR

EACH

ELECTRIC DUCT HEATER

DOWNSPOUT

DRAWING

DETAIL

DOWN

DRAINAGE FIXTURE UNITS

COLD WATER VALVED OPENING

CONDENSER WATER SUPPLY

CONDENSER WATER RETURN

DEPTH

DIRECT CURRENT

DRY BULB

DIAMETER

COLD WATER

CONDENSING UNIT

PWR

REC

RLA

REF

QTY

R/A

RCP

RCP

PNL

PVC

PSIG

PSIA

PSI

PH

PF

ODS

OZ

PD

PE

P

OD

ROOM

ROOT MEAN SQUARED

RPM

PRESSURE DROP

POUNDS PER SQUARE INCH-GAUGE

POUNDS PER SQUARE INCH-ABSOLUTE

REFORCED CONCRETE PIPE

POUNDS PER SQUARE INCH

POWER

RUNNING LOAD AMPS

REFLECTED CEILING PLAN

RECEPTACLE

REFRIGERATOR

REFERENCE

RETURN AIR

REQUIRED

QUANTITY

POLYVINYL CHLORIDE

PERFORATED

POWER FACTOR

PANEL

PLUMBING

PHASE

OVERFLOW DOWNSPOUT

PHOTO-ELECTRIC

OUTSIDE DIAMETER

POLES

OUNCE

LIN FT

MBTUH

MECH

MISC

MTRZD

NEMA

NFPA

CUBIC FEET PER HOUR

CONSTRUCTION

CONCRETE

CONNECT

CUBIC FEET PER MINUTE

COMMUNICATION

CLEAN OUT

CIRCUIT

COLUMN

CEILING

CHILLED WATER SUPPLY

CHILLED WATER RETURN

CAST IRON

NO

OBD

OA

NEC

NO

NIC

NC

NA

N

MVD

ABOVE COUNTER

AMPS, AMPERE

ABS

AMP TRIP

BRITISH THERMAL UNIT PER HOUR

CIRCUIT BREAKER

CONDENSATE DRAIN

CATALOGUE

CONDUIT

BRITISH THERMAL UNIT

AUDIO VISUAL

AUXILIARY, AUXILIARIES

BUILDING

AMPERES INTERRUPTING CAPACITY

ABOVE FINISH FLOOR

AIR HANDLING UNIT

ABOVE FINISH GRADE

AMBIENT

AMP FRAME

ALTERNATING CURRENT

AIR CONDITIONER

ADJACENT

ABOVE LAT

MCF

MTL

MTR

MTG

MTD

MIN

MIC

MCM

MA

MCC

MCB

MAX

LWT

LTG

LB

LAT

KWH

L

MOTORIZED

NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION

NATIONAL FIRE PROTECTION ASSOCIATION

OPPOSED BLADE DAMPER

NATIONAL ELECTRICAL CODE

MANUAL VOLUME DAMPER

NORMALLY OPEN

OUTSIDE AIR

NUMBER

NOT IN CONTRACT

NORMALLY CLOSED

NOT APPLICABLE

NEUTRAL

LATENT (BTU)

LEAVING WATER TEMPERATURE

THOUSAND CUBIC FEET

THOUSAND CIRCULAR MILS

MISCELLANEOUS

MICROPHONE

MECHANICAL

MOUNTING

MOUNTED

METAL

MOTOR

MINIMUM

MOTOR CONTROL CENTER

MAIN CIRCUIT BREAKER

MILI AMPS

LINEAR FOOT

POUNDS (WEIGHT)

MAXIMUM

LIGHTING

LEAVING AIR TEMPERATURE

KILOWATT - HOUR

LENGTH

9" BFC

ELECTRICAL SYMBOLS HVAC LEGEND PLUMBING LEGEND ABBREVIATIONS

1. PROVIDE 3/4"C FROM SECURITY, TELEPHONE AND DATA OUTLETS TO ABOVE NEAREST

ACCESSIBLE LAY-IN CEILING. REFER TO SPECIFICATIONS FOR WIRING

REQUIREMENTS.

2. MOUNT FIRE ALARM AUDIBLE/VISUAL AND VISUAL ONLY DEVICES AT 80"AFF UNLESS

OTHERWISE REQUIRED BY AMERICANS WITH DISABILITIES ACT REQUIREMENTS.

CO

WCO

S

K

C

S

F

F

F

MS

J

GFI

IG

A

GW

SS

TS

S

CHS

CHR

CWS

CWS

HWS

HWR

D

F

G

PROJECT NUMBER

DATE

SHEET TITLE

REV. # DESCRIPTION DATE 1

2

3

4

5

SHEET NUMBER

402 Parker Street M

cKinney, Texas

t 972.302.9747

conduitad.com

4144 N. Central Expressway, Suite 380

Dallas, Texas 75204

Ph: 214.428.7744

Fax: 214.428.7770

www.mezaengineeringinc.com

Project:

MEZA ENGINEERING, INC.Texas Registered Engineering Firm F-345

15006.000

Page 2: ELECTRICAL SYMBOLS HVAC LEGEND …storage.cloversites.com/bluestonepartnersllc/documents/CD MEP Set...data outlet (* indicates mounted 8" above ... flow line fan powered variable

16. MAJOR CHANGES TO THE SYSTEMS ARRANGED AS SHOWN ON THE DRAWINGS, IF

DURING A 1-YEAR WRITTEN LABOR AND MATERIALS WARRANTY PERIOD TO BE

B. DUCTWORK, GRILLES AND ALL ACCESSORIES

A. ALL WARRANTY CERTIFICATES ISSUED SHALL BE TRANSMITTED IN WRITING TO

4. THE CONTRACTOR SHALL COORDINATE WITH AND NOTIFY THE OWNER'S

REPRESENTATIVE FOR APPROVAL AND SCHEDULING OF ANY BUILDING SYSTEM

INTERRUPTIONS OR WORK INVOLVING EXISTING AREAS. (INCLUDING NOISE, DUST,

ETC.). THE CONTRACTOR SHALL RECOGNIZE ANY EXISTING BUILDING EQUIPMENT

WARRANTIES PRIOR TO MODIFICATION OR CONNECTION TO SAME .

5. ALL EQUIPMENT SHALL BE NEW, UNLESS NOTED OTHERWISE, AND INSTALLED IN

ACCORDANCE WITH MANUFACTURER'S PUBLISHED RECOMMENDATIONS FOR THE

SERVICE INTENDED. PROVIDE ONLY PRODUCTS BEARING UNDERWRITERS

LABORATORIES (UL) LABEL AS APPLICABLE.

EQUIPMENT PRIOR TO PLACING ORDERS. SHOULD THE CONTRACTOR SUPPLY

EQUIPMENT DIFFERING FROM THE SCHEDULED OR SPECIFIED ITEMS IN THE CONTRACT

REMEDY ANY DEFICIENCIES ARISING FROM SAME.

7. PROVIDE FIVE COPIES OF CLEARLY MARKED SUBMITTAL DATA ON THE FOLLOWING

ITEMS AND AS REQUESTED BY THE ENGINEER:

C. PLUMBING EQUIPMENT, FIXTURES & TRIM

8. MATERIALS, WORKMANSHIP, AND INSTALLATION METHODS SHALL COMPLY WITH THE

CONTRACT DOCUMENTS AND ALL CURRENT APPLICABLE CODES AND STANDARDS.

SHOULD THE CONTRACTOR PROVIDE ANY ITEM OR PERFORM ANY WORK THAT DOES

NOT COMPLY WITH THE REQUIREMENTS OF CURRENT APPLICABLE CODES AND

STANDARDS, HE SHALL BEAR ALL COSTS ARISING IN CORRECTING ANY DEFICIENCIES.

UTILITY COMPANY REGULATIONS, FEDERAL REGULATIONS AND APPLICABLE

REQUIREMENTS OF CITY AND NATIONALLY ACCEPTED CODES AND STANDARDS.

A. HANDICAPPED PERSONS AND ADA REQUIREMENTS.

1. THE PLANS AND SPECIFICATIONS HAVE BEEN PREPARED IN

2. THE CONTRACTOR SHALL VERIFY AND COORDINATE THE TYPE OF

CURRENT APPLICABLE CODES AND STANDARDS SHALL INCLUDE ALL ORDINANCES,

DOCUMENTS WITHOUT NOTIFICATION TO THE ENGINEER, HE SHALL BEAR ALL COST TO

6. CONTRACTOR SHALL OBTAIN APPROVAL FROM THE ENGINEER OF ALL MAJOR ITEMS OF

THE OWNER.

A. HVAC EQUIPMENT

B. AIR DEVICES

D. HVAC CONTROLS

INCLUDED AS PART OF THIS WORK.

10. VERIFY ALL MEASUREMENTS. NO EXTRA COMPENSATION WILL BE ALLOWED BECAUSE

OF DIFFERENCES BETWEEN WORK SHOWN ON THE DRAWINGS AND ACTUAL

MEASUREMENTS AT THE SITE OF CONSTRUCTION. DO NOT SCALE THE DRAWINGS.

THE CONTRACTOR SHALL VISIT THE PREMISIS PRIOR TO BIDDING TO

THOROUGHLY FAMILIARIZE HIMSELF WITH ALL DETAILS AND

COORDINATE WITH ALL EXISTING CONDITIONS TO BE ENCOUNTERED BY

ALL TRADES. HE SHALL VERIFY ALL CONDITIONS IN THE FIELD, INCLUDE

ANY COSTS RELATED TO SAME IN HIS BID, AND SHALL NOTE IN WRITING,

ANY EXCEPTIONS TAKEN WHEN BIDDING THE WORK.

G. WIRING DEVICES & COVERPLATES

F. SWITCHGEAR

E. LIGHT FIXTURES

9.

ACCORDANCE WITH THE ENGINEERS INTERPRETATIONS OF THE

APPLICABLE PROVISIONS OF REGULATIONS, CODES AND ORDINANCES

REGARDING HANDICAPPED PERSONS. IT IS ASSUMED THAT THE

CONTRACTOR IS ALSO KNOWLEDGEABLE OF SAME AND THEIR

APPLICATION WITH REGARD TO HIS WORK.

EQUIPMENT BEING INSTALLED AND ITS LOCATION, MOUNTING HEIGHT

AND CLEARANCES AS PRESCRIBED BY ALL APPLICABLE HANDICAP

REGULATIONS, CODES AND ORDINANCES PRIOR TO PLACING EQUIPMENT

ORDERS AND PRIOR TO INSTALLATION OF ALL WORK.

