9
Electrical plant

Electrical plant. Traditional wall (Red hollow brick) Plasterboard wall Rapid installation flush mounting solution FINAL EFFECT Traditional wall (Red

Embed Size (px)

Citation preview

Page 1: Electrical plant. Traditional wall (Red hollow brick) Plasterboard wall Rapid installation flush mounting solution FINAL EFFECT Traditional wall (Red

Electrical plant

Page 2: Electrical plant. Traditional wall (Red hollow brick) Plasterboard wall Rapid installation flush mounting solution FINAL EFFECT Traditional wall (Red

Traditional wall (Red hollow brick)

Plasterboard wall

Rapid installation flush mounting solution FINAL EFFECT

Traditional wall (Red hollow brick)

Plasterboard wall

TOTAL flush mounting solution with precision installation

FINAL EFFECT

Flush mounting solutions

Page 3: Electrical plant. Traditional wall (Red hollow brick) Plasterboard wall Rapid installation flush mounting solution FINAL EFFECT Traditional wall (Red

SFM3

Solution for Traditional wall (Red hollow brick)

1 – Make a hole in the wall and fix the box using the builder’s level provided

2 - Apply coarse mortar(DO NOT apply the frame during this operation)

3 - Finishing(DO NOT apply the frame during this operation)

4 – Fix the frame to the box, paint the wall and the frame only after installation

5 - Apply the finish plate

Rapid installation flush mounting solution

Page 4: Electrical plant. Traditional wall (Red hollow brick) Plasterboard wall Rapid installation flush mounting solution FINAL EFFECT Traditional wall (Red

SFM3CG

Solution for plasterboard wall

1 – Apply the template to the wall and use the builder’s level to mark the outline

2 – Cut hole

3 – After inserting the box apply a skim coat to the wall (DO NOT apply the frame during this operation)

4 – Fix the frame to the box, paint the wall and the frame only after installation

5 - Apply the finish plate

Rapid installation flush mounting solution

Page 5: Electrical plant. Traditional wall (Red hollow brick) Plasterboard wall Rapid installation flush mounting solution FINAL EFFECT Traditional wall (Red

Using the rapid installation solution you will have the plate flush with the wall surrounded by the narrow paintable panel covering any imperfections between the edge of the box and the cement

Rapid installation flush mounting solution

Page 6: Electrical plant. Traditional wall (Red hollow brick) Plasterboard wall Rapid installation flush mounting solution FINAL EFFECT Traditional wall (Red

TOTAL flush mounting solution with precision installation

SFM3/HP

Solution for traditional wall (Red hollow brick)

1 – Make a hole and fix the box using the builder’s level provided

2 – Apply the coarse mortar

3 – Apply the finish coat

5 – Apply the finish plate

4 – Paint the wall

Page 7: Electrical plant. Traditional wall (Red hollow brick) Plasterboard wall Rapid installation flush mounting solution FINAL EFFECT Traditional wall (Red

Solution for plasterboard wall

1 – Apply the template to the wall use the builder’s level to mark the outline

2 – Cut hole

3 – After inserting the box apply the skim coat to the wall

TOTAL flush mounting solution with precision installation

SFM3CG/HP

5 – Apply the finish plate

4 – Paint the wall

Page 8: Electrical plant. Traditional wall (Red hollow brick) Plasterboard wall Rapid installation flush mounting solution FINAL EFFECT Traditional wall (Red

Using the TOTAL flush mounting solution with precision installation you will have the plate flush with the wall completely embedded without a cover frame

TOTAL flush mounting solution with precision installation

Page 9: Electrical plant. Traditional wall (Red hollow brick) Plasterboard wall Rapid installation flush mounting solution FINAL EFFECT Traditional wall (Red

www.ave.itwww.ave.it

Electrical plant solutions