GENERAL LISTING OF MOUNTING HEIGHTS

ITEM HEIGHT TO CENTER LINE

SENSORS, ETC. 48"

THERMOSTATS,

a.

3. THERMOSTATS

CONTROL SHALL BE ±1°F OF SETPOINT.

TEST AND BALANCE EACH TO ±10% OF FLOW VALUE SHOWN ON PLANS.

2. S/A & E/A GRILLES

a.

d. S/A DUCT STATIC PRESSURE AT 2/3 DISTANCE FROM UNIT.

c. R/A & S/A TEMPERATURES AT FULL COOLING AND FULL HEATING CONDITIONS.

b. VOLTS/AMPS ALL FANS.

a. VOLTS/AMPS EACH COMPRESSOR.

1. HVAC UNITS

REQUIRED TESTSB.

A.PROVIDE PERSONNEL AND EQUIPMENT, MAKE AND RECORD ALL DATA FOR

REQUIRED TESTS, AND SECURE REQUIRED APPROVALS FROM THE ENGINEER

AND GOVERNMENTAL AGENCIES HAVING JURISDICTION.

E. INSULATION

F. CONTROLS

DRAWINGS AS SPECIFIED.

17. TESTING AND INSPECTION:

ADVANCE OF EACH OF THESE:

2. AT COMPLETION OF THE WORK.

ACCEPTED, MUST BE APPROVED IN WRITING BY THE ENGINEER, PRIOR TO

PROCEEDING. ALL SUCH CHANGES SHALL BE INCORPORATED INTO THE "AS BUILT"

C. MAKE WRITTEN NOTICE TO THE ARCHITECT/ENGINEER ADEQUATELY IN

1. WHEN ROUGH-INS ARE COMPLETE, BUT NOT COVERED.

E. TEST ALL PARTS OF ALL SYSTEMS AND DEMONSTRATE THAT ALL SUCH

18. UPON COMPLETION OF THE WORK:

THE MANUFACTURER OF ANY ITEM BEING CLEANED.

FAMILIARIZE THEM WITH THE SYSTEM OPERATION AND REQUIRED PERIODIC MAINTENANCE.

COMMUNICATION WITH OWNER OR ENGINEER.

THE DIMENSIONED LOCATIONS OF SAME.

D. WHEN MATERIAL AND/OR WORKMANSHIP IS FOUND TO NOT COMPLY WITH THE

SPECIFIED REQUIREMENTS: WITHIN THREE DAYS AFTER RECEIPT OF NOTICE OF

SUCH NON-COMPLIANCE, REMOVE THE NON-COMPLYING ITEMS FROM THE JOB

SITE AND REPLACE THEM WITH ITEMS COMPLYING WITH THE SPECIFIED

REQUIREMENTS, ALL AT NO ADDITIONAL COST TO THE OWNER.

A. THOROUGHLY CLEAN ALL EXPOSED PORTIONS OF THE MECHANICAL AND

ELECTRICAL EQUIPMENT PROVIDED AND THE GENERAL AREA WHERE WORK

WAS PERFORMED. REMOVE ALL TRACES OF SOIL, LABELS, GREASE, OIL, AND

OTHER FOREIGN MATERIAL USING ONLY THE TYPE CLEANER RECOMMENDED BY

B. PROVIDE MANUFACTURERS' OPERATING AND MAINTENANCE INSTRUCTIONS TO

THE OWNER'S REPRESENTATIVE FOR ALL MAJOR MECHANICAL AND ELECTRICAL

EQUIPMENT PROVIDED. PROVIDE 4 HOURS OF FORMAL TRAINING (2 HOURS ON

TWO DIFFERENT DAYS) TO OWNER'S MAINTENANCE PERSONNEL IN ORDER TO

C. DOCUMENTATION OF ANY TEST AND THE "AS-BUILT" RECORD DRAWINGS SHALL

BE PROVIDED TO THE BUILDING OWNER UPON COMPLETION.

19. CONTRACTOR SHALL DESIGNATE ONE PERSON TO SERVE AS SOLE POINT OF

20. WORK AMONG ALL TRADES SHALL BE FULLY COORDINATED AS REQUIRED IN THE FIELD

TO AVOID SPACE CONFLICTS AND INTERRUPTION OF THE FLOW OF WORK.

21. IN THE EVENT THAT ANY ITEM PROVIDED UNDER THIS CONTRACT IS DAMAGED PRIOR

TO FINAL ACCEPTANCE THE CONTRACTOR SHALL REPLACE, NOT REPAIR, THE ITEM

WITH NEW. IF AN EXISTING ITEM IS DAMAGED DURING THE CONSTRUCTION, THE

CONTRACTOR SHALL RESTORE THE ITEM TO NEAR ORIGINAL CONDITION AND PRIOR

OPERATING CONDITION TO THE SATISFACTION OF THE OWNER'S REPRESENTATIVE.

22. CONTRACTOR SHALL PROVIDE ALL DIMENSIONS FOR BLOCK OUTS, SLEEVES, ETC., AND

23. UNLESS DETAILED OTHERWISE MAINTAIN A MINIMUM CLEARANCE FOR LIGHTS OF 7"

ABOVE FINISHED CEILING AND 1" MINIMUM BELOW ALL DUCTS, PIPES, CONDUIT OR ANY

OTHER EQUIPMENT IN THE CEILING SPACE. PROVIDE MANUFACTURER'S

RECOMMENDED SERVICE ACCESS CLEARANCE AT ALL EQUIPMENT.

ABOVE FINISHED FLOOR

D. PLUMBING FIXTURES, EQUIPMENT AND PIPING

C. PIPING SYSTEMS

PROVIDE WRITTEN REPORT: UPON COMPLETION, ALL INFORMATION SHALL BE

NEATLY TYPED AND FIVE (5) COPIES SUBMITTED TO THE OWNER WITH

ACCOMPANYING SCHEMATIC DIAGRAMS OF SYSTEMS TESTED. ALL TEST

REPORTS SHALL BE ASSEMBLED, INDEXED, AND SUBMITTED IN VINYL COVERED

LOOSE-LEAF NOTEBOOKS WITH PROJECT NAME AND BALANCING

CONTRACTOR'S NAME PERMANENTLY PRINTED THEREON, AND INCLUDED IN

PROJECT CLOSEOUT DOCUMENTS.

F.

SPECIFICATIONS

1. IT IS THE INTENT AND MEANING OF THE CONTRACT DOCUMENTS THAT THE

CONTRACTOR SHALL PROVIDE A MECHANICAL AND ELECTRICAL INSTALLATION THAT IS

COMPLETE WITH ALL ITEMS AND APPURTENANCES NECESSARY, REASONABLY

INCIDENTAL, OR CUSTOMARILY INCLUDED, EVEN THOUGH EACH AND EVERY ITEM IS

NOT DETAILED ON THE DRAWINGS OR SPECIFIED.

A. THE TERM "PROVIDE" IN THESE SPECIFICATIONS AND ON THE DRAWINGS

MEANS; FURNISH, TRANSPORT, INSTALL, CONNECT, WARRANT AND START-UP,

THE CONTRACTOR SHALL CONTACT OTHERS AS IS REQUIRED TO ESTABLISH A

MUTUAL UNDERSTANDING OF THE PROJECT REQUIREMENTS FOR AN ITEM AND

THE RESPECTIVE COSTS FOR EACH PARTY IN ORDER TO PROVIDE A COMPLETE

OPERATING PRODUCT OR LABOR FOR THIS PROJECT.

C. THE INSTALLATION OF ALL SYSTEMS SHALL BE MADE BY EXPERIENCED

CRAFTSMEN IN A NEAT WORKMANLIKE MANNER. ALL MATERIALS, TOOLS,

PERMITS AND INSPECTIONS AND ALL OTHER COSTS AND SERVICES NECESSARY

AND PAID FOR, IN FULL, BY THE CONTRACTOR.

2. THE CONTRACTOR SHALL TAKE PROPER PRECAUTIONS TO PROTECT ANY EXISTING

CONSTRUCTION AND ADJACENT PROPERTY, WITH WHICH WORK COMES IN CONTACT,

AND OVER WHICH HE MAY TRANSPORT, HOIST OR MOVE MATERIALS, EQUIPMENT,

DEBRIS, ETC., AND SHALL REPAIR SATISFACTORILY ALL DAMAGES CAUSED BY HIM

3. THE CONTRACTOR SHALL, AT NO COST TO THE OWNER, REPLACE WITH NEW

MATERIALS AND/OR EQUIPMENT, ANY ITEMS FAILING TO GIVE SATISFACTORY SERVICE

TO PROVIDE ALL MECHANICAL AND PLUMBING ITEMS SHALL BE FURNISHED

B. THE TERM "COORDINATE" IN THESE SPECIFICATIONS AND ON THE PLANS MEANS:

INCLUSIVELY.

DURING CONSTRUCTION.

GENERAL REQUIREMENTS FOR ALL MECHANICAL, PLUMBING AND ELECTRICAL WORK

26. PROPERLY SUPPORT ALL EQUIPMENT AND PIPING WITHIN THE BUILDING AND PROVIDE

ADEQUATE PROVISIONS FOR SLOPE AND ANCHORAGE. CONTRACTOR SHALL USE AND

STRUCTURE. ALL HANGERS SHALL HAVE A MINIMUM FACTOR OF SAFETY OF 5. ALL

PIPING SHALL BE SUPPORTED AT PROPER INTERVALS WITH ONE HANGER OR SUPPORT

A. HVAC EQUIPMENT

FUNCTIONING INSTALLATION.

GOOD PRACTICE AND OTHER CONSIDERATIONS.

13. IN THE CASE WHERE TWO OR MORE TRADES OR CONTRACTORS ARE INVOLVED IN THE

INSTALLATION OF ANY ITEM, ALL SUCH PERSONS SHALL BE RESPONSIBLE FOR

COORDINATING THEIR WORK AMONG THEMSELVES TO PROVIDE A FULLY COMPLETED,

14. WHETHER ITEMS SPECIFIED OR NOTED ARE DESCRIBED AS SINGULAR OR PLURAL

SHALL NOT ALTER THE REQUIREMENT THAT SUFFICIENT QUANTITIES OF THE ITEM ARE

TO BE PROVIDED IN ORDER TO RESULT IN A COMPLETE INSTALLATION AND PROJECT.

15. THE DRAWINGS ARE DIAGRAMMATIC, BUT ARE REQUIRED TO BE FOLLOWED AS

CLOSELY AS ACTUAL CONSTRUCTION AND WORK OF OTHER TRADES WILL PERMIT.

DATA INDICATED ON THE DRAWINGS AND IN THESE SPECIFICATIONS ARE AS EXACT AS

COULD BE SECURED, BUT THEIR ABSOLUTE ACCURACY IS NOT WARRANTED. BRANCH

CIRCUITS, PIPING ARRANGEMENTS, AND MECHANICAL AND ELECTRICAL COMPONENT

LOCATIONS AND THE LIKE HAVE BEEN DESIGNED FOR ECONOMY CONSISTENT WITH

PERFORATED STRAP AS HANGERS IS PROHIBITED.

VERTICALLY ALIGN HANGERS AND RODS. INSERTS ETC. SHALL BE LISTED BY

UNDERWRITERS' LABORATORIES FOR THE SERVICE INTENDED. THE USE OF

27. SECURELY SUPPORT ALL EQUIPMENT FROM STRUCTURAL MEMBERS PROVIDED AS

NEEDED, WHICH IN TURN ARE TO BE SUPPORTED DIRECTLY FROM THE BUILDING

WITHIN 12" OF EITHER SIDE OF EACH TURN.

28. IN THE EVENT OF A CONFLICT WITHIN THE DRAWINGS AND/OR SPECIFICATIONS,

PROVIDE THE GREATER QUANTITY OR HIGHER QUALITY.

1. WORK INCLUDES BUT IS NOT NECESSARILY LIMITED TO:

MECHANICAL SPECIFICATIONS

PROVIDE WRITTEN BALANCE REPORT SHOWING INDIVIDUAL GRILLE FLOWS AND SYSTEM FAN

PERFORMANCE FOR VOLTAGE, AMPERAGE DRAW AND EXTERNAL STATIC PRESSURE.

4. TESTING AND BALANCE SHALL BE BY AIR ENGINEERING AND TESTING UNDER

G.C. CONTRACT.

5.

CHANGE.

EQUALS OR EXCEEDS THAT OF THE NAMED ITEM.

11. EQUIPMENT SUBSTITUTIONS TO THE NAMED SPECIFIED PRODUCTS MAY BE PROPOSED

BY THE CONTRACTOR. HOWEVER, THE CONTRACTOR SHALL BASE HIS BID ON THE

NAMED ITEMS. THE CONTRACTOR SHALL DEMONSTRATE TO THE SATISFACTION OF

THE ENGINEER THAT THE QUALITY, CAPACITY AND SUITABILITY OF THE PROPOSED ITEM

12. COORDINATE EQUIPMENT SUBSTITUTIONS FOR THE SCHEDULED OR SPECIFIED ITEM

WITH ALL OTHER TRADES. COMPENSATION TO OTHER TRADES DUE TO CHANGES IN

RATED VOLTAGE, PHASE, PHYSICAL SIZE, ARRANGEMENTS, SHAPE, COLOR AND ALL

OTHER CHARACTERISTICS AND THEIR RELATED EFFECTS ARISING FROM EQUIPMENT

SUBSTITUTIONS IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR MAKING THE

BE VERTICAL AND PLUMB.

24. PROVIDE ALL MATERIALS REQUIRED FOR THE SUPPORT OF SUCH ITEMS AS PIPING,

DUCTS, EQUIPMENT AND SIMILAR ITEMS. THIS SHALL INCLUDE RODS, ANGLES, ETC., TO

PROPERLY SUPPORT ALL ITEMS IN A PROPER AND SAFE MANNER. ALL HANGERS SHALL

BUILDING WALLS OR ROOF SHALL BE PROVIDED BY THE CONTRACTOR PROVIDING THE

INTEGRITY SHALL BE COORDINATED WITH THE GENERAL CONTRACTOR OR ENGINEER.

FLASHINGS FOR PENETRATIONS MAY ALSO BE PROVIDED ENTIRELY BY THE GENERAL

THE COMPLETENESS OF THIS ITEM.

25. SUITABLE FLASHINGS AND THEIR WATERTIGHT SEALING FOR OPENINGS IN THE

PENETRATING ITEM. THE INSTALLATION OF THE FLASHING AND ITS WATERTIGHT

CONTRACTOR. ALSO, REFER TO THE ARCHITECTS SPECIFICATIONS TO COORDINATE

ITEMS PROVIDED UNDER THIS SECTION FUNCTION IN THE REQUIRED

MANNER.

PROJECT NUMBER

DATE

SHEET TITLE

REV. # DESCRIPTION DATE 1

2

3

4

5

SHEET NUMBER

402 Parker Street M

cKinney, Texas

t 972.302.9747

conduitad.com

4144 N. Central Expressway, Suite 380

Dallas, Texas 75204

Ph: 214.428.7744

Fax: 214.428.7770

www.mezaengineeringinc.com

Project:

MEZA ENGINEERING, INC.Texas Registered Engineering Firm F-345

15006.000

Page 3: ELECTRICAL SYMBOLS HVAC LEGEND …storage.cloversites.com/bluestonepartnersllc/documents/CD MEP Set...data outlet (* indicates mounted 8" above ... flow line fan powered variable

SPECIFICATIONS

ELECTRICAL SPECIFICATIONS

2. WORK INCLUDES BUT IS NOT NECESSARILY LIMITED TO:

A. PROVIDE ELECTRICAL EQUIPMENT AS MANUFACTURED BY:

3. CUTLER HAMMER

2. SIEMENS

1. SQUARE D

TO LOWEST EDGE OF DEVICE COVERPLATE.

18. DEVICES NOT DIMENSIONED SHALL BE LOCATED WITHIN 12" HORIZONTALLY OF THE

LOCATION SHOWN. WHERE NO MOUNTING HEIGHT IS GIVEN, INSTALL WALL RECEPTACLES

AT 15" A.F.F. INSTALL WALL SWITCHES AT 48" A.F.F. OBTAIN FINAL APPROVED LOCATION

FROM THE ARCHITECT IN THE FIELD WHERE DEVICES ARE LOCATED IN SPECIAL WALL

FINISHES. DEVICES THAT ARE DIMENSIONED SHALL BE INSTALLED MEASURING FROM AFF

A. ALL OUTLETS SHALL BE 20A RATED HUBBELL CR120 OR APPROVED EQUAL.

B. GFCI OUTLETS SHALL BE HUBBELL GF5352 OR APPROVED EQUAL.

C. SWITCHES SHALL BE 20A RATED HUBBELL CS120 / CS320 OR APPROVED EQUAL.

D. PROVIDE OTHER WIRING DEVICES AS SPECIFIED ON THE DRAWINGS.

MECHANICAL SPECIFICATIONS

FIRE ALARM SYSTEM

IF REQUIRED BY LOCAL CODES OR FIRE MARSHAL PROVIDE A FIRE ALARM SYSTEM.

COORDINATE ANY MONITORING REQUIREMENTS RELATED TO MODIFICATIONS OF THE

EXISTING FIRE SPRINKLER SYSTEM.

1.

ACTUAL FIRE ALARM DESIGN SHALL BE BY A COMPANY LICENSED TO

DESIGN/INSTALL FIRE ALARM SYSTEMS IN THE STATE OF TEXAS. FIRE ALARM

SUBMITTALS SHALL BE SUBMITTED TO AHJ FOR REVIEW AND APPROVAL.

2.

14. LIGHT FIXTURES SHALL BE INSTALLED IN LOCATIONS IN ACCORDANCE WITH THE FINAL

APPROVED ARCHITECTURAL PLANS.

13. PROVIDE EQUIPMENT GROUND WIRE AT EACH CONDUIT.

A. GROUND ALL ELECTRICAL APPARATUS IN ACCORDANCE WITH NATIONAL

ELECTRICAL CODE.

B. INSURE CONTINUOUS BOND WHERE FLEXIBLE CONDUIT IS USED.

C. PROVIDE SEPARATE GREEN GROUND WIRE FOR ALL BRANCH AND FEEDER

CIRCUITS.

D. WIRING METHODS SERVING ANY PATIENT CARE AREAS SHALL ADHERE TO NEC

517.13 AND 205.118.

12. PANELBOARDS AND/OR CIRCUIT BREAKERS SHALL BE PROVIDED AS INDICATED OR SHOWN,

EACH SHALL BE RATED FOR AT LEAST THE MINIMUM CURRENT INTERRUPTING CAPACITY

SHOWN. PANELBOARDS SHALL HAVE ALL COPPER BUSSING. PANELS SHOWN AS

ELECTRICAL SERVICES SHALL BE RATED FOR USE AS SERVICE EQUIPMENT.

15. PROVIDE ALL ELECTRICAL EQUIPMENT OF THE CAPACITY AND QUALITY AS INDICATED OR

SCHEDULED OR APPROVED EQUAL.

1. ALL WORK SHALL BE IN ACCORDANCE WITH THE N.E.C., LATEST EDITION, AND ALL

APPLICABLE STATE AND LOCAL ORDINANCES. EACH PIECE OF ELECTRICAL EQUIPMENT

INSTALLED SHALL BE NEW UNLESS NOTED OTHERWISE AND ALL SHALL BEAR A U.L. LABEL.

GUARANTEE ENTIRE INSTALLATION (MATERIALS AND LABOR) TO BE IN GOOD REPAIR FOR A

PERIOD OF ONE YEAR FOLLOWING THE FINAL DATE OF ACCEPTANCE.

A. LIGHTING SYSTEMS.

B. ELECTRICAL DISTRIBUTION SYSTEMS, INCLUDING RECEPTACLES, AND ALL

OTHER WIRING DEVICES.

C. CONDUITS, WIRES, AND TERMINATIONS FOR LIGHTING, EQUIPMENT POWER,

GENERAL POWER.

D. POWER TO CONTROL CIRCUIT POWER SUPPLIES AND OTHER SYSTEMS AS

SHOWN OR INDICATED.

E. CONDUIT SYSTEMS FOR TELEPHONE AND OTHER CABLING.

3. IN THE DESCRIPTION OF WORK HEREIN OR ON THE DRAWINGS, THE WORD "CIRCUIT" SHALL

MEAN THE CONTRACTOR IS TO PROVIDE ALL COMPONENTS (WIRE, CONDUIT, FITTINGS,

HANGERS, CIRCUIT BREAKER, TERMINATIONS, ETC.) REQUIRED TO APPLY POWER TO AN

ITEM.

4. PROVIDE ALL BRANCH CIRCUITS AND SWITCHING AS INDICATED ON THE ELECTRICAL AND/OR

ARCHITECTURAL PLANS. SHARED NEUTRAL CONDUCTORS ARE NOT ALLOWED. PROVIDE

SEPARATE NEUTRAL FOR EACH BRANCH CIRCUIT. CIRCUITS SHALL BE #12 THWN/THHN

CONDUCTORS IN 3/4" C. METAL EMT OR RIGID METAL CONDUIT AS REQUIRED UNLESS

OTHERWISE NOTED; THESE ARE MINIMUM WIRE AND CONDUIT SIZES.

5. THE ELECTRICAL DESIGN IS BASED ON THE AMPACITY OF COPPER CONDUCTORS RATED AT

75°C FOR COMPATIBILITY WITH THE UL LISTING OF EQUIPMENT. CONDUCTORS RATED FOR

90°C SHALL BE ALLOWED, BUT AT THEIR 75°C RATING. ALUMINUM CABLE IS NOT ALLOWED.

6. FOR 120/208/240 VOLT CIRCUITS OF TOTAL PHYSICAL LENGTH OVER 150 FEET (ONE WAY),

PROVIDE #10 AWG CONDUCTORS. FOR 277/480V CIRCUITS OF TOTAL PHYSICAL LENGTH

OVER 250 FEET (ONE WAY), PROVIDE #10 AWG CONDUCTORS.

7. CONDUIT FITTINGS SHALL BE COMPRESSION TYPE OR SET SCREW TYPE, EXCEPT SET

SCREW TYPE ARE PROHIBITED FOR SUSPENDED CONDUIT. ALL CONDUCTORS SHALL BE

COPPER AND GROUND WIRES INDICATED SHALL BE INSULATED (GREEN COLOR) COPPER.

CONNECTIONS TO ALL EQUIPMENT AND LIGHTING FIXTURES SHALL BE BY A FLEXIBLE

TYPE CONDUIT ACCORDING TO THE NEC.

8. ALL LOADS SHALL BE PROPERLY BALANCED BETWEEN PHASES TO A MAXIMUM OF +/- 10% OF

AMPERAGE IMBALANCE.

9. ARRANGE FOR ALL ELECTRIC SERVICE REQUIRED BY ALL TRADES INVOLVED IN THE

CONSTRUCTION OF THIS PROJECT. RECEPTACLES, CORDS, LIGHTS, AND LEVELS OF

LIGHTING SHALL CONFORM TO O.S.H.A., NEC AND LOCAL ORDINANCES. PROVIDE

TEMPORARY POWER AT THE SITE WHEN REQUIRED.

10. PROVIDE ALL CIRCUITS IN ACCORDANCE WITH WIRING DIAGRAMS AND MANUFACTURER'S

WRITTEN INSTRUCTIONS FOR POWER AND FOR CONTROL OF HVAC EQUIPMENT.

COORDINATE ALL ELECTRICAL WORK WITH THE ELECTRICAL CHARACTERISTICS OF ALL

EQUIPMENT.

19. ALL WIRING DEVICES AND COVERPLATES SHALL BE WHITE COLOR AND ALL COVERPLATES

SHALL BE OF PLASTIC MATERIAL UNLESS NOTED OTHERWISE ON THE DRAWINGS. VERIFY

FINAL DEVICE AND COVER PLATE COLORS WITH ARCHITECT PRIOR TO PURCHASE OR

INSTALLATION OF ANY DEVICES.

90A AND 90B.

PLENUMS . . . . . . . . . . . .

RETURN AIR . . . . . . . . . .

SUPPLY AIR . . . . . . . . . .

12. INSULATE DUCTWORK AS FOLLOWS:

A. EXTERNAL DUCT WRAP SHALL BE 2" FOIL FACED EXTERNAL INSULATION

D. DUCT SIZES SHOWN ARE AIRSTREAM DIMENSIONS.

X

X

X

EXTERNAL WRAP LINER

C. DUCT SYSTEMS SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS OF NFPA

2. USE OF FLEXIBLE DUCT IS LIMITED TO THAT DETAILED ON THE

DRAWINGS, BUT ONLY IN AREAS WHERE DUCT IS NOT VISIBLE.

AND PIPE CONTENT. ADHESIVE TYPE MARKERS ARE PROHIBITED.

VAPOR TIGHT WITH FOIL TAPE OR MASTIC.

18. CONTROL ACCURACY SHALL BE +/- 1 DEGREE F.

17. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL CONTROLS THAT WILL

COMPLETELY ACCOMPLISH THE IMPLIED OR INTENDED FUNCTIONS OF THE CONTROL

OUTDOORS.

SYSTEM AS SHOWN OR SPECIFIED.

GROWTH AND NFPA-90A AND 90B.

AMERICAN STANDARD

KOHLER

ELJER

JOSAM

WADE

ELKAY

SHALL BE CERTIFIED FOR FUNGI RESISTANCE WHICH SHALL BE 100% NO-

REQUIREMENTS OF ASTM C1071 FOR PHYSICAL PROPERTIES EXCEPT LINER

PLUMBING FIXTURES AND EQUIPMENT SHALL BE FURNISHED AS SCHEDULED OR

INDICATED AND INSTALLED COMPLETE WITH STOP KITS, ESCUTCHEONS, TRIM,

CARRIERS, BLOCKING AND ALL OTHER APPURTENANCES REQUIED TO CNNECT

FIXTURES AND EQUIPMENT TO ROUGH-IN PIPING AT FLOORS AND WALS UNLESS

SPECIFIED OTHERWISE.

PROVIDE PLUMBING EQUIPMENT AS OF THE TYPE AND QUALITY AS SCHEDULED

OR INDICATED ON THE DRAWINGS AS MANUFACTURED BY:

PROVIDE EACH FLOOR DRAIN OR HUB DRAIN WITH A TRAP PRIMER AS SHOWN OR

ACCORDING TO THE LOCAL CODE AUTHORITY HAVING JURISDICTION.

PROVIDE ENGRAVED NAMEPLATE ATTACHED WITH SCREWS FOR ALL MAJOR

EQUIPMENT PROVIDED. USE NOMENCLATURE FROM EQUPMENT SCHEDULES.

13.

A.

1.

2.

3.

4.

5.

6.

B.

14.

A. PROVIDE SAFETY DISCONNECT SWITCH WHEN AVAILABLE AS A FACTORY

ELECTRICAL DRAWINGS ONLY. PROVIDE AS REQUIRED AND SPECIFIED BELOW.

PROVIDING THE EQUIPMENT THAT REQUIRES SAME. THESE ITEMS ARE SHOWN ON THE

CONTACTORS FOR EQUIPMENT. THESE SHALL BE FURNISHED BY THE CONTRACTOR

15. PROVIDE MANUAL STARTERS, MAGNETIC STARTERS, COMBINATION STARTERS AND

B. DUCT LINER SHALL BE 1" LINER, 3 PCF DENSITY COMPLYING WITH THE

19. 24 VOLT CONTROL WIRING SHALL BE IN 1/2" EMT CONDUIT WITH COMPRESSION FITTINGS

16. PROVIDE SNAP-ON TYPE PIPE MARKERS EACH 10' THAT INDICATE BOTH FLOW DIRECTION

(INSTALLED R VALUE = 5.0) SEAL ALL EXTERNAL WRAP INSULATION SEAMS

1. NAILOR

4. TITUS

A. PROVIDE AIR DEVICES AS MANUFACTURED BY:

2. KRUEGER

3. METALAIRE

10. INSULATE PIPING AS FOLLOWS:

9. ALL FANS SHALL CARRY THE CERTIFIED RATING SEAL AUTHORIZED BY AMCA.

CONDENSATE PIPING . . . . . . . . . . . . . . . . . 1/2"

PIPING THICKNESS

WITH THE PIPING.

D. SUPPORTS FOR ANY INSULATED PIPING SHALL NOT BE IN DIRECT CONTACT

25/50 FOR AIR PLENUM USE OR WHERE EXPOSED TO HVAC SYSTEM AIR.

C. PROVIDE ALL INSULATION AND JACKET MATERIALS SPECIFICALLY APPROVED IS

INSULATION AT HANGERS AND OTHER SUPPORTS.

AND SHEET METAL INSULATION SHIELDS TO PREVENT CRUSHING OF

CEILINGS AND AT HANGERS. PROVIDE REDWOOD OR CALCIUM SILICATE BLOCKS

SEALED TO PREVENT SWEATING AND CONTINUOUS THROUGH WALLS, FLOORS,

B. PROVIDE OWENS CORNING FIBERGLASS ASJ SSL-II OR APPROVED EQUAL,

2. DOMESTIC HOT AND COLD WATER AND RELIEF VALVE PIPING SHALL BE TYPE "L" COPPER

WITH WROUGHT COPPER FITTINGS. NO JOINTS SHALL BE CONCEALED IN SLABS. JOIN

ALL WATER PIPING WITH LEAD FREE SOLDER. SANITIZE POTABLE WATER SYSTEMS PER

LOCAL HEALTH DEPARTMENT REQUIREMENTS.

3. CONDENSATE DRAINAGE PIPING SHALL BE TYPE 'M' WITH WROUGHT FITTINGS JOINED

WITH SOLDER. PVC MAY BE USED (EXCEPT IN RETURN AIR PLENUMS) WHERE LOCAL

CODES PERMIT.

4. SANITARY SEWER DRAIN WASTE AND VENT PIPING SHALL BE SERVICE WEIGHT CAST IRON

WITH PROPER CAST IRON FITTINGS. PROVIDE A HUB DRAIN AND PIPING FOR ANY DRAIN

OR RELIEF VALVE.

5. ALL OTHER PIPING SHALL BE TYPE L COPPER WITH 50/50 SOLDER JOINTS. FITTINGS

SHALL BE WROUGHT COPPER, FACTORY FABRICATED, HAVING INDUSTRY STANDARD

FLOW PATTERNS.

6. PROVIDE A DIELECTRIC FITTING WHEREVER DISSIMILAR METALS ARE JOINED, EXCEPT

AT VALVE BODIES.

7. BALL VALVES SHALL BE TWO PIECE, BRASS BODY, THREAD CONNECTION TEFLON SEAT,

STOCKHAM FIGURE #S214-BR-TT OR EQUAL.

8. DIFFUSERS, REGISTERS AND GRILLES SHALL BE AS SCHEDULED OR NOTED AND ALL

SHALL BE PROVIDED WITH FRAMES COMPATIBLE WITH EACH CEILING TYPE.

CONTRACTOR SHALL COORDINATE ALL DIFFUSER LOCATIONS AND FRAME TYPES

WITH FINAL APPROVED REFLECTED CEILING PLAN FOR LIGHT FIXTURE AND ALL

OTHER CEILING MOUNTED DEVICE LOCATIONS.

11. DUCTWORK SHALL BE SHEET METAL CONSTRUCTED AND SEALED ACCORDING TO

SMACNA STANDARDS FOR 1" W.C. POSITIVE AND NEGATIVE PRESSURE. FLEXIBLE

DUCT MAY BE USED ONLY AS DETAILED ON THE DRAWINGS. REFER TO DUCTWORK

LEGEND AND DUCT DETAILS ON DRAWINGS FOR DUCTWORK, FITTINGS, VANES,

DAMPERS, ETC.

A. PROVIDE VIBRATION ISOLATION FOR MOTOR-DRIVEN MECHANICAL EQUIPMENT

PER MANUFACTURER'S RECOMMENDATIONS AND AS SHOWN.

B. PROVIDE FLEXIBLE DUCTWORK CONNECTIONS AT INLET AND OUTLET OF

EQUIPMENT.

1. FLEXIBLE DUCT SHALL HAVE 1" THICK INSULATION WITH FOIL JACKET AND

VAPOR BARRIER LINER. DUCT SHALL MEET CLASS I, UL-181, AND 25/50 FIRE

RATING REQUIREMENTS.

11. LABEL PANELBOARDS THAT ARE PROVIDED WITH ENGRAVED NAMEPLATE,

FASTENED WITH SCREWS. USE NOMENCLATURE FROM PANELBOARD SCHEDULE

AND AS NOTED ON THE DRAWINGS. PANELBOARD DIRECTORIES SHALL BE

ACCURATE AND TYPEWRITTEN.

16. PROVIDE (1) EMPTY 3/4" CONDUIT WITH PULL STRING FROM EACH DATA AND EACH

TELEPHONE OUTLET INDICATED OR SHOWN STORAGE ROOM. DATA AND

TELEPHONE CABLE TO BE PROVIDED BY OTHERS. ALL CABLE TO BE INSTALLED BY

OTHERS IS ASSUMED TO BE PLENUM RATED.

17. ALL TELEPHONE, DATA, AND ELECTRICAL OUTLETS SHALL BE MOUNTED

VERTICALLY, UNLESS NOTED OTHERWISE. REFER TO DRAWINGS FOR

MOUNTING HEIGHTS.

HOT WATER . . . . . . . . . . . . . . . . . . . . . . . . . NOTE A

COLD WATER . . . . . . . . . . . . . . . . . . . . . . . . 1/2"

TO 1". PIPE INSULATION WILL HAVE A CONDUCTIVITY OF LESS THAN

IF PIPE LESS THAN 1.5" NOMINAL DIAMETER. LARGER PIPE MUST BE INSULATED

A. SERVICE HOT WATER PIPING WHERE REQUIRED, MUST BE INSULATED TO 1/2"

0.28 BTU.IN/(H-FT2-°F).

PROJECT NUMBER

DATE

SHEET TITLE

REV. # DESCRIPTION DATE 1

2

3

4

5

SHEET NUMBER

402 Parker Street M

cKinney, Texas

t 972.302.9747

conduitad.com

4144 N. Central Expressway, Suite 380

Dallas, Texas 75204

Ph: 214.428.7744

Fax: 214.428.7770

www.mezaengineeringinc.com

Project:

MEZA ENGINEERING, INC.Texas Registered Engineering Firm F-345

15006.000

Page 4: ELECTRICAL SYMBOLS HVAC LEGEND …storage.cloversites.com/bluestonepartnersllc/documents/CD MEP Set...data outlet (* indicates mounted 8" above ... flow line fan powered variable

EXISTING

HVAC

EXISTING

ELEC

STORAGE

COMMUNITY ROOM

FIRE RISER

1

2

3

4

5

6

6

9

7

7

8

7

GENERAL NOTES

NOTES BY SYMBOL

1

THESE PLANS ARE DIAGRAMMATIC IN NATURE, INCLUDE APPROPRIATE

ALLOWANCES FOR OFFSETS AS REQUIRED TO ACCOMMODATE VERTICAL AND

HORIZONTAL VARIATIONS IN THE LOCATIONS AND ELEVATIONS OF DUCTWORK,

PIPING, ETC. DUE TO EXISTING CONDITIONS.

REMOVE EXISTING SINK, FAUCET, AND CAP ALL PLUMBING SERVICES.

REMOVE EXISTING WATER CLOSET, AND CAP ALL PLUMBING SERVICES.

REMOVE EXISTING OUTSIDE AIR INTAKE LOUVER; CAP OPENING PER

ARCHITECTURAL REQUIREMENTS. OUTSIDE AIR DUCT TO BE REROUTED TO ROOF.

EXISTING FURNACE, COOLING COILS, AND RETURN AIR GRILLE TO REMAIN. CLEAN

GRILLE, CLEAN DRAIN PAN, CLEAN COILS, REPLACE FILTERS,AND RECHARGE

REFRIGERANT. EXISTING FLUE THRU ROOF TO REMAIN.

EXISTING CONDENSING UNIT TO REMAIN. CLEAN COILS AND RECHARGE AS

REQUIRED. PROVIDE A WRITTEN INSPECTION REPORT ON ENTIRE SPLIT SYSTEM

PRIOR TO STARTING WORK.

EXISTING DUCT TO BE REMOVED AND CAPPED AT TAP. PROVIDE DUCT INSULATION

EQUAL TO EXISTING.

EXISTING CEILING AIR DEVICE TO BE RELOCATED.

EXISTING CEILING AIR DEVICE TO REMAIN. (TYPICAL)

EXISTING FLUE.

2

PENETRATIONS OF WALLS OR FLOORS FOR THE PASSAGE OF PIPING, DUCTWORK,

OR OTHER EQUIPMENT SHALL BE PROPERLY SEALED AFTER INSTALLATION OF

ITEMS AND EQUIPMENT. FIELD VERIFY EXISTING WALL PENETRATIONS AND

PROPERLY SEAL AS REQUIRED TO MAINTAIN WALL OR FLOOR RATING.

PROVIDE ACCESS TO ALL CONCEALED EQUIPMENT. COORDINATE LOCATIONS OF

ACCESS PANELS WITH ARCHITECT.

ALL CONSTRUCTION DEBRIS SHALL BE DISPOSED OF BY CONTRACTOR UNLESS

NOTED OTHERWISE.

CONTRACTOR TO VERIFY LOCATION AND SIZE OF EXISTING WATER, SEWER, AND

VENT PIPES PRIOR TO THE COMMENCING OF WORK.

ALL WORK TO CONFORM TO ALL APPLICABLE FEDERAL, STATE, AND LOCAL

BUILDING CODES INCLUDING CURRENT INTERNATIONAL ENERGY CONSERVATION

CODE.

3

4

5

6

7

8

9

PROJECT NUMBER

DATE

SHEET TITLE

REV. # DESCRIPTION DATE 1

2

3

4

5

SHEET NUMBER

402 Parker Street M

cKinney, Texas

t 972.302.9747

conduitad.com

4144 N. Central Expressway, Suite 380

Dallas, Texas 75204

Ph: 214.428.7744

Fax: 214.428.7770

www.mezaengineeringinc.com

Project:

MEZA ENGINEERING, INC.Texas Registered Engineering Firm F-345

15006.000

1 DEMO FLOOR PLAN - HVAC & PLUMBING

3/8" = 1'-0"

DEMO FLOOR PLAN

- HVAC & PLUMBING

Page 5: ELECTRICAL SYMBOLS HVAC LEGEND …storage.cloversites.com/bluestonepartnersllc/documents/CD MEP Set...data outlet (* indicates mounted 8" above ... flow line fan powered variable

WH

3

4

R300

5

R300

7

E 300

14"Ø

E300

E300

E300

8"Ø

S-1

6

MS-1

WH-1

FD-1

A50

WC-1

EF-2

L-1

L-1

EF-1

WC-1

EF-3

R100

9

9

9

10"Ø

6

9

8

FD-1FD-1

A50

1 1

2 2

GENERAL NOTES

NOTES BY SYMBOL

1. THESE PLANS ARE DIAGRAMMATIC IN NATURE, INCLUDE APPROPRIATE

ALLOWANCES FOR OFFSETS AS REQUIRED TO ACCOMMODATE VERTICAL AND

HORIZONTAL VARIATIONS IN THE LOCATIONS AND ELEVATIONS OF DUCTWORK,

PIPING, ETC. DUE TO EXISTING CONDITIONS.

2. PENETRATIONS OF WALLS OR FLOORS FOR THE PASSAGE OF PIPING, DUCTWORK,

OR OTHER EQUIPMENT SHALL BE PROPERLY SEALED AFTER INSTALLATION OF

ITEMS AND EQUIPMENT. FIELD VERIFY EXISTING WALL PENETRATIONS AND

PROPERLY SEAL AS REQUIRED TO MAINTAIN WALL OR FLOOR RATING.

3. PROVIDE ACCESS TO ALL CONCEALED EQUIPMENT. COORDINATE LOCATIONS OF

ACCESS PANELS WITH ARCHITECT.

4. ALL CONSTRUCTION DEBRIS SHALL BE DISPOSED OF BY CONTRACTOR UNLESS

NOTED OTHERWISE.

5. CONTRACTOR TO VERIFY LOCATION AND SIZE OF EXISTING WATER, SEWER, AND

VENT PIPES PRIOR TO THE COMMENCING OF WORK.

6. ALL WORK TO CONFORM TO ALL APPLICABLE FEDERAL, STATE, AND LOCAL

BUILDING CODES INCLUDING CURRENT INTERNATIONAL ENERGY CONSERVATION

CODE.

1INSTALL NEW LAV AND FAUCET AT THIS LOCATION; EXTEND PLUMBING SERVICES

TO THIS LOCATION AND MAKE CONNECTIONS ACCORDINGLY.

INSTALL NEW ADA WATER CLOSET AT THIS LOCATION; EXTEND PLUMBING

SERVICES TO THIS LOCATION AND MAKE CONNECTIONS ACCORDINGLY.

INSTALL NEW SINK AND FAUCET AT THIS LOCATION; EXTEND PLUMBING SERVICES

TO THIS LOCATION AND MAKE CONNECTIONS ACCORDINGLY.

LOCATE WH-1 ON SHELF ABOVE MOP SINK.

EXISTING CONDENSING UNIT TO REMAIN. CLEAN COILS AND RECHARGE AS

REQUIRED. PROVIDE A WRITTEN INSPECTION REPORT ON ENTIRE SPLIT SYSTEM

PRIOR TO STARTING WORK.

EXTEND EXISTING FURNACE OUTSIDE AIR DUCT (VENTILATION) UP THRU ROOF.

MAINTAIN A MINIMUM OF 15'-0" FROM AIR VENTS, FLUE'S, AND EXHAUST OUTLETS.

PROVIDE ROOF CAP. PROVIDE NEW INLINE FAN (SF-1) WITH MOTORIZED DAMPER IN

OUTSIDE AIR DUCT. LOCATE FAN IN MECH ROOM. FAN (SF-1) AND MOTORIZED

DAMPER SHALL BE INTERLOCKED WITH FURNACE (FAN/DAMPER OFF/CLOSED WHEN

FURNACE IS OFF; FAN/DAMPER ON/OPEN WHEN FURNACE IS ON). INCLUDE ALL

NECESSARY DUCTWORK, CONTROLS, POWER, ETC. AS REQUIRED.

CLEAN AND PAINT ALL EXISTING CEILING AIR DEVICES TO REMAIN. AIR DEVICES TO

BE PAINTED SAME COLOR AS NEW DEVICES. (TYPICAL OF 7)

REBALANCE ALL AIR DEVICES TO NOTED AIR QUANTITIES.

DUCT UP THRU ROOF. TERMINATE WITH ROOF CAP.

2

3

7. MODIFY THE EXISTING SPRINKLER SYSTEM TO PROVIDE COVERAGE FOR THE

RENOVATED AND EXPANDED FLOOR PLAN LAYOUT; COMPLY WITH NFPA-13 AND

LOCAL AND STATE FIRE PROTECTION CODES.

8. ALLOW FOR SAWCUTTING RELATED TO NEW UNDERFLOOR PLUMBING

REQUIREMENTS, ALONG WITH COLD WATER, HOT WATER, VENTING, ETC. FOR ALL

NEW PLUMBING REQUIREMENTS FROM A COST BUDGETARY STANDPOINT. FUTURE

PHASE WILL SHOW ANTICIPATED PIPING REQUIREMENTS.

4

5

6

7

8

9

PROJECT NUMBER

DATE

SHEET TITLE

REV. # DESCRIPTION DATE 1

2

3

4

5

SHEET NUMBER

402 Parker Street M

cKinney, Texas

t 972.302.9747

conduitad.com

4144 N. Central Expressway, Suite 380

Dallas, Texas 75204

Ph: 214.428.7744

Fax: 214.428.7770

www.mezaengineeringinc.com

Project:

MEZA ENGINEERING, INC.Texas Registered Engineering Firm F-345

15006.000

1 FLOOR PLAN - HVAC & PLUMBING

3/8" = 1'-0"

FLOOR PLAN - HVAC

& PLUMBING

Page 6: ELECTRICAL SYMBOLS HVAC LEGEND …storage.cloversites.com/bluestonepartnersllc/documents/CD MEP Set...data outlet (* indicates mounted 8" above ... flow line fan powered variable

CEILING

PERFORATED METAL GRILLE

FURNISHED WITH FAN

CEILING EXHAUST FAN

MOUNTING BRACKETS SHALL

HANGER RODS SUPPORTED

FROM STRUCTURE ABOVE

BE ADJUSTABLE TO ALLOW

FLUSH MOUNTING IN CEILING.

ROOF

SHEETMETAL DUCT

4 CEILING EXHAUST FAN DETAIL

NO SCALE

FAN TO BE

FURNISHED WITH

BACKDRAFT

DAMPER

UNION CONNECTION

DISTRIBUTION UNIT

(4-WAY MAX.) WALL MTD.

FLOOR DRAIN WITH

DEEP SEAL TRAP

FINISHED FLOOR

BALL VALVE (ISOLATION VALVE)

1/2" TRAP PRIMER SUPPLY

1/2" TRAP PRIMER LINE

DOMESTIC WATER LINE

SLEEVE THRU

SLAB

TPV

"PPPI" PRIME RITE TRAP

PRIMER VALVE WITH

INTEGRAL VACUUM

BREAKER

1/2" MIN. COLD WATER SUPPLY

(AVOID DIRECT CONNECTIONS

TO PREVENT FOREIGN

MATERIAL FROM ENTERING

PRIMER VALVE)

TRAP PRIMER ASSEMBLY AND

ISOLATION VALVE TO BE ABOVE

ACCESSIBLE CEILING OR IF IN WALL

PROVIDE STAINLESS STEEL ACCESS

PANEL FOR PROPER MAINTENANCE

TAILPIECE

DEEPSEAL P-TRAP

FLOOR

WASTE LINE

FLOOR DRAIN

REF: PLANS FOR LOCATION

1/2" TRAP

PRIMER LINE

INSULATION EXTEND DAMPER OPERATOR

THROUGH INSULATION

CEILING

SPIN-IN FITTING

WITH DAMPER

SUPPLY DUCT

INSULATE TOP

OF DIFFUSER

SECURE FLEXIBLE DUCT TO

DUCT COLLAR AND DIFFUSER

NECK WITH S.S. SCREW CLAMP

INSULATED FLEXIBLE DUCT

MAXIMUM 5 FOOT LENGTH

CEILING DIFFUSER

DUCT SIZE SAME SIZE AS

SCHEDULED NECK

CONNECTION OF

DIFFUSER

D

R

R > 1.5D MINIMUM

RADIUS

5 DIFFUSER CONNECTION DETAIL

NO SCALE

22 GA. GALV. STEEL WATERTIGHT

DRAIN PAN (2" LARGER THAN WATER

HEATER ON ALL SIDES) WITH

INDIRECT DRAIN TO MOP SINK

3/8" HANGER RODS SUPPORTED

FROM STRUCTURE (4 TOTAL)

T&P RELIEF VALVE WITH

FULL SIZE DISCHARGE

TO MOP SINK

1-1/2"x1-1/2"x3/16"

STEEL ANGLES OR

EQUIV. UNISTRUT

EXPANSION TANK

VACUUM RELIEF VALVE

CHECK VALVE (TYP.)

BALL VALVE (TYP.)

COLD WATER

SUPPLY

THERMOMETER (TYP.)

DIELECTRIC UNION (TYP.)

FINISHED

FLOOR

3/4"

MOP SINK

PROVIDE EXTERNAL HEAT

TRAPS TO COLD AND HOT

WATER PIPING

HOT WATER

SUPPLY

MIXING VALVE

TO MOP SINK

MECHANICAL AND

PLUMBING DETAILS

PROJECT NUMBER

DATE

SHEET TITLE

REV. # DESCRIPTION DATE 1

2

3

4

5

SHEET NUMBER

402 Parker Street M

cKinney, Texas

t 972.302.9747

conduitad.com

4144 N. Central Expressway, Suite 380

Dallas, Texas 75204

Ph: 214.428.7744

Fax: 214.428.7770

www.mezaengineeringinc.com

Project:

MEZA ENGINEERING, INC.Texas Registered Engineering Firm F-345

15006.000

Page 7: ELECTRICAL SYMBOLS HVAC LEGEND …storage.cloversites.com/bluestonepartnersllc/documents/CD MEP Set...data outlet (* indicates mounted 8" above ... flow line fan powered variable

PLUMBING FIXTURE CONNECTION SCHEDULE

TYPE OF FIXTURE WASTE VENT CW HW NOTES

WATER CLOSET - TANK TYPE 4" 2"

3

4

" -

LAVATORY 2" 1

1

2

"

1

2

"

1

2

"

SINK 2" 1

1

2

"

1

2

"

1

2

"

FLOOR DRAIN 3" 2" - - PROVIDE ALL FLOOR DRAIN WITH TRAP PRIMER

MOP SINK 3" 2"

3

4

"

3

4

"

WATER HEATER SCHEDULE

DESIGNATION SERVES LOCATION

ELECT

CHARACTRISTICS

MANUFACTURER MODEL NO.

RECOVERY

PER HOUR @

100° RISE

TANK

GALLONS

NOTES

WH-1SUITE

JANITOR

CLOSET

208V/60Hz/1Ph AO SMITH DEL-15 17 15 ALL

NOTE:

1. FACTORY ASSEMBLED UNIT. INLET AND OUTLET THERMOMETERS, TANK TEMPERATURE THERMOMETER, RELIEF VALVE AND TANK TEMPERATURE CONTROL.

2. REFERENCE DETAILS.

3. PROVIDE TEMPERATURE MIXING VALVE.

EXPANSION TANK SCHEDULE

MARK SERVES LOCATION TANK CAPACITY

INSTALLATION

CONFIGURATION

TANK

PRESSURE

RATING (PSI)

MANUFACTURERMODEL

NOTES

ET-1WH-1

JANITOR

CLOSET

2.1 SUSPENDED 150 AMTROL ST-5-C

ASME CERTIFIED AND SHALL

COMPLY WITH NSF 61

PLUMBING FIXTURE SCHEDULE

MARK FIXTURE DESCRIPTION

L-1LAVATORY

TOTO SUPREME LHT241.8G COTTON COLOR #01 WALL-HUNG LAVATORY, DELTA LAHARA 3538 MPU-DST, CHROME, 0.5

GPM TWO-HANDLE FAUCET 8" SPREAD. LEONARD MODEL 170-BP ADJUSTABLE THERMOSTATIC MIXING VALVE WITH

RECESSED CABINET ASSEMBLY. McGUIRE # 155-WC OFFSET GRID STRAINER DRAIN. McGUIRE # 2167-LK SUPPLIES,

LOOSE KEY STOP, JOSAM # 17100 SERIES WALL CARRIER.

S-1SINK

ELKAY MODEL NO. ELUHAD1916-5.5" "LUSTERTONE" 18 GA. TYPE 304 STAINLESS STEEL, SINGLE COMPARTMENT 5

1

2

"

DEEP UNDERMOUNT SINK. DELTA LINDEN 1353-DS, CHROME, AND 2 GPM LAMINAR FLOW SPOUT. McGUIRE #152 GRID

DRAIN. McGUIRE # 8903 P-TRAP, 1-1/2" TAILPIECE. McGUIRE # 171LK SUPPLIES WITH WHEEL HANDLE STOPS.

WC-1

WATER CLOSET

(ADA)

AMERICAN STANDARD "COLONY" 221AA.105. 1.28 GPF. TANK TYPE VITREOUS CHINA ELONGATED BOWL HIGH

EFFICIENCY TOILET, 16

1

2

" RIM HEIGHT. CHURCH MODEL 9500C

ELONGATED SEAT, OPEN FRONT LESS COVER, WHITE

SOLID PLASTIC, CONCEALED CHECK STAINLESS STEEL HINGES.

MS-1MOP SINK

FIAT #MSB 24"x24" MOLDED STONE SERVICE BASIN, 10" HIGH WITH 1" WIDE PLAIN SHOULDERS, STAINLESS STEEL

INTEGRAL DRAIN BODY AND STRAINER. FIAT #830-AA SERVICE FAUCET WITH VACUUM BREAKER, INTEGRAL STOPS,

ADJUSTABLE WALL BRACE, PAIL HOOK AND 3/4" HOSE THREAD ON SPOUT, #832-AA HOSE AND HOSE BRACKET AND 3

EACH #889-CC MOP HANGERS.

FD-1FLOOR DRAIN

J.R. SMITH # 2005Y-B-CP SQUARE FLOOR DRAIN WITH NO HUB NICKEL BRONZE HEEL PROOF STRAINER AND TRAP

PRIMER CONNECTION.

TPV

TRAP PRIMER

VALVE

PRECISION PLUMBING PRODUCTS TRAP PRIMER VALVE # P2-500 WITH DISTRIBUTION SYSTEM.

GENERAL NOTES:

1. FIXTURE MANUFACTURER SHALL BE AS LISTED.

2. PROVIDE ALL CARRIERS AND SUPPORT MATERIALS REQUIRED FOR A SOLID, SECURE INSTALLATION.

3. PROVIDE ALL DRAIN COVERS, ESCUTCHEONS,AND MISCELLANEOUS TRIM ITEMS FOR A NEAT APPEARANCE.

4. ALL MOUNTED HEIGHTS SHALL BE VERIFIED WITH THE ELEVATIONS SHOWN ON THE ARCHITECTURAL DRAWINGS.

5. ALL PUMPING FIXTURES MUST CONFORM TO CURRENT WATER CONSERVATION REGULATIONS.

6. ALL HANDICAPPED ACCESSIBLE PLUMBING FIXTURES MUST CONFORM TO CURRENT TEXAS ACCESSIBILITY STANDARDS.

AIR DEVICE SCHEDULE

MARK SERVICE TYPE MOUNTING VOLUME CONTROL

SIZE

MANUFACTURER MODEL NO. MATERIAL NOTES

FACE NECK

A SUPPLY PERFORATED CEILING NO 12"X12" NOTE 1 TITUS PAS STEEL1,2,3,5

E EXISTING - - - - - - - - 4

R

EXISTING

RELOCATED

- - - - - - - - 4

NOTES:

1. 6"Ø(25-100 CFM); 8"Ø(101-200 CFM); 10"Ø(201-400 CFM); 12"Ø(401-600 CFM).

2. REFERENCE AIR DEVICE CONNECTION DETAIL FOR VOLUME CONTROL REQUIREMENTS.

3. COORDINATE CEILING FRAME REQUIREMENT WITH ARCHITECTURAL REFLECTED CEILING PLANS.

4. EXISTING AIR DEVICE TO BE REUSED, CLEAN AND BALANCE AS INDICATED.

5. PROVIDE WITH OPTIONAL FOIL BACKED INSULATION BLANKET.

FAN SCHEDULE

MARK SERVES TYPE CFM EXT. SP. DRIVE

MOTOR

MANUFACTURER MODEL NO. NOTES

WATTS RPM VOLTS/HZ/Ø

EF-1,2

MEN/WOMEN

RESTROOM

CEILING 70 0.375 DIRECT 85 950 115/60/1 GREENHECK SP-B1101, 2, 3, 4, 6, 7

EF-3 JANITOR CEILING 50 0.375 DIRECT 55 900 115/60/1 GREENHECK SP-B802, 3, 4, 6, 7, 8

SF-1

FURNACE

OUTSIDE AIR

IN LINE DUCT 300 0.5 DIRECT 220 1070 115/60/1 GREENHECK CSP-A503, 4, 5, 7

NOTES:

1. EXHAUST FAN TO BE CONTROLLED WITH LIGHT SWITCH.

2. PROVIDE BACKDRAFT DAMPER.

3. PROVIDE ROOF CAP.

4. PROVIDE SPEED CONTROLLER AND INTEGRAL DISCONNECT. LOCATE CONTROLLER IN ACCESSIBLE LOCATION.

5. PROVIDE FAN WITH MOTORIZED DUCT DAMPER - INTERLOCKED WITH FAN.

6. PROVIDE STANDARD FAN GRILLE

7. PROVIDE HANGING VIBRATION ISOLATOR KIT.

8. PROVIDE WALL SWITCH. FAN TO RUN CONTINUOUSLY.

1/2"

1 1/2"

S-1

2"

FLOOR

CEILING

ROOF

1/2"

1 1/2"

L-1

2"

MS-1

WH-1

3/4"

2"

2"

3"

FD-1

2"

3/4"

WC-1

4"

GENERAL NOTES

1. RISER DIAGRAMS ARE SCHEMATIC IN NATURE AND DO NOT REFLECT EVERY

OFFSET, BRANCH, RISER OR UNION.

2. CONTRACTOR SHALL REFER TO PLUMBING FLOOR PLANS FOR FIXTURE

DESIGNATIONS.

3. CONTRACTOR SHALL REVIEW PLUMBING, AND ARCHITECTURAL DRAWINGS AND

PROVIDE ALL PLUMBING FIXTURES SHOWN ON EACH DRAWING.

4. CONTRACTOR SHALL VERIFY LOCATIONS OF ADA/TAS APPROVED PLUMBING

FIXTURES WITH ARCHITECTURAL DRAWINGS.

5. CONTRACTOR SHALL INSTALL SHOCK ABSORBERS ON ALL PLUMBING FIXTURE

BATTERIES AND QUICK CLOSING EQUIPMENT AND FIXTURES.

6. CONTRACTOR SHALL INSTALL TRAP PRIMERS ON ALL FLOOR DRAINS, FLOOR

SINKS, HUB DRAINS, AND INDIRECT DRAINS UNLESS OTHERWISE NOTED.

7. CONTRACTOR SHALL INSTALL 12"x12" ACCESS PANELS DIRECTLY IN FRONT OF

SHOCK ABSORBERS AND TRAP PRIMERS.

8. CONTRACTOR SHALL PROVIDE AN ISOLATION BALL VALVE ON ALL TRAP PRIMERS

AND SHOCK ABSORBERS FOR MAINTENANCE.

9. ACCESS PANEL SIZES AND EXACT LOCATIONS SHALL BE COORDINATED WITH

ARCHITECT BEFORE INSTALLATION.

10. ARCHITECT RESERVES THE RIGHT TO RELOCATE ACCESS PANELS PRIOR TO

INSTALLATION WITHOUT ADDITIONAL COST.

NOT TO SCALE

1

PLUMBING RISERS

2"

FD-1

SCHEDULES AND

RISERS

PROJECT NUMBER

DATE

SHEET TITLE

REV. # DESCRIPTION DATE 1

2

3

4

5

SHEET NUMBER

402 Parker Street M

cKinney, Texas

t 972.302.9747

conduitad.com

4144 N. Central Expressway, Suite 380

Dallas, Texas 75204

Ph: 214.428.7744

Fax: 214.428.7770

www.mezaengineeringinc.com

Project:

MEZA ENGINEERING, INC.Texas Registered Engineering Firm F-345

15006.000

Page 8: ELECTRICAL SYMBOLS HVAC LEGEND …storage.cloversites.com/bluestonepartnersllc/documents/CD MEP Set...data outlet (* indicates mounted 8" above ... flow line fan powered variable

EXISTING

HVAC

EXISTING

ELEC

STORAGE

COMMUNITY ROOM

FIRE RISER

D

D

SC

SC

D

WP

GFI/WP

(TYP)

(TYP)

(TYP)

(TYP)

(TYP)

GENERAL NOTES

NOTES BY SYMBOL

REFER TO MEP1.01 FOR SYMBOLS AND ABBREVIATIONS.

EXISTING 120/208V, 200AMP PANEL 'L' TO REMAIN.

ITEMS SHOWN DASHED OR ITEMS ON WALLS OR CEILINGS THAT ARE TO BE

DEMOLISHED ARE TO BE REMOVED. RETAIN EXISTING BRANCH CIRCUITS FOR

POTENTIAL REUSE DURING RENOVATION WORK. AS-BUILT DOCUMENTS WERE NOT

AVAILABLE FOR USE DURING CONSTRUCTION DOCUMENT PREPARATION; TRACE

OUT ALL EXISTING BRANCH CIRCUITS WITHIN PROJECT SCOPE AREA AND PROVIDE

LIST OF AVAILABLE BRANCH CIRCUITS TO ARCHITECT/ENGINEER PRIOR TO START

OF DEMOLITION OR RENOVATION WORK.

PROVIDE TYPEWRITTEN UPDATE FOR PANELBOARD CIRCUIT DIRECTORIES TO

REFLECT ALL CHANGES ASSOCIATED WITH THIS PROJECT.

WHERE DEVICES HAVE BEEN REMOVED AND EXISTING BRANCH CIRCUITS WILL NOT

BE REUSED, REMOVE BRANCH CIRCUIT FROM DEVICE TO SOURCE.

REFER TO MECHANICAL PLANS FOR OVERALL EQUIPMENT DEMOLITION

REQUIREMENTS AND ACCOUNT FOR SUCH WITHIN BID.

EXISTING WALL MOUNTED WET LOCATION RATED SPEAKERS TO BE REMOVED;

COORDINATE WITH OWNER'S REPRESENTATIVE FOR DISPOSAL REQUIREMENTS.

REMOVE EXISTING WIRING DEVICE.

REMOVE EXISTING LIGHT.

REMOVE EXISTING CEILING FAN AND RETAIN FOR RELOCATION; REFER TO

RENOVATION PLAN FOR NEW LOCATIONS.

WHERE EXISTING DEVICES HAVE BEEN REMOVED, COORDINATE WITH OWNER'S

REPRESENTATIVE FOR DISPOSAL REQUIREMENTS AND ACCOUNT FOR

ACCORDINGLY WITHIN BID.

WHERE EXISTING DEVICES HAVE BEEN REMOVED, PATCH AND PAINT OPENINGS

PER ARCHITECTURAL DOCUMENT REQUIREMENTS.

EXISTING TO BE REMOVED.

TYPE DESCRIPTION

EXISTING TO REMAIN.

PROJECT NUMBER

DATE

SHEET TITLE

REV. # DESCRIPTION DATE 1

2

3

4

5

SHEET NUMBER

402 Parker Street M

cKinney, Texas

t 972.302.9747

conduitad.com

4144 N. Central Expressway, Suite 380

Dallas, Texas 75204

Ph: 214.428.7744

Fax: 214.428.7770

www.mezaengineeringinc.com

Project:

MEZA ENGINEERING, INC.Texas Registered Engineering Firm F-345

15006.000

1 DEMO FLOOR PLAN - POWER & LIGHTING

3/8" = 1'-0"

DEMO FLOOR PLAN -

POWER & LIGHTING

Page 9: ELECTRICAL SYMBOLS HVAC LEGEND …storage.cloversites.com/bluestonepartnersllc/documents/CD MEP Set...data outlet (* indicates mounted 8" above ... flow line fan powered variable

WH

GFI

GFI

GFIGFI

A A A

AAA

A A A

AAA

A A A

AAA

A A A

AA

A

A

B B

C C

D

D

CF(b)

CF(a)

CF(c)

EM

EM

X

X

GFI

WP

D

D

SC

SC

SC

EF-2 EF-1

EM

EM

L-32

L-34

L-36

L-38

L-40

A

L-42

L-31/33

30/2

WH-1

GFI

(a)

(b)

(c)

SF-1

L-35

D

D

X

EF-3

E

EXISTING

PANEL 'L'

GENERAL NOTES

NOTES BY SYMBOL

REFER TO MEP1.01 FOR SYMBOLS AND ABBREVIATIONS.

LOCATE DEVICES TO SERVE OWNER PROVIDED PROJECTOR (INSTALL AT

APPROXIMATELY 9'-6"AFF) CONFIRM FINAL LOCATION REQUIREMENTS WITH

OWNER'S REPRESENTATIVE PRIOR TO INSTALLATION AND ACCOMMODATE

ACCORDINGLY. PROVIDE EMPTY 1 1/2"C CONCEALED TO EQUIPMENT SOURCE

LOCATION FOR PROJECTOR INPUT CABLING REQUIREMENTS.

MATCH COLOR OF EXISTING WIRING DEVICES AND COVERPLATES FOR NEW

DEVICES; COORDINATE FINAL COLOR OF ALL NEW DEVICES WITH ARCHITECT.

ALL ELECTRICAL OUTLETS IN WET LOCATIONS TO BE GFCI TYPE.

PROVIDE DEDICATED NEUTRAL CONDUCTOR FOR EACH NEW BRANCH CIRCUIT; DO

NOT SHARE NEUTRAL CONDUCTORS BETWEEN CIRCUITS.

WHERE NEW CIRCUIT BREAKERS ARE INSTALLED IN EXISTING PANELS, MATCH AIC

RATING AND MANUFACTURER OF EXISTING EQUIPMENT.

TYPE DESCRIPTION

NEW UNLESS OTHERWISE NOTED.

EXISTING TO REMAIN.

POWER SUPPLY TO OWNER PROVIDED OVERHEAD MOTORIZED PROJECTOR

SCREEN; CONFIRM FINAL LOCATION REQUIREMENTS WITH OWNER'S

REPRESENTATIVE PRIOR TO INSTALLATION AND ACCOMMODATE ACCORDINGLY.

LOCATE DEVICES IN MILLWORK; COORDINATE FINAL LOCATIONS WITH OWNER'S

REPRESENTATIVE PRIOR TO INSTALLATION AND ACCOMMODATE ACCORDINGLY.

INSTALL 1P20AMP CIRCUIT BREAKER IN AVAILABLE SPACE OF EXISTING 120/208V

PANEL 'L'; MAKE CONNECTION WITH 2#12, #12G, 3/4"C.

CONNECT NEW LIGHTS, CEILING FANS, AND EXHAUST FANS TO 120V, 20AMP

BRANCH CIRCUITS RETAINED FROM DEMOLITION. BALANCE LOAD ON AVAILABLE

CIRCUITS, AND SWITCH / CONTROL AS INDICATED.

CONNECT NEW EXIT LIGHTS AND NEW EGRESS LIGHTS TO SAME LIGHTING BRANCH

CIRCUITS SERVING OTHER SWITCHED LIGHTING FIXTURES FOR AREA LOCATED IN

AHEAD OF ANY SWITCHING (CONNECT UNSWITCHED).

INTERLOCK INLINE FAN IF-1 WITH HVAC UNIT SUCH THAT WHEN THE HVAC UNIT IS

ENERGIZED SF-1 IS ALSO ENERGIZED.

PROVIDE SEPARATE 3-SPEED SWITCH FOR CONTROL FOR EACH CEILING FAN PER

MANUFACTURER'S REQUIREMENTS; LOCATE AT WALL NEAR LIGHT SWITCHES.

CONNECT EXTERIOR LIGHT FIXTURES TO BRANCH CIRCUIT PREVIOUSLY SERVING

REMOVED EXTERIOR LIGHT FIXTURES. CONTROL BRANCH CIRCUIT SERVING

EXTERIOR LIGHT FIXTURES VIA PHOTOCELL AND/OR TIMECLOCK. CONNECT

EGRESS PORTION OF ANY EXTERIOR LIGHT FIXTURES AHEAD OF ANY SWITCHING

(SEE GENERAL NOTE 7 ABOVE).

PROJECT NUMBER

DATE

SHEET TITLE

REV. # DESCRIPTION DATE 1

2

3

4

5

SHEET NUMBER

402 Parker Street M

cKinney, Texas

t 972.302.9747

conduitad.com

4144 N. Central Expressway, Suite 380

Dallas, Texas 75204

Ph: 214.428.7744

Fax: 214.428.7770

www.mezaengineeringinc.com

Project:

MEZA ENGINEERING, INC.Texas Registered Engineering Firm F-345

15006.000

1 FLOOR PLAN - POWER & LIGHTING

3/8" = 1'-0"

FLOOR PLAN -

POWER & LIGHTING

Page 10: ELECTRICAL SYMBOLS HVAC LEGEND …storage.cloversites.com/bluestonepartnersllc/documents/CD MEP Set...data outlet (* indicates mounted 8" above ... flow line fan powered variable

LIGHTING FIXTURE SCHEDULE

MARK MANUFACTURER CATALOG NUMBER LAMP VOLTAGE MOUNTING DESCRIPTION

A DMF LIGHTING

DRDHNIC6-DRD2M10935-

DRD2TR6SWH

LED, 14.7W120V RECESSED

RECESSED LED DOWNLIGHT; SUITABLE FOR

RECESSED MOUNTING IN INSULATED ATTIC AREA.

WHERE FIXTURE IS INSTALLED AT SLOPED CEILING

AREA PROVIDE WITH SLOPED FRAME AND TRIM KIT.

B DMF LIGHTING

DRDHNIC6-DRD2M7935-

DRD2TR6SWH

LED, 11.8W120V RECESSED

RECESSED LED DOWNLIGHT; SUITABLE FOR

RECESSED MOUNTING IN INSULATED ATTIC AREA.

C TBD TBD 60W MAXIMUM 120V SURFACE

WALL MOUNTED DECORATIVE LIGHT FIXTURE,

BRONZE FINISH; CHOSEN BY ARCHITECT AND

OWNER'S VENDOR.

CF EXISTING EXISTING EXISTING 120V PENDANT

EXISTING CEILING FAN TO BE RELOCATED;

COORDINATE FINAL LOCATIONS WITH ARCHITECT.

D ASL LIGHTING

BSV-LED-12.5-

DV-3500-FBZ-EMG

LED 12.5W 120V SURFACE

WALL MOUNTED, WET LOCATION RATED LIGHT

FIXTURE, WITH INTEGRAL BATTERY PACK AND

CHARGER. COORDINATE FINAL MOUNTING LOCATION

WITH ARCHITECT.

E LITHONIA OLWX1-LED-20W-4000KLED, 22W

120V SURFACE

WALL MOUNTED, WET LOCATION RATED LIGHT

FIXTURE, WITH INTEGRAL BATTERY PACK AND

CHARGER. COORDINATE FINAL MOUNTING LOCATION

WITH ARCHITECT.

EM LITHONIA AFN DB FWDLED, 10.8W

120V SURFACE

SURFACE MOUNTED EMERGENCY EGRESS LIGHT

FIXTURE WITH INTEGRAL BATTERY PACK AND

CHARGER, DARK BRONZE FINISH.

UC LITHONIA 2UC-117-MVOLT-LP- GEB10IS

1-LAMP, 17W (24")

120V SURFACE

UNDER COUNTER FLUORESCENT LIGHT FIXTURE;

COORDINATE FINAL MOUNTING LOCATION WITH

ARCHITECT PRIOR TO INSTALLATION.

X LITHONIA LQM S W 3 R 120/ 277 ELN SDLED, 1W

120V UNIVERSAL

LED UNIVERSAL MOUNT EXIT SIGN WITH NICKEL

CADMIUM BATTERY AND INTEGRAL CHARGER, SELF

DIAGNOSTIC TEST.

NOTE:

1. WHERE RECESSED LIGHT FIXTURES ARE INSTALLED IN GYPBOARD CEILING AREAS PROVIDE LIGHT FIXTURES WITH FLANGE KIT PER MANUFACTURER'S REQUIREMENT.

E3.00

PROJECT NUMBER

DATE

SHEET TITLE

REV. # DESCRIPTION DATE 1

2

3

4

5

SHEET NUMBER

402 Parker Street M

cKinney, Texas

t 972.302.9747

conduitad.com

4144 N. Central Expressway, Suite 380

Dallas, Texas 75204

Ph: 214.428.7744

Fax: 214.428.7770

www.mezaengineeringinc.com

Project:

MEZA ENGINEERING, INC.Texas Registered Engineering Firm F-345

15006.000